Loading...
00-544CITY OF ST. PAIIL PRELIMINARY ORDER ORIGIS�AL CO C FILE NO _ O — LIy �y BY � File No._500142 - 500151 Voting Ward 2 Ia the Matter o£ sidewalk recoastruction and reconstxuctioa with integral curb at the following locations: 500142 - West Side Cliff Street from Superior Street to Goodhue Street. S00143 - North Side Curtice Street from Harvard Street to Woodbury Street. S00144 - Both Sides Erie Street from Palace Avenue to Jefferson Avenue & South Side Jefferson Avenue from Erie Street to Duke Street. 500145 - Both Sides Grand Avenue from Ayd Mill Road to South Dunlap Street. S�0146 - Both Sides Grand Avenue from South Lexington Parkway to South Oxford Street. S00147 - Both Sides Humboldt Avenue from West Elizabeth Street to West George Street. 500148 - East Side West Seventh Street from Forbes Avenue to lZamsey Street, West Side Exchange Street from Forbes Avenue to Sherman Street, North Side Forbes Avenue from West Seventh Street to South Exchange Street, South Side Ramsey Street from West Seventh Street to South Exchange Street & South Side Sherman Street from West Seventh Street to South Exchange Street at 324 West Seventh Street. S00149 - Both Sides East Sidney Street from Oakdale Avenue to Andrew Street. 500150 - Both Sides East Winifred Street from Ada Street to Anita Street & West Side Anita Street from East Winifrecl Street to East Robie Street. 500151 - Both Sides Woodbury Street from East Curtice Street to East 5idney Street. QR�GI�IAL *ESTIMATED CONSTRUCTION RATES oo- Syy RESIDENTIAL RATES (One, two or three family structures) Reconstruation (replacement of old sidewalk) -$9.65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.32 per square foot. A11 corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 1000 of actual cost estimated to be approximately $5.84 per square foot. The Council of the City o£ Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 !t3 That a public hearing be had on said improvement on the 28 dav of June, 2000 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays +/�enanav �bs���lakey �ostrom ,�oleman �Flarris ,xantry �R�iter Adopted by Council: Date�a p Certified Passed by Council Secretary �In Favor By � �Against Z ���"Q�"��l /� � � Mayor \ Y"1 / Gsi Works - Sidewalk Division �U r LflUU GREEN �DEPAR't11EN( WRECfOR � CiTY ATTWitiEY O�a� O MAYOP (�RAS515TANT) OFSt6Y1ATUpEPqG6 _ (CLIPALLtDCATION5FOR51GNANRE) Sidewalk & Reconstruct Sidewalk Wrth trrtegral Curb in Ward 2 ��( ��U/� ao–s�fc— T ' NO. 102760 INRiAWATE ❑ CIT'/ CAUNCIL ❑ CTfY pFAK ❑ FlN. & MGT. SERNCES DIR � Council Research ""'' "'""°"° "" `" "`""' °'� PEFtSONAL SERVICE CON7RACT5 NUST ANSWER THE FOLLON7NG �UESTIONS: COMMISStotd _avttSBivICECdG�l1 1. HasihisPersurJfirtneverworkedu(MeracorroactforthisdCpaM1merrt? � YES NO — 2 Has this persorJt'rtn ever been a ary employee? _ YES NO 3. Does this persoNFrtn possess a skill rwt nortnaly possessed by any currem ciry ertployee? YES NO Explain all yes answers on sepazate sheet aM attach to gresn sheet twwo, wruT. The problem °defective sidewalk° was caused by multiple prob{ems, tree roots, poor subgrade materials, freekhaw cycles, service Iffe limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corcected annually. Left uncorrected, the sidewaik condition would worsen to a state where ft woufd be unusabfe and subject to increased pedestrian injuries from falis and possible ikigations. :� The community wilt benefit fsom this project because it wili provide safe defect tree sidewalks for�tts citizens. The sidewalk contracts are done by private contractors generat+ng pubiic sector jobs as a resu{t. Historicaliy, the sidewafk teconstruciion has created negative feedback because of construction procedures and assessments. Property owners ques6on the assessments, despite the fact that up to one-haN the assessment is City subsidized. Having to assess for walk reconstruction remains a controversia! issue. This op6on would allow the infrastructure of sidewalk stock to deteriorate,.which in tum, w+it generate more personal injury suits, resuRing in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. GJitY� RE5�2PC�1 C2ittEf �AY 3 0 2000 IOUNTOFTRANSACTIONS LS)�145.4b COSTIREYENUEBUDGE7ED(ClRGLEONE) YES NO souace 00-M-0677 A, PIA �Q � 620,000 ncttvmHUMeEa C00-2T753-0784-0�000 NFOen+nnoN:��cewiN� B, AST = 365,000 C. CIB 00 = 50,000 CITY OF ST. PAIIL PRELIMINARY ORDER ORIGIS�AL CO C FILE NO _ O — LIy �y BY � File No._500142 - 500151 Voting Ward 2 Ia the Matter o£ sidewalk recoastruction and reconstxuctioa with integral curb at the following locations: 500142 - West Side Cliff Street from Superior Street to Goodhue Street. S00143 - North Side Curtice Street from Harvard Street to Woodbury Street. S00144 - Both Sides Erie Street from Palace Avenue to Jefferson Avenue & South Side Jefferson Avenue from Erie Street to Duke Street. 500145 - Both Sides Grand Avenue from Ayd Mill Road to South Dunlap Street. S�0146 - Both Sides Grand Avenue from South Lexington Parkway to South Oxford Street. S00147 - Both Sides Humboldt Avenue from West Elizabeth Street to West George Street. 500148 - East Side West Seventh Street from Forbes Avenue to lZamsey Street, West Side Exchange Street from Forbes Avenue to Sherman Street, North Side Forbes Avenue from West Seventh Street to South Exchange Street, South Side Ramsey Street from West Seventh Street to South Exchange Street & South Side Sherman Street from West Seventh Street to South Exchange Street at 324 West Seventh Street. S00149 - Both Sides East Sidney Street from Oakdale Avenue to Andrew Street. 500150 - Both Sides East Winifred Street from Ada Street to Anita Street & West Side Anita Street from East Winifrecl Street to East Robie Street. 500151 - Both Sides Woodbury Street from East Curtice Street to East 5idney Street. QR�GI�IAL *ESTIMATED CONSTRUCTION RATES oo- Syy RESIDENTIAL RATES (One, two or three family structures) Reconstruation (replacement of old sidewalk) -$9.65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.32 per square foot. A11 corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 1000 of actual cost estimated to be approximately $5.84 per square foot. The Council of the City o£ Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 !t3 That a public hearing be had on said improvement on the 28 dav of June, 2000 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays +/�enanav �bs���lakey �ostrom ,�oleman �Flarris ,xantry �R�iter Adopted by Council: Date�a p Certified Passed by Council Secretary �In Favor By � �Against Z ���"Q�"��l /� � � Mayor \ Y"1 / Gsi Works - Sidewalk Division �U r LflUU GREEN �DEPAR't11EN( WRECfOR � CiTY ATTWitiEY O�a� O MAYOP (�RAS515TANT) OFSt6Y1ATUpEPqG6 _ (CLIPALLtDCATION5FOR51GNANRE) Sidewalk & Reconstruct Sidewalk Wrth trrtegral Curb in Ward 2 ��( ��U/� ao–s�fc— T ' NO. 102760 INRiAWATE ❑ CIT'/ CAUNCIL ❑ CTfY pFAK ❑ FlN. & MGT. SERNCES DIR � Council Research ""'' "'""°"° "" `" "`""' °'� PEFtSONAL SERVICE CON7RACT5 NUST ANSWER THE FOLLON7NG �UESTIONS: COMMISStotd _avttSBivICECdG�l1 1. HasihisPersurJfirtneverworkedu(MeracorroactforthisdCpaM1merrt? � YES NO — 2 Has this persorJt'rtn ever been a ary employee? _ YES NO 3. Does this persoNFrtn possess a skill rwt nortnaly possessed by any currem ciry ertployee? YES NO Explain all yes answers on sepazate sheet aM attach to gresn sheet twwo, wruT. The problem °defective sidewalk° was caused by multiple prob{ems, tree roots, poor subgrade materials, freekhaw cycles, service Iffe limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corcected annually. Left uncorrected, the sidewaik condition would worsen to a state where ft woufd be unusabfe and subject to increased pedestrian injuries from falis and possible ikigations. :� The community wilt benefit fsom this project because it wili provide safe defect tree sidewalks for�tts citizens. The sidewalk contracts are done by private contractors generat+ng pubiic sector jobs as a resu{t. Historicaliy, the sidewafk teconstruciion has created negative feedback because of construction procedures and assessments. Property owners ques6on the assessments, despite the fact that up to one-haN the assessment is City subsidized. Having to assess for walk reconstruction remains a controversia! issue. This op6on would allow the infrastructure of sidewalk stock to deteriorate,.which in tum, w+it generate more personal injury suits, resuRing in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. GJitY� RE5�2PC�1 C2ittEf �AY 3 0 2000 IOUNTOFTRANSACTIONS LS)�145.4b COSTIREYENUEBUDGE7ED(ClRGLEONE) YES NO souace 00-M-0677 A, PIA �Q � 620,000 ncttvmHUMeEa C00-2T753-0784-0�000 NFOen+nnoN:��cewiN� B, AST = 365,000 C. CIB 00 = 50,000 CITY OF ST. PAIIL PRELIMINARY ORDER ORIGIS�AL CO C FILE NO _ O — LIy �y BY � File No._500142 - 500151 Voting Ward 2 Ia the Matter o£ sidewalk recoastruction and reconstxuctioa with integral curb at the following locations: 500142 - West Side Cliff Street from Superior Street to Goodhue Street. S00143 - North Side Curtice Street from Harvard Street to Woodbury Street. S00144 - Both Sides Erie Street from Palace Avenue to Jefferson Avenue & South Side Jefferson Avenue from Erie Street to Duke Street. 500145 - Both Sides Grand Avenue from Ayd Mill Road to South Dunlap Street. S�0146 - Both Sides Grand Avenue from South Lexington Parkway to South Oxford Street. S00147 - Both Sides Humboldt Avenue from West Elizabeth Street to West George Street. 500148 - East Side West Seventh Street from Forbes Avenue to lZamsey Street, West Side Exchange Street from Forbes Avenue to Sherman Street, North Side Forbes Avenue from West Seventh Street to South Exchange Street, South Side Ramsey Street from West Seventh Street to South Exchange Street & South Side Sherman Street from West Seventh Street to South Exchange Street at 324 West Seventh Street. S00149 - Both Sides East Sidney Street from Oakdale Avenue to Andrew Street. 500150 - Both Sides East Winifred Street from Ada Street to Anita Street & West Side Anita Street from East Winifrecl Street to East Robie Street. 500151 - Both Sides Woodbury Street from East Curtice Street to East 5idney Street. QR�GI�IAL *ESTIMATED CONSTRUCTION RATES oo- Syy RESIDENTIAL RATES (One, two or three family structures) Reconstruation (replacement of old sidewalk) -$9.65 per front foot for a five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. New construction (where no walk existed) - 1000 of the actual cost estimated to be approximately $4.32 per square foot. A11 corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 1000 of actual cost estimated to be approximately $5.84 per square foot. The Council of the City o£ Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, � that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 2000 Public Improvement Aid. 2 !t3 That a public hearing be had on said improvement on the 28 dav of June, 2000 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSONS Yeas Nays +/�enanav �bs���lakey �ostrom ,�oleman �Flarris ,xantry �R�iter Adopted by Council: Date�a p Certified Passed by Council Secretary �In Favor By � �Against Z ���"Q�"��l /� � � Mayor \ Y"1 / Gsi Works - Sidewalk Division �U r LflUU GREEN �DEPAR't11EN( WRECfOR � CiTY ATTWitiEY O�a� O MAYOP (�RAS515TANT) OFSt6Y1ATUpEPqG6 _ (CLIPALLtDCATION5FOR51GNANRE) Sidewalk & Reconstruct Sidewalk Wrth trrtegral Curb in Ward 2 ��( ��U/� ao–s�fc— T ' NO. 102760 INRiAWATE ❑ CIT'/ CAUNCIL ❑ CTfY pFAK ❑ FlN. & MGT. SERNCES DIR � Council Research ""'' "'""°"° "" `" "`""' °'� PEFtSONAL SERVICE CON7RACT5 NUST ANSWER THE FOLLON7NG �UESTIONS: COMMISStotd _avttSBivICECdG�l1 1. HasihisPersurJfirtneverworkedu(MeracorroactforthisdCpaM1merrt? � YES NO — 2 Has this persorJt'rtn ever been a ary employee? _ YES NO 3. Does this persoNFrtn possess a skill rwt nortnaly possessed by any currem ciry ertployee? YES NO Explain all yes answers on sepazate sheet aM attach to gresn sheet twwo, wruT. The problem °defective sidewalk° was caused by multiple prob{ems, tree roots, poor subgrade materials, freekhaw cycles, service Iffe limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and must be addressed and corcected annually. Left uncorrected, the sidewaik condition would worsen to a state where ft woufd be unusabfe and subject to increased pedestrian injuries from falis and possible ikigations. :� The community wilt benefit fsom this project because it wili provide safe defect tree sidewalks for�tts citizens. The sidewalk contracts are done by private contractors generat+ng pubiic sector jobs as a resu{t. Historicaliy, the sidewafk teconstruciion has created negative feedback because of construction procedures and assessments. Property owners ques6on the assessments, despite the fact that up to one-haN the assessment is City subsidized. Having to assess for walk reconstruction remains a controversia! issue. This op6on would allow the infrastructure of sidewalk stock to deteriorate,.which in tum, w+it generate more personal injury suits, resuRing in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts. GJitY� RE5�2PC�1 C2ittEf �AY 3 0 2000 IOUNTOFTRANSACTIONS LS)�145.4b COSTIREYENUEBUDGE7ED(ClRGLEONE) YES NO souace 00-M-0677 A, PIA �Q � 620,000 ncttvmHUMeEa C00-2T753-0784-0�000 NFOen+nnoN:��cewiN� B, AST = 365,000 C. CIB 00 = 50,000