94-1595 � �.L�s� � � � � - I l/� /� �
City of St. Paul COIIN IL FILE N.�� I j9 �
AMENDED FINAL ORDER i By
I File No. 18 0
Voting Ward 3
In the Matter of constuc ing and/or repairing of sanitary sewer,
storm sewer and/or water ain service connections, if requested by
the property owner, in c njunction with the Davern/Edgcumbe Area
Storm Sewer and Street P ing and Lighting Project.
under Preliminary Order 94-1176 approved 8/17, 94
The Council of the ity of Saint Paul has conducted a public
hearing upon the above i rovement, due notice thereof having been
given as prescribed by t e City Charter; and
WHEREAS, The Counci has heard all persons, objections and
recommendations pertain' g to said proposed improvement and has
fully considered the sam ; now, therefore, be it
RESOLVED, That the ouncil of the City of Saint Paul does
hereby order that the ab ve-described improvement be made, and the
proper City officers are hereby directed and authorized to proceed
with the improvement; an be it
FURTHER RESOLVED, T at upon the completion of said improve-
ment, the proper City of icers shall calculate all expenses
incurred therein and sh 1 report the same to the City Council in
accordance with Chapter 4 of the City Charter.
COIINCILPERSON Adopted by the Council: Date ��
Yeasr Nays
✓ lakey Certified Passed by the Council
� �rimm � :
uerin By �� �a-.�,,,
✓ arris
�egard �In Fa r
� � ttman Mayor
une (J Again t
�
qU _ I�R5 '
F1tB — Aeal Bstate Divisfon Date s Gr� S�t Nember;
wKn�rr n�croR i aourxx�..
r�oe ma r�o� r� .�.. nTroxrmv ci�
��
Peter White 266-8850 � ��R � �T �'� �
YOR (OR AS9STMTl� Raan�
ust be an Coenal w�ead. b�r.
AL # OF SIGNAIURB PA(3ffi 1 (Q]P LOCAIIONS FOR S[(iNA1UR�
i_
CIION RHQUB31�d: en e i r er r connections Ot 8 AVBtII Ill C1 O�C .
File l�o. 18750 �
i
�,
OQ�EIDATIOIIS: MPROME �A) OR RE�CT (R) NAi. SBRVICB OON!'RAC1S M75T ANSWBR T�g3 POLLOWIIV(i:
�
PLAtlMIN6 OOMISSIOM ,� STAFF Hes t6e pea�a�/6nm ewx woe�ed uader a co�rid �cr tLi� d�t? i
cIVIL sERVIC� aaN _ I�Lc e�c peooa/erm ever beea s CYtj► aployeet ,
CIB COIMIT'(�E _ Does t�a peaoa/Bem po.es, stm Doc no� �o.�a bs �y
TS YHIpI t70lMCIL OBJECTIVE? Mei�borhoods �� ��? - T +
' a9 YBS aos�ea as s sep�eaoe d�eet �md at�h.
UN(7i. WARD-3 DLSiWGT PiAlVIViNG QOUN(�.]S
;
o, en, ere, y: �
blic Works Sewer I?ivision has requeste that we include repair of service connections as part of th �n '
rder. i
;
;
f during the constxuction of a street/sewe a connection(s) shows that it needs to be repaired, Public �
orks can notify the property owner at ' time and repair it. i
t
�
. �
operty owners will be assessed for the r air. i
;
f connection(s) are in need of repair and 'scovered after street/sewer construction, it will lie more c�stly.
�
;
otal Amount of Transaction $ Cost/Revenue Budgeted YES NO
� i
!
unding Source Acti ' Number , �
inancial Information: (Explain) Assessm nts will be levied at actual cost.
4
,
, '
,
�
!
i
.. . .�, •�-•.��
k ._ �, s. ` � X �
Y � ORIGIN L r �
CITY OF ST. PAIIL COUIiCIL FZLS H0. ; �� {5�15�
r ,-
F�es�. o�sz aY �' �` � ;� < � ���',� -�____..._
�' ��� .
�ILE a0. 18750
VO?IIiC T�1AYD 3
In t�e Matter sf constructin sanitary sewer, storm sewer and or water
service connections, if reques ed by the property owner, in con�u ction with
the Davern/Edgcumbe Area Storm Sewer and Street Paving and Ligh ng Project.
s
�
under Preliminary Order � — approved ,�� � G
The Council of the City of Saint P 1 has conducted a ublic hearing
upon the above improvement, due noti e thereof having been given as
prescribed b}� the City Charte ; and
WHEREAS, The Council has ard all persons, ob3ections and
recommendations pertaining o sai proposed improvement and has fully
' considered the same; now, the efor , be it
• RESOLVED, That the Counc 1 f the City of Saint Paul does hereby order
that the above–described impr v ment be made, and the proper City officers
are hereby directed and autho 'zed to proceed with the improvement; and be it
FURTHER RESOLVED, Tha pon the completion of said improvement, the
proper City officers shall ca culate all expenses incurred therein and sh�ll
report the same to the Ci Co ncil in accordance with Chapter 14 of the City
Charter.
�COUNCILPERSONS Adopted by Council: Date
; Yeas Nays
Blakey Certified Passed byCouncil Secretary
Grimm
Guerin
Harris n Favor By
Megard
Rettman gainst
Thune Mayor
e .
. ��,:... •.�. . ; � ,.. _.. , , .� . . . :. ,�.. i
� ��1. '" . I . . . ,
'd =. �! ` �.l �1 � M�l ;� � 4. . - � � ,. ,� � :
�°"ti`""� ,. . .. . . , r .;� .�L- ?�,,. , .. j , � � �,,.+��
+ � , _ .,,' ..a,. w. .�'"'d
� . �"
CIlY OF ST. PAUL . ;, �; COONCIL F F N0. . � , ,,
, , � {`�
FINAL p�HBt . � BY � ' � � ��'�� ''�'`=- !
.� +
'. i `�' :x � . �ILB M�. 18 7 S 0 ` '
! VOTIHG WASD 3
,
In the Natter of constructin sanitary sewer, atorm sewer and/or water
aervice connections, if reques d by the property owner, in con�u�ction with
the Davern/Edgcumbe Area Storm Sewer and Street Paving and Ligh ng Pro�ect.
�
�� ,
under Preliminary Order 1 "" 1,' I� approved 1�-�� .`�� �� ��`'}
The Council of the City of Saint P 1 has conducted a pub`�ic hearing
upon the above improvement, due noti e thereof having been given as
� prescribed by the City Charte ; and
` WHEREAS, The Council has eard all persons, objectione and
- recommendations pertaining o sai proposed improvement and has fukly
considered the eame; now, the efor , be it
RESOLVED, That the Counc 1 f the City of Saint Paul does hereby order
that the above-described imp ement be made, and the proper City officers
� are hereby directed and autho zed to proceed with the improvement; and be it
' FURTHER RESOLVED, Tha pon the completion of said improvement, the
�� proper City officers shall ca culate all expenses incurred therein and shall
report the same to the Ci C uncil in accordance with Chapter 14 of the Citq
Charter.
�
COUNCILPERSONS Adopted by Council: Date
Yeas Nays
Blakey Certified Passed byCouncil Secretary
Grimm
Guerin
Harris n Favor By
.: Megard �
. Rettman gainst
Thune - Mayor
. � ay_�sqs'
SUMMARY OF E GINEERING RECOMMENDATIONS
DAVERN /�DGCUM E STORM SEWER & PAVING PROJECT
CI PROJECT 95-S-8105
(INCLU ES 95-P-8086 & 95-V 8086)
NEIGHBORHOOD NFORMATIONAL MEETING, XX, 1994
PUBLIC WORK COMMITTEE MEETING, XX, 1994
PUBLIC H ARING, NOVEMBER 2, 1994
PROJECT:
Construct a storm sewer system, ater and sewer service connections and
reconnections, street improveme ts and upgrade an existing lighting system in the
Davern Watershed. This area is ounded by Ford Parkway, Snelling Avenue, St. Paui
Avenue and Davern Street.
EXISTING CONDITIONS:
The project area is presently se d by a combined sewer system. During periods of
rainfall, storm water and sanitary ewage are combined in a common sewer pipe. Light
rainfall, combined with sanitary s wage, will be directed to the sewage treatment plant
where the storm water will be un ecessarily treated. Moderate to heavy rainfall,
combined with sanitary sewage, ill overflow diversion structures and untreated
sanitary sewage will outlet to the Mississippi River. Reports of sewer backups into
basements and surface flooding ave also been noted in this area.
The following streets within the oject area are paved and have concrete curb:
BEECHWO D- DAVERN to MACALESTER (existing width 27')
SAUNDERS DAVERN to MACALESTER (27')
ROME - DA ERN to MACALESTER (27')
EDGCUMB - DAVERN to SNELLING (two divided 20' lanes)
The following are oiled streets w h intermittent sections of concrete curb:
DAVERN - F RD PARKWAY to ST. PAUL AVENUE (30')
MACALEST R- FORD PARKWAY to BOHLAND (32')
MACALEST R- BOHLAND to BEECHWOOD (20')
The project area is primarily se ed by a lighting system on wood poles.
PROPOSED IMPROVEMENT :
Street improvements and storm ewer construction are proposed for the following
streets:
DAVERN - ILLCREST to ST. PAUL AVENUE
MACALEST R- HILLCREST to BEECHWOOD
BEECHWO D- DAVERN to MACALESTER STREET
SAUNDER - DAVERN to MACALESTER WALK
1
- q� -�SaS
ROME - DAV RN to MACALESTER WALK
ED�CUMBE eastbound) - DAVERN to 275' west of SNELLING
Portions of U PER, LOWER ST. DENNIS & ST. DENNIS COURT
Catch basin construction and tre h restoration is proposed for the foliowing streets:
EDGCUMBE westbound) - DAVERN to SNELLING
Street improvements are propose for the following streets:
DAVERN - F RD PARKWAY to HILLCREST
MACALESTE - FORD PARKWAY to HILLCREST
Portions of U PER and LOWER ST. DENNIS & ST. DENNIS COURT
EDGCUMBE eastbound) - 275' west of SNELLING to SNELLING
New streets will be constructed to a width of 32 feet with the following exceptions:
Upper and Lower St. Dennis and t. Dennis Court will be 30 feet; Beechwood,
Saunders and Rome will be reco structed to a width of 27 feet; Macalester, Beechwood
to Bohland, will be 20 feet, and E gcumbe (eastbound) will be reconstructed to a width
of 20 feet.
New curb will be hand formed, if ecessary, to avoid damaging trees and/or tree roots.
Tree trimming may be necessary o facilitate sewer construction.
The new storm sewer constructio � is part of a long-range storm sewer project which will
result in separate storm and sanit ry sewer systems throughout the city. The street
improvements proposed would co pliment the storm sewer construction. New
bituminous roadways with concre e curb and gutter are being proposed. All driveway
aprons will be reconstructed with concrete, and new concrete outwalks will be
constructed for each home. Boul vards will be regraded and sodded. A lantern
lighting system will be used throu hout the project area.
ALTERNATES:
To do nothing would be inconsist nt with the city's commitment to improve existing oiled
streets, improve water quality an reduce pollution. Improving the roadways in
conjunction with sewer constructi n will save time, money and inconvenience later.
POSITIVE BENEFITS:
With the completion of the city's ewer project and the disconnection of rainleaders,
sewer backups into basements w II be eliminated, surface flooding reduced and the
diversion of sanitary sewage to t e Mississippi River, as wetl as the diversion of storm
water to the sewage treatment pl t, will be eliminated.
General improvements of the pu ic right-of-ways in conjunction with sewer
construction will enhance and ad quality to the neighborhood. Street oiling would be
eliminated.
2
� � � q�--15�i�
ADVERSE EFFECTS:
Normal problems associated wit construction, such as noise, dust, reduced access to
property and general disruption ill be present. However, by constructing ail
improvements at this time, future dverse effects would be eliminated.
COST ESTIMATES:
S-8105 DAVERN / EDGC MBE STORM SEWER
Construction $ 939,500
Engineering & In ection 173,800
Miscellaneous 94.000
Total $1,207,300
P-8086 DAVERN / EDGC MBE GRADING & PAVINC
Construction $ 970,200
Engineering & In pection 198,900
Miscellaneous 97.000
Total $1,266,100
V 8086 DAVERN / EDGC MBE LIGHTINC
Construction $190,000
Engineering & In pection 35,000
Miscellaneous 19.000
Total $244,000
PROJECT TOTAL �2,717,400
3
� ` ��-15Q�`
ESTIMATED FINANCING:
S-8105 DAVERN / EDGC MBE STORM SEWER
Assessments $ 150,000
Sewer Revenue I nds 407,300
Water Surcharge 650.000
Total $1,207,300
P-8086 DAVERN / EDGC MBE GRADINC & PAVING
Assessments $ 323,500
CIB 1995 555,200
ew r Rev nu nd 387.400
Total $1, 266,100
V 8086 DAVERN / EDGC MBE LIGHTING
Assessments $ 73,200
IB 1 9 170.800
Total $244,000
PROJECT TOTAL �2,717,400
SOURCE OF ADDITIONAL INF RMATION:
For additional information, conta t Joe Mueiler at 266-6149.
RECOMMENDATION:
The Department of Public Works opinion is that this is a necessary and worthwhile
project and the Engineering Rec mmendations is for approval and financing of the
project.
�
Respectfully submitted,
Stacy Becker
Director of Public Works
7/29/94
4
i
.. � —. : �� �� q�-�sas
. ,�--�...._._, w� � �-.-„r-.---�-, �....__
z � V . ' � .: � ;; � . • ,, �,1, � � .''+� „Jj�' � y t f ,.�{ , •
� W 7_ •���� •. �' • . •� �. � ,
-Pit�(EHURST � a � •t�°'• ., ' � :
U'
'42 � a v�i HIGflLAND
FORD PARKYJAY Y✓A7CR
� rowc� �,� y�GHLAND
�
H1 LLCRC�T ! r AYE: :''f, .
, ,�,
' �: G4LF ��
lij Q 0 N L A�1 D � AV C, ;•�: :. ., ,r� �
�� 5( �, �. .
� . . .t
. ! �',�: •
� B�f�YW00D . l '� AYe. ; ; t �, :; .��. COURSE ••��i �
. . � '�;. . �.�,_, �;
� r sau���Er�s av�. ;�... � --. � , .
� SCH. . ,� w �h �; �
�. � �� .y, , . .
w._ROME � .� i v qvE, �. .�4'��''
r 3 , � 51 ..�'-�'
� �
a MONTR�AL , . . , �
ll.. ��t.. .. : :���� '�'%�'''�; � ��4. �'
� � ' ` ;Y -:,,�:,' N I GNL AND � '
HtG LAND .�' "
PK. JR.HS. �• �� �GOLF CI�URSL�'
�-IAAIPSH�IRC A . � �
� ` � \
4 �� HIGHL 1JD PK � , ',• .,�
� � S H.S. �: �` � : .• v;•s:' �vi ,u.c �,r .�,i�.•
�. � 5 ; ,. �' ' i.• z �i �ui, �vr�; • .
'yP 'J �v
Q � .�.'' :�•� EDGCUMSE •
c.-�� , .---•.-^'� � -�-�-� �-^.- .-�--. , • •, .. . ., --.
� • i l [D J
'� O. . .h,l I w(y, ` •
.� � � u r� c R ��r. � e v N i s �, �,' ��'��,�;'�����
o � �, � Z� , \ ��=\!'� k'`
� = N� o , ` ' ��l��j��������'�'
� 2 • `Vif�\111fU �`
�r ft��, � C 0 LV � �l � • c �= = 'i� ENt�� s '��i{��� �~� �'� '�r '
. t" \�1/ ur,r` i � ' . Q l�r ! �� •� 9
�r'.3vU:Y��IY,SCttf�����'� r, �� �n ' '�� r � 5 ,Cl.�! Al ��a 'y
• ��.�.i�• , �' • �� y WlliF k� i r/v,� — �-�- ,t�, „�' •� ,' " . c�F.� �i
� ���Ir.•� � y ��.r :r �l � � i P , '�
<�; ` �1'!� � (., /, 1t1.. �1/i /// \: S /
� ? 1• . . / I!// • �—._ 1�) �' �U'�
''��i 1� m���a-�r� ��c; �<<r v � ��l��; � y��-��� � � � �',o ' J�%' � •
• i 1 � 1i\� i� li !1 Itu� � 11U// U1 ��G 1 ti���n ���/�S J; � � S �
—��,��'i�ti�—;�1�. ;� l i� — "'�i i/ �j i}''* •V\Y/ /
� Ilrt�� ���:�• i���„�� �_�%, J /I ,� �� . I�
Q \ ��;r r i�rrn PAR IC � '` z�,��= � ,..,�. �. .
I � irc �.. ,,c� -� �.�1
S 7. PA U L �—' � V E. � , v ,�.� / �C�`�o ,
� C. ST. . h1. +� 0. R R �J' ' �T'"`"
�- �-; ;-:� K-t-t r-��-t-s+-�-` �y'++-+.'a'-�
�
DAVERN / EDGCUMBE
95- -8105 95- P-8086 . � �
� SEWER CONSTRUCTION '
� STREET CONSTRUCTION � � �
Public Hearing bate - November 2, 994 RE 8-5-94 '`"
TE IWITIATED 32046
�bli� wo� a GREEN SHEET No. �
IMTIAUDAlE INITIA T
��� P � �` � � DEPAR'fMENT D� RECT'OR � CITY COUNCIL
Jce M�eller (266-6149) ei wn ❑ aTr �rror�r � ciTr c��c
T� af i UTINO � BUDCiET pRECTOR � FIN � Ml3T. &ERVICE8 DIR
no on�da �-15f 9�4 � ❑"""''�t°R"ss's�r�""T► � ��,
TOTAL N OF SIGNATWi� PAGES 1 • �cu AI,L LOCA710NS FON 813NAT11pQ � A880CIATE � o��er�rnccour►r
ACTON REOUESTED
Hold public heazing for the Davern / Edgcumbe Storm ewer and Paving Project (City Pmject 95-S-8105, includes 95-P-8086).
_ _
_
File No. 18750 CONNECTIONS
i
REt�Mi�ND�AnONS'App°w W°r R°)sot (� ERSONAL SERViC.E CONTRACTS NIUST ANSWER THE FOLLOWINO �UESTIONS:
_ PLANNINfi COMMISSION CML SERVICE COMMIS810N . Has thb p6rsoMirtn eVer wofk9d under a ootlt�ect iof lhis depeArt�eflt? � ;
_ CIB COMMITTEE YES NO � I ,
� STAFF Hes 1Ms persoMkm eV� beetl8 dY �PbY�� i
i
YES NO �
_ as�acTCOUNCa —.].5` . ooes u�s pe�swvrkrn poseess a sldx nw rwm�aMy ao� br �r a� �v errployee? �
BUPPORTS WFpCH COUNCIL OBJECTNE4 YES NO
in aN ya answars o� sapaM� sheat and attach to praan �haet �
,
Neighborhoods Ward 3 � �
inaTU►nrrci P�M, issue, oP�n�mr lwHO, ww►r, wH�, vv�
TLis project is part of the 1995 C�nbined Sewer S 'on Program and has been approved through the CIB process. � �
� !
I �
� f
�
;
j
ADVANTAGE8IF APPROVED: (
Will reduce combined sewage overflow (CSO) W the ississippi River during rains. i
�
�
I !
,
i
as�vu � nrPaovEO:
�
Assessment levied against properties.
i
�O�lC� A@5881't�l �SI' �
i
AUG 0 8 1994 �
;
�
DISAD'VANTAf3E8 IF NOT APPROVEP. I
This is part of the City's National �llution Discharge imination System (NPDFS) permi� Not proceeding with the work may re lt 1
in penaldes. ;
� � � � I
�
�
f
,
�
f
�
TOTAL AMOUNT OF TRANSACTION S C�BT/REVENUE BUDGETED (CIRCLE ONE) YE S No ;
See attac6ed summ of En meerin R ommend. Ac7ivrrY NuMeER M
FUNbIW�i SOURCE g� g I
FINA►�IAL INFORAMTION: (EXPWI� �
�
_'+ , q� � ��E��
�
�
O
R���Na�
CIZY OF ST. PADL I COD FILE 0.
PYBLIMIHAYY OZDEi BY
F LB ■O. 187 0
VOTIBG WASD 3
.
In the �atter of construct'ng sanitary sewer, storm sewer and/or water
service connections, if reque ted by the property owner, in con3unction with
the Davern/Edgcumbe Area St -"---^� fl*+�.Street Paving and Lighting Project.
�
� � �/ �
� �'<</ , '� J
' G-
� � �
♦
.
The Council of the Ci y of Saint Paul having received the report of
the Mayor upon the above im rovement, and having considered said report,
hereby resolves:
.
1. That the said repo t and the same is hereby approved with no
alternatives, and t at the estimated cost thereof is per
connection assessedlat the cost in effect at the time of
installation.
2. That a public heari g be had on said improvement on the 2nd
day of November , 1 94 , at 3: 30 0' clock P.M. , in the Council
Chambers of the Cit Hall and Court House Building in the City of
� Saint Paul.
3. That notice of said Ipublic hearing be given to the persons and in
the manner provided�by the Charter, stating the time and place of
hearing, the nature lof the improvement and the total cost thereof
as estimated.
COUNCILPERSONS I Adopted by Council: Date �� y-
Yeas Nays �,�j -�
�akey i/' i Certif ied Passed bq Council Secretary
� i/�G imm
✓G}� erin I
r/Harris �In Favor By
�/�P� g a r d
VRettman �Ag inst
j/'Fhune Mayor
l bse �-.�-
.