272231 _ ___ _ _. . . T ........ . . _. ......_. - - .
WHITE' - CITV CIERK � �
PINK - FINANCE GITY OF SAINT PATTL Council ����� � . .
CANARV -DEPARTMENT � � ,
BLUE -MAVOR File NO.
• ) �
i O/ ZIZCLIZCP. Ordinance N O. �C����
. � �yG,�c.�.�.. �
Presented By
Referred To Committee: Date
Out of Committee By Date
AN ORDINANCE MAKING PROVISION THEREFOR AND GRANTING UNTO THE HOUSING AND -
REDEVELOPMENT AUTHORITY OF THE CITY OF SAINT PAUL, MINNESOTA, A MINNESOTA
CORPORAT�ON, AND ITS SUCCESSORS OR ASSIGNS, PERMISSION TO CONSTRUCT, MAINTAIN
AND OPERATE AN OVERHEAD PEDESTRIAN PASSAGEWAY ACROSS SAINT PETER STREET
BETWEEN THE INTERSECTION THEREWITH OF WEST EXCHANGE STREET AND WEST TENTH
STREET. SAID OVERHEAD PEDESTRIAN PASSAGEWAY 70 B� EXTENDED FROM SAINT JOSEPH
HOSPITAL ON THE WEST SIDE OF SAINT PETER STREET TO THE GALLERIA BUILDING ON
THE EAST SIDE OF SAINT PETER STREET,
THE COUNCIL OF THE CITY OF SAINT PAUL DOES ORDAIN:
Section 1.
That permission and authority hereby are granted to the Housing and Redevelop-
ment Authority of the City of Saint Paul, Minnesota, a Minnesota Corporation and/
or its swccessors in interest to const 'ruct, maintain and operate an overhead
pedestrian passageway across Saint Peter Street between the intersection there-
with of West Exchange Street and West Tenth Street. Said overhead pedestrian
bridge to be extended from Saint Joseph Hospital on the west side of Saint Peter -
Street and the Galleria Building on the east side of Saint Peter Street,
Section 2.
That the Director of Public Works is hereby authorized to issue necessary
permits to said permittee, the Housing and Redevelopment Authority of the City �
of Saint Paul, Minnesota, for the construction, maintenance, and operation of said
COUIVCILMEN Requested by Department of:
Yeas Nays
Butler In Favor � —
Hozza
Hunt
Levine Against BY
Maddox
Showalter
Tedesco Form Approved b City Attorney
Adopted by Council: Date
Certified Passed by Council Secretary BY
By ` 1\, `
Approved by Mayor: Date Ap o d by Mayo for m sion to Council
sy B
, � -2- �������
. � �����
overhead pedestrian passageway according to the plans and specifications
approved by and on file with the Department of Public Works by and at the
separate cost and expense of said permittee, upon said permittee's compliance
with the following conditions:
a. That said permittee and/or its successors in interest shall, at its
own cost and expense and in accordance with all applicable ordinances of the
City of Saint Paul, statutes of the State of Minnesota and regulations of
public authority having cognizance, construct, maintain, and operate said
overhead pedestrian passageway hereunder;
b. That said permittee shatl pay the costs for the publication of this
ordinance;
c. That said permittee shatl pay the costs of administration, engineering,
and inspection incurred by the Department of Public Works due to this under-
taking, said costs are estimated to be a sum of Six Hundred Dollars ($b00.00)
and shall be accounted for under separate Department of Public Works Project
Number;
d. That said permittee shatl furnish the Department of Public Works all
documents of record that are a part of the contract or incidental to its
execution including, but not limited to, addendums, award of contract, contract
amount, "as built" plans, tracings and tracings of shop plans;
e. That said permittee shall construct said overhead pedestrian passage-
way to the satisfaction of the Directvr of Public Works and in accordance with
approved plans and specifications of the Housing and Redevelopment Authority of
the City of Saint Paui, Minnesota, said plans and specifications on file in the
Department of Public Works. Such construction shall be made in strict compli-
ance with the American Association of State Highway and Transportation Officials
(AASHTO) Specifications, as amended, and the Uniform Building Code and be
authorized under a buitding permit issued by the Department of Community Services,
Division of Housing and Building Code Enforcement;
f, That said permittee and/or its successors in interest shatl fully
indemnify, hold harmless, and defend the City of Saint Paul, it agents,
officers and employees from any and all damages, claims, losses, judgments,
suits or expenses and on account of all claims of whatever nature for injury
to person(s) and/or property arising out of or connected with the construction,
erection, maintenance, operation and/or removal of said overhead pedestrian
passagearay hereunder; and thafi supplemental to all other obligations, on their
part, jointly and/or severally, hereunder, said permittee and/or its successors
in interest shall furnish and maintain and pay all premiums and other expenses
therefor, Casuatty Insurance Coverage, with a duly licensed Casualty Insurance
Company to the extent of $500,000.00 for injury to any person and/or persons
in any single incident, and to the extent of $200,000.00 for damage to property
in any single accident, indemnifying the City of Saint Paul against liability
on account of all claims o�F third persons for injury to person(s) and/or prop-
erty arising from or connected with the construction, erection, maintenance,
-3-
. , �'�'���'��
e���c
aperation and/or removal of said structure hereunder, at all times, and to
furnish competent evidence of said coverage, fran time to time, to the Director
of Finance and Management Services of the City of Saint Paul;
g. That said permittee shall not proceed with constructio� unless and
until said permittee shall have fully complied with the provisions regarding
insurance and indemnification contained in the City of Saint Paul, Department
of Public Works "Standard Supplementat Specifications for Highway Construction",
dated June 1, 1978, Section numbered 1305.2. For the purpose of this Ordinance,
the aforesaid Section of said Specifications shall be read as though the word
"permittee" was substituted for the word "contractor" wherever same appears
therein. Section 1305.2 of the Department of Public Works, City of Saint Paul
"Standard Supplemental Specifications for Highway Construction" dated June 1,
1978 is hereby incorporated herein by reference as fully and as completely as
if set forth herein verbatim.
h. That said permittee and/or its successors in interest, shall among
other things, at their own cost and expense make adequate and effective pro-
visions therefor and drain all moisture, rain and snow which shall accumulate
thereon by proper devices through said overhead pedestrian passageway and in
a manner so that the flowing and/or spilling of same on any part of said section
of said Saint Peter Street shall be prevented at all times. Said permittee
and/or its successors in interest shatl maintain and operate said overhead
pedestrian passageway at its sole cost and expense in a safe condition for
pedestrian travel, such maintenance to include, but shall not be limited to,
glass, floor, metal trim, and hardware cleaning, polishing, and replacement;
roof maintenance; repainting; light bulb replacement and light fixture cteaning;
and the supply of heated and cooled air within said bridge to maintain temper-
ature comparable to that normally maintained within heated and air-conditioned
office spaces;
i. That said permittee and/or its successors in interest shall, at atl
times, construct and maintain all of the supports of said overhead pedestrian
passageway entirely within the lines of the subject private real estate and
entirely without pubtic street rights-of-way;
j. That said permittee shall notify the Traffic Bureau of the Department
of Public Works if the construction or maintenance of said overhead pedestrian
passageway shall make necessary the closing of Saint Peter Street or any part
thereof; all expenses incurred by the Traffic Bureau in furnishing, installing,
or remaving barricades, signs, apd other control devices shalt be paid by the
permittee;
k. That said permittee and/or its successors in interest shall not use
any part of said overhead pedestrian passageway for any advertisement or dis-
play purposes, without the written consent of the City of Saint Paul and the
application thereto of any advertising materiat or display shall be deemed
prohibited by this Ordinance;
1. That said permittee and/or its successors in interest shall, at all
pertinent fiimes, in the construction, maintenance, and operafiion of said over-
head pedestrian passageway hereunder, provide respectively a minimum vertical
� -4- �:�`����_
. i1�4qn
clearance of at least 17 feet 4 inches between and throughout the course of
the bottom of said structure and the surface of said section of Saint Peter
Street, except as may be altered by the City's future street work;
m. That said permittee expressly agrees to comply with Chapter 216 of
the Saint Paul Legislative Code, as amended, pertaining to street obstructions;
n. That said permittee and/or its successors in interest shall complete
the construction and erection of said overhead pedestrian passageway by not
later tM�an one (1) year after comnencement of construction. Said comnencement
shatl be evidenced by Pubtic Works' receipt of a written notification thereof,
and shall be dated therein, as further provided for under Paragraph (o} bela�v;
a. That said permittee shali notify the Bridge Engineer of the Department
of Public Works before and when construction starts and notify the sar� said
Bridge Engineer when canstructian has been completed to allow for a final
inspection.
p. That said overhead pedestrian passageway shall be removed by and at
the sote cost and expense of said permittee and/or its successors in interest
whenever the Council of the Ctty of Saint Paul shall by Resolution determine
such removal necessary in the public interest and accordingiy order the re-
moval of said structure from said 1ocation;
q. That said permittee shalt, within the period of ten (10) days after
the publication of this Ordinance, file with the City Clerk its written
acceptance of this Ordinance and agreement to be bound by all the provisions,
terms and conditions thereof without limitetion which written instrument of
acceptance and agreement shatl be in the form approved by the City Attorney;
r. That upon the execution of an Agreement by and between the City af
Saint Paul, the Housing and Redevelopment Authority of the City of Saint Paut,
Minnesota, and the applicable building/property owners respecting the aforesaid
pedestrian passageway over Saint Peter Street, the permittee, the Housing and
Redevelopment Aufihority of the City of Saint Paul, Minnesota, shalt be relieved
of any further obligation uncfer the terms of this Ordinance, and the successors
in interest of the permitfiee, the applicable building/property owners, shall be
responsible for paying the insurance premiums of said overhead pedestrian
passageway and shatl also be responsible for providing the maintenance and
operation of said overhead pedestrian passageway;
s. That upon the Housing and Redevelopment Authority's conveyance of
its obtigations under the terms of this Ordinance to the above successors in
interest, said permittee's successors in interest shall furnish and deliver
unto the City of Saint Paul a Surety� Bcmet in the amount of Fifty Thousand
Dollars ($50,000.00) for said overhead` pedestrian passageway (bridge) , made
and executed by said permittee's successors in interest as Principal, and a
Corporat� Surety Company duly authorized to transact business in the State of
Minnesota as Surety, to and in favor of the City of Saint Paul as obligee,
conditioned upon the permittee's successors in interest comptying with the
terms and conditions of this Ordinance and also conditioned that, in the event
the permittee's successors in interest fail to maintain or repair said over-
WHIT�' - GITV CLERK .
PINK - FINANCE GITY OF SAINT PAUL Council
CANARY - DEPARTMENT l
BLUE -MAVOR � Flle NO. �����
--FS! �rV F .
•
` • � . O/ indnce Ocdinance N�. f�y��
Presented By
Referred To Committee: Date
Out of Committee By Date
-5-
head pedestrian passageway to a reasonable standard of safety, or fail to
remove said overhead pedestrian passageway upon order by the Couneit, the
City of Saint Paul may undertake the maintenance, repair or removal thereof
and may recover its reasonable cost incurred thereby from said surety, whfch
Surety Bond shall remain in fuil force and effect as long as said overhead
pedestrian passageway or any part thereof remains in that portio� of Saint
Peter Street as shown on plans on file with the Department of Public Works.
The Surety Bond shall be in such form as shall be approved by the City Attorney,
and shall have such surety as shall be approved by the Director of Finance �
Management Services;
t�. That said permittee and/or itS successors in interest shall submit
proposed plans and specifications to the Department of Public Works for re-
view and approvat of any intended structural repairs or major maintenance work
on the bridge, before any such work is carried out. Upon ca�npletion of such
structurai repairs approved by the Department of Public Works, permanent re-
producible tracings shail be furnished the Department showing the work done and
marked with any "as built" changes, as welt as reproductble shop drawing tracings
of the same;
u, that said permittee shall submit the necessary insurance documents to
the Office Engineer of the Department of Public Works. The Office Engineer in
turn shall submit said documents to the Ctty Attorney of the City of Saint
Paul for review and, if said insurance is sufficient, said documents shall be
filed with the Director of Finance � Management Services of the City of Saint
Pau 1.
Section 3.
That this Ordinance shall take effect and be in �force thirty (30) days
from and after its passage, approval and publication.
mf'
COUNCILMEK
Yeas Nays Requested by Department of:
+�1�s-� � Pub 1 i c Works
In Favor
Hozza, Pres i dent . � I ?
Hunt d � �;���,�!�� � / /
� Against BY '`J`"'�-
on , ygaar , r ctor
Showalter �
Tedesco �aN 4 1979 Form Approved by C1'ty A torney
Adopted b ncil: Date I�
' ,
C ified P ed by Cou�cil ecretary BY
By
C
A pr v d by Mayor: te T-��� �7�1 A r ve by Mayor for�b i 'on to Council
B BY �
,
t��tsH�o ,lAN l 3 1979
.. . . . . . . . . . . . . . f . .
� aM az: �.�/z��z5
, . . , Rev. : s/s�7�G
�
� , EXPLANATION OF�ADMTIdISTRATIVE ORDERS, ���
� RESOLUTI4NS, AND QRDINANCES ' �a��
--- � f�yq�
,
" .� .� � RECEiVE� .
Date: Nover�er 24, 1978 ;
UC C ` `T 197�
NIAYOR'8i OFFIC� .
TO: MAYOR GEORGE LATIMER f
FR: Robert A. Horrisbert,�er, Jr., Publ tc Works • ! -
RE: Pedestrian bridge over St. Peter Street betw�een Exchange Street and Tenth Stre�t �
, �
.
�
ACTION REQUESTEDc Ordinance woutd permTt the construction operation and �aintena�ce
of the pedestrtan bridge over St. Peter`Street betw�een St.' Joseph Hospital and�
the Galleria Building, sub,ject to certaln conditions as� contained in the 'ordinfince.
�
. ,
'�
�
i
, ;
. - i
r
. ;
. �
�
,
4
�
. . ;
_ . �
� PURPOSE AND RATIONALE FOR THIS ACTION: � Cowncil by Ordinancm t�as granted�
permission for prevlously constructed pedestrlan bridges; (i,e. Ordinance ; '
No. 16348 adopted 9/22/77 for pedestrtan bridge over Wabasha 'Str�et betwneer� �
Exchange Street and Tenth Street.) '� •
_ �
. 'i
i
' ' ' � � .
� ,.
ATTAGHMENTS: Ord i nance . ;
. �
_ i
-���f.� . '
� ..
� _=_:�°��zY F''°�� CITY OF SAINT PAUL
_�� ,:�,,
'4 '�'` OFFICE OF THE CITY ATTORNEY
�o �'
:� IIBI'd{I'll ��
�;� �� SUZANNE E. FLINSCH, CITY ATTORNEY
�`>;,,,. �as+ 647 City Hall, Saint Paul,Minnesota 55102
�.�.��°
612-298-5121
GEORGE LATIMER
MAYOR
April 24 , 1979
Ms . Rose Mix
Offi ce of the Ci ty C1 erk
386 City Hall
St. Paul , Minnesota 55102
Re : Council File No . 272231
Ordinance No . 16490
Skyway Bridge , District 17
Dear Ms . Mix :
Enclosed herewith please find Certificate of Acceptance of the above
referenced Ordinance.
Y ry truly ,
,.
4..�
Ri d H. Ze ing
Assistant City Attorney
298-5695
enc .
cc: Darold McMahon
��
1
Saint Paul, Minnesota
April 19 , 1979
Members of the Council
of the City of Saint Paul
The undersigned Petitioner hereby accepts and agrees
to comply with the terms and conditions of Council File No.
272231 , being Ordinance No. 16490 , adopted January 4 , 1979.
HOUSING AND REDEVELOPMENT AUTHORITY
OF THE CITY OF SAINT PAUL, MINNESOTA
By ����
( S E A L ) Its Exe tive irector
�
. �
, �
lst � �� 2nd '�� �
3rd �� ��� Adop ted_�
Yeas pay8
BUTLER
HUNT
I.EVINE �-� ` ��-l��.�'�3
MADDOX �(1! / ��
i
SHOWALTER
TEDESCO
PRESIDENT (HOZZA)