97-245Council File #` ��� S
r�����=�i�€���
Green Sheet � 31190
MINNESOTA
Presented By
Referred To
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Co[�ittee: Date
`1..7
RESOLVED, that upon execution and delivery of a release in full to the CYty of Saint
Paul, the proper City officers aze hereby authorized and directed to pay out of the Tort
Liability Fund 09070-0511 to Neil Gosman and Sandy Pappas the sum of $15,000.00 in full
settlement of their claim for damages sustained to their house at 182 Prospect Boulevard
as a result of a sewer backup.
APPROVED:
dge of District Court
a ����
Requested by Department of:
Adopted by il
Adopti Certified
By: �
Approved by Ma r:
BYe '� �
Secretary
City Attorney
By ������� �
Form Ap roved by City Attorney
BY=���.{ ��L
� `— � Approved by Mayor for Submission to Council
Date �3 �2,�/� � � /
I l By:
�i�t -��lS
DEPAHTME AttOFJCOU DA2�26 D97 GREEN SHEE N°-_ 31� 19 0
F
CAlRACT PERSON 8 PHONE � DEPAFi'fMENT DIqECTOfl O CRY COUNdL INITIAUDATE
. 77 ASSIGN O CRYATTORNEV � CfTV CLEflK
MUST BE ON CAUNCIL AGENDA BY (DATE) NUYBER FOR O BUDGET DIRECTOR � FlN. & MGT. SERVICES DIR.
XOUfING
�� Q MAYON (OR ASSISTAtdT) � o
TOTAL # OF SIGNATUpE PAGES (CLIP ALL LOCATIONS FOR SIRNATUR�
ACTION FiE�UE57ED:
Approval o£ resolution settling claim o£ Neil Gosman and Sandy Pappas
against the City o£ St. Paul £or $15,000.
RECOMMENDAi70NS: Nprove (A) a Reject (fi� pERSONAL SERVICE CON7HACTS MUST ANSWER THE FOLLOWING QUESTIONS:
_ PLANNING COMMI$$ION _ pVll SFAVICE COMMISSION �� Has Mis persoNfirtn ever worked under a contrad for tt�is deparlmeM? -
_ CIB COMMII7EE YES �NO
_ STAFF 2• Has lliis perso�rm e�er been a city emplqree?
r � , �� — VES NO
— ����'�P�IC]� R - 3. Does this persoMirm possess a skill not normalty possessetl by any curteM city employee?
SUPPORTSwHICHCOUNCILO&IEC77VE? �� �r YES NO
� Explain all yes answera on separate sheet antl attaeh to green sheet
'�"::�� r 3 ���1
INI7IATING PROBLEM, ISSUE, OPPOFiTUNIN (Who. Whet, When, Where, Why):
Neil Gosman and Sandy Pappas brought suit against the City of Saint
Paul, Car1. Bolander & Sons Company, the City's general contractor,
Bonestroo, Rosene, Anderlik & Associates, Inc., the City's
consulting engineer, and others for damages to their home at 182
Prospect Boulevard as a result of the Combined Sewer Separation
Project. Records of the Public Works Sewer Division indicating
tha the' riv te ouse connec 'o to t e sewer ma'n located 50
ADVANTAGESIFPP��fED:belOW street level, was 16 feet north of a catch basin
connection that serviced Bellows Street. The house connection was
via a vertical drill hole and horizontal drift tunnel. In fact,
the house connection, made in 1947, was to the catch basin
connection.
As part of the CSSP and relying on the City's records, Bonestroo
determined that the catch basin connection should be sealed to
DISADVANTAG puYSUant tO L�Ie contract, bulkheaded the catch basin effectively
sealing the Gosman/Pappas' house connection. Eventually the sewage
backed up and flooded their basement. The cost to construct a new
drill hole and drift tunnel to restore the house connection was
more than $25,00-0. The Gosman/Pappas' total claim was $38,500.
Gosman/Pappas asserted various theories against the defendants,
including negligence, trespass, nuisance and breach of contract.
DISr1DVAMAGE nP a e con i e e oca ion o eir
house connection before sealing off the catch basin. The
defendants denied any culpabiiity. The City claimed its decision
was protected by statutory and official immunity. The parties
eventually reached a compromise settlement of $25,000 with the City
paying $15,000 and Bolander and Bonestroo paying the balance. The
CAO recommends approval.
TOTAL AMOUNT OF TRANSACTION $ 15 � OOO. OO COST/HEVENUE BUDGETED (CIFiCLE ONE) VES NO
FUNDIfdGSOURCE Tort Liability ACTIVITYNUMBER 09070
FINANCIAL INFORMATION: (EXPLAIN)
Council File #` ��� S
r�����=�i�€���
Green Sheet � 31190
MINNESOTA
Presented By
Referred To
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Co[�ittee: Date
`1..7
RESOLVED, that upon execution and delivery of a release in full to the CYty of Saint
Paul, the proper City officers aze hereby authorized and directed to pay out of the Tort
Liability Fund 09070-0511 to Neil Gosman and Sandy Pappas the sum of $15,000.00 in full
settlement of their claim for damages sustained to their house at 182 Prospect Boulevard
as a result of a sewer backup.
APPROVED:
dge of District Court
a ����
Requested by Department of:
Adopted by il
Adopti Certified
By: �
Approved by Ma r:
BYe '� �
Secretary
City Attorney
By ������� �
Form Ap roved by City Attorney
BY=���.{ ��L
� `— � Approved by Mayor for Submission to Council
Date �3 �2,�/� � � /
I l By:
�i�t -��lS
DEPAHTME AttOFJCOU DA2�26 D97 GREEN SHEE N°-_ 31� 19 0
F
CAlRACT PERSON 8 PHONE � DEPAFi'fMENT DIqECTOfl O CRY COUNdL INITIAUDATE
. 77 ASSIGN O CRYATTORNEV � CfTV CLEflK
MUST BE ON CAUNCIL AGENDA BY (DATE) NUYBER FOR O BUDGET DIRECTOR � FlN. & MGT. SERVICES DIR.
XOUfING
�� Q MAYON (OR ASSISTAtdT) � o
TOTAL # OF SIGNATUpE PAGES (CLIP ALL LOCATIONS FOR SIRNATUR�
ACTION FiE�UE57ED:
Approval o£ resolution settling claim o£ Neil Gosman and Sandy Pappas
against the City o£ St. Paul £or $15,000.
RECOMMENDAi70NS: Nprove (A) a Reject (fi� pERSONAL SERVICE CON7HACTS MUST ANSWER THE FOLLOWING QUESTIONS:
_ PLANNING COMMI$$ION _ pVll SFAVICE COMMISSION �� Has Mis persoNfirtn ever worked under a contrad for tt�is deparlmeM? -
_ CIB COMMII7EE YES �NO
_ STAFF 2• Has lliis perso�rm e�er been a city emplqree?
r � , �� — VES NO
— ����'�P�IC]� R - 3. Does this persoMirm possess a skill not normalty possessetl by any curteM city employee?
SUPPORTSwHICHCOUNCILO&IEC77VE? �� �r YES NO
� Explain all yes answera on separate sheet antl attaeh to green sheet
'�"::�� r 3 ���1
INI7IATING PROBLEM, ISSUE, OPPOFiTUNIN (Who. Whet, When, Where, Why):
Neil Gosman and Sandy Pappas brought suit against the City of Saint
Paul, Car1. Bolander & Sons Company, the City's general contractor,
Bonestroo, Rosene, Anderlik & Associates, Inc., the City's
consulting engineer, and others for damages to their home at 182
Prospect Boulevard as a result of the Combined Sewer Separation
Project. Records of the Public Works Sewer Division indicating
tha the' riv te ouse connec 'o to t e sewer ma'n located 50
ADVANTAGESIFPP��fED:belOW street level, was 16 feet north of a catch basin
connection that serviced Bellows Street. The house connection was
via a vertical drill hole and horizontal drift tunnel. In fact,
the house connection, made in 1947, was to the catch basin
connection.
As part of the CSSP and relying on the City's records, Bonestroo
determined that the catch basin connection should be sealed to
DISADVANTAG puYSUant tO L�Ie contract, bulkheaded the catch basin effectively
sealing the Gosman/Pappas' house connection. Eventually the sewage
backed up and flooded their basement. The cost to construct a new
drill hole and drift tunnel to restore the house connection was
more than $25,00-0. The Gosman/Pappas' total claim was $38,500.
Gosman/Pappas asserted various theories against the defendants,
including negligence, trespass, nuisance and breach of contract.
DISr1DVAMAGE nP a e con i e e oca ion o eir
house connection before sealing off the catch basin. The
defendants denied any culpabiiity. The City claimed its decision
was protected by statutory and official immunity. The parties
eventually reached a compromise settlement of $25,000 with the City
paying $15,000 and Bolander and Bonestroo paying the balance. The
CAO recommends approval.
TOTAL AMOUNT OF TRANSACTION $ 15 � OOO. OO COST/HEVENUE BUDGETED (CIFiCLE ONE) VES NO
FUNDIfdGSOURCE Tort Liability ACTIVITYNUMBER 09070
FINANCIAL INFORMATION: (EXPLAIN)
Council File #` ��� S
r�����=�i�€���
Green Sheet � 31190
MINNESOTA
Presented By
Referred To
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Co[�ittee: Date
`1..7
RESOLVED, that upon execution and delivery of a release in full to the CYty of Saint
Paul, the proper City officers aze hereby authorized and directed to pay out of the Tort
Liability Fund 09070-0511 to Neil Gosman and Sandy Pappas the sum of $15,000.00 in full
settlement of their claim for damages sustained to their house at 182 Prospect Boulevard
as a result of a sewer backup.
APPROVED:
dge of District Court
a ����
Requested by Department of:
Adopted by il
Adopti Certified
By: �
Approved by Ma r:
BYe '� �
Secretary
City Attorney
By ������� �
Form Ap roved by City Attorney
BY=���.{ ��L
� `— � Approved by Mayor for Submission to Council
Date �3 �2,�/� � � /
I l By:
�i�t -��lS
DEPAHTME AttOFJCOU DA2�26 D97 GREEN SHEE N°-_ 31� 19 0
F
CAlRACT PERSON 8 PHONE � DEPAFi'fMENT DIqECTOfl O CRY COUNdL INITIAUDATE
. 77 ASSIGN O CRYATTORNEV � CfTV CLEflK
MUST BE ON CAUNCIL AGENDA BY (DATE) NUYBER FOR O BUDGET DIRECTOR � FlN. & MGT. SERVICES DIR.
XOUfING
�� Q MAYON (OR ASSISTAtdT) � o
TOTAL # OF SIGNATUpE PAGES (CLIP ALL LOCATIONS FOR SIRNATUR�
ACTION FiE�UE57ED:
Approval o£ resolution settling claim o£ Neil Gosman and Sandy Pappas
against the City o£ St. Paul £or $15,000.
RECOMMENDAi70NS: Nprove (A) a Reject (fi� pERSONAL SERVICE CON7HACTS MUST ANSWER THE FOLLOWING QUESTIONS:
_ PLANNING COMMI$$ION _ pVll SFAVICE COMMISSION �� Has Mis persoNfirtn ever worked under a contrad for tt�is deparlmeM? -
_ CIB COMMII7EE YES �NO
_ STAFF 2• Has lliis perso�rm e�er been a city emplqree?
r � , �� — VES NO
— ����'�P�IC]� R - 3. Does this persoMirm possess a skill not normalty possessetl by any curteM city employee?
SUPPORTSwHICHCOUNCILO&IEC77VE? �� �r YES NO
� Explain all yes answera on separate sheet antl attaeh to green sheet
'�"::�� r 3 ���1
INI7IATING PROBLEM, ISSUE, OPPOFiTUNIN (Who. Whet, When, Where, Why):
Neil Gosman and Sandy Pappas brought suit against the City of Saint
Paul, Car1. Bolander & Sons Company, the City's general contractor,
Bonestroo, Rosene, Anderlik & Associates, Inc., the City's
consulting engineer, and others for damages to their home at 182
Prospect Boulevard as a result of the Combined Sewer Separation
Project. Records of the Public Works Sewer Division indicating
tha the' riv te ouse connec 'o to t e sewer ma'n located 50
ADVANTAGESIFPP��fED:belOW street level, was 16 feet north of a catch basin
connection that serviced Bellows Street. The house connection was
via a vertical drill hole and horizontal drift tunnel. In fact,
the house connection, made in 1947, was to the catch basin
connection.
As part of the CSSP and relying on the City's records, Bonestroo
determined that the catch basin connection should be sealed to
DISADVANTAG puYSUant tO L�Ie contract, bulkheaded the catch basin effectively
sealing the Gosman/Pappas' house connection. Eventually the sewage
backed up and flooded their basement. The cost to construct a new
drill hole and drift tunnel to restore the house connection was
more than $25,00-0. The Gosman/Pappas' total claim was $38,500.
Gosman/Pappas asserted various theories against the defendants,
including negligence, trespass, nuisance and breach of contract.
DISr1DVAMAGE nP a e con i e e oca ion o eir
house connection before sealing off the catch basin. The
defendants denied any culpabiiity. The City claimed its decision
was protected by statutory and official immunity. The parties
eventually reached a compromise settlement of $25,000 with the City
paying $15,000 and Bolander and Bonestroo paying the balance. The
CAO recommends approval.
TOTAL AMOUNT OF TRANSACTION $ 15 � OOO. OO COST/HEVENUE BUDGETED (CIFiCLE ONE) VES NO
FUNDIfdGSOURCE Tort Liability ACTIVITYNUMBER 09070
FINANCIAL INFORMATION: (EXPLAIN)