Loading...
D00531��White �- City Clerk Pink - Finance Dept. Canazy - Dept. Aceounting Blue - Engineer H.L. Holzschuh Green - Contractor 320 LPB � No. o OQ 5 I Date '�i �� �� �JJ CITY �F SAINT PAUL — OFFICE OF TAE MAYOR ADMINISTRATIVE ORDER for CONTRACT CHANGE AGREEMENT N0. 1 ORDER, Whereas, additions whieh proved to be necessary to the Improvement described � as_ Interior RemodelinQ for Womens Locker Room & Handicap Accessibility at the Traffic Operation Building, 899 N. Dale. St., Saint Paul. k¢own as Contsact J,- 14187, City Project No. 9G10.00 , CM Construction � Contracta, is composed of the following: 1. Additional concrete cutting & plumbing work 2. Extend ceramic tile into toilet area 3. Install masonry privacy screen in Mens room 4. (lI5) is to rewire roof-top exhaust fan per code 5. (4�6) is to tie-in heating system into existing unit heater piping. TOTAL Summary ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing additions made in ac- cordance with the specifications in the sum of � 14,009.00 , said amount to be added to the lump sum con- sideration named in the contract, known as contract L� � 4187 , and whieh amount is to be financed from: C94-2F013-0784-00000 Contract Amount This Chg. Order Total Coatract � $805.00 $812.00 $11,775.00 $817.00 ($200.00)deduct $14,009.00 $64,997.00 $14,009.00 $79,006.00 �19�� CM Construction Contcactor "��19�_ By �see attached) � f' 1 s� L_.L, ��.�c.c.�iJ i����- Head o�epartment c�f Finance / ' � � 19� Administrative Assistant to the Mayor � ,} I.E.P. T�00531 GREEN SHEET INITIALlDATE— N_ 29785 1 TOTAL # OF SIGNATURE PAGES ACTION REQUESTED: DEPARTMENTDIRE OCITYCqUNCIL CITY ATr�RNEY � CfiY CLERK BUDGEf DIRECTOR FIN. & MGT. SE MAYOR (OR ASSISfAN'� � �, HOI<' (CLIP ALL LOCATIONS FOR SIGNATURE) � — � �►�!� Required s�gnatures for change order �il for Interior Remodeling at the Traffic Operations Building, 899 N. Dale Street, Saiat Paul. o� _ PIANNING COMMISSION _ CIVIL SERVICE COMMISSION _ q8 GOMMfREE _ _ 5TAFF _ _DISTpICTCOURT _ SUPPORTS WHICH COUNCIL O&IECTIVE? PERSONAL SERYICE CONTRACTS MUST ANSWER THE FOLLOWING QUES710NS: i. Has thi5 per5on/Firm ever worked untler a contract for this departmeM'+ YE5 NO 2. Has this personflirm ever been a city employee? YES NO 3. Does this persoMfirm possess a skill'rot normaNy possessed by any curtent ciry employee? YES NO Explafn all yes answers on aeparete sheat anA attaeh to 9reen sheet INITIATING PR�BLEM, ISSUE, OPPORTUNITY (WFO, What, When, Where, Why): -Drain pipe, under slab, wasn't located per plan. -Ceramic tile in Womens Shower doesn't extend into the toilet area. -no privacy screen is in Mens locker/toilet room. -Exhaust Ean wiring doesn't mee*_ coda. -Mechanical system would need to be drained to install additional heat for Locker room. Would enable proper completion of work. � . ' None RECEIVED APR 2 6 1995 CITY GLERF4 APR 2a i995 CtTY ATTO�RNEY -Drain pipe would not be installed per plan. -Ti1e and privacy screen installation would cost more to complete at a later date. -Exhaust Fan will not be wired per code requirement. -Heating system does/� need to be shut down. I 14,009.00 TOTAL AMOUN7 OF TPANSACTION $ COST/REVENUE BUDGE7ED (CIRCLE ONE) YES NO C94-2F013-0784-00000 FUNDI(dG SOUHCE ACTIVIiV NUMBER FINANpAI INFORMATION: (EXPLAIN) ��Y