Loading...
94-1040 ORIGINAL . CITY OF ST. PAUL COUNCIL FILE NO. 7 / , FINAL ORDER By TM ,f,L( ; 1 Fil No. S9479 Voting Ward 6 In the Matter of Sidewalk recons ruction at the following location(s): on the north side East Maryland venue from Edgewater Boulevard to North McKnight Road at'2251 East Mary1 nd Avenue. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or t ree family structures) Reconstruction (replacement of o d sidewalk) — $6.84 per front foot for a five (5) foot wide walk and $8.2 per front foot for a six (6) foot wide walk. All other widths will be rorated accordingly. New construction (where no walk existed) — 100% o the actual cost estimated to be approximately $3.10 per square f ot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed side alk along and abutting the "long side" of the property. MULTI — RESIDENTIAL (More than thre family structures), NON RESIDENTIAL RATES For new and reconstructed sidewa k; 100% of actual cost estimated to be approximately $4.15 per square f ot. under Preliminary Order C A — 1 approved M e S \ Cc: y � 1 The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, d e notice thereof having been given as prescribed by the City Charter; nd WHEREAS, The Council ha heard all persons, objections and recommendations pertaining to aid proposed improvement and has fully considered the same; now, theref re, be it RESOLVED, That the Council f the City of Saint Paul does hereby order that the above — described improve ent be made, and the proper City officers are hereby directed and authorize to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Counc'_1 in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Adopted by Council: Date, �, 0 ( 1a Yeas Nays • y � ��I't�-� 1 VBlakey Cert' le. Passe b J•uncil Secretary Grimm /Guerin LA arris 4 In F vor B OP A e∎ VM e g a r d AP" /Arlirfir4 �/kettman Agai st /at. j/Thune ( k Mayor ' • yy _Public Hearing Date — July 20 1994 RE 5 -13 -94 ft�- /04/0 287 • DEPARTMENT/OFFICE/COUNCIL DATE INITIATED GREEN SHEET N o . Public Works Sidewalks 426 -94 INITwtIOATE INITIALIDATE CONTACT PERSON & PHONE DEPARTMENT DIRECTOR [J cm couNCL Thomas P. Keefe - 266 -6121 ASSIGN CITY ATTORNEY 0 CITY CLERK BE ON COUNCL AGENDA BY (DATE) 6— — FOR )BOER BUDGET DIRECTOR FIN. & MGT. SERVICES DIR. 0 MAYOR (OR ASSISTANT) III Council Reset TOTAL N OF SIGNATURE PAGES 1 (CUP ALL LOCATIONS FOR SIGNATURE) 0 ASSOCIATE ip • ' TMENTAL ACCOUNTAtft ACTION REOUESTED Aldl 4 - -r s Reconstruct Sidewalk in Ward 6 (See attached list) P l / . S9L74 RECOMMENDATIONS: Approve (A) or Reject (R) PERSONAL SERVICE CONTRACTS MUST ANSWER THE FOLLOWING QUESTIONS: _ PLANNING COMMISSION CIVIL SERVICE COMMISSION 1. Has this person/firm ever worked under a contract for this department? YES NO _ CIS COMMITTEE 2. Has this person/firm ever been a city employee? A STAFF YES NO DISTRICT COUNCIL . 3. Does this person/firm possess a skill not normally possessed by any current city SUPPORTS WHICH COUNCIL OBJECTIVE? employee? YES NO Explain all yes answers on separate sheet and attach to green shoat 140 INITIATING PROBLEM. ISSUE. OPPORTUNITY (WHO, WHAT, WHEN. WHE E. WHY): The problem "defective sidewalk" was created becal se of tree roots, deleterious subgrade material, alternating free/thaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide level and must be addressed and corrected on an annual basis. Left ui corrected, the sidewalk condition would worsen to a state where it would be rendered unusable and subject to increased pedestrian injuries from falls and possible litigations. ADVANTAGES IF APPROVED: The community will benefit from this project because it will provide safe detect free sidewalks for its many citizens. The sidewalk contracts are executed by private contractors, so it allows that private sector jobs are created as a result of this activity. DISADVANTAGES IF APPROVED: Historically, the sidewalk reconstructions have crested negative feedback in the area of construction procedure and assessment Simply stated, property owners detest assessments, and despite the fact up to one -half the assessment is City subsidized, it stil remains controversial. MAY 16 1994 DISADVANTAGES IF NOT APPROVED: This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits, ultimately resulting in the expenditure of larger dolly amounts in eventual repairs and /or replacement, as well as claim payouts. • TOTAL AMOUNT OF TRANSACTION $ 1 n . 9 7n of COST/REVENUE BUDGETED (CIRCLE ONE) YES NO FUNDING SOURCE 94 —M -0663 A. PIA 94 = 495,000 ACITVITYNUMBER C94- 27726- 0784 -27009 FINANCIAL INFORMATION: (EXPLAIN) B. AST it 400,000 C. CIB 94 = 50,000 1 -1? \#*1 8 7 SUMMARY OF ENGINEERING RECOMMENDATIONS gym 70‘. Ward 6 PROJECT: REC•NSTR , T - IDEWALK B.S. CASE AVE. from N. Ruth St. to S� ' Nokomis Ave. INITIATING ACTION: This orde as initiated by the Director of Public Works as public necessity on the basis of ei ; (8) complaints and an inspection of the walk. EXISTING CONDITIONS: his wal 's poured concrete with tree heaves, asphalt patches, scaled, settled and racked pane . 591./78' PR • ECT: RECONSTR C IDEWA S.S. E. IVY AVE. form Van Dyke St. to N. Hazel St. at 1894 E. Ivy Ave. r INITIATING ACTION: This order - as initiated by the Director of Public Works as public necessity on the basis of a • .ti on with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: his, walk is poured concrete with one (1) mutli- cracked panel. PROJECT: RECONSTRUCT SIDEWALK N.S. E. MARYLAND AVE. from 59'07 Edgewater Blvd. to N. McKnight Rd. at 2251 E. Maryland Ave. Only. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of a p etition with one (1) signer and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves and asphalt patches.