00-540CITY OF ST. PAUL
PRELIMINARY ORDER
QRIGIS��L
COUNCIL FILE NO O� S�{O
B y —
Fil No. 134 - S00 41
Voting Ward 1,3 & 4
In the Matter of sidewalk recoastruction at tha followiag locations:
30
500134 - Both Sides Grand Avenue from South Albert Street to South Hamline Avenue.
500135 - Both sides Grand Avenue from South Hamline Avenue to South Syndicate
Street & East Side South Hamline Avenue from Lincoln Avenue to Grand Avenue.
500136 - Both Sides Grand Avenue from South Snelling Avenue to South Saratoga Street_
500137 - South Side Grand Avenue from South Syndicate Street to Ayd Mill Road.
500138 - West Side North Grotto Street from Iglehart Avenue to Carroll Avenue at
283 North Grotto Street Only.
500139 - Both Sides Hubbard Avenue from North Lexington Parkway to North Oxford
Street.
500140 - Both Sides Hubbard Avenue from North Oxford Street to North Chatsworth
Street.
500141 - South Side Edmund Avenue from Aldine Street to Fry Street at 1658 Edmund
Avenue Only.
OR1Gl�IAL
*ESTIMATED CONSTRUCTION RATES
ao - syo
RES2DENTIAL RATES (One, two or three family structures)
Reconstruction ireplacement of old sidewalk) -$9.65 per fronC foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100g of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "3ong side" of
the property.
Mi1LTI-RESIDENTSAL(More than three family structures�, NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
�
R]
That a public hearing be had on said improvement on the 28 dav of June, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
�b5c..� = Blakey
✓Bostrom
,�ol eman
vHarris
,�L�antry
�eiter
Adopted by Council: Date c_„(�.,.a ^ r J ��,0�0
Certified Passed by Council Secretary
� In Favor By c� � � �
�Against
� t e9��(prB� Mayor
v p'�'l!�
II�� u �IvG.
: Works - Sidewalk Division
�T FERSON & PHONE
Tvedt (266-608�
E ON COUNGI.AGENDA @Y (OATEI "1
�tIUV
t
OFSIGNANFEPAGES _ (CLIPALLIACATIONSFORSIGNA'NR�
Sidewalk in Wards 1, 3& 4
�
STAFF
CMLSEftY10E C�MMISSION
IGREEN :
� �EPARiMENT DIRECiOR
a CtTY ATT�RNEY
� BUDGEf DIftECTOq
� MAYOR (OR ASSISTANI)
NO. 102761
❑ CRY CAVNCII
❑ C(TY CLERK
❑ FlN. & MGT. SERVICES Dlq.
0 Council Research
I I DEPT. ACE UP7� .
PERSOSIAL SERYICE CONTRACTS MUST ANSWER THE FOLLOWING 4UESTIONS:
1. HasthispersonlfirtneverworkedunderacrontractforlFiisdepartmenY?
YES NO
2. Has Ihis persoNfirtn ever been a ciry employee?
YES NO
3. Does this personfirm possess a skill not nortnalty possessed 6y any current city employee?
YES NO
Ezplain a11 yes answers on separate shret and attach to green sheet
The problem "defective sidewalk" was caused by multiple probiems, tree roots, poor subgrade materials, freefthaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These probiems occur on a citywide basis and
must be addressed and corrected annualiy. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusabie and subject to increased pedestrian injuries from falls and possible litigations.
IFAPPROVED.
The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewafk
contracts are done by private contractors generating public sector jobs as a result.
OISADVANTAGESIF
Historicalfy, the sidewaik reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
This option woufd allow the infrastructure of sidewaik stock to deteriorate, which in tum, wiii generate more personai injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as weil as claim Qayouts.
C�unc� Research Genter
��Y � 0 2000
10UNT OF TRANSACTION $
soudce DO-M-O6
(EXPLAfIC)
A, PIA 00 = 620,.000
B. AST = 365>000
C, CIB 00 = 5Q,0�o
NUMBER
YS�t `✓l�/UU oa-s�a
�CIRCLE ONE) ( YES� NO
CITY OF ST. PAUL
PRELIMINARY ORDER
QRIGIS��L
COUNCIL FILE NO O� S�{O
B y —
Fil No. 134 - S00 41
Voting Ward 1,3 & 4
In the Matter of sidewalk recoastruction at tha followiag locations:
30
500134 - Both Sides Grand Avenue from South Albert Street to South Hamline Avenue.
500135 - Both sides Grand Avenue from South Hamline Avenue to South Syndicate
Street & East Side South Hamline Avenue from Lincoln Avenue to Grand Avenue.
500136 - Both Sides Grand Avenue from South Snelling Avenue to South Saratoga Street_
500137 - South Side Grand Avenue from South Syndicate Street to Ayd Mill Road.
500138 - West Side North Grotto Street from Iglehart Avenue to Carroll Avenue at
283 North Grotto Street Only.
500139 - Both Sides Hubbard Avenue from North Lexington Parkway to North Oxford
Street.
500140 - Both Sides Hubbard Avenue from North Oxford Street to North Chatsworth
Street.
500141 - South Side Edmund Avenue from Aldine Street to Fry Street at 1658 Edmund
Avenue Only.
OR1Gl�IAL
*ESTIMATED CONSTRUCTION RATES
ao - syo
RES2DENTIAL RATES (One, two or three family structures)
Reconstruction ireplacement of old sidewalk) -$9.65 per fronC foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100g of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "3ong side" of
the property.
Mi1LTI-RESIDENTSAL(More than three family structures�, NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
�
R]
That a public hearing be had on said improvement on the 28 dav of June, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
�b5c..� = Blakey
✓Bostrom
,�ol eman
vHarris
,�L�antry
�eiter
Adopted by Council: Date c_„(�.,.a ^ r J ��,0�0
Certified Passed by Council Secretary
� In Favor By c� � � �
�Against
� t e9��(prB� Mayor
v p'�'l!�
II�� u �IvG.
: Works - Sidewalk Division
�T FERSON & PHONE
Tvedt (266-608�
E ON COUNGI.AGENDA @Y (OATEI "1
�tIUV
t
OFSIGNANFEPAGES _ (CLIPALLIACATIONSFORSIGNA'NR�
Sidewalk in Wards 1, 3& 4
�
STAFF
CMLSEftY10E C�MMISSION
IGREEN :
� �EPARiMENT DIRECiOR
a CtTY ATT�RNEY
� BUDGEf DIftECTOq
� MAYOR (OR ASSISTANI)
NO. 102761
❑ CRY CAVNCII
❑ C(TY CLERK
❑ FlN. & MGT. SERVICES Dlq.
0 Council Research
I I DEPT. ACE UP7� .
PERSOSIAL SERYICE CONTRACTS MUST ANSWER THE FOLLOWING 4UESTIONS:
1. HasthispersonlfirtneverworkedunderacrontractforlFiisdepartmenY?
YES NO
2. Has Ihis persoNfirtn ever been a ciry employee?
YES NO
3. Does this personfirm possess a skill not nortnalty possessed 6y any current city employee?
YES NO
Ezplain a11 yes answers on separate shret and attach to green sheet
The problem "defective sidewalk" was caused by multiple probiems, tree roots, poor subgrade materials, freefthaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These probiems occur on a citywide basis and
must be addressed and corrected annualiy. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusabie and subject to increased pedestrian injuries from falls and possible litigations.
IFAPPROVED.
The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewafk
contracts are done by private contractors generating public sector jobs as a result.
OISADVANTAGESIF
Historicalfy, the sidewaik reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
This option woufd allow the infrastructure of sidewaik stock to deteriorate, which in tum, wiii generate more personai injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as weil as claim Qayouts.
C�unc� Research Genter
��Y � 0 2000
10UNT OF TRANSACTION $
soudce DO-M-O6
(EXPLAfIC)
A, PIA 00 = 620,.000
B. AST = 365>000
C, CIB 00 = 5Q,0�o
NUMBER
YS�t `✓l�/UU oa-s�a
�CIRCLE ONE) ( YES� NO
CITY OF ST. PAUL
PRELIMINARY ORDER
QRIGIS��L
COUNCIL FILE NO O� S�{O
B y —
Fil No. 134 - S00 41
Voting Ward 1,3 & 4
In the Matter of sidewalk recoastruction at tha followiag locations:
30
500134 - Both Sides Grand Avenue from South Albert Street to South Hamline Avenue.
500135 - Both sides Grand Avenue from South Hamline Avenue to South Syndicate
Street & East Side South Hamline Avenue from Lincoln Avenue to Grand Avenue.
500136 - Both Sides Grand Avenue from South Snelling Avenue to South Saratoga Street_
500137 - South Side Grand Avenue from South Syndicate Street to Ayd Mill Road.
500138 - West Side North Grotto Street from Iglehart Avenue to Carroll Avenue at
283 North Grotto Street Only.
500139 - Both Sides Hubbard Avenue from North Lexington Parkway to North Oxford
Street.
500140 - Both Sides Hubbard Avenue from North Oxford Street to North Chatsworth
Street.
500141 - South Side Edmund Avenue from Aldine Street to Fry Street at 1658 Edmund
Avenue Only.
OR1Gl�IAL
*ESTIMATED CONSTRUCTION RATES
ao - syo
RES2DENTIAL RATES (One, two or three family structures)
Reconstruction ireplacement of old sidewalk) -$9.65 per fronC foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100g of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "3ong side" of
the property.
Mi1LTI-RESIDENTSAL(More than three family structures�, NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
�
R]
That a public hearing be had on said improvement on the 28 dav of June, 2000
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
�b5c..� = Blakey
✓Bostrom
,�ol eman
vHarris
,�L�antry
�eiter
Adopted by Council: Date c_„(�.,.a ^ r J ��,0�0
Certified Passed by Council Secretary
� In Favor By c� � � �
�Against
� t e9��(prB� Mayor
v p'�'l!�
II�� u �IvG.
: Works - Sidewalk Division
�T FERSON & PHONE
Tvedt (266-608�
E ON COUNGI.AGENDA @Y (OATEI "1
�tIUV
t
OFSIGNANFEPAGES _ (CLIPALLIACATIONSFORSIGNA'NR�
Sidewalk in Wards 1, 3& 4
�
STAFF
CMLSEftY10E C�MMISSION
IGREEN :
� �EPARiMENT DIRECiOR
a CtTY ATT�RNEY
� BUDGEf DIftECTOq
� MAYOR (OR ASSISTANI)
NO. 102761
❑ CRY CAVNCII
❑ C(TY CLERK
❑ FlN. & MGT. SERVICES Dlq.
0 Council Research
I I DEPT. ACE UP7� .
PERSOSIAL SERYICE CONTRACTS MUST ANSWER THE FOLLOWING 4UESTIONS:
1. HasthispersonlfirtneverworkedunderacrontractforlFiisdepartmenY?
YES NO
2. Has Ihis persoNfirtn ever been a ciry employee?
YES NO
3. Does this personfirm possess a skill not nortnalty possessed 6y any current city employee?
YES NO
Ezplain a11 yes answers on separate shret and attach to green sheet
The problem "defective sidewalk" was caused by multiple probiems, tree roots, poor subgrade materials, freefthaw cycles,
service life limits, chemical additives, extreme temperature variations, etc. These probiems occur on a citywide basis and
must be addressed and corrected annualiy. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusabie and subject to increased pedestrian injuries from falls and possible litigations.
IFAPPROVED.
The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewafk
contracts are done by private contractors generating public sector jobs as a result.
OISADVANTAGESIF
Historicalfy, the sidewaik reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
This option woufd allow the infrastructure of sidewaik stock to deteriorate, which in tum, wiii generate more personai injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as weil as claim Qayouts.
C�unc� Research Genter
��Y � 0 2000
10UNT OF TRANSACTION $
soudce DO-M-O6
(EXPLAfIC)
A, PIA 00 = 620,.000
B. AST = 365>000
C, CIB 00 = 5Q,0�o
NUMBER
YS�t `✓l�/UU oa-s�a
�CIRCLE ONE) ( YES� NO