08-397CITY OF ST. PAUI,
PRELIMINARY ORDER
COUNCIL FILE NO. Q � � ��
BY— � �
Eile Nos. 19054 & 19055 ��
Voting Ward 2
Green Sheet No. 3�S ���
In the Matter of constructing an above standard globe style street lighting
system on the west side of Broadway, the east side of Wa11 Street and the
north side of Kellogg (File No. 19054).
also,
In the Matter of the Operation Costs of the Above Standard Street Lighting
System for 2008 for the above project (File No. 19055).
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
l. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $ 118,000.00 , financed by
Assessments and CIB funds.
2. That a public hearing be had on said improvement on the 7th day of May,
2008, at 5:30 o'clock p.m., in the Council Chambers of the City Hall and
Court House Building in the City of Saint Paul.
:
3. That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearinc3, the
nature of the improvement and the total cost thereof as estimated.
Yeas Na s Absent
Bostrom ✓
Carter ✓
Harris ✓
Hel en ✓
Lantry ✓
Stark ✓
Thune r
%
Adopted by the Council: Date: ��G /��p�
Certified Passed by the Council Secretary
By '
Mayor
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet
ba-3y�
. Departmentlofficelwuncil: I Date Initiated:
; Pw -�b���W� :�2-�-0e ! G r e en Sheet NO: 3050973
Co�d Person 8 Phone:
Brian Yttek
266-6256
Doc. Type: PUBLIC HEARING (RESOLU7
E-Document Required: N
Document Contact: Brian V'dek
ContaM Phone: 2666256
�
Assign
Number
For
Routing
Order
7oW I# of Signature Pages _(Clip All Locations for Signature)
� Public Worl¢ Paat St Martin I
I Pnblic Works I Real Estate
2 'Council f CiryCounc�
3 'C� Clerk I CiN Clerk
��
�
Set date of public heazing to approve instal(ation, operarion and maintenance assessment for above standazd globe style street lighting
system for the west side of Broadway, the east side of Wall Street and the north side of Kellogg.
Planning Commission
CIB Committee
Civil Service Commission
1. Has this person�rm ever worked under a contract for this departmenY?
Yes No
2. Has this persoNfirtn ever been a ciry employee?
Yes No
3. Dces this person/firm possess a skill not nortnally possessed by any
current city employee?
Yes No
E�cplain all yes answers on separate sheet and aMach to green sheet
Initiating Problem, lssues, Opportunity (Who, What, When, Where, Why�:
Residents of Great Northern Building, 300 Wall Stree[, requested installation of above standazd globe style lighting.
AdvanWges IfApproved:
Lighting installation will proceed
DisadvaMages If Approved:
Increase in the City's operation and maintenance costs.
Dfsadvantages If NotApproved:
The lighting project will not proceed.
Transaction: $118,000.00
Funainy source: CIB, Assessments
Financial Information:
(Expiain)
Activity Number.
CosVRevenue Budgeted:
April 9, 2008 220 PM Page 1
68- 3� �
SUMMARY OF ENGINEERING RECOMMENDATIONS
GREAT NORTHERN BUILDING
Above Standard Street Lighting System Construction
March 12, 2008
Project
Installation of 3-Globe and 5-Globe Style Street Lighting System on the east side of
Wall Street and on the wesi side of Broadway to the north of Kellogg Boulevard. Single
Globe lantems will be installed on Kellogg Boulevard between Wall Street and
Broadway.
Initiating Action
The project was initiated by members of the Great Northern Condominium Association.
The Great Northern Condominium Association representative has obtained signed
Waivers of Notification and Waivers of Right of Appeal from the Condominium owners.
Proposed Improvements
It is proposed to install two 3-Globe and one 5-Globe Style Street lights on the east
side of Wall Street, and one 3-Globe and one 5-Globe Style Street lights on the west
side of Broadway. Also, two Single Globe lanterns will be instafled on Kellogg Soulevard
between Wall Street and Broadway. Please see attached pian.
The area will be included in the existing Lowertown Maintenance Area. The above
standard portion of the operation and maintenance costs will be assessed at the current
Lowertown Maintenance rate.
Positive Benefits
The new light installation will match the surrounding street light system.
Adverse Effects
An increase in the City's operation and maintenance budget.
Time Schedule
Work to be completed spring 2008
Cost Estimate
Labor and materials $118,000
Operation & N{aintenance $1,576
Estimated Financing
Assessments $59,000
2008 CIB $59,000
b8�3��
Proposed Assessments
Estimated
Above Standard Assessment $59,000.00
Yearfy Operation & Maintenance Assessment $ 2.50 per assessable foot.
Source of Additional information
Brian Vitek at 266-6256
Summary and Recommendations
The Department of Public Works believes this is a necessary and worthwhile project
and the Engineering Recommendation is for approval of the project.
68-3�?
U1 �
x O
0.; ~
O H
a � �
� Q
�
�a�
��a�
�a�
�w�
�oa
�
�w�
N�
���
��
aw
w�
��
�
�
►
E-+ �
� O
� E-�
O �
a �
o
a
�
� �
� w
a�
��
�a�
��
wzo
���
o a 00
��o
�w
w
��
��