08-1257CITY OF ST. PAUL
PRELINIINARY ORDER
COUNCIL FIL NO. L�' �a��
By ��
File No. 19064 �� _
Voting Ward 5
Green Sheet No. 3062318
In the Matter of improving the area referred to as VICTORIA STREET from Como Boulevard to Arlington
Avenue, by constructing new bituminous surface streets with concrete curb and gutter, concrete driveway aprons
and outwalks, boulevards landscaped with sod and trees, and a new lantem style lighring system and doing all other
necessary work to complete said project.
Also, lead water services in the right-of-way will be replaced.
Also, the conshuction of and/ar repair of sanitary sewer, storm sewer, and/or water service connecrions will be made
at the request of the property owners. (File No. 19064C)
The Council ofthe City of Saint Paul having received the report ofthe Mayor upon the above improvement, and
having considered said report, hereby resolves:
1. That the said report and the same is hereby approve with no alternatives, and that the estimated cost thereof
is $ L299.530.00, financed by Minnesota 5tate Aid and assessments.
2. That a public hearing be had on said improvement on the 3rd day of December. 2008. at 530 o'clock ti.m., in
the Council Chambers of the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating
the time and place of hearing, the nature of the improvement and the total cost thereof as estimated.
Adopted by Council: Date l/��� f�j�
Adoption Certified by Council Secretary
By: - ,
Approved� a r: Date � �� 7 �}�
By: , SC>" " U i
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Coreen Sheet �
�' � �'�7
P W _ Public Works
; ConWct Person 8 Phone:
` Barbara Mundahi
� 266-6112
Must Be on Council Agenda by (Date):
Type: �T�'{� �OOESNT FIT M1Y
CATEGORI7
E-DOCttment Required: Y
DocumeM CoMact: Lynn Moser
Conqct Phone: 266-8851
o��0�-08 ; Green Sheet NQ: 3062318
y
Assign
Number
For
Routing
Order
ToWI # of Signalure Pages,(Clip All Locations for Signature)
Action Requested: � -
Set Hearing Date: Construct new bihuninous surfaced sheet wi[h wncrete cur6 and gutter, concrete driveway aprons and outwaiks,
boulevazds landscaped with sod and sheet, and a new lantem style lighting system; replace lead water services; and make sanitary
sewer repairs in azea called V ictoria Sheet from Como Boulevazd to Arlington Avenue.
Recommendafions: Approve (A) or Reject (R):
Planrrin9 Commission
as comm�a�
Civil Service Commission
Personal Service Contracts Must Answer ihe Following Questions:
1. Has this perso�rm ever worked under a wntract for this department?
Yes Na
2. Has this persoNfirm ever been a city employee?
Yes No
3. Ooes this person(firtn possess a skill not normally possessed by any
wrzent city employee?
Yes No
Explain all yes answers on separate sheet and attach to green sheet
Initiating Problem, issues, OppoAuniYy (Who, What, When, Where, Why):
This project for general improvement of the public righUOf-way will enhance and add quality to the Victoria Street from Como
Boulevazd W Arlingtoa Avenue.
AdvanWges if Approved:
General improvement of the right-of-way will enhance and add quaLity Go the neighborhood. The newly rebuilt roadways will
improve drivability of the neighborhobd and continue the City's efforts to improve the street system in Saint Paul. Street oiling in this
neighborhood wi31 be elimina[ed. Lantem style lighting will also enhance neighborhood safety a�d aesthetics.
Disadvantages lf Appraved:
Normal problems associated with consttuction, such as noise, dust, and general disruprion will occur.
DisadvanWges If Not Approved:
The pavement stcucture will conrinue to deteriorate, maintenance cost will rise, and the level of service provided by these sReets will
drop.
7ota� Amount of $1,299,530.00
Trensadio�:
Funding Source: MSA and AsS2SStnents
Financialtnformation:
(Explain)
CosURevenue Budgeted: Y
Activity Number:
November 5, 2008 11:44 AM Page 1
6 � -/a57
SUMMARY OF ENGINEERING RECOMMENDATiONS
Victoria Street Paving Project
City Project No. 09-P-1331
Report Prepared — 10/20/08
Public Hearing — 11/19/08
PROJECT
This project is to improve Victoria Street ftom Como Boulevard to Ariington Avenue
by constructing a new bituminous surfaced street with concrete curb and gutter,
concrete driveway aprons and outwalks, boulevards landscaped with sod and trees,
and a new lantern style street light+ng system. In addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way will be replaced and storm
and sanitary sewer reconnections will be made at the request of property owners.
EXISTiNG CONDITIONS
Victoria Street is an oiled street that is in poor condition. The existing street width varies
from 34' to 42'. Existing boulevards are eroded. Victoria Street has wood pole lighting.
PROPOSEDIMPROVEMENTS
ft is proposed to improve Victoria Street with the construction of a new bituminous
surfaced street with concrete curb and gutter, concrete driveway aprons and outwalks,
and boulevards landscaped with sod and trees. in addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way will be replaced and storm
and sanitary sewer reconneetions will be made at the request of property owners.
The proposed street width is 38' to allow for parking on both sides of the street. A
petition for bump-outs at the intersections in currently being circulated.
Victoria Street will have a lantern style street lighting system instailed as part of this
project.
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve existing
oiled and older paved streets.
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadway will improve drivabifity of the neighborhood,
and continue the City's efforts to improve the street system in Saint Paul. Lantern style
lighting will enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normai probiems associated with construction such as noise, dust, reduced access to
the neighborhood, and generai disruption wilf be present.
�� � a5�
EFFEGTS ON TREES
New trees wiil be planted as part of the boulevard restoration. Some trees may naed to
be removed to accommodate the construction of a storm water infiltration/rain garden
on the west s+de of Victoria between Como Blvd, and Como Lake Drive. New tress wil{
be planted in the boulevards around the rain garden site.
TIME SCHEDULE
The project will begin in the spring of 2009 and will be completed by the fall of 2009.
COST ESTIMATE
Construction
Engineering
PROJECT TOTAL
ESTIMATED FINANCING
MSA
Assessments
PROJECT TOTAL
$ 1,039,624
$ 259.906
1,299,530
$ 1,098,539
$ 201.000
$ 1,299,530
The estimated 2009 assessment rates for residential street paving and lighting are:
$38.65 per ASSESSABLE �OOT for street paving
$8.84 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
SOURCE OF ADDITIONAL INFORMATtON
For additional information, contact the Project Engineer, Barb Mundahl, at 266-6112.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
Respec I{y ubmitted,
�� °�