Loading...
D001086No. D c�o�oa� Date : f �_ � _ �� • ADM2NISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described as: Mears Park Sidewalk Replacement known a5 Contraot 015512 , City Project No. L96-17-03 , Lindahl & Carlson. Inc. , Contractor, is composed of the following: 1 2 3 4 Provide two colored concrete sample panels. Provide drain field for area of poor soil drainage Install compacted stone base £or retaining wall. Install fill material behind stone retaininq wall. Add $ 442.43 Add 3,423.99 Add 1,589.52 Add 735.00 __'_"_'_'_'__'_ "'__' TOTAL ADD $6,190.94 ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in accordance with the specifications in the sum of $ 6,190.94 , said amount to be added to the lump sum consideration named in the contract, known as • Contract 015512 , and which amount is to be financed from: Original Contract Sum $194,931.�0 Change Orders to Date -0- Amount this Chanae 6 190 44 New Contract Sum $201,121.94 Chief Engineer Director o£ / �' �y19 �� /!/ lg� �creation 19_ 19_ cc: City Clerk Finance Department . Department Accounting Project Manager Contractor Inspector Office Copy Contract File Copy CITY OF SAINT PAUI, - OFFICE OF THE MAYOR ADMINISTRATIV& ORDTR for CONTRACT CHANGE AGRPsPsMENT NO. 1 C96-3R006-�882-34�55 Lindahl & Carlson Inc Contractor ay letters dated 812. 8/20. 9/4 & tOJ�l/96 � /)(/d ��t.0 �r� ����� Din'ector of FirYance & Management Services �E� Administrative Assistant to the Mayor r_ �'� V { DEPARrMEM/OFFICE/COUNGIL pATEINfMTED GREEN SHEET lo NO. 4 4 Parks and Recreation 11/5l96 CONTACTPERSONANDPHONE INITIAUDATE INRIAWATE n Ganje - 266-6425 � � DEPARiMENTDIFEGTOR _CfiYCOUNCIL ASSIGN NUMBER W �CRV ATTORNEY 4 CfiY CLERK MUST BE ON COUNCIL AGENDA 8V (DATE) ROUi1NG ORDER BUDGEf DIRECTOR 3 FlN. & MGT. SERVICES �IR. rJp, MAYOR (OR ASSISTAf�IT) 5 Parks & Recreation TOTAL � OF SIGNANRE PAGES � (CLIP ALL LOCAilONS WR SIGNANRE7 [t�F� ACTION REQUESTED: ��^ ^ Approval of Contract Change Agreement No. 1 ��� 1$ y0 Mears Park Sidewalk Replacement x�iAYO�'S QFFlC� RECOMMENDATIONS: Approve (A1 or Re�ect (R) PEfiSONAL SERVICE CONTfiACTS MUST ANSWER THE FOLLOWING WESTIONS: _PLANNING COMMISSION _CIVIL SERVICE COMMISSION �. Has Mis person/tirm ever worked untler a conhact for this tlepartmen[? CIB COMMITTEE _ YES NO {� STAFF 2. Has this person/firm ever b¢en a city employee? VES NO DISTRICT COUNQL — — 3. Does [his person/tirm possess a skill not normaily possessetl by any current city employee? SUPPORTS WHICH COUNCIL OBJECTIVE? VES NO Ezplain all yes answers on separa[e sheM and attach to green sheet. INITIATING PROBLEM, ISSUE, OPPORTUNITV (Who, What, When, Wh¢r¢, Why�: 1. Proposed concrete walks designated to be colored, yet no specific color was indicated. 2. Following removal of the old concrete walk along 5th St., an area of non-draining subsoil was discovered. 3. Proposed widening of the sidewalks along 5th and Wacouta Streets required excavation of adjacent slopes. ADVANTAGES IF APPROVED: 1. Provision of actual formed and colored concrete samples, to allow selection of correct concrete color. 2. Poor soil needed to be removed and a drain system with new free-draining material installed to prevent future failure of sidewalk along 5th St. 3. A retaining wall was required along 5th and Wacouta Streets to stabilize excavated slopes and allow for installation o# a new wider sidewalk. DISADVANTAGESIFAPPROVED: RECEIVED �E���'"���,��,� � ��w a,�* � . m,+:,. � � '��e.- None DEC 31996 CITY CLERK � � � ���� "� ��6 €� DISADVANTAGES IF NOT APPROVED: 1. Correct concrete walk color could not be selected. 2. Sidewalk would eventually fail, creating a safety hazard. 3. Retaining wail could not be built. AL AMOUNT OF TRANSACTION S 6.190.94 COST/HEVENUE BUDGETED (CIRCLE ONE) YES NO FUNDINGSOURCE C�B ACTNITYNUMBER C96-3R006-0882-34055 FINANCIAL INFORMATION: IEXPLAINI , � �� l�