Loading...
91-2103 •�- '� }; CITY OF ST. PAUL COUNCI�L�iLE N0. �� �l o� FINAL ORDER , '�`�� � j `%� ,:,`�"� ... Byi- =;,i'.�.�%! File No. I$bi3 Voting In the Matter of �ta22atiaa of th� iil�eloct/Ivp Arsa Storie Se�rer Yro��ct ia � Ward ar�a bomaded by Soyt Ave�e, Payas Araau�, 1.srpeata�nr Atrenue and 6 Aresda Street. under Preliminary Order �����a` approved � �`'���/ _� __ :� The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improve- ment and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. NOV 2 6 1991 COUNCIL PERSON Adopted by the CouncIl: Date YeasDlaoad Nays Gostritz Certified Pa by,C ncil Secretal�y / �� � / I�CCabs! � In Favor By � A�sits�an � Thtu�e � Against '� Wil�on oEC ,� j��� Mayor F�l�USNED pEC 14'9l . ' • � Summary of Engineering Recommendations �F9'a��� Wheeiocic/ivy Storm Sewer and Paving Project Project No. 92-S-8086 (P-8066 & V-8066) Report Prepared July 16, 1991 Neighborhood Informationa! Mee#ing Pubiic Worics Committee November 6, 1991 Pubiic Hearing November 19, 1991 pROJECT: Construct a storm sewer system, water and sawer senrica connections and reconnections, strest improvements and an omamerrtai lighting system in part of the Lake Phalen Watershed. The ar+ea is bounded by Duiuth, Maryiand, Edgerton and Kingston. �,XIS?'1.NC GONDITIONS: The project area is presentty served by a combined sewer system. During periods of moderate to heavy rainfalis, stormwater and sanitary sewage combine to fiow over a diversion structure and outlet to the Mlssissippi River. Reports of sewer bacicups into basements and surface fiooding have also been noted in this area. Payne, Eari, Frank, and Orange are paved with concrete base and have concrete curb. Arcade and Parkway Dr have a concrete surface. Larpertiteur and Wheelocic Parkway are paved with asphalt base. � Generally the streets within the project area have an oiled roadway surface with no curb or onty intermittent sections of concrete a�rb. The driving surfaces are fairto poor and roadway widths vary because of lacic of curb. PROPOSED IMPROVEMENTS: Storm sewer construction and restoration in kind is proposed for the foilowing: Wheelocic Parkway at the Phalen Park Playground Earl - Hawthorne to Ivy Frank - Orange to Ivy Orange - Hyacinth to Duluth ` An outlet to Lake Phaien befinreen Hyacinth and Orange Alley 100' E of cypress betwesn Hawthorne and Maryiand Phalen Park Playground Payne - Idaho to lowa Parkway Drive - Payne to Hoyt Larpenteur- Parkway Drive to Arcade Arcade 500' N of Larpenteur to Larperrteur Vacated Weide between Idaho and Larpenteur Alley 100' E of Payne between Hoyt and Morrtana . � , . �q�-a�o 3 ' " Street improvements, street lighting and storm sewer construction are proposed for the following streets: Nebraska- Edgerton to Payne Hoyt - Parkway Drive to Gresnbrier Hoyt - Waish to Arcade lowa - Greenbrier to Walsh Idaho - Parkway Drive to Weide � Greenbrier- Hoyt to Idaho Street improvements and street lighting are proposed for the foilowing stresis: Hoyt - Greenbrier to Waish lowa - Parkway Drive to Gresnbrier The new storm sawer is part of a long-range storm sewer project which wiil result in a separated storm and sanitary sewer system for the Lake Phaien area. The strest improvements proposed would compliment the storm sewer construction. New bituminous roadways with concrete curb and gutter are being proposed. All driveways will be reconstructed with cancrete and new cancrete outwalks will be constructed for each home. Boulevards will be regraded and sodded. A new energy efficierrt sodium vapor lighting system will be installed. ALTERNATIVES: To do nothing wouid be inconsisterrt with the City's commitment to improve existing oiied streets. � Typical roadway improvements which have been constructed recently in adjacent residerrtial areas are being proposed here. Improving the roadways in conjunction with sewer construction will save time, money and in�nvenience later. paSiT1VE BENEFITS: With the campietion of the City's sewer projeci, the chance of sewer backups into basements and surface flooding will be reduced� General improvement of the public right-of-way in conjunction with sewer construction wiil enhance and add quaiity to the neighbofiood. Stree�t oiling would be eiiminated . on new bituminous roadways. ADVERSE EFFECTS: Normal problems associated with construction, such as noise, dust and general disruption, wiil be preserrt. However, by constructing afl improvemerrts at this time, future adverse effects would be eliminated. . �9�a��3 ' ' COST ESTiMATES: ' S-8086 - Wheelocic/Ivy Storm Sewer Construction 688,400 Engineenng & Inspection 127.000 815,000 P-8066 - WheelociUlvy Grading and Paving Canstruction 361,152 Engineering & lnspection 74,036 Misceilaneous �11� 471,303 V-8066 - Wheelocic/Ivy Lighting Construction 68,523 Engineering & Inspection 12.677 81 ,200 Project Total 1,367,503 ESTIMATED FiNANCING: S-8086 - WheeiocWivy Storm Sewer � Assessmerrt 6,OQ0 Sewer Revenue Bonds 809.000 815,000 P-8066 - Wheelocic/Ivy Grading & Paving Assessmerrts 120,796 C1B (1992) 315,616 Sewer Revenue Bonds 4 1 471,303 , V-8066 - Wheeiocf</Ivy Lighting Assessments 13,400 CIB (1992) �J.800 81,200 Project Total 1,367,503 ' SOURCEOFADDIT10NallNFO�iMATION: (.,/"��0��� 3 For further information, corrtact Tim Cutting at 292 6008. RECOMMENDATIONS: The Department of Public Works thinks that tfiis is a necessary and worthwhiie project and the engineering recommendation is for approva! of the project and flnanang. Respectfully submitted, Thomas J. Eggum Director of Public Works TJC/bjh . . , � � CO�I��T�?UCTION OF SE�/ER ���� •••. _ S�T_QRM SE1rvER� ASSF.,.�.SN1E1dT ____._ __.NEW PAV►NG AND ��GHTS 9r a�� _ ��"T/�1i . �� �F. � AREA �AAPEN � . -i : 4� N;. �` -�.-�_ �, � . '� � .�'`''�F-a^.�`M;,. � � Q �-, � c���ROR v� � :` "4� , � . ' � _ _ _ .�,� ��C'=-,�,;:;. •;��• -�'� � � � � . .� - ��7�,; �...a�di+� «;, '. . i � � /OAMO : .• i. "T ^ . 4:� � ;��� � :��.'.•' "•' -'� BRti'"`�`~�3.r� � � �� . � •., � ,.. oww. �`�,../ .r'. ;�'� - � ; •� ; �� J �• �� . �. � � �""� a � ' • •• \� .�:� . "�,��.r � � � � � . r Horr . •• ` Pf�A L.EN P!1 R K . :c• 'y w": � i I vE: "_ ;�" 1 � �*` � �- ,_ :-• GaLF C�URS'� .: f � \� :� Q � ���,��� ;�s f �8 �"�at�s� r Z 1 ~ 1 •� �VEBRASKA a .1VE� T••• ,:r:-.: X. x�': � t \� � ���� , � f �3� �..�.}-�' �' ..� ,'•.. �."•. .� ���� � �. � u'�`�. �`—�'rr+� � NEIIAOA 1Y ��:..e..-_ "1- i'-y.�~.':'.C'-.: �e.�'�yi+.� z ' '�. —� �,� ( � �'�'- -- . '-,j. sr. ..,` ` � `r�.d '�E . ��, ��a• ,'� l � � � � d Q Q�� ,� a ?;�. _ � < � • --• ' " � : ti �'yTt'rt ��� Q �j .�i�� �'� �`' ��,=��?: �1 .. SHEltYtl000 ayE. I--� � "}?"�t=• ' `� (_,__I ��,�� Q I�. �.- �' 'Y{�:: �_ AA�A .a .: ��� .,� �E. r-� j'�- � � �.,. '" 2. � �� �:� .Johnsan�. �� � �EF�d�' . :::.: Q y CLEAR m� �iv� *� � �' i� . � �l'11►�.�" ��.`, �. . `� `'�' nZi S C1100I `�• r I` '' � � AYE-��r' � ,v�� Y ' � � � 6.►. .e:�.�..�.,c.•: .�.�.nw.:a F �. J 'V • � s �J � H YAC=tr TH� � 1.-: � � � �4VE.�� �` . � �� �� �. e. ORAN6E • � �� 1I ��'';r��::.:.. ��ZI � ;�J � � I-�.-� � � ��--�- I�,�;, r±;==,� � 7- �yE � HA1N fHORN�^� av �� =';,•'! - +Q -,� (�'�t ( s �� ::V.`,R� �~-� � �= ��f.� N � " ".:. y 3i .__.. =�—� � __ —.� �••'°' �� � �W� � � � � � � r � � � ' - �� ayt� � J � �� Q Q � C 3� U ����' -Q ��� C�� _ .._ ' �t�,+w�r —�- < � r . � � Q: j � �. r� Q y�. i� I� :�,�J �� C-' .r . � � �� � � � � �PFIALEAI:, � ' � t I= I— ..� � LX. 1��.�. 1.�.....:. � 'i+ � YE. �' Q �..�;� Q°____� :N�=..;�- = S�- �'� [� I� � Q � � Q�.��-� Q��_'� �:� � Q . :,: ;� � ,�£ � w ���-� (��� ,.----;e� : � outurH � �st.1 I � ��t' ��'��a -�'`�'J� r ---- J.`, ^����.-•�.l 1"�i " rrt. . ._ . . � C/7`�� ST. PAUL C�TY COUNCIL C/�.- i� PUgLIC HEARING NOTICE ����'0� PUBLIC IMPR � VEMENT CONSTRUCTION City Council Ward �l6 Distric • C Dear Property Owner: File No. 18643 and 18644 , + t- To decide whether to proceed with construction of storm sewers as part P V R P Q S c of the WHEELOCK/IVY AREA SEWER SEPARATION PROJECT, the construction area is bounded by Edgerton Street, Larpenteur Avenue, Arcede Street, A N a and Nebraska Avenue in the northern area; and Forest Street, Wheelock Parkway, Duluth Street, and Maryland Avenue in the area south. Also, to decide whether to proceed with the street improvements and L O C A TIO N lantern-tyle lighting work in connection with the 4JNEELOCK/IVY SEWER ' SEPARATION PROJECT for the streets listed on the reverse side of this '1�.�_�Ev��,��.���, notice. . '_�`;��' t r � ��1t9�° �, 1 �g1_ � �°� � � _. ��igg�� �. ��, n� ;�� ,.`� � _e,�,,, Tuesday, November 19, 1991, at 9 a.m. H E A R�N(� �ity Council Chambers, Third Floor City Hall - Court House ---------------------------------------------------------------------- Please note that the Public Works Committee of the City Council will discuss this item and develop a recommendation to the full City Council. Please bring any unresolved concerns that you may have to this meeting on Wednesday, November 6, 1991, Third Floor City Hall - Court House at 9 a.m. F�N A N C�N Q If the Council approves this project, a portion of the costs will be assessed against benefitted properties after ratification. The �����^� � � ,*,���� estimated costs and financing for the project area are as follows: ZOTSS E�osauuzy� �Tnsd �uzes asnoH �.zno� - 1Tsg �C�z� gTZ sa�inzas �uama�susy� g a�usui3 uozszntQ a�s�sg jsag aq� �q `i661 `8i �aqo��p �uas a�z�oN anuany EMOj o� anuan� ��og - �aa.z�S uSTEM anuany ouspI o� anuany ��og - �aa.z�S �ai.zquaa�� �aaz�s apzaM o� ani.zQ �tsM�.zad - anuany ou�pi �aa.z�S qsTsM o� �aa.z1s .zatzquaa.z� - anuany sMOI �aa��s apa�.zy anzzQ �CsMxzsd - anuany ��Sog anuany au�sd o� �aaz�s uo�za�p� - anuany sxss.zqaN Q�A02idI�II �fi OZ SZ��2IZS ��i �> � l_� L.,.._i"1-) !� U!.......,.�J L-J !J 1-.=+�J L�l'� To insure an effective sewer separation program and to comply with state and federal mandates, all rainleaders (downspouts) must be disconnected from the sanitary sewer. Your building's rainleaders are connected if exterior downspouts connect to an underground pipe or if your roof drains through the interior of your building. Some apartments, commercial, and industrial buildings will require a separate storm sewer connection, and you should request a connection stub from the main sewer to the property at this time to avoid a substantially higher cost to have it installed later. For some information, call the Sewer Division at 292-6024 (residential property) or 292-6247 (commercial property). Should you request a new storm sewer connection, sanitary sewer connection, or water connection, it will be be assessed at actual cost per connection. If you own vacant property which you plan to develop soon, we suggest that you request that we construct these connections at this time. CONSTRUCTION OF SEwER ����•••• �T_QRJv1 SEWER ASSE,,S,SMEN7 NE�N �'AV�NG AN� ��GHTS / � rE�. LARP►ENT U ' - �� � �. . �, �„��� � 1 I �,•_. .�. r,,. ; '� ;?i �- �� (�'� � ���: RN �� ��. :. '�� tir= .�� � I I (''� ' A VE � i•.,.,�� M� L�` � r: � �U � - - ,:A,. � ,'�"' �y� � � I _''� � � �- . ;�C.t�:�: <p . ' ; �... � �IOAMO'�1 �� �i¢ �'� ^., 1 I� .��.� r.. < r I � '--o�w.--�� �. 6i ... :��, '"'I.,':••:�•'°; � °� �' � � i �J � ~. .t- �� � ;-. � � f' � � .. .� :ar: ! � ~ �i �Hom' •�• .�'�. � ��. :�-�s � � vE Tnn • PHALEN P14RK . _�- - `' t I � � y � ~ GOLF COURSE '.�;I •r j � `�� � � � � �a��+� ;a• /8'HQLLS T" � NEe�„sx.. -' A z.-� _ �. _. %.� � �.�,�1 � r �� I,_ � �3� �:q7� . ��%�"�' ;�� +�i.�•. •�r1� < � � � e�']` �� rIEYADA AI/E� �•:r"-:r'J t ..,.C-;~(''•. .e. r•• � � \ I ('""_'` � � r � �.�.��� '•;� • a.�^;, Z �'�. � r� � • � � �< � ��' , -� � m m� `' •, �v:. '�a � AR�1N�T � � Cx avE :7'. -, .} -. < � � i r. `i �� (��. �-, � � .._,w . .,;:..:� ;il . SHERYY000 pyE � (� � '- �= • ��. � ( �= U �:: � �� .,Y t_ �' F'i' °3_� - o r� <�. AAEA �' � � � . W,..JQ�_..: � S-_ �' ;,,�F�t � :._ 2. Q y� CL� fiAR� a *YE� C�' •! i. . _ � �'t�ry.,,,�``: � o;,.� Hiph � O . ozi. $C�100� •� '• ,i E. IVY tu. , � �Vtr � ,, � � �...�..t..�:r..w�.i� � � �• 1 �'�. E, hY�C�NTM �. '� ' � � ;�` � � i���II , I � � ��� I I �� i' � f� . s , , . . 1 /�- �����/ � W' _ ���*.a. CfTY OF SAINT PAUL '~' ' DEPAI�TMENT OF PUBLIC WORK$ �° � , 3�:� _�� �; THOMAS J.EGGUM,DIRECTOR ,��. 600 Clity Hall Annex, Saint Paul,Minnesota 55102 ! 612-298-4241 JAMES SCHEIBEI � � i � MAYOR September 26,1991 � I 'I ; Dear Saint Paulite: � The Department of Public.Works has preliminary plans fo� a large prnject in your neighborhood for new atorm sewers, street paving and streiet light,ing. It is part of #,he city's ten-y�ar Cambined Street and Sewer Program: The project would be constructed in 1992. You are invited to an infornaational mieeting ta discuss project details, financing and the construction schedule. PKOJECT: WHEELOCK/IVY STORM S�WER- CITY PBO.TECT 92-$-8086 DATE: Tuesday, October 29,1991 TIME: 7:00 p.m. ' PLACE: East Side Y.M.C.A. ! 1075 Arcade Street I The total cost of the project is estimated at $1.4 Million. A�ortion will come from a redirection of taxes Saint Paulites are already payin�, and a sewer service surcharge to all city property owners. The rest would co�ne from assessments to properties affected by construetion. Please see the map or� the reverae side of this notice for more detailed construction information. The .street paving and lighting would consist of conatruct�on of concrete curb and gutter, a new bituminous surfaced roadway, concrete driv�eway aprons, boulevard sodding and installation of lantern atyle street lighting. The meeting we are inviting you to is informational o�ly. Final decisions on whether to construct any or all of this project will be m�de at an. of�'icial public hearing of the Saint Paul City Council, scheduled for Nove�inber 19, 1991. Property owners who will be assessed will be notified of that hearing� If you need more information before the meeting, yau can ca�ll me at 292-6008. Sincerely, � r/1-' • Timothy C ting I Project Engineer ', Sewer Design Division '� TJC/ck � _____.___._._..._......_.__...__._. ___..._ .�..._,._ _ :. _ . . . . . . �: . . : . . . • � <..,.:_ . . . . ����11��=_�:La��:�C _ . _.IVY _ - _ � � SEINE,R_"-CONST'RUCTtO�t - S._T.__REE'f. � .PA�/Itil6� � � � 92=S-8O86 � 92=p=8466 STQ��S�V�E�,A�A�:STOi�E�jCi�'I'1iJti_ SUR�AC�.�.�.::_..-:'�'�.�» - �'fOP_�.:.�VN�'R-�►tJQ=�S�R��T----�%iiP.R►�V�CMEt�IT3:_� :.-_.-::-_;:.:._`--:---�- �� -- - . ._ . __ .. __ .- ---------- -- STREET_:it�PRoV t.!'fs ,--.----- ---- ------ �,.�_..__: - �- . _ . . .._ . ,. . -. .. - .-.-:. -.-•--. . . ._.__.-•� -:----._ --_._; � . % , MAPLEv1RoOf7 • :. � ; :• • � .• ;� .:• � C��,...3� � . ,�:.��: ';�;�;;..:-`•��.. :... � �, �r 1 ,. . :,., ..ca�.�FORt��a_avE �°��G�/ . ` i4=� 'q '''•' ' '�. � �g A � �.�� •„ ,;� � �� . � �� '' `7�t•i� `� -:���:+:� `' 7.... . . . I �oaho� — . • � � ~i� �R .��: .. �, � 1011VA .�ir. 11yE� � �s( `.�,�� i p � . 4.. � :�r ., J . � �.._� U �" � :�': �` � � � 'rF�J1T . .`: '`:'+'.�i':� � t�►1� �J C� � PHA l.EN� 'PARK -,�t` .e � rav�. � � • G4LF CDURSE ��- �� "� � �'Q �� LJ N�N� . •`,� f '� � ,m. NEBt@,�ISKA � Q-= AVE. r; �'•�� � 9 � � � �� �����--.+..� ��1' ` . ���' � ` � �''-�. �'"'`���� E, NEVADA AVE. N `•i:"'�•'ti ::r: �^ r:;? l� �� 'V�,_ t � l,� a� +r w .'1D 4:. Z � � � �W � , , •tf W . � � � J �`� 'i ' � � �� E.WH �OCK AV �� Q w ' � • �i �� •' • •, �• �` '�r:• �p� , n 0 S„� � ��� , . �,xf� ;18 ,: AYE.1� a� � � , ??� s � .1�.�1 t�J�� +�'. .,�' � � �� � ' a . ,� e �'�'�' �r. W . ; AV E. ("'_'; � .k. S. (�j (�'� � < ' w Johnso�i�� L__J L_�.l' wH �OCK . `p � a CLr EAR� � �i9h •. AVE- � • (n�, P/;�,Y . . � �J . t l W SCF100I , - _ � E. n. IVY w . tYY--AVE. . ' � � r .—� �� . � . . Fa . [� �,: . --. � � �µ' � :ry ��� HYACINTH . � � . � r-�. a ::�-I \ . : ORANaE-� r-- .'`� � - . � � � � � • . HAWTHORN�_ ' . �vq. ' . . .� � �J ����_ ��J3 'Y� � —�%._ " _ . . Q , � -. . . ' ` . ' . . ..._.. �� ��� .�� ` _ E W...AvE. !. , . 1 �1 �-1�r'_"l . _'i r_—� � ' . � . ��� `i== °'�, ST. PAUL CITY C�UNCIL ,a,o3 0 a .1 : ;;,;i;Iln a PUBLIC H�EARfNG NOTICE +s �, . . _�•• STREET�ALLEY VACATION. , ' City Plaaning Ward ��4 District P�anaiag Couacil��12 Fil� No. 12-1991 PURPOS� To decide whether to proceed with the vacation of a utility easement in Block 1, West Gate Addition No. 4 located at Territorial Road and West Gate Drive. � Rivertown Trading Company PETiT10NER . Tuesday, November �3, 1991, at 9 a.m. H EA RIN G City Council Chambers, Third Floor City Ha11 - Court House ` • -=--------------------------------------------------------------- Please note that the Public Works Committee of the City Council will • discuss this item and develop a recommendation to the full City Council. Please bring any unresolved concerns that you may have to this meeting on Wednesday, November�, 1991, Third Floor City Hall - Court House at 9 a.m. Call 298-5317 aad refer to the File # above. City staff vill be QU E S Ti0 N S available to aaswer any last minute questions oa this project ia Foom 218 City Bail from 8:30 - 9:00 A.M. the same day as the hear3ng. � � J.Yr.%� J . � �.._„�,,._..�e_ . .. � ;�,,._. � - o a...__. '• W EST � ' . � — 1— � �` a � � � OCT �.+� �' � GATE� . DD. � '; MAP ` � � i . '„�� ��K •3 N0. 4 ` � Notice seat October 25, 1991, � „, ; . �'� "' � , , �.:"r ' t4�� �. r ; by the �� Estate =.:' ' , . �"N i+: r Division tl . Dept. of Fiaaace � �' � Maaageffieat Sernicas �;_ "� ' ; ! Room 218 Citq Ha11 - � Y . '•• � ',� � � Ccurt House � �� � M. ., St. Paul, r4d 55102 � + � � j ? ��.� �. I . ��.., , _ J�� ., . _x , , ,.� . .:� � r �/03 C'�'9� - __ _ - - _ _ PRELI��lRY QRD�3t . ' .,.;' :, ; ' oundl Ftie No.91-1821 —BY Rogd'J.Qasalt�— .f ._ -± - _ In the Matter of ivatallation M the Whaelock/Tvy Sta�m°Sed�er Pco,ket�n ari srta : bou�da!by Heyt Ave.,Payae;l4vre..L�be�r Av�e.aad l�rcada S'�in Votlzlg Wau+d 6, The Coundl of the City of Sa1nt Panl having�e.Ceivad#he repa�o�'the M�j►�'nptfri the abe�re improvement. and havlag oonaid�ed ea�d re�ork.her�by,�� . ' 1.That�e eatd report aad the ssme 1s her.eby apprpved wlth;}ia al that the�timated cc�t thereof is$816,000,Snanced �� by aseeeements$6. �.00 atid Seara.Re�1t4 BOtlde 8809.0OO.Od. � 2.�'ft,at a public heasing be.l�ad qu oaki impscvemart oa the��f�������� 1ssl.at s:oo o•clock a.m..1n rhe Goqnc�i C2}�mbeFS or tk,e c�i�r I�iatl; t, use Bu�iding in the City�'3aint Paul. :�:. - < ., ,,, x;-. . � 3.ltiat notice of said public hearing bc glv�to-the�eraw�a and#n �a�t� ; Provlded by tl�e Chartcr, statipg:.the tia�e<and°pl�ee c�"ti�g.`the �of..the": 1mPravement and the totai c:ost thend.�s ta�imated. File No. 18643 . ' AdaPt�t b9 Coi�c�t SEpteatb�l`�1�:f98i: ._ -- . , • r;i APP�b5'MaYor SePtember 90. 1991.. . . , � fOctober b-1�. 19911. - i - - - . . _. _. .,:;rr�' ,, 6. ,. � �'/--a/a 3 Summary of Engineering Recommendations WheelocWivy Storm Sewer and Paving Project Project No. 92-S-8086 (P-8066 & V-8066) Report Prepared July 16, 1991 Neighborhood Informational Meeting October 29, 1991 Public Works Committee November 20, 1991 �ECEIVED Public Hearing November 26, 1991 �4�i:�v 191991 PROJECT: `%N�l� CLERK Construct a storm sewer system, water and sewer service connections and reconnections, street improvements and an ornamental lighting system in part of the Lake Phalen Watershed. The area is bounded by Duluth, Maryland, Edgerton and Kingston. EXlSTING CONDITIONS: The project area is presently served by a combined sewer system. During periods of moderate to heavy rainfalls, stormwater and sanitary sewage combine to flow over a diversion structure and outlet to the Mlssissippi River. Reports of sewer backups into basements and surface flooding have also been noted in this area. Payne, Earl, Frank, and Orange are paved with concrete base and have concret� curb. Arcade and Parkway Dr have a concrete surface. Larpenteur and Wheelock Parkway are paved with as�ihalt base. Generally the streets within the project area have an �iled roadway surface with no curb or only intermittent sections of concrete curb. The driving surfaces are fair to poor and roadway widths vary because of lack of curb. PROPOSED IMPROVEMENTS: Storm sewer construction and restoration in kind is proposed for the following: Wheelock Parkway at the Phalen Park Playground Earl - Hawthorne to Ivy Frank - Orange to Ivy Orange - Hyacinth to Duluth An outlet to Lake Phalen between Hyacinth and Orange Alley 100' E of cypress between Hawthorne and Maryland Phalen Park Playground Payne - Idaho to lowa Parkway Drive - Payne to Hoyt Larpenteur- Parkway Drive to Arcade � Arcade 500' N of Larpenteur to Larpenteur Vacated Weide between Idaho and Larpenteur Alley 100' E of Payne between Hoyt and Montana ,. • . ��i a�a 3 Street improvements, street lighting and storm sewer construction are proposed for the following streets: Nebraska- Edgerton to Payne Hoyt - Parkway Drive to Greenbrier Hoyt - Walsh to Arcade lowa - Greenbrier to Walsh Idaho - Parkway Drive to Weide Greenbrier- Hoyt to Idaho Walsh - Hoyt to lowa Street improvements and street lighting are proposed for the following streets: Hoyt - Greenbrier to Walsh lowa - Parkway Drive to Greenbrier The new storm sewer is part of a long-range storm sewer project which will result in a separated storm and sanitary sewer system for the Lake Phalen area. The street improvements proposed would compliment the storm sewer construction. New bituminous roadways with concrete curb and gutter are being proposed. All driveways will be reconstructed with concrete and new concrete outwalks will be constructed for each home. Boulevards will be regraded and sodded. A new energy efficient sodium vapor lighting system will be installed. ALTERNATIVES: To do nothing would be inconsistent with the City's c�mmitment to improve existing oiled streets. Typical roadway improvements which have been constructed recently in adjacent residential areas are being proposed here. Improving the roadways in conjunction with sewer construction will save time, money and inconvenience later. POSITIVE BENEFITS: With the completion of the City's sewer project, the chance of sewer backups into � basements and surface flooding will be reduced. General improvement of the public right-of-way in conjunction with sewer construction will enhance and add quality to the neighborhood. Street oiling would be eliminated on new bituminous roadways. ADVERSE EFFECTS: Normal problems associated with construction, such as noise, dust and general disruption, will be present. However, by constructing all improvements at this time, � future adverse effects would be eliminated. . � ����a�� a COST ESTIMATES: S-8086 - Wheelock/Ivy Storm Sewer Construction � 688,000 Engineering & Inspection 127.000 815,000 P-8066 - Wheelock/Ivy Grading and Paving Construction 361 ,152 Engineering & Inspection 74,036 Miscellaneous 6 115 471 ,303 V-8066 - Wheelock/Ivy Lighting Construction 68,523 Engineering & Inspection 12.677 81 ,200 Project Total 1 ,367,503 ESTIMATED FINANCING: S-8086 - WheelocWlvy Storm Sewer Assessment 6,000 Sewer Revenue Bonds 809.000 815,000 P-8066 - WheelocWlvy Grading & Paving � Assessments 120,796 CIB (1992) 315,616 Sewer Revenue Bonds 34•891 471,303 V-8066 - Wheelock/Ivy Lighting Assessments 13,400 CIB (1992) 67.800 81,200 Project Total � 1,367,503 . � ��i�a� 3 '' SOURCE OF ADDITIONAL INFORMATION: For further information, contact Tim Cutting at 292-6008. RECOMMENDATIONS: The Department of Public Works thinks that this is a necessary and worthwhile project and the engineering recommendation is for approval of the project and financing. Respectfully submitted, Thomas J. Eggum Director of Public Works TJC/bjh , .; _ . . i � � � W. � ��:��:�.o � �C i�Y �g'�a'�3 S.�1NER � Co.�iSTRUCT�dN r S!..RE.�T PAVI�� 92=S-8085 � 9�=P-�066 sTORM._ s�K1�R �Np RES'roRE �EXisT��lG SuRFQC� . . . . . :����`e STORt�1 SEvJER Ah►� STREET I�MPR4VEMENTS . . . . : . . y����--%��- SYREET IMPROVE�lTS . . . . . �. . . . . . . . . . . . . . . . . .����� / MAP�.EWooD � • � . T . \ .,�:� . �J �L._7 �s ` . �� �;�� ����:. . l h� ;;:��:= =,�, ..C/�LiFORNIA-hVE `�`���ti1% L�� `�� � �'. `.�\ � � G�9 � py \�. �.�%�', '+'•� � �J 1----�.�_—/ L��_ �z:� �� ' �"� -�II-i o A F�o � ��.�..•�.�tr . — _ w o �''°`-9`�/,•`�. U f��L� C _� I�J ��6 i ' ''!lr'^� � \� ":'� � _J _i U1!'fi.�, +ev�. .�Gar'%� ?tV E- :`,r_� �l/ ���\:�:� `I° '�� r T+ r f �—�y I r - I ��'/ � � I � � `�\:.. �` � I •/ ���' _� I � � ��. ' f � I ., I \4i u ^ '�`�- J �_.._ �/l�� � c� i-;O1'T .-�s'iiw► �i-,.a�-r.�-�ri ':\<',•r'..r�% � 1 1 ��`���-__.! L---� !---! L� ! �h.'A � E l� �PA R K `;���' � � \I � �_ �'%' " __q�/F. r—.— --- i—"_'� i � - ;,'t3 �� . ' `'; �� �'� �: ' '_ � � � � �aLF CDUf�?Sc ���;�`` � �'v , {. ���'�� l___! �_-� �_.���_--� ��:� � � ' �aTii..r.��-�NEBf�,SKA Q...— iil�A1�E. � ':If�' •� ; � �� �~� .L_. i i—����°-,�L..� � . . �•`�� �:� :�� �''� t:, i r° . � vz-,�� NEVI�,DA 3 AVE. I .. .., ....r•,.' '�. •. . � _��^�1�t�� \� oa .mn.i �L'i` :i�:, 'ds' _� � � �� � � � ' .•r�• W ' t1 i. \`2 � � � � J •i. \ /ti�, � � � �� f"�`-E.WH LOCK AV • a w ` �r.". . � ' ����� �r�Q����� 'l �'c:� ��� : � '� IU '';:-,'•;� .: � � � r SHERWOOD AYE. � pC � � � •,t;,•:��:. � U CC�s`��0 l� .,:.�s: � ?�� � � � AVE. �— � 0 ,,. �!` �,?;'; w � r (� � a �� W Johnsot�� AL—� �. WyF �oCx \ \ W � I}(�'CLEAR..:: Z 1-liQti —` � �,i. pr,wY\\ -� U l�J w 5Cho0� � 7� \� . `�' E. nQ.r IYY .a`. . �AR.. IVY—AVE. . �� � � 1 � c� �( � � L�:� � � . \ 1� _� � � ' HYACIN7H " •�;. . � �----� r---� :�_� . � �\\. ' . ORANGE-� � �. � � � C� �_I l�. 7 ' � ,.._ ' � HAW7HORNE AvE. ! _ _lQ'�� L-.—.J -'�.�� t~/'� �•y- _ I j- h-- . _.l ! _� � ° . � ��[� �C�Q�� � r � � . ,�r---±-� ^----,�r---���_��E--, � --; � � ° � '�%�9� ��a�e3 ,��t.o. �.--, �� �° �, CITY OF SAINT PAUL � Members: o � � OFFICE OF THE C1TY COUNCIL Roger J.Goswitz,chair + �����um �, �ECEIVED David Thune,vice chair , ° Tom Dimond ,••• Date:Novembet 21.1991 �o v 211991 Bob Long � Committee Report '��TY CLERK To: Saint Paul City Council From: Public Works, Utilities, and Transportation Committee Roger J. Goswitz, Chair Hearinq Date ACTION Approval of Minutes of October 30, 1991 APPROVED 3-0 / � 9l- d� � `/ 1. vll/26/91 VACATION: Petition of Rivertown Trading LAID OVER 4 and C S M for the vacation of an ease- WEEKS ment in Block 1, West Gate Addition No. 4. Purpose is to vacate a utility easement required by the building site. ,e� 9 � - a� 53 2. 11/26/91 VACATION: Petition of Southview Bank fo.r the APPROVED 3-0 vacation of Blair Avenue - bounded by Elfelt Street & Como Avenue. Vacated property is to be used for parking by the Brandtjens-Kluge Bldg. redevelopment project at 653 Galtier St. 3. ��11/26/91 FINAL ORDERy� Construction of the Wheelock/ APPROVED 3-0 ' Ivy Area Storm Sewer Project in an area bounded by Hoyt Avenue, Payne Avenue, � ' Larpenteur Avenue and Arcade Street. �'/—a/C� � 4. 11/26/91 FINAL ORDER: Improving the following APPROVED 3-0 streets with a new bituminous roadway, . concrete curb and gutters, driveway aprons will be reconstructed with concrete and new concrete outwalks. Boulevards will be regraded and sodded and a lantern style street lighting system will be installed: Parts of Nebraska, Hoyt, Iowa, Idaho and � Wheelock/Ivy Area Street Paving and Lighting Project. `��` a ��� � 5. 1/26/91 FINAL ORDER: Installation of sanitary, APPROVED 3-0 storm sewer and water service connections, if requested by the property owner, for the Wheelock/Ivy Area Storm Sewer and Street Paving and Lighting Project. 6. 11/21/91 FINAL ORDER: Construction of the Macalester/ APPROVED 4-0 Bayard Area Storm Sewer Project. Area is bounded by Fairview, James, Saratoga and Ford �