In the Matter of improving public areaways within the Fourth Street right-of-way abutting 336 Robert 5treet
North (the Pioneer Building) and 333 Sibley Street (the Sibley Squaze building) in conjunction with the Central
Corridor Light Rail Transit Project by temporarily disconnecting, removing, shoring up and reinstalling existing
utility connections, piping, mechanical equipment and lighting located within said areaways, and doing all other
necessary work to complete said project.
The Council ofthe City of Saint Paul having received the report ofthe Mayor upon the above nnprovement, and
having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is
$91,883.00, to be financed by assessments.
2. That a public hearing be had on said improvement on the 21st dau of Julv. 2010, at 530 o'clock .�m., in the
Council Chambers of the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public heazing be given to the persons and in the manner provided by the Charter, stating the
time and place of hearing, the nature of the nnprovement and the total cost thereof as estimated.
Yeas Nays Absent
Bostrom
Carter
Harris
Helgen
Lanhy �
Stark
Thune �
Adopted by Council: Date
Adoption Certified by Co ci]
By:
Approved by May Date
Y �_ _l�
B:
%%���J
Secretary
7�,.� /,�
Requested by Department of:
PUBLIC WORKS
By: �B-.tl/fZ f�' /�C ro�/�4-
Approved by the Office of Pinancial Services
By:
,
Approved by City Attorney
BY �154� � , ���2�
Approve� b a or Submission to Council
gy: �/ � '��C./�—L
����
� Gree� Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet �
DepartmenUOffice/COUncil: Datelnitiated: �
FS —FinancialServices o8�„N2o,o Green Sheet NO: 3114 57
Contad Person & Phone:
Bruce Enqelbrekt
266-8854
� Must Be on Council qqenda by (Date):
Doc. 7ype: OTHER (DOESN'T F T ANY
CATEGORI� �
E-Document Required: N
Uocument Contact: �uan Ortiz
I ConWctPhone: 266-8858
y
Assign
Number
For
Routing
Order
� Total # of Signature Pages ` (Clip All Locations for Signature)
^ Z° -
� �
Action Requested:
Set date of Public Hearing to consider sub-surface utility improvements in the 4th Street right-of-way, abutting the Pioneer building
and the Sibley Squaze Building.
Recommendations: Approve (A) or Reject (R):
Planning Commission
CIB Committee
Civil Service Commission
Personal Service Contrects Must Answer the Following Questions:
1. Has this person/firm ever worked under a contrect for this department?
Yes No
2. Has this person/firm ever been a city employee?
Yes No
3. Does this person/firm possess a skiil not normally possessed by any
curtent city employee?
Yes No
F�cplain all yes answers on separate sheet and attach to green sheet.
lnitiating Probfem,lssues, Opportunity (Who, What, Wfien, Where, Why): .
Owners of the above-menuoned downtown buildings have requested sub-surface improvemenu in the right-of-way and want said
improvemenu assessed to their properties.
Advantages If Approved:
Improvement would benefit said properties.
I Disadvantages If Approved:
Assessments levied to the properties.
Disadvantages If Not Approved:
No work being done would go against the desues of the properry owners.
Totaf Amount of $91,853.00
Transaction:
Funding Source: ASSeSSRlentS
Financial Infortnation:
(Expiain)
CosVRevenue Budgeted:
Activity Num6er.
fti� � � C��U
� �����e
June 11. 2010 10:55 AM p�nc �
�a ���
SUMMARY OF ENGINEERING RECOMMENDATIONS
Fourth Street Areaways — Jackson to Sibley
Report Prepared 6-9-10
Public Hearing 7-21-10
PROJECT
As part of the CC LRT project the sidewalk on the north side of Fourth Street between
Jackson Street and Sibley Street, will be removed and reconstructed. The Pioneer Building
and Sibley Square Building have areaways which are in need of improvement so that the CC
LRT work may proceed. The property owners have requested the work be completed by Met
Council and assessed to them. This work consists of relocating and/or supporting utilities and
performing all other related work to complete said improvement.
EXISTING CONDITIONS
The existing areaways have utilities attached to the underside of the sidewalk which wi11 be
removed to perform the CC LRT work. These utilities must be relocated and/or supported during
this sidewalk work.
PROPOSEDIMPROVEMENTS
It is proposed to improve the sidewalk on the norkh side of Fourth Street between Jackson
Street and Sibley Street, by relocating and/or supporting existing utilities, removing the existing
sidewalk, performing the necessary CC LRT work, replacing the sidewalk and replacement of
areaway utilities.
The property owners have requested the work be completed by Met Council and assessed to
them. Once the work has been completed the City will assess the property owners for the full
cost of the work. The City will reimburse Met Council the fuli cost of the work for the two
areaways under the CC LRT Master Funding Agreement between the City of Saint Paul and
Met Council.
ALTERNATES
To do nothing would be inconsistent with the property owners desire to have this work assessed
to them. The property owners would need to cover 100% of the cost of the work immediately.
POSITIVE BENEFITS
By Met Council controlling the work there is less chance for delays to the CC LRT project which
is on a tight timeframe.
ADVERSE EFFECTS
The City will be financing the work.
r �-� � �-
TfME SCHEDULE
The work will be completed in the summer of 2010. Ekact timing and schedule of work will be
coordinated by Met Council to minimize disruption to adjacent property owners and to keep CC
LRT on schedule.
COST ESTIMATE
Construction Sibley Square
Construction Pioneer Building
PROJECT TOTAL
ESTIMATED FINANCING
Assessments Sibley Square
Assessments Pioneer Building
PROJECT TOTAL
$ 35, 000
$ 65,006
$ 100,000
$ 35,000
$ 65,000
$ 100,000
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Dan Haak, at 266-6084.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a wo�thwhile project, and the Engineering
Recommendation is for approval of the project and financing.
Respectfulfy submitted,
Dan Haak
Public Works