CITY OF SAINT PAUL - OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT NO. P 1.1
•
ADMIDIISTRATIVE ORDER, Whereas, addiuons which proved to be necessazy to the Improvement described
as Saint Paul Civic Center fixpansion CP-1 Demolirion Ezcavation & Bridge Construction-Pazkin� Ramp
Excavation Alternate A
known as Conuact L Project No.014440 Fdward Kraemer & Sons, is composed of the following:
L.
2.
- Conuactor
_ - Project Manager (CPMn
Constcuction Change Directive C1.6 Washingwn & Fourth Saeet tunnet.
Reason: Field condition (Tunnel collapsed due ro natural fissure in sandstone).
Shotcrete final design-cost for changes in design.
Reason: Field conditions and design calculation changes. Includes work required by
Requests For Praposals No. C1.9, C110, C1.13 and CI.14.
Total
$9,685.46
214,002.00
$223,687.46
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing addiuons made in accordance with the
specifications in the sum of $ 223.687.46 . said amount to be added to the lump sum considerapon named in the
contract, lmown as contract L-
.♦ " • �. C
. .. .
and which amount is to be financed from:
AP OV D S J F,
� � � 2 -' Z�/ 19—'J�.Z
Assistant City Attomey
Expansion
Expansion
Ciry of Saint Paul ( D) '—
_ � __[��5��— �
Aichitect
•
Edwazd Kraemer & Sons
�S l�
- . ��cor��r�a��ra�s: ,.,
�
•
PROJECT:
Saint Paul Civic Center DATE ISSUED: 5 December 1995
Expansion Project CONTRACT NO.: CP-1
Saint Paui, Minnesota CONTRACT TITIE: Demolition, Excavation &
Bridge Construction
CONTRACTOR Edward Kraemer & Sons
1020 Wesf Cliff Road
Bumsville, MN 55337
OriginalContractAmount: $1,026,000.00
CO No.
CPA1.1
Subtotal
Deduct Add
223,687.46
00 $223.687.46
CONTRACT DATE: 29 March 1995
Net Amount of Contract
including this Change Order: $1,249,687.46
•
_ �
•
C ,
J
f
i
�
i
�
Lt : fr
c�a r�=-r �,�.c.r o
ProjecL" �yint Pa��t Givic C.enraT CanifaCi No.
A ahange in the saape at the work is reqUes[ed as indiCatad below:
M � - -.
1. it i3 retatiesied the completioh dare be [} extended. !) deCtCasad. ( 1 unchanged by —
calender d8ys. The adjusted completion d8te wilt be
2. �escriROOn of rhe change: (Refer to drawings, specifications, addenda, if appiicahte).
{Raference 'RFP Na.: • CCD No.: �.� : FO No.: t
3. B��is ot paymenr. (Check one) ea
f.}'�=itm pitce far performing this changa ;s ....................................S � � ¢b
Ad@quate supparting detaiis and informatlon creas Aeductf
must ba attached to al[ow Ownet to evaivata.
()'Iime and mgterial per contraet, 6ut not to excesd g
f) Rcivai cpst at r,pmptevon of work $
3ubmitted k�y: ��A� r2�t e e�.� Osta� a 4 S'
- ^---------
t
2.
Aciion Recommanded: (Check orte?
i, ) Chang�a will nat be made. Explain:
Fr q. P O' S li• C.
R�r�kN�rr� ,�J� - �imp
C?MI Job No.: 3225
�.Proceed an the following basis: �
{ 1 As iadicated ahove, change and�basis ot payment is acr,Eptah{e.
�Change is acceptab(e, basis of paYmens is noc acceRrabfe. C`�NLU 5� m�vP �y
t) Basis af payment s}iall_be 3 (oS � i
� t I.ThB foilcwing ptadificatfon is �eCOmrttendsd: �T� �� � G�N� /
() Change in completian daie is accap2ed. ��>� C�a7� is �D�
( I CfiangB is accaptahte +evixh no change in price. "Q� pg�pp� �-��,r� �� �b . Z
( t Chsnge is acceptable wixh no change in comptetion date.
Raasohi0r Change:
t) DeSign Changs () qietrt Request �Feld Cqnditian
i.1 Suggested by Contractor (� Oesign Qmission or Othar (expfainl
3. Is this a patL of ihe originaai ccnrracs seope? t) 1'fS �NO
4. Is Cantractar's Esumate anacf�ed? £S ( y NO
5. AJ� consuksd. �ES ti NO
Prepared Ery:- CPMIS
A�gtaved f� �° �� !G!(Y� i GA?
Approvad b , tpwner�
Post-it° Fax Note
]g]� Date �
<
� From �
�. cP r
15- 6�
pCPANSiON
Oate: / J ; � � g�_
Data: �� �
Date: 0 S"I �,(
bE IF�� ����.��� Faz# 15Naf1H-5>13 W02i� 90 � I T S6 � 7 1J0
�►; �
•
BREAKDOWN SHEET
CONTRACTOR'S pROPOSAL
SAINT PAl3L CIViC CFN'fER EXPANSION
IABOR, MATERIAL & EQlliPMENT
DlRECT EMPLOYEE LABOR
MATERIALS & EQt11PMENT INCORPORATED
TOTAL G.AB & MATERIAL & EO.UIPMENT
75% FEE
TOTA� LA6QR, MATERtAL, EQIJ[P., & FEE
SUBCQNTRACTORS •
5°h FEE
Tp7AL SUBCONTRACTORS & EEE
OTHER COSTS
• TRAVEL & SUBSI5TENCE
MATERIALS & EQUlPMENT NOT INGURPORATED
R�N7Al,S
TAXES
PERMITS & LICENSE FEES
UTlLIT1ES, FUEL, FACILITIES Ai' S1TE
INC[DEN7qL EXPENSES
BOND & INSURqNCE PROVfSIDNs
TOFAL �TNER CQS7S
i
�
1�
TdTAI. OF CHANGE PROPOSA�
Sq1NT PAUt, CIVIC CENTER EXPANSION
S
S
S
�I 22�}-, 2�
s ��~
S �
4col.,�
�
$ � -k�-t��-a
i
� �I � �OP �J ,�°
,$
S
S
S
5
S
5
5
`���-
$
���(�55�
700i�00' 39Hd 3"7"7I�SNbf1H-SN3 W621d L0 � i T S6. b 1�0
i
���
c/o Saint Paul Civic Center
I.A. O'Shaughnessy Plaza
743 West Fourth Street
Saint Paul, MN 55102-1299
612/298-5409
FAX TRAIVSMITTAL
CPMI FAX: 16121 298-5417
• � L����_�•
COMPANY:
FAX #:
FROM:
•
T/ L/1 I
332- 90/3
��: i�1� � ��L
11: �
DATE: U �
DOCUMENT INFORMATION: ,
DESCRIPTfON: /,JJ � - -
NUMBER QP PAGES (tNCLUD(NG COVER PAGE►: __ '�
. �_ .�ai ii �_. _' � a,_�� I: i♦ i s
PROJECT #: ��Z� - 32�
�
- — ,11ES--BURN51kIl-LE -- ' 812 435 7142 fi0 KRAEMER BVILIE P.01�01 - '
Ll)..J��V -
• AML�S CONST'SUCTIUN, INC.
iaazo cout�r�r xoan s
BUANSz1I1S$, b�tE3UTA S.i306
- (61?J 43S-7IOb � FAX 435�7142
-{)ctober�, I99a
•,. .�.. �
u � ` � • .:.
� : �•.. :. .
, ,,.. .... _. • - • . : -
St�ect; CCD-CI.6-Ui�tt
Sgnitaty Sew� at Fourth Stra�r
- Ssint Pant f.`ivi� Cantar fiacPa�
. �P-i Ddno, Exc�xvafi� & Bzidge C�on .
� a .,.
_.� - :� - . . : «� . �
. � . ��._. „ � _ .,, , � .
�„ ;,, : .. ,.
..:..�� :� u ,... .,� ,_ . .
. - . ,,., �� �~- � ��,:« ��.�. _
.: , ., ,., :. .: � �., . �
,. . . . _ :.. ... . . . .:..
i w • �.: Mil� � �-� A .� �: "� � �.: � . •
.: � , . : .. :.. .
�, �H • • �y � l. . -{ � O 11 \ � [1�� � ' Y.{�
� 1 r� � • • .
i� \:fau ♦ � 14l"� :1 t� ♦♦ � n�1 �- �I
� • • � � � • 1 y �\ • " r
�1• !\ �:V '� \ � • i\' .• 1 { �
:�� �u Y V. e y� u�. 1
� i
l� � \• ♦. ��1
� � ��
• � :�� • • • �.1\ � �' � � � iY �• :• ♦ 1 l� � -
• �. �, � 4 1 � �1� '� �' .� • \ \\1• �
• • ' • :11 1 i l b � : � �i • •
� �l 11 � �� : II � Mi � . �1 }U 1 :
• , \1 \ 1 �� ♦�•
♦•
��11 �.\ � \Y. i .�: �
�}
- �' y �
1�L�Gl f`.�^NrR6�� . .
�� i���
� �� �f•C: �.�_ uU5At1.�P�ll �01]SS • �2v�
� - . �� AA Pl4u� Lypa+M'b` �
- �. QPiiG7$ gI: BffiQL'YRr �1.0� •� T�3A%. AR2Y:02�A ' gALi GICE C[IY, Vl'AH
** 70TR1. PaGE.6 *�
.. OCT— 4-.J.5 ..�.F.p . 1 _�.�. 0 �- ..... ........_.. ....�� ..a«a.n..•ia�
• ����
cio Saint Paut Civic Centes
�.A. O'Shauphnassy Pfaza
4 a3 µfest �outth SVeet
Saint Paul, MN 551Q2•1299
612f288-5408
PAX TRANSN[ITTAL
CPMI FAX: (6121 298-5�t77
11TTENTfON: ^..,,�1�� _! �:.�'t��f�._.__.__--
COh7PANV: __ ����.F J--•------_._..�........ ___.._.
�OS i0
_ p . 0 �.
. P11
Qa��:�� �5'
Fax #: w� � � _ ��� r.._._. .
----� . .�.�_..._.
i F���: ,�.�_� ._ �����'----
qOGt1M EN7 Ih'POkMATt 0lY:
E� ES GRl pTtON:_...__.... �.��.#.� — -- _ , . . . _.. _. . _
NUN1Li�R OF PAGF.S ((�fCi.UUING COVER PAC4��: --..�j"`._
t
ca=�nr.�srsrs: .w�'�.���"1. �=, ex la l::E ��= ..-:� . _ �_h•:�� ��S.I:1..Sw_._
e
•
Paasscr #: �2��-32.Z-
1 ���r��.
� ��
��✓c�.
���
d
d
CON$TRUCTION o�.rEx xi
CHANGE �o��nc-�roR �
• DIRECTIVE FiELD �
OTHER �] CPMI
A!A DOCUMENT G714
�� (fnsbzrctiorzs on reixise sicie. 7bis document reptaces AIA Douuner+t G713, Consin�cfiOn Change Au[boriza[ion )
PROJECT:
(name, address)
TO CONTRACTOR:
(name, address)
Saint Paul Civic Center
143 West 4th Street
Saint Paul, MN 55102
Edward R. Kraemer & Sons
1020 West Cliff Road
8umsvitfe, MN 55337
You are hereby directed to make the following cl�ange(s) in this Contcact:
1
•
2.
Psovide stabilizatiosi of Fourkh Street tunnet.
DIRECTtVE NO:
DATE:
�BIp S•S
CCD-C1.6
15 September 1995
ARCHITECT'S PROJECT NO:
CONTRACT DATE: Q7 MarCh 1995
CONTRACT FOR: CP-1 Demolition, Excav
& Bridge Construction
Stabilize per one of the methods on the attached letter from the City of Saint Paul.
3. EKS/Ames to review with Lametti 'rf unit prices ftom City of Saint Paul Sewer Separation project are applicable.
REASON: �ield Condition
PROPOSED�4DJUSTMENTS
�
1. The proposed basis of adjustment to the Contratt Sum or Guaranteed Ma�mum Price is:
❑ Lump Sum (increase) (decrease) of
❑ Unit Price of
per
❑ as provided in Subparagraph 73.6 of AIA Docuinent A201, 1987 edition.
❑ as touows: rme and Material. Tum in timesheets dailv.
2. The Contrac[ Time is proposed t� adius[ed) (remain unchanged). The proposed adjus[ment, if any, is (an increase o[ —�—
days} (a deccease of _.�.— days).
When signed by the Owner and Architect and received by the Con[racror, this document
becomes effective IMMEDIATELY as a Construc[ion Change D'uective (CCD), and che
Con[ractor shali proceed with the change(s) desctibed above.
Nammet Gseen Abrahamson, Inc. Saint Paul Givic Center Authority
ARCHITECT OWNER
�20� Harmon Place 143 West4th Street
Address Address
I1�A1 cqAnZ C' ♦ D 1 ��1.1 FF9l19
—{V�*ini@d�9�l��e�r�ov-rvv— �
I_:j�
DATE
BY
DATE
Signacure by che Concraaor indiaca [he Con-
trattor's agreemenc with [he proposed adjust-
mrnrs in Contact Sum and Concracc Time sec
forth in �his Const�uaion Change Directive.
Edward Kraemer & Sons
CON7RACTOR
109n t'liff Road
AddreSs
BY
DATE
� � CAUTION: You should sign an original AIA document which has this caution printed in red.
An original assures that changes wfff not be obscured as may occur wfien documents are rep[oduced.
AIA DOCUMEN7 G714 • CONSTRUCTION CHANGE DIRECI'NE � 1987 EDITION � AU° � OO 1987 � THE
AMERICAN INSCCTUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON. D.C. 20006
G7141987
G
� CITY OF SAINT PAUL
Norm Coleman, Mayor
September 12, 1995
Susan C. Jones
Project Manager, CPMI
c/o Saint Paul Civic Center
4. A. O'Shaughnessy Plaza
143 West 4th Street
Saint Paul, Minnesota 55102-1299
Tetepharse: 6I2-266-6070
Facrimi[e: 612-292-7857
�ag�a
DEPARTIvIENT OF PUBLIC WORKS - � --
Stary M. Becker, Director
600 City Hall Arsrser
Saini Pau4 MN 55102
f�_i���_.s _---
SEP 1 3 lyyJ
���'��?'�
Re: Civic Center Construction - Fourth Street Sewer Tunnel
Dear Ms. Jones:
• •
I have been informed that a section of sandstone has collapsed into the sanitary
sewer tunnel for a length of about 25 feet. This will have to be stabilized.
The City's contract with Lametti, in nearb� streets, includes work in similar tunnels.
The plans and specifications outline several steps to stabilize the exposed
sandstone. Your contractor should fake the necessary actions to stabilize the wal{
before furthec damage is done. S9milar to our contract, one method is rock bolts, wire
mesh and shotcrete. We also generally use a chemical grout called spraygrout in our
plans.
The problem section seems timited in length. The use of a grout anchored into place
may be sufficient. Lametti, who is working for us, is experienced working in such
conditions. Your contractor might seek their help in securing the tunnel in 4th Street.
If you have any questions, please call me at 266-6148.
Sincerely,
��tit'
Richard Hedman, P.E.
Civil Engineer
RH/dm
�
� r. r_ _i.. r`__I......�O�:A..
.
•
�$id
;� ��
C'� N=_t:K:/r.:Q T O° R' S P R O P O S A C
Contractor Proposat No.: va�e:_
Project� S�int Paul Civio Center Contract
A change in the scope of the work is requested as indicated below:
1
`�
3.
1
2.
CPMI Job No.: 3225
It is requested the completion date be (�xtended, () decreased, ( 1 unchanged by _
calendar days. The adjusted completfon date wili be �- �"-`�S
Description of the change: (Refer to drawings, specifications, addenda, if applicable).
(Reference RFP No.: : CCD No.: • FO Na•: 1
Basis of payment: (Check one) '°
() Firm price for pe�forming this change is .................................... S Z�� Oc Z
Adequate supporting details and information (Increa�Deduct)
must be attached to ailow Owner to evaluate.
() Time and materiai per contract, but not to exceed $
() Actual cost at compietion of work $
Action Recommended: SCheck onel
() Change will not be made. Explain:
() Proceed on the following basis:
( 1 As indicated above, change and basis of payment is acceptable.
() Change is acceptable, basis of payment is not accepta6le.
() Basis of payment shall be S
() The foliawing modification is recommended:
( � Change in completion date is accepted.
() Change is acceptable with no change in price.
f 1 Change is acceptab4e with no change in completion date.
Reason for Change:
( 1 Design Change O Client Request f 1 Feld Condition
{ � Suggested by Contractor ( 1 Design Omission or Other (explain!
3. is this a part of the originaal contract scope? {) YES (} NO
4. Is Contractor's Estimate attached? () YES () NO
5. A/E consulted. () YES I} NO
Prepared by: CPMII
Approved by (HGA)
Approved by (Owner)
• Approved by:
cc: Chris Hansen Bake E
Eriks Ludins 3225-.
Date•
Date•
Date-
3225- BL
Dick Zehring
SA{NT PAUI CIV(C CENTER EXPANSION
Submitted by: �aw�cD W���C^�3'� `��"�� Date: 2- ���
Contractor
•
September 13, 1995
Susan Jones
CPMI
c/o of St. Pau1 Civic Center
I.A. O'Shaughnessy Piaza
143 W. Fourth Street
St. Paul, MN 55102-1299
,�� �-o. �: - �
� _ � �- �� yl/�s
� ..
���
i
� `i..11U�o
�
EDWARD
KRAEMER
& SONS,
IfdC.
Re: C.P.1, St. Paul Civic Center Demolitiun Excavation and Bridge Construction
Dear Susan:
We have previously submitted unit prices for the pian revisions to the shotcrete walls
during the design analysis, The foilowing is the approximate quantities and unit price
revisions we would iike to establish for pay requests.
Description
Unit Price ( t . Extension
3" Shotcrete Wail $ 6.30 720 SF $ 4,536.00
(R) 4" Shotcrete Wall $10.50 2,320 SF $ 24,360.00
• (R)6" Reinforced Shotcrete Wall $10.92 25,000 SF $273,000.00
(R)8" Reinforced Shotcrete Wall $14.33 13,200 SF $189,156.00
(R)12" Reinforced Shotcrete Wall $17.80 10,600 SF $188,680.00
(o`1t,'t3z
These quantities do reflect changes made in RFP's 1.9, 1.10 and 1.14. I will address
these R�P's under separate cover.
if you shouid have any questins, please contact me at (612) 890-2820.
��
Sincerely, .
� ' �� �/, � ����,_
Jerry A. Volz
Regional Operations Manager
cc: Bob BeckeUEKS
Chris Munn/EKS
� � ��.
� C�`�'
�.�,��.� �� �(� �
�_ I �j5
or��.�sa is5 '.�.a
��
�.,
�z
�
3�
2.0,30o E'_ L„ `
44
Zu� �o� C..' c� •
�LAou L' �� ap -
: \Zl,�qo
� �� �a��
lbl, 3Zo
4�s,-� ��
�� f l `�,��.�.�,�e. ' �. ��i, eoz.
CONSTRUCTION DIVISION
10 WESTCUFFROAD BURNSVILLE,MINNESOTA55337 612-890-2820
�„�,,,�,�c��,m,��,,,, �,�„�,,.,
Q_
fAX- 612-890-2996 g�
�
��
•
BREAKDOWN SHEET
CON7RACTOR'S PROPOSAL
SAINT PAUL CIVIC CENTER EXPANSiON
�A.BOR, MATER(AL & EQUIPMEtVT
DIRECT EMPLOYEE LABOR
MATERIALS & EQUIPMENT INCORPORATED
TOTAL LAB & MATERIAL & EQUIPMENT
�5% FEE
TOTAL LABOR, MATERIAL, EQUIP., & FEE
SUBCONTRACTORS S�-Z �<'ca��� -
5 % FEE
TOTAL SUBCONTRACTORS & FEE
S
S
S
! :i
�
$ ��.� �..� �.,..���
"(��\laSv�cv Qv�v�r_�'�
$
�
OTHER COSTS
TRAVEI & SUBSISTENCE $
MATERIALS & EQUIPMENT NOT INCORPORATED $
RENTAIS $
TAXES g
PERMITS & LICENSE FEES S
UTILITIES, FUEL, �ACILITIES AT SITE S
INCIDENTAL EXPENSES $
BOND & iNSURANCE PIiOVISIONS S
TOTALOTHER COSTS
TOTAL OF CHANGE PROPOSAL
,C;
5
SAINT PAUL CNtC CENTER EXPANSION
�
70TAL # OF SIGNASIIRE
�������
�
MMENDATONS: Ayp�ova (A) or qejecl
PIANNING COMMI$$I�N __ f
CIB COMMI7'TEE _ _
STAFF __ "
DI5fA1CTCAUR7 _'
DqTS WHICH COUNCIL OBJECTIVE?
GREEN
'�'+N CRYATfORNEY
�� � O UDGEf DIflECTOR
mr�
)ER MpyOR (OR ASSISTANT)
� ALL LOCATIONS FOR SIGNATUR�
�����
1/: i .
21789
� INRIAVDATE �
CIiY GOUNGLL
CffYCLEflK
FIN. & M(3T. SEflVICES DIR.
����
PERSONAL SERVICE CONTRACTS LIUST ANSWER THE FOLLOWING QUESTIONS:
1. Has this perso�rm ever worked untler a corrtract for ttiis,de�jfi�q,g�t�� �� �
YES NO
2. Has thfs person/firm ever been a city employee?
YES NO
3. Does this personlfifm possess a skill not normatly possesse0 by any curtent cM1y employee?
YES NO
Explain all yes answers on separate sheet and attaeh to green sheet
IfT1ATiNG PfiOBIEM. ISSUE, OPPORTUWTY (Wlto. WM1at, When, Whara, Why):
7-�. �� � �-�4.1.,,� /� �� � r����
,�,(, � ���,�� � � �� 6 4r-� a� ��`
�
.;� � ; � , t�� �., �t- ���'� � -
�/A�SIFAPPROVE� � � J ,� I A /J L `,/ '^^ ^ - �
I � i� �,a.�s9r �0 9d��-� ,
Lu �vo� w-v-�..G% � a �� � � � C�'`?�l'�/'� ,
� ,�,� �,�-e� � ,� � �� `� �
� ��
� ati , a ,�,r ce �- ,� ��..�u-.�, � , ,t� c�-�
�C �„r� � �� -
������ �
RECEfVED
J Aid - 2 1996
CGTY CLERK
- ,•
��� 2 �-1995
�� -
��
70TAL AMOUNT OF TRANSAC710N $��� 7`'� � COS7lREVENUE BUDGETED (CIFCLE ONE) YES NO Cy
/; /
FUNDINGSOURCE___��'� �� • ACTIVITYNUMBER )�I 7�o0q - 073� -6a'osa �
FINANCIAL INFORMATION: (EXPLAIN) � � A /
����