98-582Council File # _����
Green SheeL # lp 03 1 ,
RESOLUTION
Presented By
Referred To
Committee: Date
1 RESOLVED, that, upon execufion and delivery of a release in fizll to the City of Saint Paul,
2 the proper Ciry officers are hereby authorized and directed to pay from the Tort Liability
3 Fund, 09081-0511, to Robert'I'havis and Juliann Geiss, the sum of $87,000.00; to Ron Schutte
4 and Wendy Schutte, the sum of $56,800.00; in full settlement of their property damage claisns
5 arising out of the July 1, 1997 rain storm. This clann arises from the Ciry and Skafer
6 Contracting's failure to properly separate the storm and sanitary sewers. Shafer Contracting
7 has agreed to pay twenry-five percent (25 %) of the total claims settlement. The net loss
8 payment by the Ciry will be $107,850.00.
APPROVED:
� �,.�Z�
Judge of District ourt
Requested by Department of:
Technolog�and Managemen Services
By: `/,��
Adopted by Council: Date
Adoprion Certifi by Coim ' Secretazy
By:
Approved l�y Ia o Da
(
By:
CITY OF SAINT PAUL, MINNESOTA
Approval Recommettded by Budget Director.
Tech & Mgmt Serv/Risk Mgmt Div
Steve Voldal 266 8887
�µ..�.��,�
q8-s��-
No 60311
mnvuo..
�,.�.
� ^ T �} } } j�
NUMBERFOR ❑MYAiTOR1EY"�_� �piYCLiAR
RWi111G �
� ❑iMYCNLfFANCNWL ANMC4LiERV/ICCTO
� YWR(OR118AtiM1Il � ❑
TOTAL # OF SIGNATURE PAGES one (CLIP ALL LOCATIONS FOR SIGNATURE)
Approval of Resolution settling the property damage claims of Robert Thavis and Juliann Geiss;
and, Ron Schutte and Wendy Schutte; against the City of Saint Paul in the amount of
$143,$00.00. Tfie City of Saint Paui will recover twenty-five percent (25%), or 535,950.00, of
this settleme�t from Shafer Contracting. The net payment 6y the City wiil be $107,850.Q0.
PL4NNING CAMMISSION
CIB COMMITTEE
CNIL SERVICE COMMISSION
tias Mis aersaJ6rm eHerwaked unaer a canUact ra this aepartment7
VES NO
Has tlua aeraoMrm ever heen a cily emabYee?
YES NO
Does this persoMfirm poesess a sltlll not nonnallypouessetl by anY �� �Y �PbY�7
YES NO
Is this pe�sonfirm a tergeted vendoR
YES NO
During the July 1, 1997 rain storm, the sanitary sewer at Lexington Parkway and Summit Avenue
backed up into the homes at 1134 Summit Avenue and 1126 Summit Avenue. The City of Saint
Paul Public Works Department, and Shafer Contracting, were jointly responsible for improper
sewer separation work which caused this backup of sewage. I have reached a settlement with the
home owners regarding the damage to their property.
1DVANTAGESIfAPPROVED
TRANSAGTIONt �
GL 007 Tort Liability
(EfPWN)
06/23/98 I GREEN SHEET
COST/REVENUE BUDf3ETED (GRCLE ON�
�crnm NureaEn
��: •
f:lusers\gaughan\wpfites\resoladm\ronwendywpd
,�
i�-=�
GERRY STRATHMAN
Airector
3une 25, 1998
TO: Stacy Becker
FROM: Gerry Strathman�
��
MEMORANDUM
�� - 5��
RE: Resolution - 48-582 - Settling the properiy damage claims of Robert Thavis
and Juliann Geiss and Ron Schutte and Wendy Schutte against the City of Saint
Paul in the amount of $143,800.00.
At the Council meeting last night the Council passed Resolution 98-582 to settle a
claim against the City for properiy damage. At that time, the Council requested
that they receive a written report from you outlining the steps which have been
taken by your department to prevent reoccurrence of this type of situation. Thank
you for your attention to this matter.
Attachment
C: Councilmembers
CITY HALL SLRTE s10 SAINT PAUL, MINNESOTA 55102
CYTY OF SAINT PAi3L
COUNCIL INVESCICATION AND RESEARCH CENTER
5�46
Pr:med o�� 3ecycted Paper
612/2b6-8560
Council File # _����
Green SheeL # lp 03 1 ,
RESOLUTION
Presented By
Referred To
Committee: Date
1 RESOLVED, that, upon execufion and delivery of a release in fizll to the City of Saint Paul,
2 the proper Ciry officers are hereby authorized and directed to pay from the Tort Liability
3 Fund, 09081-0511, to Robert'I'havis and Juliann Geiss, the sum of $87,000.00; to Ron Schutte
4 and Wendy Schutte, the sum of $56,800.00; in full settlement of their property damage claisns
5 arising out of the July 1, 1997 rain storm. This clann arises from the Ciry and Skafer
6 Contracting's failure to properly separate the storm and sanitary sewers. Shafer Contracting
7 has agreed to pay twenry-five percent (25 %) of the total claims settlement. The net loss
8 payment by the Ciry will be $107,850.00.
APPROVED:
� �,.�Z�
Judge of District ourt
Requested by Department of:
Technolog�and Managemen Services
By: `/,��
Adopted by Council: Date
Adoprion Certifi by Coim ' Secretazy
By:
Approved l�y Ia o Da
(
By:
CITY OF SAINT PAUL, MINNESOTA
Approval Recommettded by Budget Director.
Tech & Mgmt Serv/Risk Mgmt Div
Steve Voldal 266 8887
�µ..�.��,�
q8-s��-
No 60311
mnvuo..
�,.�.
� ^ T �} } } j�
NUMBERFOR ❑MYAiTOR1EY"�_� �piYCLiAR
RWi111G �
� ❑iMYCNLfFANCNWL ANMC4LiERV/ICCTO
� YWR(OR118AtiM1Il � ❑
TOTAL # OF SIGNATURE PAGES one (CLIP ALL LOCATIONS FOR SIGNATURE)
Approval of Resolution settling the property damage claims of Robert Thavis and Juliann Geiss;
and, Ron Schutte and Wendy Schutte; against the City of Saint Paul in the amount of
$143,$00.00. Tfie City of Saint Paui will recover twenty-five percent (25%), or 535,950.00, of
this settleme�t from Shafer Contracting. The net payment 6y the City wiil be $107,850.Q0.
PL4NNING CAMMISSION
CIB COMMITTEE
CNIL SERVICE COMMISSION
tias Mis aersaJ6rm eHerwaked unaer a canUact ra this aepartment7
VES NO
Has tlua aeraoMrm ever heen a cily emabYee?
YES NO
Does this persoMfirm poesess a sltlll not nonnallypouessetl by anY �� �Y �PbY�7
YES NO
Is this pe�sonfirm a tergeted vendoR
YES NO
During the July 1, 1997 rain storm, the sanitary sewer at Lexington Parkway and Summit Avenue
backed up into the homes at 1134 Summit Avenue and 1126 Summit Avenue. The City of Saint
Paul Public Works Department, and Shafer Contracting, were jointly responsible for improper
sewer separation work which caused this backup of sewage. I have reached a settlement with the
home owners regarding the damage to their property.
1DVANTAGESIfAPPROVED
TRANSAGTIONt �
GL 007 Tort Liability
(EfPWN)
06/23/98 I GREEN SHEET
COST/REVENUE BUDf3ETED (GRCLE ON�
�crnm NureaEn
��: •
f:lusers\gaughan\wpfites\resoladm\ronwendywpd
,�
i�-=�
GERRY STRATHMAN
Airector
3une 25, 1998
TO: Stacy Becker
FROM: Gerry Strathman�
��
MEMORANDUM
�� - 5��
RE: Resolution - 48-582 - Settling the properiy damage claims of Robert Thavis
and Juliann Geiss and Ron Schutte and Wendy Schutte against the City of Saint
Paul in the amount of $143,800.00.
At the Council meeting last night the Council passed Resolution 98-582 to settle a
claim against the City for properiy damage. At that time, the Council requested
that they receive a written report from you outlining the steps which have been
taken by your department to prevent reoccurrence of this type of situation. Thank
you for your attention to this matter.
Attachment
C: Councilmembers
CITY HALL SLRTE s10 SAINT PAUL, MINNESOTA 55102
CYTY OF SAINT PAi3L
COUNCIL INVESCICATION AND RESEARCH CENTER
5�46
Pr:med o�� 3ecycted Paper
612/2b6-8560
Council File # _����
Green SheeL # lp 03 1 ,
RESOLUTION
Presented By
Referred To
Committee: Date
1 RESOLVED, that, upon execufion and delivery of a release in fizll to the City of Saint Paul,
2 the proper Ciry officers are hereby authorized and directed to pay from the Tort Liability
3 Fund, 09081-0511, to Robert'I'havis and Juliann Geiss, the sum of $87,000.00; to Ron Schutte
4 and Wendy Schutte, the sum of $56,800.00; in full settlement of their property damage claisns
5 arising out of the July 1, 1997 rain storm. This clann arises from the Ciry and Skafer
6 Contracting's failure to properly separate the storm and sanitary sewers. Shafer Contracting
7 has agreed to pay twenry-five percent (25 %) of the total claims settlement. The net loss
8 payment by the Ciry will be $107,850.00.
APPROVED:
� �,.�Z�
Judge of District ourt
Requested by Department of:
Technolog�and Managemen Services
By: `/,��
Adopted by Council: Date
Adoprion Certifi by Coim ' Secretazy
By:
Approved l�y Ia o Da
(
By:
CITY OF SAINT PAUL, MINNESOTA
Approval Recommettded by Budget Director.
Tech & Mgmt Serv/Risk Mgmt Div
Steve Voldal 266 8887
�µ..�.��,�
q8-s��-
No 60311
mnvuo..
�,.�.
� ^ T �} } } j�
NUMBERFOR ❑MYAiTOR1EY"�_� �piYCLiAR
RWi111G �
� ❑iMYCNLfFANCNWL ANMC4LiERV/ICCTO
� YWR(OR118AtiM1Il � ❑
TOTAL # OF SIGNATURE PAGES one (CLIP ALL LOCATIONS FOR SIGNATURE)
Approval of Resolution settling the property damage claims of Robert Thavis and Juliann Geiss;
and, Ron Schutte and Wendy Schutte; against the City of Saint Paul in the amount of
$143,$00.00. Tfie City of Saint Paui will recover twenty-five percent (25%), or 535,950.00, of
this settleme�t from Shafer Contracting. The net payment 6y the City wiil be $107,850.Q0.
PL4NNING CAMMISSION
CIB COMMITTEE
CNIL SERVICE COMMISSION
tias Mis aersaJ6rm eHerwaked unaer a canUact ra this aepartment7
VES NO
Has tlua aeraoMrm ever heen a cily emabYee?
YES NO
Does this persoMfirm poesess a sltlll not nonnallypouessetl by anY �� �Y �PbY�7
YES NO
Is this pe�sonfirm a tergeted vendoR
YES NO
During the July 1, 1997 rain storm, the sanitary sewer at Lexington Parkway and Summit Avenue
backed up into the homes at 1134 Summit Avenue and 1126 Summit Avenue. The City of Saint
Paul Public Works Department, and Shafer Contracting, were jointly responsible for improper
sewer separation work which caused this backup of sewage. I have reached a settlement with the
home owners regarding the damage to their property.
1DVANTAGESIfAPPROVED
TRANSAGTIONt �
GL 007 Tort Liability
(EfPWN)
06/23/98 I GREEN SHEET
COST/REVENUE BUDf3ETED (GRCLE ON�
�crnm NureaEn
��: •
f:lusers\gaughan\wpfites\resoladm\ronwendywpd
,�
i�-=�
GERRY STRATHMAN
Airector
3une 25, 1998
TO: Stacy Becker
FROM: Gerry Strathman�
��
MEMORANDUM
�� - 5��
RE: Resolution - 48-582 - Settling the properiy damage claims of Robert Thavis
and Juliann Geiss and Ron Schutte and Wendy Schutte against the City of Saint
Paul in the amount of $143,800.00.
At the Council meeting last night the Council passed Resolution 98-582 to settle a
claim against the City for properiy damage. At that time, the Council requested
that they receive a written report from you outlining the steps which have been
taken by your department to prevent reoccurrence of this type of situation. Thank
you for your attention to this matter.