Loading...
01-214CITY OF ST. PAUL P'RELIMINARY ORDER �'Et..�.. ti COUNCS7� FZLE O. O��a.�� / � BY —E-{l��d � � File No. S01004 - 501018 Voting Ward_ 2 & 7 In the Matter of sidewalk reconstruction and/or new construction at the following locations: 501004 - Both sides West Baker Street from South Smith Avenue to Ohio Street. 501005 - Both sides West Curtice Street from South Smith Avenue to Ohio Street. 501006 - Both sides West King Street from South Smith Avenue to Ohio Street. 501007 - Both sides Manomin Avenue from West Annapolis Street to West Page Street. 501008 - Both sides Manomin Avenue from West Page Street to West George Street. 501009 - Both sides West Morton Street from South Smith Avenue to Ohio Street. 501010 - Both sides Orleans Street from West Page Street to West George Street. 501011 - Both sides West Page Street from South Smith Avenue to Ohio Street. 501012 - Both sides West Sidney Street from South Smith Avenue to Ohio Street. 501013 - Both sides West Stevens Street from South Smith Avenue to Ohio Street. 501014 - Both sides West Winona Street from South Smith Avenue to Ohio Street. 501015 - North side West Wyoming Street from South Smith Avenue to Ohio Street. 501016 - North side Euclid Street from Flandrau Street to North White Bear Avenue. 501017 - Both sides East Fourth Street from Kennard Street to Flandrau Street & West side Flandrau Sttreet from Fremont Avenue to East Fourth Street. 501018 - Both sides Fremont Avenue from Flandrau Street to North Wl.ite Bear Avenue. � '�i' �' � �" �% � i S ,`'1 *ESTIMATED CONSTRUCTION RATES o �-i��l RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. Naw construction (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.50 per square foot. Al1 corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 1000 of actual cost estimated to be approximately $6.09 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 3 That a public hearing be had on said improvement on the 28 dav of March, 2001 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays ✓Benanav ✓'�lakey ✓�ostrom V�ol eman ��.,�' Harris �antry �Keiter Adopted by Council: Date�� � Certified Passed by Council Secretary � In Favor By a- . � �Against __ ��� Mayor 1 3��� �v 'ubl Works - Sidewalk Division :OMACT PERSON & PHONE IerryTvedt (266-6087) �U5T BE ON COUNdLAGENDA BY (DATE� 5� AfBuc HEkRI li�'r Ol� t6�, f OF SIGNANNE PAGES _ (CLIP � � I�.; I REEN SHEE I� DEPAFLIMENT DIRECTOR FOfl �CmATTOflNEY � BUDCaET DIRECTOR � MAYOR (OR ASSISTAM) �,������ °�-a�y No. 102773 = �Nmnuoare ❑ cm courva� ❑cmc�aK � ❑ FlN. 8 MGT. SERVICES DIR �j Council Research �econshuct Sidewalk 8 Construct Sidewalk in Wards 2& 7 � t� � � '� � 5 0 3ECAMMENDATONS: Apprwe (A) a ReJect (R} pEHSONAL SEpVICE CONTHACTS MUST ANSWER THE FOLLOWING QUESTIONS: _PLANNINGCAMMISSION _�LSERVICECOMMISSION t. HasthispersoNfirtnevervrorkedurWeracontractforthisdepamnent? GBCOMMfTiEE YES NO — — 2 Has this perso�rtn ever been a dry employee? q �� YES NO — 3. Does Nis perso�rm possess a skill not rrortnaly possessed by arry curteM ciry empioyee? _DISiHICTCOUNCIL _ YES NO Slmrorrrs wHiCH COUNQL oeJECnvE? Explain all yes answers on separete sheet and attach to green sheet WHAT, WHEN, WHERE, WH1]: The probiem "defective sidewatk" was caused by muitipie probiems, tree roots, poor subgrade materials, ireefthaw cyctes, service life limits, chemical additives, wctreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falls and possible litigations. The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors generating public sector jobs as a resuR. Historicaliy, the sidewalk reconstruction has created negative feedback because of construction procedures and assessments. Property owners question the assessments, despite the fact that up to one-half the assessmenf,i�s�'i,'�Yy subsidized. Having to assess for walk reconstruction remains a controversial issue. Cp � nc+1 � e � S ��tu"1 ="" 4, <�, � 2� � 4',G This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personai injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. OFTRANSACTION$ IJb,j76,�J ;E o1-r�-o672 A, PtA = 610 C01 NO ��-aty SUMMARY OF ENGINEERING RECOMiVIENDATIONS Wazd 2 PRO.IECT: RECONSTRUCT SIDEWALK W.S. W. BAKER ST. from S. Smith Ave. to Ohio St. 5 0� � INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of five (5) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, asphalt patches, scale@, setfled, and cracked panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. CURTICE ST. from S. Smith Ave. to Ohio St. �' wW INITIATING ACTION: This order was initiated by the Director of Public works as public necessity on the basis of four (4) complaints and an inspection of the wa1k. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, and cracked panels. PRO.IECT: RECONSTRDCT SIDEWALK B.S. W. KING ST. from S. Smith Ave. to Ohio St. �� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled, cracked, and uneven panels. PXO.IECT: RECONSTRIICT SIDEWALK B.S. MANOMIN AVE. from W. Annapolis St. to � w�j W. Page St. W � INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. o � -a- � �i -2- � �' � i EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, asphalt patches, scaled, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. MANOMIN AVE. from W. Page St. to W. George St. INITIATING ACTION: This order was iniriated by the Director of Public Works as public necessity on the basis of six (6) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, � �rr scaled, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. MORTON ST. from S. Smith Ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. ORLEANS ST. from W. Page St. to W. George St. 501 O' O INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of four (4) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. PAGE ST. from S. Smith Ave. to Ohio St. S O�O' 1 INITIATINGACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of four (4) complaints and an inspection of the walk. D�-a�y -3 - EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, offgrade, asphalt patches, scaled, settled, cracked, and uneven panels. PROJECT: RECONSTRUCT SIDEWALK B.S_ W. SIDNEY ST. from S. Smith Ave. to Ohio St. s o� aZ INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of seven (7) complaints and an inspection of the walk. 501DI3 EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. STEVENS ST. from S. Smith ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection ofthe walk. cracked, and uneven panels. This walk is poured concrete with tree heaves, scaled, settled, PKO.IECT: RECONSTRUCT SIDEWALK B.S. W. WINONA ST. from S. Smith Ave. to Ohio St. �� oI� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of one (1) compiaint and an inspection of the wa7k. EXISTING CONDITIDNS: This walk is poured concrete with tree heaves, reverse slope, scaled, setfled, cracked, and uneven panels. 501015 PRO.IECT: RECONSTRUCT SIDEWALK N.S. W. WYOMING ST. from S. Smith Ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. ol-aiy � EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, scaled, settled, and cracked panels. o�-a��I SUMMARY OF ENGINEERING RECOD��NDATIONS Ward 7 �O�O'� PRO.IECT: CONSTRUCT NEW SIDEWALK N.S. EUCLID ST. from Findrau St to N. White Bear Ave. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on an inspection of the walk. EXISTING CONDITIONS This walk is first time construction. PRO.IECT: RECONSTRUCT SIDEWALK B.S. E. FOURTH ST. from Kennazd St. to Flandrau St. & W.S. FLANDRAII ST. from Fremont Ave. to E. Fourth St. 501 D'� INITIATINGACTION: This order was initiated by the Director of Public works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, cracked, and uneven panels. � PRO.IECT: RECONSTRUCT SIDEWALK B.S. FREMONT AVE. from Flandrau St. to N. White Beaz Ave. �' D�� INITIATINGACTION.• This order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, cracked, and uneven panels. CITY OF ST. PAUL P'RELIMINARY ORDER �'Et..�.. ti COUNCS7� FZLE O. O��a.�� / � BY —E-{l��d � � File No. S01004 - 501018 Voting Ward_ 2 & 7 In the Matter of sidewalk reconstruction and/or new construction at the following locations: 501004 - Both sides West Baker Street from South Smith Avenue to Ohio Street. 501005 - Both sides West Curtice Street from South Smith Avenue to Ohio Street. 501006 - Both sides West King Street from South Smith Avenue to Ohio Street. 501007 - Both sides Manomin Avenue from West Annapolis Street to West Page Street. 501008 - Both sides Manomin Avenue from West Page Street to West George Street. 501009 - Both sides West Morton Street from South Smith Avenue to Ohio Street. 501010 - Both sides Orleans Street from West Page Street to West George Street. 501011 - Both sides West Page Street from South Smith Avenue to Ohio Street. 501012 - Both sides West Sidney Street from South Smith Avenue to Ohio Street. 501013 - Both sides West Stevens Street from South Smith Avenue to Ohio Street. 501014 - Both sides West Winona Street from South Smith Avenue to Ohio Street. 501015 - North side West Wyoming Street from South Smith Avenue to Ohio Street. 501016 - North side Euclid Street from Flandrau Street to North White Bear Avenue. 501017 - Both sides East Fourth Street from Kennard Street to Flandrau Street & West side Flandrau Sttreet from Fremont Avenue to East Fourth Street. 501018 - Both sides Fremont Avenue from Flandrau Street to North Wl.ite Bear Avenue. � '�i' �' � �" �% � i S ,`'1 *ESTIMATED CONSTRUCTION RATES o �-i��l RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. Naw construction (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.50 per square foot. Al1 corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 1000 of actual cost estimated to be approximately $6.09 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 3 That a public hearing be had on said improvement on the 28 dav of March, 2001 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays ✓Benanav ✓'�lakey ✓�ostrom V�ol eman ��.,�' Harris �antry �Keiter Adopted by Council: Date�� � Certified Passed by Council Secretary � In Favor By a- . � �Against __ ��� Mayor 1 3��� �v 'ubl Works - Sidewalk Division :OMACT PERSON & PHONE IerryTvedt (266-6087) �U5T BE ON COUNdLAGENDA BY (DATE� 5� AfBuc HEkRI li�'r Ol� t6�, f OF SIGNANNE PAGES _ (CLIP � � I�.; I REEN SHEE I� DEPAFLIMENT DIRECTOR FOfl �CmATTOflNEY � BUDCaET DIRECTOR � MAYOR (OR ASSISTAM) �,������ °�-a�y No. 102773 = �Nmnuoare ❑ cm courva� ❑cmc�aK � ❑ FlN. 8 MGT. SERVICES DIR �j Council Research �econshuct Sidewalk 8 Construct Sidewalk in Wards 2& 7 � t� � � '� � 5 0 3ECAMMENDATONS: Apprwe (A) a ReJect (R} pEHSONAL SEpVICE CONTHACTS MUST ANSWER THE FOLLOWING QUESTIONS: _PLANNINGCAMMISSION _�LSERVICECOMMISSION t. HasthispersoNfirtnevervrorkedurWeracontractforthisdepamnent? GBCOMMfTiEE YES NO — — 2 Has this perso�rtn ever been a dry employee? q �� YES NO — 3. Does Nis perso�rm possess a skill not rrortnaly possessed by arry curteM ciry empioyee? _DISiHICTCOUNCIL _ YES NO Slmrorrrs wHiCH COUNQL oeJECnvE? Explain all yes answers on separete sheet and attach to green sheet WHAT, WHEN, WHERE, WH1]: The probiem "defective sidewatk" was caused by muitipie probiems, tree roots, poor subgrade materials, ireefthaw cyctes, service life limits, chemical additives, wctreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falls and possible litigations. The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors generating public sector jobs as a resuR. Historicaliy, the sidewalk reconstruction has created negative feedback because of construction procedures and assessments. Property owners question the assessments, despite the fact that up to one-half the assessmenf,i�s�'i,'�Yy subsidized. Having to assess for walk reconstruction remains a controversial issue. Cp � nc+1 � e � S ��tu"1 ="" 4, <�, � 2� � 4',G This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personai injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. OFTRANSACTION$ IJb,j76,�J ;E o1-r�-o672 A, PtA = 610 C01 NO ��-aty SUMMARY OF ENGINEERING RECOMiVIENDATIONS Wazd 2 PRO.IECT: RECONSTRUCT SIDEWALK W.S. W. BAKER ST. from S. Smith Ave. to Ohio St. 5 0� � INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of five (5) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, asphalt patches, scale@, setfled, and cracked panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. CURTICE ST. from S. Smith Ave. to Ohio St. �' wW INITIATING ACTION: This order was initiated by the Director of Public works as public necessity on the basis of four (4) complaints and an inspection of the wa1k. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, and cracked panels. PRO.IECT: RECONSTRDCT SIDEWALK B.S. W. KING ST. from S. Smith Ave. to Ohio St. �� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled, cracked, and uneven panels. PXO.IECT: RECONSTRIICT SIDEWALK B.S. MANOMIN AVE. from W. Annapolis St. to � w�j W. Page St. W � INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. o � -a- � �i -2- � �' � i EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, asphalt patches, scaled, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. MANOMIN AVE. from W. Page St. to W. George St. INITIATING ACTION: This order was iniriated by the Director of Public Works as public necessity on the basis of six (6) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, � �rr scaled, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. MORTON ST. from S. Smith Ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. ORLEANS ST. from W. Page St. to W. George St. 501 O' O INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of four (4) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. PAGE ST. from S. Smith Ave. to Ohio St. S O�O' 1 INITIATINGACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of four (4) complaints and an inspection of the walk. D�-a�y -3 - EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, offgrade, asphalt patches, scaled, settled, cracked, and uneven panels. PROJECT: RECONSTRUCT SIDEWALK B.S_ W. SIDNEY ST. from S. Smith Ave. to Ohio St. s o� aZ INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of seven (7) complaints and an inspection of the walk. 501DI3 EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. STEVENS ST. from S. Smith ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection ofthe walk. cracked, and uneven panels. This walk is poured concrete with tree heaves, scaled, settled, PKO.IECT: RECONSTRUCT SIDEWALK B.S. W. WINONA ST. from S. Smith Ave. to Ohio St. �� oI� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of one (1) compiaint and an inspection of the wa7k. EXISTING CONDITIDNS: This walk is poured concrete with tree heaves, reverse slope, scaled, setfled, cracked, and uneven panels. 501015 PRO.IECT: RECONSTRUCT SIDEWALK N.S. W. WYOMING ST. from S. Smith Ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. ol-aiy � EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, scaled, settled, and cracked panels. o�-a��I SUMMARY OF ENGINEERING RECOD��NDATIONS Ward 7 �O�O'� PRO.IECT: CONSTRUCT NEW SIDEWALK N.S. EUCLID ST. from Findrau St to N. White Bear Ave. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on an inspection of the walk. EXISTING CONDITIONS This walk is first time construction. PRO.IECT: RECONSTRUCT SIDEWALK B.S. E. FOURTH ST. from Kennazd St. to Flandrau St. & W.S. FLANDRAII ST. from Fremont Ave. to E. Fourth St. 501 D'� INITIATINGACTION: This order was initiated by the Director of Public works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, cracked, and uneven panels. � PRO.IECT: RECONSTRUCT SIDEWALK B.S. FREMONT AVE. from Flandrau St. to N. White Beaz Ave. �' D�� INITIATINGACTION.• This order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, cracked, and uneven panels. CITY OF ST. PAUL P'RELIMINARY ORDER �'Et..�.. ti COUNCS7� FZLE O. O��a.�� / � BY —E-{l��d � � File No. S01004 - 501018 Voting Ward_ 2 & 7 In the Matter of sidewalk reconstruction and/or new construction at the following locations: 501004 - Both sides West Baker Street from South Smith Avenue to Ohio Street. 501005 - Both sides West Curtice Street from South Smith Avenue to Ohio Street. 501006 - Both sides West King Street from South Smith Avenue to Ohio Street. 501007 - Both sides Manomin Avenue from West Annapolis Street to West Page Street. 501008 - Both sides Manomin Avenue from West Page Street to West George Street. 501009 - Both sides West Morton Street from South Smith Avenue to Ohio Street. 501010 - Both sides Orleans Street from West Page Street to West George Street. 501011 - Both sides West Page Street from South Smith Avenue to Ohio Street. 501012 - Both sides West Sidney Street from South Smith Avenue to Ohio Street. 501013 - Both sides West Stevens Street from South Smith Avenue to Ohio Street. 501014 - Both sides West Winona Street from South Smith Avenue to Ohio Street. 501015 - North side West Wyoming Street from South Smith Avenue to Ohio Street. 501016 - North side Euclid Street from Flandrau Street to North White Bear Avenue. 501017 - Both sides East Fourth Street from Kennard Street to Flandrau Street & West side Flandrau Sttreet from Fremont Avenue to East Fourth Street. 501018 - Both sides Fremont Avenue from Flandrau Street to North Wl.ite Bear Avenue. � '�i' �' � �" �% � i S ,`'1 *ESTIMATED CONSTRUCTION RATES o �-i��l RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. Naw construction (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.50 per square foot. Al1 corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 1000 of actual cost estimated to be approximately $6.09 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 3 That a public hearing be had on said improvement on the 28 dav of March, 2001 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays ✓Benanav ✓'�lakey ✓�ostrom V�ol eman ��.,�' Harris �antry �Keiter Adopted by Council: Date�� � Certified Passed by Council Secretary � In Favor By a- . � �Against __ ��� Mayor 1 3��� �v 'ubl Works - Sidewalk Division :OMACT PERSON & PHONE IerryTvedt (266-6087) �U5T BE ON COUNdLAGENDA BY (DATE� 5� AfBuc HEkRI li�'r Ol� t6�, f OF SIGNANNE PAGES _ (CLIP � � I�.; I REEN SHEE I� DEPAFLIMENT DIRECTOR FOfl �CmATTOflNEY � BUDCaET DIRECTOR � MAYOR (OR ASSISTAM) �,������ °�-a�y No. 102773 = �Nmnuoare ❑ cm courva� ❑cmc�aK � ❑ FlN. 8 MGT. SERVICES DIR �j Council Research �econshuct Sidewalk 8 Construct Sidewalk in Wards 2& 7 � t� � � '� � 5 0 3ECAMMENDATONS: Apprwe (A) a ReJect (R} pEHSONAL SEpVICE CONTHACTS MUST ANSWER THE FOLLOWING QUESTIONS: _PLANNINGCAMMISSION _�LSERVICECOMMISSION t. HasthispersoNfirtnevervrorkedurWeracontractforthisdepamnent? GBCOMMfTiEE YES NO — — 2 Has this perso�rtn ever been a dry employee? q �� YES NO — 3. Does Nis perso�rm possess a skill not rrortnaly possessed by arry curteM ciry empioyee? _DISiHICTCOUNCIL _ YES NO Slmrorrrs wHiCH COUNQL oeJECnvE? Explain all yes answers on separete sheet and attach to green sheet WHAT, WHEN, WHERE, WH1]: The probiem "defective sidewatk" was caused by muitipie probiems, tree roots, poor subgrade materials, ireefthaw cyctes, service life limits, chemical additives, wctreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falls and possible litigations. The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors generating public sector jobs as a resuR. Historicaliy, the sidewalk reconstruction has created negative feedback because of construction procedures and assessments. Property owners question the assessments, despite the fact that up to one-half the assessmenf,i�s�'i,'�Yy subsidized. Having to assess for walk reconstruction remains a controversial issue. Cp � nc+1 � e � S ��tu"1 ="" 4, <�, � 2� � 4',G This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personai injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. OFTRANSACTION$ IJb,j76,�J ;E o1-r�-o672 A, PtA = 610 C01 NO ��-aty SUMMARY OF ENGINEERING RECOMiVIENDATIONS Wazd 2 PRO.IECT: RECONSTRUCT SIDEWALK W.S. W. BAKER ST. from S. Smith Ave. to Ohio St. 5 0� � INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of five (5) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, asphalt patches, scale@, setfled, and cracked panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. CURTICE ST. from S. Smith Ave. to Ohio St. �' wW INITIATING ACTION: This order was initiated by the Director of Public works as public necessity on the basis of four (4) complaints and an inspection of the wa1k. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, and cracked panels. PRO.IECT: RECONSTRDCT SIDEWALK B.S. W. KING ST. from S. Smith Ave. to Ohio St. �� INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled, cracked, and uneven panels. PXO.IECT: RECONSTRIICT SIDEWALK B.S. MANOMIN AVE. from W. Annapolis St. to � w�j W. Page St. W � INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of three (3) complaints and an inspection of the walk. o � -a- � �i -2- � �' � i EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, asphalt patches, scaled, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. MANOMIN AVE. from W. Page St. to W. George St. INITIATING ACTION: This order was iniriated by the Director of Public Works as public necessity on the basis of six (6) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, � �rr scaled, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. MORTON ST. from S. Smith Ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of two (2) complaints and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets, asphalt patches, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. ORLEANS ST. from W. Page St. to W. George St. 501 O' O INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of four (4) complaints and an inspection of the walk. This walk is poured concrete with tree heaves, asphalt patches, scaled, setfled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. PAGE ST. from S. Smith Ave. to Ohio St. S O�O' 1 INITIATINGACTION: This order was initiated by the Director of Public Works as public necessiry on the basis of four (4) complaints and an inspection of the walk. D�-a�y -3 - EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, offgrade, asphalt patches, scaled, settled, cracked, and uneven panels. PROJECT: RECONSTRUCT SIDEWALK B.S_ W. SIDNEY ST. from S. Smith Ave. to Ohio St. s o� aZ INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of seven (7) complaints and an inspection of the walk. 501DI3 EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, settled, cracked, and uneven panels. PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. STEVENS ST. from S. Smith ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection ofthe walk. cracked, and uneven panels. This walk is poured concrete with tree heaves, scaled, settled, PKO.IECT: RECONSTRUCT SIDEWALK B.S. W. WINONA ST. from S. Smith Ave. to Ohio St. �� oI� INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on the basis of one (1) compiaint and an inspection of the wa7k. EXISTING CONDITIDNS: This walk is poured concrete with tree heaves, reverse slope, scaled, setfled, cracked, and uneven panels. 501015 PRO.IECT: RECONSTRUCT SIDEWALK N.S. W. WYOMING ST. from S. Smith Ave. to Ohio St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. ol-aiy � EXISTING CONDITIONS: This walk is poured concrete with tree heaves, reverse slope, scaled, settled, and cracked panels. o�-a��I SUMMARY OF ENGINEERING RECOD��NDATIONS Ward 7 �O�O'� PRO.IECT: CONSTRUCT NEW SIDEWALK N.S. EUCLID ST. from Findrau St to N. White Bear Ave. INITIATING ACTION: This order was initiated by the Director of Public Works as public necessity on an inspection of the walk. EXISTING CONDITIONS This walk is first time construction. PRO.IECT: RECONSTRUCT SIDEWALK B.S. E. FOURTH ST. from Kennazd St. to Flandrau St. & W.S. FLANDRAII ST. from Fremont Ave. to E. Fourth St. 501 D'� INITIATINGACTION: This order was initiated by the Director of Public works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, scaled, settled, cracked, and uneven panels. � PRO.IECT: RECONSTRUCT SIDEWALK B.S. FREMONT AVE. from Flandrau St. to N. White Beaz Ave. �' D�� INITIATINGACTION.• This order was initiated by the Director of Public Works as public necessity on the basis of one (1) complaint and an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with tree heaves, cracked, and uneven panels.