Loading...
D402 White — City Clerk No. D =- L Pinks — Finance Dept. �A� 2 619T3 Canary — Dept. Accounting Date Blue — Engineer Greer — Contractor • CITY OF SAINT PAUL — OFFICE OF THE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT NO._ 1 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as MARIA THIRD STORM SEWER SYSTEM known as Contract L- 7524 , City Project No. 72-5-1438A, F. Morettini Construction Come Contractor, is composed of the following: As per attached sheet. Total Deductions from Contract $30,250.00 Total Additions to Contract 7,780.00 TOTAL NET DEDUCTION FROM CONTRACT $22,470.00 • ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- deducted from cordance with the specifications in the sum of $ 22.470.00 said amount to be qodmb= the lump sum con- sideration named in the contract, known as contract L-7524 and ...,ieh ° nt is be aaneed APPROVE AS TO FORM �A Q�6t - — 19 fail rtA; AssistaF1_qqttP&e0 Contrac or y Ict 19_ By G • _ �_ 19 eer Head of Department of Finance 'z 19 ZI Fh 3 Director of Ader6istrative AssistAnt to th Mayor 1 i • Attachment to ADMINISTRATIVE ORDER FOR CONTRACT CHANGE AGREEMENT NO. I MARIA-THIRD STORM SEWER SYSTEM City Project No. 72-S-1438A Contract No. L-7524 Contractor - F. Morettini Construction Company DEDUCTIONS FROM CONTRACT Type 7A catch basin 1 each @ $500.00 = $ 500.00 Type 10A catch basin 1 each @ 400.00 = 400.00 Street Restoration lump sum 29,350.00 = 29,350.00 Total Deductions = $30,250.00 ADDITIONS TO CONTRACT Type IV Manhole 5 each @ $500.00 = $2,500.00 �L'ype lA Catch Basin 1 each @ 300.00 = 300.00 Type 3C Catch Basin 3 each @ 225.00 = 675.00 Manhole opening (1303) 4 each @ 100.00 = 1+00.00 • Manhole opening (1302) 8 each @ 50.00 = 400.00 Remove Catch Basin 3 each @ 60.00 = 180.00 Reconstruct Catch Basin 6 lin. ft. @ 50.00 = 300.00 Sewer Service Connection 1 each @ 250.00 250.00 Remove Monolithic Walk 93 sq. yd. @ 1.00 = 93.00 Remove Concrete Curb 201 lin. ft. @ .75 150.75 Construct 4" Monolithic Walk 834 sq. ft. @ 1.00 = 831+.00 Construct Concrete Curb 201 lin. ft. @ 1+.00 = 801 .00 Construct Support Piers 2.5 cu. yd. @ 50.00 = 125.00 Subgrade Excavation 105 cu. yd. @ 1.50 = 157.50 Trench Excavation 39.5 cu. yd. @ 3.50 = 138.25 Gravel Base (Class u) 105 cu. yd. @ 4.50 = 472.50 $ 7,780.00 TOTAL NET DEDUCTION FROM CONTRACT = $22,470.00