Council EYle No. 208484 — By 'Milton
Rosen —
Whereas, The City of Saint Paul in-
CITY OF ST. Pj tends to construct certain sewers and
OFFICE F THE CI portion exfctingg sewers in the vacated
of !- I'.nd_•,l Street from Atwater
Street .to-VS Lc Street and to rin-
} ;net in Bur p., r GU..
UNCIL RE O UTION— - �.. � l.t �� to c . ag1' ra,
wai 1 }� ,11c (342daZ.
WHEREAS, the City of Saint Paul intends to construct
certain sewers and improve existing sewers in the vacated portion
of Arundel Street from Atwater-Street to Topping Street and to
construct a public sewer in Burgess Street from Mackubin Street
to Como Avenue and to construct sewers in Stinson Street and
Burgess Street east of Arundel Street, all such construction
and improvements being a part of the ATWATER -KENT RELIEF SEWER
SYSTEM; and
WHEREAS, in order to perform such construction and to
install said sewers, it will be necessary for the Great Northern
Railway z,Company to remove a certain spur track owned by it
located in Arundel Street and serving the City Asphalt Plant
and the Inter -City Paper Company, together with a certain spur
track which crosses Burgess Street west of Mackubin Street;and
WHEREAS, said Great Northern Railway Company has agreed
to remove said tracks and to replace said tracks after construction
at those points where the track crosses the proposed alignment of
the public sewers contemplated by the ATWATER_ -KENT RELIEF SEWER
SYSTEM and described above, said removal and replacement of track
to be performed for an estimated cost of $3,450.00, which cost
must be borne by the City of Saint Paul; now, therefore, be it
` RESOLVED; 'That' -tYie -proper` City - officers are liereby aithorized
and directed to execute on behalf of the City of Saint Paul,
Application for Pipe Line Permit addressed to the Great Northern
Railway -and covering the spur tracks located as�above described,_
and deliver said Permit to the Great Northern Railway- Company,
a"copy of said Permit being attached_to and made a part of this
resolution; and be it
FURTHER RESOLVED, That upon completion of the removal of said
spur tracks, installation of said sewers, and replacement of said
tracks, the proper•City officials are hereby authorized and directed
COUNCILMEN
Yeas Nays
DeCourcy
Holland
Loss
n Favor
Mortinson
Peterson
Rosen
Mr. President, Vavoulis
5M 6-61
Adopted by the Council 19—
V '
ORIG0)A11,10 CITY CLERK
CITY OF ST. PAUL
„1. OFFICE OF THE CITY CLERK
COUNCIL RESOLUTION - GENERAL FORM
PRESENTED BY
COMMISSIONER DATE
2
4'
COUNCIL
FILE NO. -
to reimburse said Great Northern Railway Company for their
actual cost incurred in removing said tracts and replacing
same, now estimated to be $3,450.00, said reimbursement,
however, to be limited to the amount of actual cost incurred
by said Railway Company in effecting the removal and replacement
of said trackage.
COUNCILMEN
Yeas Nays
DeCourcy
Holland
Loss
Mortinson
Peterson
Rosen
Mr. President, Va.vvo uli
5M 6-61
OR 2 21962
Adopted by the Council 19—
�p►R 2 219
Approved - T
In Favor 1 /
�d�[f Mayor
Against
4�
PUBLISHED L�
I
Form 590 (Rev. 7 -1 -60) RP - 206484
r APPLICATION FOR PIPE LINE PERNIIT
(Applicant please complete all items 1 to 6)
TO GREAT NORTHERN RAILWAY COMPANY Date March 12, 1962
1. At what Station is permit desired? ARUND EL- Atwater to Toppinq,ARUNDEL at Burgess & St* nson,B_URGES.-
2. Full name and address of ApplicantCity of St. Paul,Dept. of Public Works,234'City Hali;o Mackubin
3. If Applicant is a corporation, in what state incorporated ? St. Paul 2, Minnesota
If an individual, under what firm name is business conducted?
If partnership, give name of all partners
4. For what is pipe to be used? Combined Sewage
5. If pipe is to be placed under track, what method of placing is to be used?
(Check) Jacking Tunneling Trenching X Bridging
6. If pipe is to be placed longitudinally with track, give location of pipe in relation to track and depth of coverage.
ARUNDEL - Atwater to Topping - SeeAttached Drawing.'
Application to be accompanied by a plan, prepared by Applicant showing location of proposed installation, size and
" kind of carrier and casing pipes, depth of pipe, pressure per inch of substance in line, etc.
Applicant agrees to place all pipe lines that are under tracks in accord with construction requirements shown on
sketch below. Applicant agrees that if installation requires any or all of the following work: removal and re-
placement of track, bridging, protection of track or other railway facilities by work or flagging, engineering
and /or supervision; such work is to be performed by railway em p yes and the cos borne by Applicant.
By a
'EUGENE V. AVERY, (Applicant) Chief Engineer John A. De Lauxiers, ewer Engineer Title
CONSTRUCTION OF PIPE LINES CARRYING FL BLE SUBSTANCES UNDER RAILWAY TRACKS
This includes oil, gas, gasoline or other flammable or highly volatile substance under pressure.
Approved Casing Pipes are as follows:
Steel Pipe with minimum yield strength of 35,000 psi and thicknesses in accordance with AREA specifications.
Cast Iron Pipe- American Standards Association specification A21 class 150 for 12" and under and class 250 for
over 12 ", mechanical joint type or plain end with compression type couplings when installed by open
trench.
Casing shall be installed with even bearing throughout its length and shall slope to one end.
Ft. (Min) �{
See e Note
Sign Scr lon
I � n 1
h - -45 Ft. (Min.) -- I See Not,3 J 4 Ft. llMin.)
See Note 2
Sign
,See ddle 3 I o
3
Screen HMW I I g Appr
o> Co
coupling
5 FI.6In. (Min.)
6 Apps.
1Ff 3Ft.(Min.) 3 FL(Min.) I /Seal
1 1 rCASING PIPE 1 I' IISNAbta I
Seal] /Vent pipe at low end of casing to be Vent pipe of high end of casing,'
See No /e1 connected to side or bottom of casing pipe to be connected to top of casing pipe
NOTE: 1. Seal and vent pipe not required if casing ends above ground where drainage is available.
2. Casing to extend beyond limit of railway right -of -way if necessary to provide proper length outside of
track.
3. Sign to indicate location of pipe line at right -of -way line is required fo rossings carrying pressures of
45 psi or over.
4. Pipe line to be constructed according to AREA specifications for United States.
5. Pipe line to be constructed according to General Orders No. 812 and /or 813, 'Board of Transport Comm.
for Canada.
CONSTRUCTION OF PIPE LINES CARRYING NON - FLAMMABLE SUBSTANCES UNDER RAILWAY TRACKS
Pipe lines included under these specifications are those installed to carry steam, water, or any non - flammable sub-
stance which from its nature or pressure might cause damage if escaping on or in the vicinity of railway property.'
Sewers and drains do not require casing pipe unless conditions exist which would endanger security of track, but
should be of coated corrugated metal or reinforced concrete for that part of line under roadbed according to Railway
Company specifications.
Approved Casing Pipes are as follows:
Cast iron pipe —extra heavy, ASTM A- 142 -38.
Reinforced concrete pipe — Current ASTM C -76 57 T Table IV wall "B ".
Corrugated Metal Pipe —Gauge and coating subject to review by Railway Company.
Casing shall be installed with even bearing throughout its length and shall slope to one end.
Ground Surface
LS Ft.T-1.5 D I II Ft. Subgrade
D
i 5 Ft-61n. (Min.)
3 1761Min_I
RRIER PIPE
Seal If required Seal if required
RECOMMENDATIONS OF SUPERINDENT: (If additional space required attach supplemental sheet.)
Date 19
APPLICATION APPROVED:
Assistant Chief Engineer
(Superintendent)
Chief Engineer
General Manager Vice President (Operations)
Has Form Been Completely Filled Out and All Supplemental Sheets Attached to Each Copy?