02-65CITY OF ST. PAUL
PRELIMINARY ORDER
�,-,:
COIINCIL� N� S
By
File No. 18962 & 18962A
Votiag Ward 2,5,6
11]
.
In tha matter of constructing public improvements for the Phalen Boulevard
Phase I project. Public improvements to include construction of a sanitary
sewer, storm sewer, water main, concrete curb and gutter, new bituminous
surfaced roadways, Westminster Junction Bridge #62598 over Union Pacific and
BNSF railroad, retaining walls, sidewalks, pedestrian/bicycle trail,
landscaping, street lighting, traffic signal, storm water sedimentation pond,
water and sewer service connections.
Also, improving Westminster Street from York Avenue to Case Avenue with new
bituminous roadway, concrete curbs and gutters, concrete driveway aprons and
outwalks, boulevard sodding, tree planting, construction of a lantern style
lighting system and doing all other work necessary to complete said
improvements as part of the Phalen Boulevard Phase I project.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $18,800,000.00, financed
by assessments and miscellaneous aid.
2. That a public hearing be had on said improvement on the 20"' dav of
March, 2002, at 5:30 o'clock p.m., in the Council Chambers of the City Ha11
and Court xouse Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing, the
nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nay�
✓�enanav
✓�lakey
✓�ostrom
�oleman
�YYarris
,xantry
�R�iter
�_In Favor
�Against
Adopted by the Council : Date ��_ a 3, 8 ao'�
v
Certified Passed by the Council
�
►:�rs��
Ci PERSON b PFiONE
St Martin 266-6118
3E ON CAIA�I('JIAGENDA BY (DA7Ej
�I 02/13/02
❑ AIAYOq(OflASSI5TAHT)
❑
No. � 1 0474 �
�te O Z -6J
❑ CffYfI.EFi1C
❑ FlNANqALSQiV/ACCTG
❑ COUNGLflESEAflGN
❑
TOTAL # OF SIGNATURE PAGES (CLIP ALL LOCATIONS FOR SIGNANR�
ncnor+aEa�sreo
Construct public improvements for the Phalen Boulevazd Phase I project. Public improvements to include construction of sanitary sewer,
storm sewer, water main, concrete c�sb and gutter, new bituminous surfaced roadways, Westminster Junction Bridge #62598 over Union
Pacific and BNSF railroad, retaining walls, sidewalks, pedestrian/bicycle �ail, landscaping, street lighung, uaffic signal, storm water
sedimentaiion pond, and water and sewer service connections.
L File Nos. 18962 & 18962A
RECAMMENDATIONS:App�Me (A) or pejec( (q)
. PUWNINGCOMMISSION
� qBCOMMtTTEE
A
CML SERVICE COMMISSION
SfAFF
GREEN SHEET
��
.
. -
tles tl�tc persoNfi�m Bverxo'ked utMBr e conired fortltis Oeparbneni?
YES NO
Hes tl�k ParsoMi�m ever Oean e dly empbyae7
YES NO
DoBSUtls Vars�rtn possess a sl� not mrtnely WHSesseC Ey enY w�reM dtY empbyee4
YES NO
b Ma persOMl�m a tetgBteO vaMOft
YES NO
' 'El1�Y�11 tl1 �1{ �1HWNa OII!lWyh ill!!1 tl1d �lMdl b 9�� tlllBl
I �Nmanrac vaoe�M. �ssue. ovroaruNm �wrro. w'+nr. wr�N. w�+eae. wF+n:
� Phalen Boulevazd is a new roadway proposed by the City of Saint Paul to be constructed on the city's East Side between I-35E on the west a
; Johnson Parkway on the east. This new roadway would support an initiative by the City and azea business and residents to encourage
i redevelopment oF vacant and underuulized land in the corridor. The project will also significanUy enhance access to the neaz East Side by
' providing a better connection to the regionai roadway system at I-35E and by providing a direct route from the Phalen Village area to I-35E
� north of Saint Paul's downtown. Phase I includ I-35E to Payne Avenue section oF Phalen Boulevazd.
�NOVnNrAGESIPAPPROVEP. -�--
� Construction of roadway, bridge and utilities provide access for development of Westminster Junction Business Pazk. Roadway will
i provide the fust leg of important transportation link on the East Side. Bicycle path will evenmally link Gateway and Vento trails.
Cotxx# Res�arch Center
DISRDVANTAGES IF APPpOVW:
None
DISADVANTAGES lf NOTAPPROVED
Project will not proceed.
�;�� � � ZQ�
nraouNr oF twwsacnoN s
SOURCE
COST/REVENUE BUDGETED (CIHCLE ON�
ACT1VIfY NUMBEq
ES q0
CITY OF ST. PAUL
PRELIMINARY ORDER
�,-,:
COIINCIL� N� S
By
File No. 18962 & 18962A
Votiag Ward 2,5,6
11]
.
In tha matter of constructing public improvements for the Phalen Boulevard
Phase I project. Public improvements to include construction of a sanitary
sewer, storm sewer, water main, concrete curb and gutter, new bituminous
surfaced roadways, Westminster Junction Bridge #62598 over Union Pacific and
BNSF railroad, retaining walls, sidewalks, pedestrian/bicycle trail,
landscaping, street lighting, traffic signal, storm water sedimentation pond,
water and sewer service connections.
Also, improving Westminster Street from York Avenue to Case Avenue with new
bituminous roadway, concrete curbs and gutters, concrete driveway aprons and
outwalks, boulevard sodding, tree planting, construction of a lantern style
lighting system and doing all other work necessary to complete said
improvements as part of the Phalen Boulevard Phase I project.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approve with no
alternatives, and that the estimated cost thereof is $18,800,000.00, financed
by assessments and miscellaneous aid.
2. That a public hearing be had on said improvement on the 20"' dav of
March, 2002, at 5:30 o'clock p.m., in the Council Chambers of the City Ha11
and Court xouse Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the
manner provided by the Charter, stating the time and place of hearing, the
nature of the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nay�
✓�enanav
✓�lakey
✓�ostrom
�oleman
�YYarris
,xantry
�R�iter
�_In Favor
�Against
Adopted by the Council : Date ��_ a 3, 8 ao'�
v
Certified Passed by the Council
�
►:�rs��
Ci PERSON b PFiONE
St Martin 266-6118
3E ON CAIA�I('JIAGENDA BY (DA7Ej
�I 02/13/02
❑ AIAYOq(OflASSI5TAHT)
❑
No. � 1 0474 �
�te O Z -6J
❑ CffYfI.EFi1C
❑ FlNANqALSQiV/ACCTG
❑ COUNGLflESEAflGN
❑
TOTAL # OF SIGNATURE PAGES (CLIP ALL LOCATIONS FOR SIGNANR�
ncnor+aEa�sreo
Construct public improvements for the Phalen Boulevazd Phase I project. Public improvements to include construction of sanitary sewer,
storm sewer, water main, concrete c�sb and gutter, new bituminous surfaced roadways, Westminster Junction Bridge #62598 over Union
Pacific and BNSF railroad, retaining walls, sidewalks, pedestrian/bicycle �ail, landscaping, street lighung, uaffic signal, storm water
sedimentaiion pond, and water and sewer service connections.
L File Nos. 18962 & 18962A
RECAMMENDATIONS:App�Me (A) or pejec( (q)
. PUWNINGCOMMISSION
� qBCOMMtTTEE
A
CML SERVICE COMMISSION
SfAFF
GREEN SHEET
��
.
. -
tles tl�tc persoNfi�m Bverxo'ked utMBr e conired fortltis Oeparbneni?
YES NO
Hes tl�k ParsoMi�m ever Oean e dly empbyae7
YES NO
DoBSUtls Vars�rtn possess a sl� not mrtnely WHSesseC Ey enY w�reM dtY empbyee4
YES NO
b Ma persOMl�m a tetgBteO vaMOft
YES NO
' 'El1�Y�11 tl1 �1{ �1HWNa OII!lWyh ill!!1 tl1d �lMdl b 9�� tlllBl
I �Nmanrac vaoe�M. �ssue. ovroaruNm �wrro. w'+nr. wr�N. w�+eae. wF+n:
� Phalen Boulevazd is a new roadway proposed by the City of Saint Paul to be constructed on the city's East Side between I-35E on the west a
; Johnson Parkway on the east. This new roadway would support an initiative by the City and azea business and residents to encourage
i redevelopment oF vacant and underuulized land in the corridor. The project will also significanUy enhance access to the neaz East Side by
' providing a better connection to the regionai roadway system at I-35E and by providing a direct route from the Phalen Village area to I-35E
� north of Saint Paul's downtown. Phase I includ I-35E to Payne Avenue section oF Phalen Boulevazd.
�NOVnNrAGESIPAPPROVEP. -�--
� Construction of roadway, bridge and utilities provide access for development of Westminster Junction Business Pazk. Roadway will
i provide the fust leg of important transportation link on the East Side. Bicycle path will evenmally link Gateway and Vento trails.
Cotxx# Res�arch Center
DISRDVANTAGES IF APPpOVW:
None
DISADVANTAGES lf NOTAPPROVED
Project will not proceed.
�;�� � � ZQ�
nraouNr oF twwsacnoN s
SOURCE
COST/REVENUE BUDGETED (CIHCLE ON�
ACT1VIfY NUMBEq
ES q0