Loading...
D00495CITY OF SAINT PAUL OFFICE OF THE MAYOR Nor -"`�� • ADMINISTRATIVE ORDER Date:Ty� pS ADMINISTRATIVE ORDER, WHEREAS, the City of Saint Paul has contracted with the United States Army Corps of Engineers to construct flood control structures aVong the bank of the Mississippi River within the corporate limits of the City; and WHEREAS, these flood control structures incorporate into their design pedestrian walkways which are significant components of the City's overall vision for the redevelopment of the riverfront; and WHEREAS, one segment of the pedestrian walkway crosses over the privately owned railroad right-of-way for the Chicago and Northwestern Transportation Company; and WHEREAS, the Department of Public Works, on behalf of the City of Saint Paul, has negotiated Railroad Crossing Agreement, PW/16 which is attached and incorporated herein by reference, which grants to the general public the right to cross over the railroad right-of-way via the pedestrian walkway; NOW THEREFORE � BE IT ORDERED, that the proper City officials are hereby authorized and directed to execute Railroad Crossing Agreement PW/16 authorizing the general public the right to cross over the railroad right-of-way via the pedestrian walkway so long as the City maintains a pedestrian crossing insurance policy as set forth in PW/16 APPROVED AS TO FORM -� ���"'°-" Assistant City Attomey • Date ��'� l �� l � ys ������ Public Works Sewer Divisi � . , . , qoNr�ctrEasox;aefa�, , , Rafic Chehouri 266-6226 eqlNNIE PAOES 7 (CllP ALL LOCA710NB Poli &filM7Wiq MGT. SEfMCES �95 � GREEN SHEE N0.259 � wr�woa�� ra+n�rtr<ar€cron _ ° _4 ldncouNa� - , _ � . r:�.c...�:>� To mcec�rte tl�e Chicago Northwestem Railroad gra� cr�sing surface agrsemerrt at the fbod corrtrol project west of Robert Street - _ v JNCIL X COIAxILOBJEC7NET PERSONAL SEHNCE COIARACTS NUST ANSINEH 7i¢ FOLLOWING QUESTIONS: 7. 'Fias tliis persoNPom ever wo�ked utber a coMmcT tartlis depar6neN7 YES NO 2 Has 1t�s DersaN4m ever.been. a ciy ertpbyce? YES NO 3. Does Uis RersoMW'm Russess a sMY not mmdN G�� bY �Y current ciryl employee? YES NO E�6ain all yas uiswen m aeparate SMa1 sheet 14 1995 INfMiING PHOBLEM, ISSUE.OPPOF77UM7Y (WHO. WHAT. WHEN. NM1iERE. WHY): Construdion of the fbod coMrol on the Chicago and Northwestem tracks require�a� e���i�POSSing agreement with the railroad. � If city wili have continuous riverside walkway on the flood control project. The city will have to carry liability insurance policy at a cost of approximately $2,000 per year. RECEIVE� MAR 16 1gg5 CITY CLERK The city would be required to install a fence on both sides of the railraad track affectively cutting the continous walkway and flood caitrol project in half. TOTAL/WOUNTOFTHANSACTIONY $�O COST/REVENUEBUDGETED(dACLEONE) FUNqNG SOURCE Floodwall Prolec[ Fund ACRVITY NUMBER FlruNaa. U7FOwAnnora (Eiwu�M � � YES No - C.l Y •