02-387CITY OF 5T. PAIIL
ORDER �
COUNCIL FILE NO. 0.7.• 3g a`
�
gy ��_ � ,.,.
Fil . 02039-S02042,502044,502049,
S02051,502052,502055,502056,502059,
502063,502066,502072,S02088,s02089
Voting Ward_ 1,3,4,5
Iu the Aiatter of sidewalk reconstxuction and/or new coastruction at the following
locations:
(See Attached)
*ESTIMATED CONSTRUCTION RATE5
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.49 per front foot for a
five (5) foot wide walk and $12.59 per front foot for a six (6) foot wide
walk. A11 other widths will He prorated accordingly. D7aw aonstruction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.64 per square foot.
All corner residential properties wi11 receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MI7LTI-RESIDENTIALiMore than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.35 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2002 Public Improvement Aid.
2
3
That a public hearing be had on said improvement on the 22°" dav of Mav 2002
5:3� o'clock P.M. in the Council Chambers of the City Hall and Court House
Euilding in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
+Blakey
vBOStrom
�oleman
�I3arr i s
,h�antry
,�&eiter
� In Favor
�Against
Adopted by Council: Date_�,�_ �-uo�
Certified Passed by Council 5 cretary
>r
� Z . 3�7
502039 - Both sides Bayard Avenue from South Albert Street to South Hamline Avenue,
502040 - Both sides Fulham Street from Hendon Avenue to West Hoyt Avenue.
502041- Both sides Hythe Street from Doswell Avenue to Buford Avenue.
502042 - Both sides Lafond Avenue &om Virginia Street to Farrington Street�
502U44 - Both sides Virginia Street from Thomas Avenue to Lafond Avenue.
502049 - Both sides Charles Avenue from Fry Street to North Snelling Avenue.
502051- East side North Hamline Avenue from Englewood Avenue to Hewitt Avenue.
S02052 - Both sides West Idaho Avenue from North Chatsworth Street to North Milton
Street.
502055 - Both sides Laarel Avenue from Fry Street to North Snelling Avenue.
502056 - Both sides Lincoln Avenue from South Finn Sttreet to South Cleveland Avenue.
502459 - Both sides Princeton Avenue from Mount Curve Boulevard to South Cretin
Avenue.
502063 - East side North Snelling Avenue from Blair Avenue to Van Buren Avenue at 678
North Snelling Avenue Only.
502066 - Both sides North Syndicate Street from University Avenue to Sherburne Avenue.
502072 - Both sides Wellesley Avenue from South Cleveland Avenue to Kenneth Street.
502088 - Both sides South Cretin Avenue from Hartford Avenue to Randolph Avenue &
West side Watson Avenue from South Cretin Avenue to South Cleveland Avenue.
S02Q89 - West side North Hamline Avenue from Englewood Avenue to Hewitt Avenue.
�
Works - Sidewa{k Division
OFSIGI1�TUflEPAGES _ (CUPALI.LOp1i10N5FOASIONATUR�
Sidewalk in Wards 1, 3, 4& 5
AERSO�AL SERVICE CbNTRACTS MU$iANSWER THE�OLLOWING
1. FlasthisPeisonfl'rmeverwo'ketlunderacontraalrntliistlepaNnam?
YES NO
2. #ias tlrispersoNfirm ever bean a ciry empityce?
YES NO
.� ! _
3. Does7hispersorJfirmposs�sasiuifnotnortnaMyP��eCb�'anYwrremciryertployee?
YES NO
£xpiaSn all yes ansrrera m� aepazste aheet erW atyeh to grean aheet
v/NERE. M?IY>:
The probiem'defective sidewafk" was caused by muitipfe probfems, tree roots, poor subgrade materials, treefthaw cycles,
service life fimfts, chemical addftives, extreme temperature variations, etc. These probiems occur on a c'dywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewafk condition woutd worsen to a state where it
would be unusable and subject to increased pedestrian injuries from #afis and possible litigations.
The commurrity wiif benefit from Yhis project because it wili provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a resui� �,��t�
� Reseacch G=.
APR 2 4 2602
Historicafiy, ffie sidewaik reconstruction has created negative feedback because of coristruction procedures and
assessmer»s. Property owners question the assessments, despite the fact that up fo one-half the assessment is City
subsidized. Having to assess for watk reconsfruction remains a crontroversial issue.
This option wouid allow the infrastructure of sidewalk stock to deteriorate, which in tum, wili generate more personai injury
suits, resutting in the expenditure of larger doAar amounts in repairs and reptacement, as weli as ciaim payouts.
IOUNT OF 7RANSACTION S 88,717.$2 COST/REVENUE BU
sour+ce 02 A. PIA = 610,000 B. AST = 380,000 AC1NIiY NUMBER
MFOAMATION: (D�WN)
��i 'I ��"UG
�GREEN SHEET a�a ��o�-�
WtitAUDATE WRIALNA7E
��DEPARTMENCDlflEG70R QCRYCOUNCiI _ Q _
�CiiYATfOPoiEY �GRYCLERK
�BUDGETqRELTOR �FlN.dMGT.SEFMCES0IR
� e.uvoa (ors nss�.srarq [�] Counpl Aesearch
t70
8 a--'� ��
w�a i
PRO.TECT: RECONSTRUCT SIDEWALK E.5. N. HANII.INE AVE. from Englewood Ave. to
Hewitt Ave.
�'V V� ✓� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
on the basis of an inspecfion of the walk.
This walk is poured concrete with setfled, uneven, and cracked panels.
PRD.TECT: RECONSTRUCT 5IDEWALK B.S. LAFOND AVE, from Virginia St. to Farrington
St.
fjQl /1Lh INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
w�'�� ���on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITION5: This waik is poured concrete with water pockets, settled, and cracked
panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. SYNDICATE ST. from W. University Ave.
to Sherburne Ave.
��0� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
on the basis of one (1) complaint and an inspection of the walk.
This walk is poured concrete with heaves, asphalt patches, scaled, uneven,
and cracked panels.
PRD.IECT.• RECONSTRUCTSIDEWALK B.S. VIRGINIA ST. fromThomas Ave. toLafondAve.
� INITIATINGAC770N: This order was initiated by the Director of Pubiic Works as public necessiry
on the basis of twa (2) compiaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphalt patches, settled,
uneven, and cracked panels.
oa .��-�
SUMMARY OF ENGINEERING RECOM114ENDATIONS
pd�Lc'
PROJECT: RECONSTRUCT SIDEWALK B.S. BAYARD AVE. from S. Alben St. to S. Hamline
Ave.
/�(-j/.� INITIATINGACTION: ThisorderwasinitiatedbytheDirectorofPubiicWorksaspublicnecessiry
on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, uneven,
and cracked panels.
PRD.TECT.• RECONSTRUCT57DEWALK B.S. S. CRE'I'IN AVE. fromHartford Ave. toRandolph
Ave. & W.S. WATSON AVE. from S. Cretin Ave, to S. Cieveland Ave.
c � INITIATINGACTION: This order was initiated by the Directar of Public Works as public necessity
/V� on the basis of three (3) compiaints and an inspection of the walk.
EXISTING CONDITIONS: This waik is poured concrate with tree heaves, water pockets, asphait
patches, scaled, settled, uneven, and cracked panels.
PRO.JECT: RECONSTRUCT SIDEWALK B.S. WELLESLEY AVE. from S. Cleveland Ave. to
Kenneth St_
���(/INITIATINGACTION.• ThisorderwasinitiatedbytheDirectorofPublicWorksaspublicnecessity
on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled,
uneven, and cracked panels.
e3a-��'7
SIJNIMARY OF ENGINEERING RECOD�IlVIENDATIONS
Wazd 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. CHARLE5 AVE. from Fry St. to N. Snelling Ave.
& E.S. FRY ST. from Sherburne Ave. to Charles Ave.
y �� INITIATINGACT70N: This order was initiated by the Director of Pubiic Works as public necessity
on ihe basis of one (1) complunt, a petition with one (1) signer, and an inspection of the waik.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt
patches, settled, uneven, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. FULHAM ST. from Hendon Ave. to W. Hoyt
Ave.
�Q�� INITIATINGACTION: This arderwas initiated by the Director of Public W orks as public necessity
on the basis of two (2) complaints, a petition with one (1) signer, and an inspection of the waik.
EXISTING CONDZTIONS: This walk is poured concrete with tree heaves, asphalt patches, settled,
reverse slope, uneven, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK W.S. N. HAMLINE AVE. from Englewood Ave. to
Hewitt Ave.
'� INITIATINGACTION: This order was initiated by the Director of Public Works as pubiic necessity
��/ D � on the basis of one (1) compiaint and an inspecfion of the walk.
This walk is poured concrete with water pockets, scaled, settled, uneven,
and cracked panels.
PRO.TECT.• RECONSTRUCT SIDEWALK B.S. HY'THE ST. from Doswell Ave. to Buford Ave.
��1 INITIATINGACTION.• This order was initiated by the Director of Public W orks as public necessity
on the basis of a peution with one (1) signer and an inspection of the walk.
bd -
-2-
This walk is poured concrete with tree heaves, settled, uneven, and
cracked panels.
PRO.TECT: RECONSTRUCT SZDEWAI,K B.S. LAUREL AVE. from Fry St. to N. Snelling Ave.
5� O INITIATINGACTIDN: This order was initiated by the D"uector of Public Works as public necessity
on the basis of five (5) complaints and an inspecfion of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt
patches, settled, uneven, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. LINCOLN AVE. from S. Finn St. to S.
Cleveland Ave.
'Q,� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
....i
on the basis of two (2) complaints and au inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt
patches, scaled, settled, reverse slope, uneven, and cracked panels.
PRO.TECT.• RECONSTRUCT SIDEWALK B.S. PRINCETON AVE. from Mount Curve Blvd.
to S. Cretin Ave.
� �(� (� INITIATNG ACTION: This order was initiated by the Directar of Public Works as public necessity
w✓ ( on tt�e basis of one (1) complaint, a pefition with one (1) signer, and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with scaled, settled, uneven, and cracked
panels.
, ��1
PRO.TECT: RECONSTRUCT SIDEWALK E.S. N. SNELLING AVE. from Blair Ave. to Van
Buren Ave. at 678 N. Snelling Ave. Only.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the waik.
oa-���
-3-
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches and settled panels.
oa--a��
SUNINIARY OF ENGINEERING RECOMNIENDATION
Wazd 5
PRO.TECT.• RECONSTRUCT SIDEWALK B.S. W. IDAHO AVE. from N. Chatsworth St. to N.
Milton St.
�W !� INITIATINGACTION: This order was initiated by the Duector of Public Works as public necessity
on the basis of three (3) complaints and an inspection of the walk.
EXISTING GONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled,
settled, uneven, and cracked paneis.
CITY OF 5T. PAIIL
ORDER �
COUNCIL FILE NO. 0.7.• 3g a`
�
gy ��_ � ,.,.
Fil . 02039-S02042,502044,502049,
S02051,502052,502055,502056,502059,
502063,502066,502072,S02088,s02089
Voting Ward_ 1,3,4,5
Iu the Aiatter of sidewalk reconstxuction and/or new coastruction at the following
locations:
(See Attached)
*ESTIMATED CONSTRUCTION RATE5
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.49 per front foot for a
five (5) foot wide walk and $12.59 per front foot for a six (6) foot wide
walk. A11 other widths will He prorated accordingly. D7aw aonstruction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.64 per square foot.
All corner residential properties wi11 receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MI7LTI-RESIDENTIALiMore than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.35 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2002 Public Improvement Aid.
2
3
That a public hearing be had on said improvement on the 22°" dav of Mav 2002
5:3� o'clock P.M. in the Council Chambers of the City Hall and Court House
Euilding in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
+Blakey
vBOStrom
�oleman
�I3arr i s
,h�antry
,�&eiter
� In Favor
�Against
Adopted by Council: Date_�,�_ �-uo�
Certified Passed by Council 5 cretary
>r
� Z . 3�7
502039 - Both sides Bayard Avenue from South Albert Street to South Hamline Avenue,
502040 - Both sides Fulham Street from Hendon Avenue to West Hoyt Avenue.
502041- Both sides Hythe Street from Doswell Avenue to Buford Avenue.
502042 - Both sides Lafond Avenue &om Virginia Street to Farrington Street�
502U44 - Both sides Virginia Street from Thomas Avenue to Lafond Avenue.
502049 - Both sides Charles Avenue from Fry Street to North Snelling Avenue.
502051- East side North Hamline Avenue from Englewood Avenue to Hewitt Avenue.
S02052 - Both sides West Idaho Avenue from North Chatsworth Street to North Milton
Street.
502055 - Both sides Laarel Avenue from Fry Street to North Snelling Avenue.
502056 - Both sides Lincoln Avenue from South Finn Sttreet to South Cleveland Avenue.
502459 - Both sides Princeton Avenue from Mount Curve Boulevard to South Cretin
Avenue.
502063 - East side North Snelling Avenue from Blair Avenue to Van Buren Avenue at 678
North Snelling Avenue Only.
502066 - Both sides North Syndicate Street from University Avenue to Sherburne Avenue.
502072 - Both sides Wellesley Avenue from South Cleveland Avenue to Kenneth Street.
502088 - Both sides South Cretin Avenue from Hartford Avenue to Randolph Avenue &
West side Watson Avenue from South Cretin Avenue to South Cleveland Avenue.
S02Q89 - West side North Hamline Avenue from Englewood Avenue to Hewitt Avenue.
�
Works - Sidewa{k Division
OFSIGI1�TUflEPAGES _ (CUPALI.LOp1i10N5FOASIONATUR�
Sidewalk in Wards 1, 3, 4& 5
AERSO�AL SERVICE CbNTRACTS MU$iANSWER THE�OLLOWING
1. FlasthisPeisonfl'rmeverwo'ketlunderacontraalrntliistlepaNnam?
YES NO
2. #ias tlrispersoNfirm ever bean a ciry empityce?
YES NO
.� ! _
3. Does7hispersorJfirmposs�sasiuifnotnortnaMyP��eCb�'anYwrremciryertployee?
YES NO
£xpiaSn all yes ansrrera m� aepazste aheet erW atyeh to grean aheet
v/NERE. M?IY>:
The probiem'defective sidewafk" was caused by muitipfe probfems, tree roots, poor subgrade materials, treefthaw cycles,
service life fimfts, chemical addftives, extreme temperature variations, etc. These probiems occur on a c'dywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewafk condition woutd worsen to a state where it
would be unusable and subject to increased pedestrian injuries from #afis and possible litigations.
The commurrity wiif benefit from Yhis project because it wili provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a resui� �,��t�
� Reseacch G=.
APR 2 4 2602
Historicafiy, ffie sidewaik reconstruction has created negative feedback because of coristruction procedures and
assessmer»s. Property owners question the assessments, despite the fact that up fo one-half the assessment is City
subsidized. Having to assess for watk reconsfruction remains a crontroversial issue.
This option wouid allow the infrastructure of sidewalk stock to deteriorate, which in tum, wili generate more personai injury
suits, resutting in the expenditure of larger doAar amounts in repairs and reptacement, as weli as ciaim payouts.
IOUNT OF 7RANSACTION S 88,717.$2 COST/REVENUE BU
sour+ce 02 A. PIA = 610,000 B. AST = 380,000 AC1NIiY NUMBER
MFOAMATION: (D�WN)
��i 'I ��"UG
�GREEN SHEET a�a ��o�-�
WtitAUDATE WRIALNA7E
��DEPARTMENCDlflEG70R QCRYCOUNCiI _ Q _
�CiiYATfOPoiEY �GRYCLERK
�BUDGETqRELTOR �FlN.dMGT.SEFMCES0IR
� e.uvoa (ors nss�.srarq [�] Counpl Aesearch
t70
8 a--'� ��
w�a i
PRO.TECT: RECONSTRUCT SIDEWALK E.5. N. HANII.INE AVE. from Englewood Ave. to
Hewitt Ave.
�'V V� ✓� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
on the basis of an inspecfion of the walk.
This walk is poured concrete with setfled, uneven, and cracked panels.
PRD.TECT: RECONSTRUCT 5IDEWALK B.S. LAFOND AVE, from Virginia St. to Farrington
St.
fjQl /1Lh INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
w�'�� ���on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITION5: This waik is poured concrete with water pockets, settled, and cracked
panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. SYNDICATE ST. from W. University Ave.
to Sherburne Ave.
��0� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
on the basis of one (1) complaint and an inspection of the walk.
This walk is poured concrete with heaves, asphalt patches, scaled, uneven,
and cracked panels.
PRD.IECT.• RECONSTRUCTSIDEWALK B.S. VIRGINIA ST. fromThomas Ave. toLafondAve.
� INITIATINGAC770N: This order was initiated by the Director of Pubiic Works as public necessiry
on the basis of twa (2) compiaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphalt patches, settled,
uneven, and cracked panels.
oa .��-�
SUMMARY OF ENGINEERING RECOM114ENDATIONS
pd�Lc'
PROJECT: RECONSTRUCT SIDEWALK B.S. BAYARD AVE. from S. Alben St. to S. Hamline
Ave.
/�(-j/.� INITIATINGACTION: ThisorderwasinitiatedbytheDirectorofPubiicWorksaspublicnecessiry
on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, uneven,
and cracked panels.
PRD.TECT.• RECONSTRUCT57DEWALK B.S. S. CRE'I'IN AVE. fromHartford Ave. toRandolph
Ave. & W.S. WATSON AVE. from S. Cretin Ave, to S. Cieveland Ave.
c � INITIATINGACTION: This order was initiated by the Directar of Public Works as public necessity
/V� on the basis of three (3) compiaints and an inspection of the walk.
EXISTING CONDITIONS: This waik is poured concrate with tree heaves, water pockets, asphait
patches, scaled, settled, uneven, and cracked panels.
PRO.JECT: RECONSTRUCT SIDEWALK B.S. WELLESLEY AVE. from S. Cleveland Ave. to
Kenneth St_
���(/INITIATINGACTION.• ThisorderwasinitiatedbytheDirectorofPublicWorksaspublicnecessity
on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled,
uneven, and cracked panels.
e3a-��'7
SIJNIMARY OF ENGINEERING RECOD�IlVIENDATIONS
Wazd 4
PRO.TECT: RECONSTRUCT SIDEWALK B.S. CHARLE5 AVE. from Fry St. to N. Snelling Ave.
& E.S. FRY ST. from Sherburne Ave. to Charles Ave.
y �� INITIATINGACT70N: This order was initiated by the Director of Pubiic Works as public necessity
on ihe basis of one (1) complunt, a petition with one (1) signer, and an inspection of the waik.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt
patches, settled, uneven, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. FULHAM ST. from Hendon Ave. to W. Hoyt
Ave.
�Q�� INITIATINGACTION: This arderwas initiated by the Director of Public W orks as public necessity
on the basis of two (2) complaints, a petition with one (1) signer, and an inspection of the waik.
EXISTING CONDZTIONS: This walk is poured concrete with tree heaves, asphalt patches, settled,
reverse slope, uneven, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK W.S. N. HAMLINE AVE. from Englewood Ave. to
Hewitt Ave.
'� INITIATINGACTION: This order was initiated by the Director of Public Works as pubiic necessity
��/ D � on the basis of one (1) compiaint and an inspecfion of the walk.
This walk is poured concrete with water pockets, scaled, settled, uneven,
and cracked panels.
PRO.TECT.• RECONSTRUCT SIDEWALK B.S. HY'THE ST. from Doswell Ave. to Buford Ave.
��1 INITIATINGACTION.• This order was initiated by the Director of Public W orks as public necessity
on the basis of a peution with one (1) signer and an inspection of the walk.
bd -
-2-
This walk is poured concrete with tree heaves, settled, uneven, and
cracked panels.
PRO.TECT: RECONSTRUCT SZDEWAI,K B.S. LAUREL AVE. from Fry St. to N. Snelling Ave.
5� O INITIATINGACTIDN: This order was initiated by the D"uector of Public Works as public necessity
on the basis of five (5) complaints and an inspecfion of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt
patches, settled, uneven, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. LINCOLN AVE. from S. Finn St. to S.
Cleveland Ave.
'Q,� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity
....i
on the basis of two (2) complaints and au inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt
patches, scaled, settled, reverse slope, uneven, and cracked panels.
PRO.TECT.• RECONSTRUCT SIDEWALK B.S. PRINCETON AVE. from Mount Curve Blvd.
to S. Cretin Ave.
� �(� (� INITIATNG ACTION: This order was initiated by the Directar of Public Works as public necessity
w✓ ( on tt�e basis of one (1) complaint, a pefition with one (1) signer, and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with scaled, settled, uneven, and cracked
panels.
, ��1
PRO.TECT: RECONSTRUCT SIDEWALK E.S. N. SNELLING AVE. from Blair Ave. to Van
Buren Ave. at 678 N. Snelling Ave. Only.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the waik.
oa-���
-3-
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches and settled panels.
oa--a��
SUNINIARY OF ENGINEERING RECOMNIENDATION
Wazd 5
PRO.TECT.• RECONSTRUCT SIDEWALK B.S. W. IDAHO AVE. from N. Chatsworth St. to N.
Milton St.
�W !� INITIATINGACTION: This order was initiated by the Duector of Public Works as public necessity
on the basis of three (3) complaints and an inspection of the walk.
EXISTING GONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled,
settled, uneven, and cracked paneis.