Loading...
94-1113 w P ORIGIN AL .��. CITY OF ST. PAUL COUNCIL FILE NO. 7X - 7//1 , --3 FINAL ORDER B y Fi a o 4 �S 418 _ Voting Ward 7 In the Matter of Sidewalk reconstruction at the following location(s): on both sides Conway Street frd,m Cypress Street to Earl Street. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or :three family structures) Reconstruction (replacement of ;old sidewalk) — $6.84 per front foot for a five (5) foot wide walk and $8.'22 per front foot for a six (6) foot wide walk. All other widths will ba prorated accordingly. New construction (where no walk existed) — 100 % of the actual cost estimated to be approximately $3.10 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI — RESIDENTIAL (More than thee family structures), NON RESIDENTIAL RATES For new and reconstructed sidega1k; 100% of actual cost estimated to be approximately $4.15 per square foot. under Preliminary Order 1 approved �► -w� \S ��qy I 1 The Council of the City cf Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, ther€,fore, be it RESOLVED, That the Counci:, of the City of Saint Paul does hereby order that the above — described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That uton the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. � np COUNCILPERSONS Adopted by Council: Date '1 s U Yea Nays �+ Blakey Certified Passed by Council Secretary iGrimm 1./ Guerin ,_ arris �In :Favor s, (� �r ���,� _�_ __ egard � / � / V Rettman Against it/4- .,� //�11 / Thune V Mayor 1 Public Hearing Date - August 3, 1994 RE 5 -27 -94 Y ,, DEPARTMENTTOFFICE/COUNCI. DATE INITIATED GREEN SHEET V 0 . . � �� ' Public, Works Sidewalks 5 "10- INITIAUDATE INITI • TE _ CONTACT PERSON & PHONE DEPARTMENT DIRECTOR CITY COUNCIL Thomas P. Keefe -266 -6121 - CITY ATTORNEY CITY CLERK ti 41, ►• r BY ' 4 •— BUDGET DIRECTOR FIN. & MGT. SERVICES DIR. ORDER MAYOR (OR ASSISTANT) CoundI Res TOTAL / OF SIGNATURE PAGES 1 (CUP ALL LOCATIONS FOR SIGNATURE) El ASSOCIATE III • ' • ENTAL A T i ACTION REQUESTED Reconstruct Sidewalk in Ward 7 (See attached lilt) RECOMMENDATIONS: Approve (A) or Reject (R) PERSONAL SERVICE CONTRACTS MUST ANSWER THE FOLLOWING QUESTIONS: _ PLANNING COMMISSION _ CIVIL SERVICE COMMISSION 1. Has this person/firm ever worked under a contract for this department? CM COMMITTEE YES NO 2. Has this person/firm ever been a city employee? . STAFF YES NO DISTRICT COUNCIL w 3. Does this person/firm possess a skill not normally possessed by any current city SUPPORTS WHKI COUNCIL OBJECTIVE? employee? YES NO Explain all yes answers on separate sheet and attach to green sheet WJ INITIATING PROBLEM. ISSUE, OPPORTUNITY (WHO, WHAT, WHEN. WIfRE, WHY): The problem "defective sidewalk" was created because of tree roots, deleterious subgrade material, alternating free/thaw.cycles,j service life limits, chemical additives, extreme temmarature variations, etc. These problems occur on a citywide level and must ba addressed and corrected on an annual basis. Left ' ncorrected, the sidewalk condition would worsen to a state where it would be rendered unusable and subject to increased pedestrian injuries from falls and possible litigations. ADVANTAGES IF APPROVED: The community will benefit from this project because it will provide safe detect free sidewalks for its many citizens. The sidewalk contracts are executed by private contractors, so 'r follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF APPROVED: Historically, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment. Simply stated, property owners detest assessmen, and despite the fact up to one -half the assessment is City subsidized, it still remains controversial. Cooed Research Center MAY 2 7 1994 DISADVANTAGES IF NOT APPROVED: This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, wl)I geheraiMiere injury suits, ultimately resulting in the expenditure of larger dolkir amounts in eventual repairs and /or replacement, as well as claim payouts. TOTAL AMOUNT OF TRANSACTION $ 2 A s nAR " COST /REVENUE BUDGETED (CIRCLE ONE) YES NO FUNDNGSOURCE 94•Ma0663 q. p tp 94 • 495,000 ACITVITY C94- 2T726 •27009 FINANCIAL INFORMATION: (EXPLAIN) 0, AST • 400,000 C, CtB 94 • 50,000 • ■ 1 ORIGINAL J +II f-) /1 CITY OF ST. PAUL COUNCIL FILE NO. / �'�j PRELIMINARY ORDER By c, t r ,A.A. File No. S9488 Voting Ward 7 In the Matter of Sidewalk reconEtruction at the following location(s): on both sides Conway Street from Cypress Street to Earl Street. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) — $6.84 per front foot for a five (5) foot wide walk and $8.22 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) — 100% of the actual cost estimated to be approximately $3.10 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI — RESIDENTIAL(More than three family structures), NON— RESIDENTIAL RATES For new and reconstructed sidewalk; 100% of actual cost estimated to be approximately $4.15 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1994 Public Improvement Aid. 2. That a public hearing be had on said improvement on the _3rd_ day of _August 1994 , at 3:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. 3. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Adopted by Council: Date Yeas Nays akey Certified Passed by Council Secretary �imm erin _ arris In Favor By ,� __� :_�.__ egard ttman 0 Against une Mayor ��w °ITy 0 � 9 , ff t Saint P. ul City Council yi . �® .i 1 Public Hearing Notice '' ttil!) lifiit %% " "f i ii M1 It f Public Ixnpr 0 vexnent Construction (� i ° C r & 5 4 . OWNER OR TAXPAYER COUNCIL DISTRICT #7 PLANNING COUNCIL #04 .......... ............................... FILE # .S9488 PROPERTY ADDRESS ............................................................................... ............................... ............ ............................... PARCEL ID PROPERTY TAX DESCRIPTION THE TIME: WEDNESD Y, AUGUST 3, 1994 AT 3:30 P.M. PUBLIC PLACE: City Co cil Chambers, 3rd Floor City Hall-Court House HEARING Written or oral s .tements by any owner will be considered by the Council at th s hearing. PURPOSE To consider appr • val of the proposed project as follows: Reconstruction of sidew -Ik on both sides CONWAY STREET from Cypress Street to Earl Street. ESTIMATED If the City Counc I approves the project, all or part of the ASSESSMENT cost will be asse .sed against the benefitted properties. The INFORMATION ESTIMATED asse . sment for the above property is $. THIS AMOUNT W LL NOT NEED TO BE PAID ALL AT ONE TIME! Please see PAY ENT INFORMATION on the reverse side of this notice and also t e enclosure for additional project information. ESTIMATED ASSESSMENT CALCULATION CONTINUED ON REVERSE SID: NOTIFICATION DATE: 07/15/94 SUMMARY OF ENGINEERING RECOMMENDATIONS Li Ward 7 s'y 8ff PROJECT: RECONSTRUCT pIDEWALK B.S. CONWAY ST. from Cypress St. to Earl St. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of four (4) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaves, asphalt patches, disintegrated, scaled, setled and cracked panels. S 9y8 PROJECT: RECONSTR■ T .IDEWL B.S. N. WINTHROP ST. from North Park Dr. to Burns Ave. INITIATING ACTION: This order .s initiated by the Director of Public Works as public necessity on the basis of f. (4 omplaints and an inspection of the walk. EXISTING CONDITIONS• his walk is pob -d concrete with heaves, offgrade, asphalt patches, settled and cracked panels.