Loading...
03-579CITY OF ST. PAUL PRELIMINARY ORDLR COUNC E NO . O3 � S�`q By '� °1 � File .503003 Voting Ward_ 2 In the Mattez of sidewalk reconstruction and/or new construction at the following locations: 503003 - South Side Bast Fourth Street from Wacouta Street to Wall Street at 270 Bast Fourth Street Only. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$11.32 per front foot for a five (5) foot wide walk and $13.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 100% of the actual cost estimated to be approximately $5.06 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstrueted sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100% of actual cost estimated to be approximately $6.85 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEg ABOVS for estimated construction rates, financed by assessments and 2003 Public Improvement Aid. 2 �� That a public hearing be had on said improvement on the 2i day of July 2003 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and_place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILP&R50NS Yeas Nays ✓ Benanav �/ Blakey ✓BOStrom P,�qScr.�- —coleman ���^� –Harris ✓Lantry �/Aeiter � In Favor �Against � ��Se.v�l Adopted by Council: Date��� � Certified Passed by Council Secretary o3-s�t9 SUMMARY OF ENGINEERING RECOMMENDATION Wazd 2 PROJECT: RECONSTRUCT SIDEWALK S.S. E. FOURTH ST. from Wacouta St. to Wall St. at 270 E. Fourth St. Only. l��311VITIATINGACTION.• This orderwas initiated bythe Director ofPublic Works as public necessity ��� on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with heaves, asphalt patches, and underxnined panels. I �`U`I�N(. �1�liv� �ff"y�.� v v�.t � ��;v.� � Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet � P�/ — public Works Contact Person 8 Phone: Allan C�aia 266-&108 Must Be on Council A$en 30-MAY-03 � Assign by (D tej� F�umber }[�N Routing Order Totai # of Signature Pages _(Clip AII Locations for Signature) Reconstruct sidewalk in Ward 2. idations: Approve (A) or Planning Commission C4B Committee �� -, Civil Service Commission � 5i?#FF . I Green Sheet NO: 110507 D � ublic�VOrks � i 1 rouncil 1. Has this persoNfirm ever worked under a contract for this department? tl � Yes No 2. Has this person/firm ever been a city employee? Yes No 3. Does this person/firm possess a skili not normally possessed by any current city employee? Yes No Explain ali yes answers on separete sheet and attach to green sheet . . _ --- ----- ----�---------- -------------..._— - Initiating Problem, Issues, Opportunity (Who, What, When, Where, Why): The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, freeze/thaw cycles, service life kimits, chemical additives, extreme temperature variations, eta These problems occur on a citywide basis and must be addressed and corrected annually. Lefr unebttected, the sidewallc condirion would worsen to a state where it would be unusable and subject to increased pedestrian injuzies from falls and possible litigations. ' AdvantapesifApproved: The community will benefit from this project because it will provide sAfe defect free sidewalks for its citizens. The sidewal conttracts are done by private conkactois generating public sector jobs as a result. DisadvantaaeslfApproved: , , � _ Historically, the sidewalk reconstruction has created negative feedback because of constiuction procedures and assessments.Property owners questiou the assessmenu, despite ttie fact that up to one-half the assessmentt is City subsidized. Having to assess for walk reconstruction remains a controversial issue. . DisadvantageslfNotApproved: This option would allow t�he infrastructure of sidewalk stock to deteriorate, which in twn, wi11 generate more personal injury suits, resulting in the expenditure of larger dollar amounts in repairs and rreplacement, as well as claim payouts. Total Amount of Trensaction: �� Fundinq Source: 03-M-0674 A. PIA Financial Information: 991,637.89 B. AST {Explain) Z�0,000.00 CosURevenue Badgeted: Y ActiviN Number: CO3-2T756-0784-d000 �3�i1'?F1'fh t' �.�¢�a�i �' � �Q�S��