Loading...
D00969_ - City Cletk _ - Finance Dept. • _ - Dept. Accounting (Civic Centet) _ - Engineer (HGA) - Contractor _ - Project Manager (CPMn No. ��n-/ I lD ! Aate �' � "� �n CITY OF SAINT PAUL - OFFICE OF THE MAYOR ADMII�TISTRATIVE ORDER for CON'CRACT CfIAIQGE AGREEMENT NO. PC 4_Ol-4 ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as Saint Paul Civic Center Exnan�ion CP-4 Building Construction k¢own as Contract L- City Project No.015117 M.A. Mortenson, is composed of the following: I. Excavate and backfill to reroute water service main into parking ramp per Field Order (FO) #F4.08. Reason: Field condition-main in different location than sire survey showed. 2. Revise portal frame `G" per FO NF4.09. Reason: Field condition: V ault in different location than site survey showed. 3. Reroute existing sewer line azound caisson per FO #F4,19. Reason: Field condition. Sewer not shown on site survey. • 4. Shore up and fill mauhole at 12/Rl pe� FO #F4.20. Reason: To allow caisson work ro continue. Manhole not shown on site survey. 5. Aemolish 2 existing caissons neaz Eleva[or 9 per FO #F4.23. Reason: Unknown si[e condition. $2,896.00 3,341.00 2,277.00 1,229.00 450.00 $10,193.00 Total ORDERED, That the City of Saint Paul, tluough its Mayor, approves the foregoing additions made in accordance with the specificadons in the sum of $ 10.193.0� . said amount to be added to the lump sum consideration named in the contract, lrnown as contcact �- 930-90300-0898-00000 Civic Cemer Eapansion Fund. AS � �� � � r„- D'uector of Civic Center ,��I�E'�4'� nrchireoc and which amount is to be financed from: c —z y �9 yc 19_ , �. ,�, � / i�, � M.A. Mortenson Contrac � Head of Departme� of Finance / �_�__`� —� ��2"�"1 Administcative Assistant to the Mayoi C t J ? G-- Cccr �tTACT PERSON 8 PHO�NE� S V S3Y`. '�)O �'��IC. t�-t3 V� . �}�h, � TOTAL # OF SIGNA7UHE PAGES (CLI \CTION FE�UESTED' L'k�� Ort�EC' � � �c� Col�'�-�ac-�' RECAMMENDATONS: Apprare (A) or RBjee[ (R) _CIBCOMMRTEE !� _ _ STAFF _ _ _ DISTRICTCOURT _ _ SUPPORTS WHICH CqUNCIL O&IECTIVE? � 4. _ a`E-E-a�1n�. �. S� �i OOR�� 3g��� � ����2� GREEN SHEET INITIAV9ATE— � �EPARTMENS DIREC�OR `/ iN f .�I CRYATTOFNEY SESS F08 � BUDGET DIREC70H 7NG 'fl MAYOR (OR ASSIST ALL LOCATfONS FOR SiGNATURE) CfTV CAUNCIL INfT1AlAATE ���-�eEn CiJ:L C�c��€:,la��° ,��y `l5 1995 PERSONAI SEqVICE CONTpACSS MUST ANSWER SNEFOLCOYANG AUESTIONS: 1. Has this persoMirm ever worked under a conhaCt for this department? VES NO 2. Has this person/firm sver been a ciry employee? YES NO 3. Ooes this personftirm possess a skill not normafty possessed by any curtent city emQloyee? YES NO Explsin ell yes answers on separata aheet and ettaeh to green sheet -�P,-,>:x�:. � °�;-- . . -: � ,�,; ;,� �,`;;� �,�,,s � RECEIVE� JUL - 3 1996 CITY CLERl� IFAPPROVED. DISADVANTAGES IF NOT APPflOVED' � � TOTA4 AMOUN70FTRANSACTION $ LO , �S>. COST/REVENUE BUDGETED (CIRCLE ONE) E NO � �^ � FUNDIWG SOURCE ` � d a - �I� C �? Y� C ,� .�'�2� I �CFl�S� ±J'A�TIVITY NUMBER ��– �� ���� �� '���a� FINANCIAL INFORfRATION: (EXPL41 ) N S � ,p 11vV . • PROJECT: Saint Paul Civic Center Expansion Project Saint Paul, Minnesota CONTRACTOR M.A. Mortenson PO Box 710 Minneapolis, MN 55440 Original Contract Amount: PO # 015117 $33,973,000.00 PO # 385,700.00 GO No. C4A1-01 C4.01-02 C4.01-03 C4.01-04 Subtotal Qeduct Add 34,475.00 157,969.00 29,684.00 10,193.00 �226.321 00 DATE ISSUED: CONTRACT NO.: CONTRACT TITLE: CONTRACT DATE: 17 June 1996 CP-4.07 Building Construction Multiscope 18 January 1996 Net Amount of Contract induding this Change Order. $34,585,027.00 � „*� ►_..d I� L ��E�EIi�� .���N 1, ��� A change in the scope of tfie work is requested as indicated below: It is requested the completion date be () extended, () decreased, (X) unchanged by calendar days. The adjusted completion date will be I1 U r 1 L J 2. Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: ; FO NO.: F4.23 Title: Demolish 2 existinq caissons discovered near Elevator #9. 3. Basis of payment: (Check one) (X) Firm price for performing this change is S 450.00 Adequate supporting details and information (Increased) (Deduct) must be attached to allow Owner to evaluate. ( 1 Time and material per contract, but not to exceed S (} Actual cost at completion of work $ Submitted by: M.A. MORTENSON Date: �•![;�� Contractor V �kS4� ���-x+ Contractor Signature FOR CPMIUSE () Change will not be made. Explain: roceed�5 the following basis: (� indicated above, change and basis of payment is acceptable. () Change is acceptable, basis of payment is not acceptable. () Basis of payment shall be S (� The following modification is recommended: () Change in completion date is accepted. () Change is acceptable with no change in price. { � Change is acceptable with no change in compietion date. ( ) Other 2. Reasonfor Change: () Design Change ( � Client Request ( Field Condition () Suggested by Contractor () Design Omission or Other (explain) 3. Is this a part of the original contract scope? (�f� �Y S () NO 4. Is Contractor's Estimate attached? (�'YtS () NSY 5. A/E cons d. ( 1 YES (i.Y�10 Action Recommended: (Check one) CPMI Job No.: 3225 Prep red by: � CPMI) Date: �P /Z Approve (HGA) Date: Approved by (Owner) Date: Approved by: �Owner) Date: CPMI Inc., c/o Saint Paul Civic Center, I,A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55 7 02-1 299 cc: Chrfs Hansen Mike Aederson Dick Zehring 3225- Contractor Proposal No.: F4.23 Date: '11June'1996 Project: St. Paul Civic Center CP.4 Contrect No.: 4.01 � . 6/11/96 St. Paul Civic Center Expansion Summary Change Proposal ��q � ��� ST. PAUL C1VIC CENTER EXPANSION SAINT PAUL, MN 55102 PK� 6/2/193-9154 FAX� 612/293-9557 • � FIELD ORDER PROPOSAL DesCription: F4.23 Title: Demolisb 2 eacisting caissons discovered near Elevator #9. 5 Amount Mortenson Labor. � - (See attached) Mortenson Material: $ ' (See attached) Mortenson Equipment $ - (See attached) Associated Costs $ - (Change Proposap General Conditions: $ - (Mortenson Work) SUBTOTAL M. A. Mortenson S - SUBCONTRACTORSNENDORS 1. Ames Construdion 7. $ $ $ $ $ $ 425 SUBTOTAL SubNend S 425 SUBTOTALFee M. A. Mortenson Company Fee: SubcontredorsNendors Fee 5%: M. A. Martenson Work 15%: $ 21 $ - $ 27 Total Material 8 Equipment $ - M. A. Mortenson Material & Equipment Tar: 7% $ - SUBTOTALTax S - SUB707AL: M. A. Mortenson + SubNend + Fee +Tax $ 446 Builders Risk 0.0007 ($.7Nhousand) $ 0 GCL Insurance Costs 0.0038 ($3.77lThousand) $ 2 Payment & Performance Bond 0.0050 ($4.9593/Thousand) $ 2 SUBTOTAL Insurance & Bonds $ 4 TOTAL FIELD ORDER PROPOSAL S 450 Page 1 � ' JUhI G i '�� G��=33 FF, RMES EUF.hLVILLE 612 43� 7142 TO 25:,��57 �a�q AMES CONSTRUCTION, INC. • 14420 COUNTY ROAD 5 BURNSVILLE, NIINFYESOTA 55306 {6I2} d35-7106 • FAX A35-7142 Sune 7, i 996 .!/p Yed� r1 U M.A. Mortensan Company 300 Eagle Street Saint Paul, Iviizuaesota 55102 Attenrion: Todd Schilling Subject: Remove Eusting Caissoa at Elevator #9 Saint Paul Czvic Center Expansion - CP-4 Mortenson Job # 951042 Mr. Schilling: As directed by pour �ield persannel, we have removed tlie existing caisson which was in the way of the cylinder for the new eIevator. This work was extra to our contract_ Please fmd a copy of the field work order attached. Following is the cost for t}us additional work. Labor & Equinment Case 9030 Backhoe Triaxle'x'zuck L2borer 6/3 6/4 6/5 2.0 2.5 2.0 6/6 6/7 6/8 Total Rate 2.0 $95.d0 2.5 $50.00 2.0 $27.22 Sabtotal E�tension $F90.00 $t25.00 $54.44 $369.4d F.ci�r�2 �„ s�� � Tota1 with l5% 14Iaz'k-Up • � It zs our request thai a change order be issued for this amount. Shouid there be any questions, please give me a call. Sincerely, Y Mi� Moeller '" Project NFanager. Pcst-ita Fax Note 7671 .4n Equai Opponimitv Fmployer QFFICFS IN: DENVF.R, COLORAM) • PHOEI�IY, ARSZONA • SAT,7 LAT{E CTTY, UTAH � D f r AMES CONSTRUCTI�N IIVC. �(1(_ (y 14420 County Rd. 5 `� �U`�� P.O. Box 1137 Burnsville, Minn. 55337 • Telephone (612)435 FIELD WORK ORDER � (FOR EXTRA WORK, TIME & MATERIAL WORK, AN� BACKCHARGESI � y ,z3 Date l� ' � — L � / � Bill to Address n � �� p Projact No. �/v� �C7 r� Project Name S i YTIi� � �. l l� d L�+ �; ts� EJ YL- � Location of Work Performed � t�. s) R��f �. �'�' � Nat�re of y�rk �� �{,�(vvM SfL c� �f*� 1� /' /� Ss/c7 n� �/�l L�S /� EMPLOVEE LABORERS& TRADE HOURS RATE I TOTAL LABOR SUB TOTAL EQUIPMENT ' EMPLOYEE EQUIP. NO. DESCRIPTION M T W HO TRS F C S HoURS RATE TOTA� EQUIPMENT SUB 707AL OTHER CHARGES � � / UBr� • � , �� � . WO K ORDER PR AREO BY QUANTITY L UNfTCOST � TOTAL MATERIAL SUB TOTAL LABOR SUB TOTAL EQUIPMENT SU8 TOTAL PROFIT AT _%& O.H. AT _%a TOTAL BILLED WHITE-TOCUSTOMER YELLOW-MPLS.ACCOUNTING PINK-FIELDOFFICE ��� � ����1��� JUN 11 == The Construction Organizatron 3une 11, 1996 Ms. Susan Jones CPMI:c/o St, Paul Civic Center 143 West 4th Street St. Paul, MN 55102-1299 RE: St. Paul Civic Center Expansion CP-4 Building Construction FO 423: Demolish 2 existing caissons discovered near Elevator #9. • C� Dear Susan: 32zs-���,� � bG BUILDING DIVISION Minneapolis Office 700 Meadow Lane North P.O. Box 710 (55440-0770) Minneapolis, Minnesota 55422-4599 Telephone: (672) 522-2100 Facsimile: (6t2) 520343� We are submitting a cost proposal for the changes in work defined by Field Order 4.23 dated 5 June 1496. We are requesting a Change Order to increase our Contract Amount by Four Hundred Fifty Doilars ($450.00) to perform the subject modification specified in Field Order F4.23. Mortenson reserves the right to submit a proposal for additional costs and time related to the impact of this change on unchanged work or the effect of this change in combination with other changes. Should you have any questions or comments, please contact me. Sincerely, � �� Todd Schilling, Assistant Projeet Manager cc: File: FO 4.23 Minneapotis•Seattle•Denver•Colorado SpnngsMilwaukee•Grand RapidsSan Diego•San Franasco•Honolufu•Los Angeles REC�IVE� JUN 11 = � 1! � Contractor Proposai No.: F4.08 �` `"``' Date: 11June1996 Project: St. Paul Civic Center CP.4 Contract No.: 4.01 A change in the scope of the work is requested as indicated below: tt is requested the completion date be (! eutended, ( 1 decreased, (X) unchanged by calendar days. The adjusted completion date will be • 2. Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: ; FO NO.: F4.08 Title: Excavation and backfill necessarv to reroute service main into parkinq ramp. 3. Basis of payment: (Check one) (X) Firm price for performing this change is S 2.896.00 Adequate supporting details and information (Increased) (Deduct) must be attached to allow Owner to evaluate. () Time and material per contract, but not to exceed S () Actual cost at completion of work S Submitted by: M.A. MOR7ENSON Date: (a•// •g� Comractor FOR CPMiUSE Action Recommended: (Check one) CPMt Sob No.: 3225 ( � Cha ge will not be made. Explain: ( Proceed� n the following basis: (y'As indicated above, change and basis of payment is acceptable. () Change is accepta6le, basis of paymertt is not acceptable. ( 1 Basis of payment shall be S ( 1 The following modification is recommended: O Change in completion date is accepted. () Change is acceptable with no change in price. () Change is acceptable with no change in completion date. ( ) Other 2. Reason for Change: () Design Change () Client Request ( Field Condition () Suggested by Contractor () Design Omission or Other (explain) 3. Is this a part of the original contract scope? (� () NO 4. Is Contractor's Estimate attached? YES () I�O 5. A/E consulted. ( 1 YES �YfVO Prep ed by: �� (CPMf) Approved by (HGA) Date: Ce iZ . Approved by (Owner) Approved 6y: (Owner) Date: CPMI loc., c!o Saint PaW Civic Center, I.A. O'Shaughnessy Plaza, 143 West Fourth Street, Saint Paul, MN 55 7 02-1 299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- u 6/11 /96 St. Paul Civic Center F�cpansion Change Proposal � ��ummary ST. PAUL GVIC CENTER IXPANSION SAlNTPAUL, MN SSIO2 PH.� 672/293-9754 FAX.� 6I2/293-9557 . • FfELD ORDER PROPOSAL Description: F4.08 Tdle: Provide excavation 8 bacldll to remute service main info Mortenson Labor. (See attached) Mortenson Matenaf: (See attached) Mortenson Equipmerrt (See attached) Associated Costs (Change Proposan ramp. 5 Amount $ - $ - $ - $ - General Conditions: $ � (Mortenson Work) SUBTOTAL M.A.Mortenson $ - SUBCONTRACTORSNENDORS 1. Ames Construction � Q $ $ $ $ $ $ 2,732 SUBTOTALSubNend $ 2,732 M. A. Mortensa� Campa�y Fee: SubcontractorsNendors Fee 5°fo: M. A. Mortenson Wo[k 15°fo: SUBTOTALFee Sotal Material & Equipment $ M. A. Mortenson Material & Equipment Tax: SUBTOTAL Ta�c $ t37 S - 7% $ - $ - SUBTOTAL:M.A.Mortenson+SubNend+Fee+Tax $ 2,869 BuildePs Risk GCL insurance Costs Payment 8 Performance Bond SUBTOTAL Insurance & Bonds 0.0007 ($.72lfhousand) 0.0038 ($3.777Thousand) 0.0050 ($d.9593/7housand) $ 2 $ 11 $ 74 $ 27 TOTAL FIELD ORDER PROPOSAL $ 2,896 Page 1 • May 16, 1996 AMES CONSTRUCTION, INC. 14420 COUNTY ROAD 5 BURNSVILLE,MINNESOTA55306 (612) 435-7106 • FAX 435-7142 � ��� D � � �� � 1 �'� 6 GO • �` 1 �� �� ��, M.A. Mortenson Company 300 Eagle Street Saint Paui, Minnesota 55102 Attention: Todd Schilling Subject: �F4.08 Earthwork for Rerouting Water Service at Portal G Saint Paut Civic Center Expansion - CP-4 Mr. Schilling: � �q UYr1 e e ,�` : ROUTE STAMP RS: Ts: AR: l:1C As requested, we have done the excavation and backfill required to relocate the water service which conflicted with the new caisson at portal G. This water service was not shown on the • drawings and is therefore extra to our work. Please find the relevant field work orders attached. The cost for this work is tabulated below. Labor & Equipment 4122 4� 4/24 4l25 4126 4J27 Total Rate Extension CAT 235 Backhoe SA � 9A '� 14.0 $125.00 $1,750.00 Laborer SA � 9A✓ 14.0 $27.22 $381.08 Laborer 9A � 9.0 $27.22 $244.98 Subtotal $2,376.06 Total with 15% Mark-Up $2,732.47 It is our request that a change order be written for this amount. Should there be any questions, please give me a call. Sincerely, • �„�.'�� Michael Moeller Project Manager. M H4u°I�PPortuniN EmPlq'er OFFICES A`: DENVER, COIARADO • PHOENIX� ARiZONA • SALT LAKE CITY, UTAH `J AMESCONSTRUCTIONINC. ��IJV`1� 14420 County Rd. 5 P.O. Box 1137 L,� (�� Burnsville, Minn. 55337 � � / Telephone (612)435-7106 FIELD WORK ORDER (FOR EXTRA WORK, TIME & MATERIAL WORK, ANO BACKCHARGESI Date �^��� /� "� � Bi11 to Address f . ,�/� Project No. �f -,�U O� Project Name �'� �AL�h � L l� l C� ���Tv 1"'' Location of Work Performed / Ol� /✓s�/-� `� Nature of Work Performed �«1 ` �' ��'l�� �.� Tl��, S�, l� j�;' l� EMPLOYEE TRADE HOURS RATE I TOTAL LABOR SUB TOTAL EMPLOYEE EQUIP. NO. DESCFtiPT10N HOURS EQUIPMENT SUB TOTAL DESCRIPTION • .v AUTHOR BY QUANTITY � S'.^' �� .-. MATERIAL SUB TOTAL LABOR SUB TOTAL EQUIPMEPST SUB SOTAL � PROFlT AT _% & O.H. AT _% TOTAL BILLED RATE I TOTAL 70TAL WHITE-TOCUSTOMER YELLO�^1-MPLS.ACCOUNTING PINK-FIELPOFFICE . Date "�� <ay-`�l O 8��� ro AMES CONSTRUCTION INC. 14420 County Rd. 5 P.O. Box 1137 Burnsville, Minn. 55337 Telephone (6121435-7106 FIELD WORK ORDER (FOR EXTRA WORK, TIME & MATERIAL WORK, AND 6ACKGHAAG£5) MATERIALSUBTOTAL Address Project Na �n r� � I7 r�., [' P�roject Name S t �� J 4_ � ZV i C ��J 1✓1� Location of Work Performed C"(� � A L G / Nature of Work Performed �� .1-� � SZC i�. 1" 1� �— �Q � �� �� ��"� J' L � �p � J `� EMPLOYEE TRADE VISION tiOURS � �s u�nT�oe I RATE � TOTAL LABOR SUB TOTAL IPMENT UNIT COST r- �- N10FIK AUTHORIZED BY (SIGNATURE) • WORK D R PREPARED BV LABOR SUB TOTAL EQUIPMENT SUB TOTAL PROFIT AT ,% & O.H. AT _% TOTAL BILLED WHITE-TOCUSTOMER VELLOW-MP�S.P.CCOUNTING PINK-FfELDOFFiCE EQUIPMENT SUB TOTAL MATERiAL & OTHER CHARGES � � MORTENSOH RECEiy� JUN 11 fc;r The Canstruction Organilation June 11, 1996 • l J Ms. Susan Jones CPMI:c/o St. Paul Civic Center 143 West 4th Street St. Paul, MN 55102-1299 BUILDING DIVISION Minneapolis Office 700 Meadow Lane North P.O. Box 710 (55440-0770) MmneapoVis, Minnesota 55422-4899 Telephone: (612) 522-2100 Facsimile: (612) 5203430 RE: St. Paul Civic Center Expansion CP-4 Building Construction FO 4.08: Provide excavation necessary for reroute of service main to parking ramp. Dear Susan: We aze submitting a cost proposal for the changes in work defined by Field Order 4.08 dated 19 April 1996. We are requesting a Change Order to increase our Contract Amount by Two Thousand Eight Hundred Ninety-Six Dollars ($2,896.00) to perform the subject modification specified in Field Order F4.08. Mortenson reserves the right to submit a proposal for additional costs and time related to the impact of this change on unchanged work or the effect of this change in combination with other changes. Should you have any questions or comments, please contact me. Sincerely, ��,b�J / \ :�e� �— Todd Schilling, Assistant Project Manager cc: File: FO 4.08 Minneapolis•Seattle•Denver•GoloradoSprings•Milwaukee•Grand Rapids•San Diego•San Francisco•Honolulu•Los Angeles 3�a�-409'�� f �R b� RECE(1/E� 11 � �� JUN 1 � =sF.- �-� Z � • -. ` eo�u��acTn�-, - ''FasA_L, ° Contractor Proposal No.: F4.09 Date: 11June1996 Project: St. Paul Civic Center CP.4 Contract No.: 4.01 A change in the scope of the work is requested as indicated below: • 3. 4t is sequested the completion date be () extended, () decreased, {X) unchanged 6y calendar days. The adjusted completion date will be Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: : FO NO.: F4.09 Title: Revise portal Frame "G ". Basis of payment: (Check one) (X) Firm price for performing this change is S 3,341.00 Adequate supporting details and information (Increased) (Deduct) must be attached to ailow Owner to evaluate. () Time and material per contract, but not to exceed S () Actual cost at completion of work S Submitted by: M.A. MORTENSON Date: �' ��'S� Contractor 1) Change in completion date is accepted. ( 1 Change is acceptable with no change in price. () Change is acceptable with no change in completion date. i ) Other 2. FOR CPMI USE Action Recommended: (Check one) CPMI Job No.: 3225 ( � Change wili not be made. Explain: ( Proceed�n the following basis: (y' As indicated above, change and basis of payment is acceptable. () Change is acceptabie, basis of payment is not acceptable. (� Basis of payment shall be $ () The following modification is recommended: Reason for Change: O Design Change O Client Re est ( 1 Field Condition () Suggested by Contractor i esign Omission or Other �explain) 3. Is this a part of the original contract scope? (��'(� S () NO 4. Is Contractor's Estimate attached? ('1� �Y S 1) NO 5. A/E consulted. (�t"YES ( 1 NO Pre red by: �� C � CPMI) Approv (HGA) Date: � Q� � Approved by (Owner) Date: CPMI Inc., c(o Saint Paul Civic Center, f.A. O'Shaughnessy Piaza, 143 West Fourth St�eet, SaiM Paul, P cc: Chris Hansen Mike Pederson Dick Zehring 3225- • • • 6/11/96 St. Paul Civic Center Expansion Change Proposal � - Summary ST. PAUL G!V!G CENTER IXPANSION 300 F✓1GLE STREET JOB ID: SAINT PAUL, MN 55IO2 PH.� 6121293-9154 FAX: 6I2/293-9557 FIELD ORDER PROPOSAL Description: F4.08 Title: Provide excavation & ba�ll to reroute service main into Mortenson Labor: (See attached) Mortenson Material: (See attached) Mortenson Equipment (See attached) Associated Costs (Change Proposal) $ Amount 3 2,�42 $ 779 5 10 $ - Generel Conditions: $ � (Mortenson Work) SUBTOTAL M. A. Mortenson $ 2,831 SUBCONTRACTORSNENDORS 1. � � $ $ $ $ $ $ SUBTOTALSubNend $ - SU8T07ALFee SUBTOTALTau M. A. Mortenson Company Fee: Subcontractors/Vendors Fee 5%: M. A. Mortenson Work 15%: Total Material & Equipment $ M. A. Mortenson Material & Equipment Tax: $ - $ 425 $ 425 ns 7^io S ss $ 55 SUBTOTAL:M.A.MOrtenson+SubNend+Fee+Tax $ 3,310 Suildets Risk GCL Insurance Costs Payment 8 Perfortnance Bond SUBTOTAL Insurence & Bonds 0.0007 ($.72ffhousa�d) 0.0038 ($3.77/Thousand) 0.0050 ($4.9593lfhousand) $ 2 $ 12 $ 16 $ 31 TOTAL FIELD ORDER PAOPOSAL $ 3,341 Page 1 � � O � � J `J n Q M Q N b � C n � n C � � Q J a N Y N � b � C 0 I�i u o m Z a =' �� � m � d 0 ii� a� � rn ¢ � N � O � � r K n N J m !O �g �� 0 � �, � Q W � S ` o ° o o ° o ° o ° o U W N o 0 0 0 0 Q � � II" � N (") � q oJ � O O O O O O O w O H O O O O O LL a Q K Q W � � Y Z n c? o ° o, ° o o ° o o J � O N O O O O O � Q m � � w � d � Z m � `h � N � °> � � � � � � � � � � N Q U - � LL1 W N � � Z ^ � O o O o O o g � o 0 0 000 � �Z m�� � ° o 0 000 g oa � 0 m � g � O E � °' Z LL � W � W O R m W� � 2 c � Q m � ii � o C� q � ¢ m m m s c i- m 1- � � J � E �n OKO m � d m m.- mmm s � o � � �s� � a/ N a MaYI � �� � ; . I C.P. No. Reference: pate: � C J F4.08 6N 1/96 11� �� S7. PAUL qVlC CENTFI2IXPANSlON 300 EAGLESTREET 70B ID: 951042 SAlNT PAUL, MN 55102 PH: 6[2/Z93-9l54 FAX 6l2/293-955i Material Quanfity Uni[ Unit Cost Totat Measure H.D. plywood t2 ea 7.74 92.88 2x4x10' 54 ea 5.48 295.92 PVC pipe x 10' 10 ea 15.83 158.30 10% waste factor 1 Is 54.77 1"threaded rod x 20' 6 ea 9.70 5820 t t/2" condUit 76 ea 6.40 102,40 Rod splice sleeves 4 ea 4.10 16.40 0.00 0.00 0,00 0.00 0.00 0.00 0.00 Subtotal 778.81 Page 1 • • • Eqpt. C.P. No. F4.08 Reference: Date: 6/11l96 DESCRIPTION Skil saw Hammer drili 1�� �i!, ST. PAUL C1V/C CENTER IXPANSION 300 EAGLE 57REEZ 70B ID: 951042 SAINTPAUL, M.N SSIO? PH: 6!2/293-9l54 F9X� 612/293-9557 EQPT. 1 5 1 5 ea ea EQPT. 5 TOTAL EQUIPMENT 10 Page 1 MOR'i'ENSOH The Caur�uc�ion o,gan;mtion�" ,&�.,1� S7�i�rz �1�� GcSc� o� o�,s�%� • M. A. MORTENSON COMPANY P.O. Box 710 ■ Minneapolis, Minnesota 55440 ■ 612/522-2�100 �, -�_ " Job Number % S/O S'Z Job Name �!/ •�- c�C%✓��� Date J� �� Authorized Subcontractor � U Detailed description of work: WORK AU�H��R,�ZATION �{�f M AY 2 3 1996 Address �, ��� Q �,�� C � � �iei`1Se �G��� `/.dJ Materials used -- type and quantity (attach delivery tickets): �fxg S� PJ w�� la s�« �.� 1�,� �iy �✓ge� � X 1 ,S ��� � �1 �t e u. l ���' � — / �� �'.fr.�L�ci�� !'DcQ .. ao-��1 i �6 - / a e � n c�a ��- � ' le�es /p -. Pu c ��; t�� /o � Lon i- y f a S�i ce S Equipment used in performance of work and len�th of time used: S� �+-�1�s Labor hours for performing work: � C,�� e��e r s — 3 � ho�.r� ��L � � a�� �� �a..� Q � •Signature of owner or representative � Signature of subcontractor representative � Signature of M. A. Mortenson Company representative S� ��� , l�s ��� Complete in trip�icate - white to office - canary to owner of sub - pink job site file MORTEHS�H rhe cqum,ction o�ga„i�arian�" WORK AUT ORIZATION i�0(� %� y �.� F � M. A. MORTENSON COMPANY P.O. Box 7i0 ■ Minneapolis, Minnesota 55440 ■ 612/522-2100 Job Number S���Z- J�o Name(,j/,� �6'•v��2 Date �-� / � Authorized Subcontractor ./`�✓�Pti So-�.� Address Detailed description of work: .S`�t�� ' ��t�L � 57�-7�n � �`/r��` �r-s iu��/� � � � �? D(/C�2 ��f�'cc� L�£L_ �R..c,�� A/o� ���✓,� O:✓ vcu�n�=N� � s� ��s ��� ' lL� %a� ' Materiais used -- type and quantity (attach delivery tickets): • Equipment used in performance of work and length of time used: Labor hours for performing work: � v//Lir3�� � �% h(�-S ��, '� pl h� S �v�? L , L j f" t�'`"�� C ' P —�,tiF,� y/�s e,�� — �i/�s 7�"�- C''4� - � • Signature of owner or representative Signature of subcontractor representa���c Signature of M. A. Mortenson Company representative Complete in triplicate - white to office - canary to owner or sub - pink job site file • �ECENE� JUN 1 � i,'.` � Contractor Proposal No.: F4.19 Project: St. Paul Civic Center CP.4 �� � /�M 3 Date: 11 Ju ne 1996 Contract No.: 4.01 A change in the scope of the work is requested as indicated below: It is requested the completion date be () extended, () decreased, (X) unchanged by calendar days. The adjusted completion date will be • 2. Description of the change: tRefer to drawings, specifications, addenda, if applicable). Reference RFP No.: ; FO NO.: F4.79 Titie: Reroute existinq 8" sewer {ine around caisson {ocated near qrid 12lR1. 3. Basis of payment: (Check one) (X) Firm price for performing this change is S 2.277.00 Adequate supporting details and information (Increased) (Deduct) must be attached to allow Owner to evaluate. () Time and material per contract, but not to exceed S ( S Actuaf cost at completion of work $ Submitted by: M.A. MORTENSON Contractor FOR CPMI USE Action Recommended: (Check one) CPMI Job No.: 3225 () Change will not be made. Explain: ( Proceed the following basis: ( As indicated above, change and basis of payment is acceptable. () Change is acceptable, basis of payment is not acceptable. () Basis of payment shall be S () The following modification is recommended: () Change in completion date is accepted. f) Change is acceptable with no change in price. ( � Change is acceptable with no change in completion date. ( 1 Other • 2. Reasonfor Change: �) Design Change ( 1 Client Request ( ) Suggested by Contractor ( ) Design ( Field Condition Omission o Other (explain) 3. Is this a part of the original contract scope? ( Y�ES () 4. Is Contractor's Estimate attached? (�-YY ( 1 5. A/E cons Ited. ES () NO NO NO Prepa d by: ^ CPMI1 Date:__Gt� 6 Approved by (HGA) Date: Approved by (Owner) Date: Approved by: (Owner) Date: CPMI Inc., c/o Saint Paul Civic Center, I.A. O'Shaughnessy Piaza, 143 Wes[ Fourth Street, Saint Pau1, MN 55102-1299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- Date: �'/�'S� `� 6/11/96 St. Paul Civic Center F�cpansion ��� Summary Change Proposal ��� ST. PAUL CIVIC CENTER IXPANSION SAINT PAUL, MN 55102 PH.� 672/293-9154 FAX.� 612Q93-9557 • . Mortenson Labor. $ - (See attached) Mortenson Material: $ - (See attached) Mortenson Equipment $ ' (See attached) Associated Costs $ ' (Change Proposaq General Conditions: $ - (Mortenson Work) SUBTOTAL M. A. Mortenson $ - FIELD ORDER PROPOSAL Description: F4.19 TRIe: Reroute existing 8" sewer line around caisson located near grid 12/Rt. S Amount SUBCONTRACTORSNENDORS t. Ames Construdion $ $ $ $ $ $ 2,'148 � Q SUBTOTALSubNend S 2,�48 M. A. Mortenson Company Fee: SubcontractorsNendors Fee 5%: $ 107 M. A. Mortenson Work 15%: $ - SUBTOTALFee $ 107 Total Material & Equipment $ - M. A. Mortenson Material & Equipment T�: 7% $ - SUBTOTALTax $ - SUBTOTAL:M.A.Mortenson+SubNend+Fee+Ta�c $ 2,255 Builder's Risk 0-0007 ($.7Nhousand) $ z GCL Insurance Costs 0.0038 ($3.77lfhousand) $ 9 Payment & Performance Bond 0.0050 ($4.9593/Thousand) $ 11 SUBTOTAL Insurance 8 Bonds S Z� TOTAL FIELD ORDER PROPOSAL $ 2,277 Page 1 AMES CONSTRUCTION, INC. 14420 COUNTY ROAD 5 • BURNSVILLE, MINNESOTA 55306 (612) 435-7106 • FAX 435-7142 June 5, 1996 M.A. Mortenson Company � 2��� M�, � 300 Eagle Street f �� �� U C;� Samt Paul, Minnesota 55102 � � JUN - 6 1990 Attention: Todd Schilling �^.�• P�.?.. MORTENSON C0. Subject: Sanitary Sewer Repair -� 4.19 Saint Paul Civic Center Expansion - CP-4 Saint Paul, Minnesota 55102 Mortenson Job # 951042 Mr. Schilling: �oo�i�q � au(e �'ei� C` As requested, we have repaired the sanitary sewer damaged during caisson operations by others. This work was done on Saturday as requested utilizing overtnne labor. Our additional cost for this item is tabulated below. � Labor & Equipment 5/27 5/28 5/29 5/30 5/31 CAT 322 Backhoe CAT 953 Loader L,aborer Overtime - Operator Overtime - Laborer 6/1 Total Rate Extension 8.0 8.0 $125.00 $1,000.d0 4.0 4.0 $80.00 $320.00 8.0 8.0 $27.22 $217.76 12.0 12.0 $17.50 $210.00 s.o s.o �-s:er� �e:�a subcotat $1,867.76 l3,CP� Total with 15% Mark-Up $2,147.92 It is our request that a change order be issued for this amount. Should there be any questions, please give me a call. Sincerely, Mi c�Moelle� • Project Manager. � O'1 _ An Equa1 Opportuniry Employer OFFICES IN: DENVER, COLORADO • PHOENIX, ARIZONA • SALT LAKE CITY, UTAH • Date O "" I — � � Bill to AMES CONSTRUCTION INC. 14420 County Rd. 5 P.O. Box 1137 Burnsvifle, Minn. 55337 Telephone (6121435-7106 � � / FIEID WORK ORDER (FOR EXTRA WORK, TSME & MATER7AL WORK, AND SACKCHARGESI �� `�'� / � Address (� Project No. 1�n �`-1 ��. Project Name s� 1� �v L, C` ( t)� G. C. rS.�-) i HJ`/l Location of Work Performed SllPERVISION LABOR SUB TOTAL EQUIPMENT EMPLOYEE I EQUIP. NO. _ f d..JTR(_ DESCRiPT10N HOURS EQUIPMENTSUBTOTAL MATERIALSUBTOTAL LABOR SUB TOTAL RATE� 70TAL WHITE-TOCUS70MER YELLOW-MPLS.ACCOUNTING PINK-FIELDOFFICE � EQUIPMENT SUB TOTAL PROFIT A7 %& O.H. AT %, w K O DER PR PARED BY TOTAL BILLED Nature of Work Performed � �o. \ ��c,�' � � t_. � � Q� �(� �. F � 6�1-- �C a � AP � �e-75 �' v � 32z5 - �to�� �' � �G �����V�� � ��N 11 .. The Construction Organi;.ation June 11, 1996 Ms. Susan Jones CPMI:clo St. Paul Civic Center 143 West 4th Street St. Paul, NIN 551021299 RE: St. Paul BUILD{NG DIVISION Minneapolis Office 700 Meadow Lane North P.o. eox �io �ssaao-o�io) Minneapolis, Minnesota 55422-4899 Telephone: (612) 522-2100 Facsimile: (612) 520-3430 frame "G" foundation. � • Deaz Susan: � /L6z.n` S � � �--� ��ke We are submitting a cost proposal for the changes in work defined by Field Order 419 dated � 3 7une 1996. We are requesting a Change Order to increase our Contract Amount by Two Thousand Two Hundred Seventy-Seven Dollars ($2,277.00) to perform the subject modification specified in Field Order F4.19. Mortenson reserves the right to submit a proposal for additional costs and time related to the impact of this change on unchanged wark or the effect of this change in combination with other changes. Should you have any questions or comments, please contact me. -�--.-� � `�� Sincerely, Todd Schilling, Assistant Project Manager cc: File: FO 4.19 Minneapolis•Seattle •Denver•Colorado Springs•Milwaukee•Grand Rapids•San Diego•San Francisco•Honolulu•Los Angeles . r L_ ������ JUN 11 ,-.. A change in the scope of the work is requested as indicated below: `� � � It is requested the completion date be () extended, () decreased, (X) unchanged by calendar days. The adjusted compfetion date will be • 2. Description of the change: (Refer to drawings, specifications, addenda, if applicable). Reference RFP No.: ; FO NO.: F4.20 Title: Shore up and pour north wall of the manhole at 12/R1 to allow caisson installation. 3. Basis of payment: (Check one) (X) Firm price for performing this change is $ 1.229.00 Adequate supporting details and information (Increased) (Deduct) must be attached to allow Owner to evaluate. ( 1 Time and material per contract, but not to exceed $ () Actual cost at completion of work $ Submitted by: M.A. MORTENSON Date: �o •/�- �{ Contractor FOR CPMI USE Action Recommended: (Check ane) CPMI Job No.: 3225 ( 1 Change will not be made. Explain: ( Proceed yr�the following basis: ����As indicated above, change and basis of payment is acceptable. i 1 Change is acceptable, basis of payment is not acceptable. ( 1 Basis of payment shall be S ( 1 The following modification is recommended: ( 1 Change in completion date is accepted. t) Change is acceptable with no change in price. () Change is acceptable with no change in completion date. ( ) Other 2. Reasonfor Change: () Design Change () Client Request ( Field Condition ( � Suggested by Contractor () Design Omission or Other (explain) 3. Is this a part of the original contract scope? (`7 Y�S () NO 4. Is Contractor's Estimate attached? (�.Y� () NO 5. A/E consul i ES { 1�10 Prepar d bv: \ � (CPMp Approved by (HGA) � Approved Date: tG � Y� Approved by: IOwner) Date: CPMI Inc., c/o Saint Paul Civic Center, I.A. O'Shaughnessy Plaza, 743 West Fourth Street, Saint Paul, MN 5 5 7 02-1 299 cc: Chris Hansen Mike Pederson Dick Zehring 3225- Contractor Proposal No.: F4.20 Date: 11June1996 Project_ St. Paul Civic Center CP.4 Contract No.: 4.01 • 6/11/96 St. Paul Civic Center Expansion .���,,�n��� Summary Change Proposal V.�� { � � x ST. PAUL C/V/C CEN7ER EXPANSION __ _ _ _ ._ 300 EAGLE 57'REE7 JOB ID: 951042 Sd/MPAUL, MN 55102 PH.� 6!2/193-9154 FifX� 6l2293-9557 • • FIELD ORDER PROPOSAL Description: F420 Title: Shore up and pour north wail of manhole at 12/R7 for caisson installation. S Amount Mortenson Labor. 5 275 (See attached) Mortenson Material: $ � (See attached) Mortenson Equipment $ Z� (See attached) Associated Costs $ - (Change Proposal) General Conditions: $ - (Mortenson Work) SUBTQTAL M. A. Mortenson $ 1,026 SUBCONTRACTORSNENDORS 1. 2. 3. $ $ $ $ $ $ SUBTOTALSubNend $ - M. A. Mortenson Company Fee: SubcontradorsNendors Fee 5%: $ - M. A. Mortenson Work 75°/a: $ 154 SUBTOTAL Fee $ 154 Total Material & Equipment $ 542 M. A. Mortenson Material & Equipment Tax: 7°/a $ 38 SUBTOTAL Tax $ 38 SUBTOTAL: M. A. Mortenson + SubNend + Fee * Tax $ 1,2'18 Buildets Risk 0.0007 ($.72/Thousand) S � GCL insurance Costs 0.0038 ($3.77Rhousand) $ 5 Payment 8 Perfortnance Bond 0.0050 ($4.9593IThousand) $ 6 SUBTOTAL Insurance 8 Bonds $ 12 TOTAL FIELD ORDER PROPOSAL S 1,229 Page 1 • • ` a N � r� L n h �t a N b j Q n � n 2 h � a j a N i � z b � a o� � N LL � N �� o � Z N m U K O ��r Q � m Q ¢ � < c�) N � m J � m � � 0 � � � ��� Z ~ O O � N a � N ` .- l �j N m C U a W N N � 0 � LL Q N � y��m � o 0 0 0 0 0 � r o 0 0 0 0 0 O p � N LL � � Q W � � Y z � °J � ° o ° o ° o ° o o U K o N o 0 0 0 0 � O m ' � w � m r r �n W � N ` h N A f0 C a � � � v m oi a . � N N N'- V Q U K W W N � � Z� m o o ° o ° o ° o ° o � h o 0 0 0 0 0 p.' � y �, o r � o 'n � " m gn ai �' m . °° g oo � 0 m � 5 � � „ W o z ` LL � � m Z � N 3 R � 3 m 2� N J �' � 7 �.m. o `p (7 � d' 2� J � 0 o Q d' � m Q ` R N � Q1 m R1 5 � o � � �5� � N N a L' _ ' ���,,,,,,//�� � MaYI m y � �,{ �� vw- � • C.P. No. F420 Reference: Date: 6/17l96 ST. PAUL CIVIC CENTER IXPANS(ON 300EAGLES7'REET JOBID:951042 SAINTPAUL, MN SS102 PH.- 612/193-9154 FAX� 612/?93-9i57 �� � �N �� � • • Page 1 � �R�,EHS�H WORK AUTHORIZATlON The�co,asm,�riai o,gn„v�uiore�' � �� M. A. MORTENSON COMPANY S'.0. Box 710 ■ Minneapolis, Minnesota 55440 ■ 612/522-2100 Job Number 9�/D y Z Job Name Authorized Subcontractor Detailed description of work: � I71� n,= No/c ��..;<=h mur l--f o �� on t3�.� ¢ f�. 1 Materials used -- type and quantity (attach delivery tickets): g' y�r�s � ���5 �� �(('puf J a Sh��f - of �� Equipment used in performance of work_anc � ,,., e. r �`u M1 � ` � � ,r' Labor hours for performing work: / /-/o v- r s ydwf of time used: Date � . 7 yC Address � �-` �.. ���c- Mo�n�olL 1•i,�� ; � �� � � � �,� � l �� � ,� C , � ��� �� Signature of owner or represent v��'� ��� C��--`a- �ignature of subcontractor represen aYiv� Signature ot M. A. Mortenson Company Complete in iriplicafe - white to office - canary to owner or sub - pink job site file fd r C' �� �D / �C ti � 0Y' Q-' . � � 3 225- `-(9�-;t� Mo�xsox The Const�uctiorz O,gani�.ation ° 7une I l, 1996 Ms. Susan Jones CPMI:c/o St. Paul Civic Center 143 West 4th Street St. Paul, MN 55102-1299 RE: St. PauI Civic Center Expansion CP-4 Building Construction ��C�iVE� JUN 11 ;:__ � ��! � BUIIDING DIVISION Minneapolis Office 700 Meadow Lane North P.O. Box 770 (55440-0710) Minneapolis, Minnesbta 55422-4899 Teiephone: (612) 522-2100 Facsimile: (612) 5203430 FO 420: Excavate to reroute existing sanitary sewer over hmneI (Grid 1281 }. � • Dear Susan: We are submitting a cost proposal for the changes in work defined by Field Otder 4.2Q dated 3 June 2996. We are requesting a Change Order to increase our Contract Amount by One Thousand Two Hundred Twenty-Nine DoIlars ($1,229.00) to perform the subject modification specified in Field Order F4.20. Mortenson reserves the right to submiY a proposal for additional costs and time related to the impact of this change on unchanged wark or the effect of this change in combination with other changes. Should you have any questions or comments, please contact me. Sincerely, � � e r Todd Schilling, Assistant Project anager cc: File: FO 4.20 Minneapolis•Seattle •Denver•Colorado Springs•Milwaukee•Grantl Rapids•San Diego•San Franasco•Honolulu•LOS Angeles