06-157CITY OF ST. PAIIL
PRELIMINARY ORDER
,�
Votiag
d�- I S� 2i
�
In the Matter of improving the area referred to as the CHATSWORTH/GOODR2
RSVP (Residential Street Vitality Projeat). This project area is bounded
generally by Summit Avenue on the north, Lexington Parkway on the west,
Lombard Avenue on the south, and Victoria Street on the east.
It is proposed to improve the following streets with the construction of a
new bituminous surfaced street at the listed width, with standard concrete
curb and gutter, concrete driveway aprons and outwalks, and boulevards
landscaped with sod and trees. In addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way will be
replaced, and storm sewer and sanitary sewer connections will be made at
the request of property owners.
LINCOLN AVENUE, 32' - West end by Ayd Mill Road to Lexington Parkway
FINN STREET, 36' - Summit Avenue to Grand
OTIS AVENUE, 38' - Marshall Avenue to approximately 200 feet north, and from 600 feet north of
Marshall to Peiham
OTIS AVENUE, 30' - from approximately 200 feei north of Marshall to 600 feet north of Marshall
MILTON STREET, 30' - Benhill Road to St. Ciair Avenue
It is proposed to improve the following streets with the construction of
new bituminous surfaced streets at the listed width, with concrete curb and
gutter, concrete driveway aprons and outwalks, and boulevards landscaped
with sod and trees. The curb will have a 6" wide gutter, and will be
colored to look like the original sandstone curb. In addition, appropriate
sanitary sewer repairs will be made, lead water services in the right of
way will be replaced, and storm sewer and sanitary sewer connections will
be made at the request of property owners.
LINCOLN AVENUE, 30' - Lexington Parkway to Victoria Street
GOODRICH AVENUE, 32' - Lexington Parkway to Chatsworth Street
GOODRICH AVENUE, 30' - Chatsworth Street to Victoria Street
FAIRMOUNT AVENUE, 32' - Oxford Street to Chatsworth Street
FAIRMOUNT AVENUE, 30' - Chatsworth Street to Victoria Street
OSCEOLA AVENUE, 32' - Lexington Parkway to Milton Street
LINWOOD AVENUE, 28' - Lexington Parkway to Victoria Street
OXFORD STREET, 30' - St. Clair Avenue to Summit Avenue
CHATSW ORTH STREET, 30' - St. Clair Avenue to Summit Avenue
MILTON STREET, 30' - St. Clair Avenue to Summit Avenue
o� is�
It is proposed to improve the following street with the construction of a
new bituminous surfaced street at the listed width, with concrete curb and
gutter, concrete driveway aprons and outwalks, and boulevards landscaped
with sod and trees. The curb will have a 6" wide gutter but will not have
coloring added. In addition, appropriate sanitary sewer repairs will be
made, lead water services in the right of way will be replaced, and storm
sewer and sanitary sewer connections will be made at the request of
property owners.
LOMBARD AVENUE, 22' - Lexington Parkway to Milton Street
It is proposed to improve the following street with existing sandstone
pavers. The improvements will also include concrete driveway aprons and
outwalks, and boulevards landscaped with sod and trees. The existing
granite curb will be reset, and the small section of existing sandstone
curb will be replaced with stockpiled granite. In addition, appropriate
sanitary sewer repairs will be made, lead water services in the right of
way will be replaced, and storm sewer and sanitary sewer connections will
be made at the request of property owners.
OSCEOLA AVENUE, 32' - Milton Street to Victoria Street
All the streets in the project area that have an existing lantern lighting
system will have that system refurbished and reinstalled. In locations
where there are not existing lanterns, a new lantern style street lighting
system will be installed.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $ 5,468,000.00 , financed
by MSA, CIB funds and Assessments.
2. That a public hearing be had on said improvement on the Sth day of
April, 2006, at 5:30 o'clock p.m., in the Council Chambers of the City Hall
and Court House Building in the City of Saint Paul.
0�- ►S�1
3. That notice of said public hearing be given to
manner provided by the Charter, stating the time and
nature of the improvement and the total cost thereof
Yeas Na s Absent
Benanav v
Bostrom
Harris ,i
Hel en �
L.an
Mont ome ,i
Thune ✓
d �
the persons and in the
place of hearing, the
as estimated.
Adopted by the Council: Date: � SadOG
Certified Passed by the Counci] Secretary
By
Mayor
� Green Sheet Green Sheet Green Sheet Greeo Sheet Green Sheet Green Sheet �
ay . , . ��
Departrnent/office/council: UafelnAiated: - -
pw �b�;�w� o�fE� Green Sheet NO: 3029637
ContactPerson 8 Phone:
Usa Falk
266-6717
N1ustBe on Council qgen�
72-FEB-0C.
� ,
Assign
ia by (Date): Number
For
Routing
Order
Deparhnent SentTo Person - In'�tiallDate
0 ' W
1 rie
2 er
ContractType: „� , ,
OT-0THER(DOES[SiFfi'ANY � �
CATEGORI� .
Tofal � of SignaW re Pages_ (Clip PJI Locations for:
' Approve Chatscvorth-Goodrich RSVP (Area 8 n boimded by Summit, Lexington, Lombartl, & Yicforia. Color concrete cuib & gutter to
resemble exisfing sandstone cutb. Osceola, Milton to Victoria, reset exi�ting g'anite curb & sandstone pavers. Improve Finn, Snmmit
, to Giend, & Otis, Marshall to Pell�am. ,Refurbish'existing lantem lights & install new lantems where no lights exist. ,
'_ File No. 1897G � ': _ � _ - �. � ,
� Recorrimendatiors;Appm�e(AjorReject(R):- , " �PersonalServiceContracts�MugtMswerfheFdllowing�Questions: . -
. " Plae»iog Coriimission ,- - , 1. Hasthis persoNfiirn e�ervrorked un2lei a confracYfor'this departrnerd? ,-
. . CIB Committe@ ., ' . - - . � . y�' ,� _ _ _ . ' ' -
� %Crvil Service Commission ,. - . � 2. Has this persoNfirm ecer beeqa cit.y empioqee4.. � ' �
. . - , . . . YRS_. No. � .. , , � _ . ,
, _. - . , , � " � - " '3. �es'this persoNfirm Pdssess.a skill.not normalN [�sesseC%y arry � . .
.. - . � , . , carFer�t�fy empioyee?, � � ' � ' , ' - _ - -
. _ - Yes � No � - � .
- - �, �-ExpW7n alf yes answers on separate sheef and.a'ttach to green sheeh,
lnitiatingProbYem,dssues,6pportunity(W}io '_ - `� - ', � , _ - ^ -
This project �is being compleYed as part of 17ieS2esidential St[eef �itaTi(}%Prqg[a� (RSVP). This is ane of several RSVP,projecfs
' ,,seleoted �'or 200Y conshvetion by Publio 1T,/orlcs and approveii by the Long I2angeCapital Improvement Bui3get Comniiftee and tke'
Ciry Council. .
� Advar�2a9eslfdlppioved:�� � -.�'-: � � �`: - . "�.:.��,�� .�� ,. "� . .. � - .� �.' .. ; . .
Genetal improvement af the right-of-way will enhance and add guality to the neighborhood. The newly rebuilt roadways will impro�
' driveability of.the neighborhood and continue the City's efforts to improve the street system in Saint Paul. Street o3ling in fliis
' neig�borhodflhvill be elimixiated Refurbishe� lan�em sireet lighting wifl,also�eni�arice ileighborhood sa�ety and aesfhetios. � �`
'�DisadvantageslfApProved:, . � '� .. �� . . � " . , � � � � . . ' '
Noimal .problems assooiated wifh.construction such a's noise, dust; and geneial clisruption will pccuv '
DisadvantagesifNotApProved: " .. � - . � � � � . . - �.. . , . . �
The paveme�, structure will continue to deteriorate, rnaintenance costs will rise, and the leyel of sarvice provided try these streets will
drop. ;
Total Amonnt af - -
� - � Transaction• $5;468,000 � CosNRevenueBudgeted: �'
-_ = Fur,ding5ource:� CIB; �ssessments, .- . ' �'Mrtv�xumber". � :
Financiallnformatian: � � , -
� (Explain) � ' -
February 7, .2006 12:54 PM
Page 1
����a�� ��,._,�'Sn �€� �'nn��r
��� �, � ���
�.