00-329CITY OF ST. PA02, COUNCI I E NO_ �O - 3a�
PRELIMINARY ORDER By � "�'~'�'
File No. 500002 - 500014
Voting Ward 3_
In the Matter of sidewalk reconstruction at the following locations:
S00002 - Both sides Bayard Avenue from South Griggs Street to Edgcumbe Road.
500003 - Both sides Bayard Avenue from South Syndicate Street to South Griggs Street
& West side South Griggs Street from Hartford Avenue to Bayard Avenue.
500004 - Both sides Goodrich Avenue from South Fairview Avenue to South Wheeler
Street.
500005 - Both sides South Griggs Street from St. Clair Avenue to Osceola Avenue.
500006 - East side Hamline Avenue from James Avenue to Palace Avenue.
500007 - Both sides Highland Parkway from Kenneth Street to South Fairview Avenue.
500008 - Both sides James Avenue from South Syndicate Street to South Griggs Street.
500009 - West side Kenneth Street from Bohland Avenue to Hillcrest Avenue.
500010 - West side Soutfi Prior Avenue from Wellesley Avenue to Stanford Avenue.
500011 - North side St. Clair Avenue from South Fairview Avenue to South Wheeler
Street & East side South Fairview Avenue from St. Clair Avenue to Sargent
Avenue.
500012 - Both sides Watson Avenue from South Griggs Street to Edgcumbe Road.
500013 - Both sides Wellesley Avenue from Kenneth Street to South Prior Avenue.
500014 - Both sides South Wheeler Street from Princeton Avenue to Goodrich Avenue.
do � 3aq
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. A11 other widths will be prorated accordingly. New construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City o£ Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
2. That a public hearing be had on said improvement on
5:30 o'clock P.M. in the Council Chambers of the
Building in the City of Saint Paul.
�o'� d4.�, i`���„
the � of 2000
City Hall and Court House
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
,�.x„i.'E�enanav
B]_akey
✓Bostrom
✓(_`oleman
✓�3arris
�antry
/�Reiter
Adopted by Council: Date���
Certified Passed by Council Secretary
�In Favor By ti ��.. �/�-���+-�/
_�Against �/'ui/`�
� % ' " - _ Mayor'
� ��(15c� �
dP' � i ��'b'tJ�
: Works - Sidewalk Division
T PEFSON & PF10NE
TVEdI (ZBE-BOS�
, EONCOUNqLAGENDABY(DA'f� .,
PAGES
SHEET
—INITIALIDATE
NO. �02745
MfTIAVDATE
❑ CRV CAUNCIL
❑CfiYCIERK ��
❑ FlN. d MGT. SFAVICES dR
� Council Research
� � DEPT. AL IYr 211
I� DEPARiMEM DIRECTOR
� CITY ATTOflNEY
� &1DGET DIRECTOR
� MAYOR (OF ASSISTANi)
PoR SIGN�NR�
strud Sidewaik in Ward 3(See attached list)
�. �5 90000L- 50001�
=NDATONS. Appm�e (A) w Rejeq (R)
NNINGCOMMISSION ph�SEflVICECdAMISSION
as conttnrrr�
5�AFF
PERSONAL SEiiVICE CONTRACTS MUST ANSWER THE FOLLON7NG QUESTIONS:
7. HasMispersoNfirtneverworkedunderacontrac[forihistlepartment?
VES NO
2. Has Mis perso�rtn ever been a crty empbyee?
YES NO
3. Does mis persoNfirm possess a skin rwt nortnany possessetl by any wrrent dry empbyee?
YES NO
Explain ail yes a�wers on separate sheet a�M attaeh to grnen sheet
OPPORRINRV (WHO. WHAT, WHEN, WHERE, WHY):
The problem "defective sidewalk° was caused by multiple problems, tree roots, poor subgrade materials, freeRhaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorcected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falis and possible litigations.
IFAPPROVED:
The community will benefit from this project because it wiN provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
Historically, the sidewalk reconstructions have created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
C�;� �;::i i�:;s�a,;.� Canter
t �;;� � � 20�Q
This option would allow the infrastructure of sidewalk stock to deteriorate, which in tum, wili generate more personal injury
suits, resuiting in the expendRure of larger dollar amounts in repairs and replacement, as weil as claim payouts.
Ci4GRC� PiES@3fC�1 �°�Y42r
I�i�� V U £UFlL
AMOUNTOFTRANSACT10N5 03�o//,OV COST/REVENUEBUDGETED(GIRCLEONE) YES xo
iGSOURCE �� . ` f ACRVT'NUMBER C00-2T753-0784-00000
ALINFORMATION:(IXPWN) � � �
C, CIB oo = 50,000
CITY OF ST. PA02, COUNCI I E NO_ �O - 3a�
PRELIMINARY ORDER By � "�'~'�'
File No. 500002 - 500014
Voting Ward 3_
In the Matter of sidewalk reconstruction at the following locations:
S00002 - Both sides Bayard Avenue from South Griggs Street to Edgcumbe Road.
500003 - Both sides Bayard Avenue from South Syndicate Street to South Griggs Street
& West side South Griggs Street from Hartford Avenue to Bayard Avenue.
500004 - Both sides Goodrich Avenue from South Fairview Avenue to South Wheeler
Street.
500005 - Both sides South Griggs Street from St. Clair Avenue to Osceola Avenue.
500006 - East side Hamline Avenue from James Avenue to Palace Avenue.
500007 - Both sides Highland Parkway from Kenneth Street to South Fairview Avenue.
500008 - Both sides James Avenue from South Syndicate Street to South Griggs Street.
500009 - West side Kenneth Street from Bohland Avenue to Hillcrest Avenue.
500010 - West side Soutfi Prior Avenue from Wellesley Avenue to Stanford Avenue.
500011 - North side St. Clair Avenue from South Fairview Avenue to South Wheeler
Street & East side South Fairview Avenue from St. Clair Avenue to Sargent
Avenue.
500012 - Both sides Watson Avenue from South Griggs Street to Edgcumbe Road.
500013 - Both sides Wellesley Avenue from Kenneth Street to South Prior Avenue.
500014 - Both sides South Wheeler Street from Princeton Avenue to Goodrich Avenue.
do � 3aq
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. A11 other widths will be prorated accordingly. New construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City o£ Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
2. That a public hearing be had on said improvement on
5:30 o'clock P.M. in the Council Chambers of the
Building in the City of Saint Paul.
�o'� d4.�, i`���„
the � of 2000
City Hall and Court House
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
,�.x„i.'E�enanav
B]_akey
✓Bostrom
✓(_`oleman
✓�3arris
�antry
/�Reiter
Adopted by Council: Date���
Certified Passed by Council Secretary
�In Favor By ti ��.. �/�-���+-�/
_�Against �/'ui/`�
� % ' " - _ Mayor'
� ��(15c� �
dP' � i ��'b'tJ�
: Works - Sidewalk Division
T PEFSON & PF10NE
TVEdI (ZBE-BOS�
, EONCOUNqLAGENDABY(DA'f� .,
PAGES
SHEET
—INITIALIDATE
NO. �02745
MfTIAVDATE
❑ CRV CAUNCIL
❑CfiYCIERK ��
❑ FlN. d MGT. SFAVICES dR
� Council Research
� � DEPT. AL IYr 211
I� DEPARiMEM DIRECTOR
� CITY ATTOflNEY
� &1DGET DIRECTOR
� MAYOR (OF ASSISTANi)
PoR SIGN�NR�
strud Sidewaik in Ward 3(See attached list)
�. �5 90000L- 50001�
=NDATONS. Appm�e (A) w Rejeq (R)
NNINGCOMMISSION ph�SEflVICECdAMISSION
as conttnrrr�
5�AFF
PERSONAL SEiiVICE CONTRACTS MUST ANSWER THE FOLLON7NG QUESTIONS:
7. HasMispersoNfirtneverworkedunderacontrac[forihistlepartment?
VES NO
2. Has Mis perso�rtn ever been a crty empbyee?
YES NO
3. Does mis persoNfirm possess a skin rwt nortnany possessetl by any wrrent dry empbyee?
YES NO
Explain ail yes a�wers on separate sheet a�M attaeh to grnen sheet
OPPORRINRV (WHO. WHAT, WHEN, WHERE, WHY):
The problem "defective sidewalk° was caused by multiple problems, tree roots, poor subgrade materials, freeRhaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorcected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falis and possible litigations.
IFAPPROVED:
The community will benefit from this project because it wiN provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
Historically, the sidewalk reconstructions have created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
C�;� �;::i i�:;s�a,;.� Canter
t �;;� � � 20�Q
This option would allow the infrastructure of sidewalk stock to deteriorate, which in tum, wili generate more personal injury
suits, resuiting in the expendRure of larger dollar amounts in repairs and replacement, as weil as claim payouts.
Ci4GRC� PiES@3fC�1 �°�Y42r
I�i�� V U £UFlL
AMOUNTOFTRANSACT10N5 03�o//,OV COST/REVENUEBUDGETED(GIRCLEONE) YES xo
iGSOURCE �� . ` f ACRVT'NUMBER C00-2T753-0784-00000
ALINFORMATION:(IXPWN) � � �
C, CIB oo = 50,000
CITY OF ST. PA02, COUNCI I E NO_ �O - 3a�
PRELIMINARY ORDER By � "�'~'�'
File No. 500002 - 500014
Voting Ward 3_
In the Matter of sidewalk reconstruction at the following locations:
S00002 - Both sides Bayard Avenue from South Griggs Street to Edgcumbe Road.
500003 - Both sides Bayard Avenue from South Syndicate Street to South Griggs Street
& West side South Griggs Street from Hartford Avenue to Bayard Avenue.
500004 - Both sides Goodrich Avenue from South Fairview Avenue to South Wheeler
Street.
500005 - Both sides South Griggs Street from St. Clair Avenue to Osceola Avenue.
500006 - East side Hamline Avenue from James Avenue to Palace Avenue.
500007 - Both sides Highland Parkway from Kenneth Street to South Fairview Avenue.
500008 - Both sides James Avenue from South Syndicate Street to South Griggs Street.
500009 - West side Kenneth Street from Bohland Avenue to Hillcrest Avenue.
500010 - West side Soutfi Prior Avenue from Wellesley Avenue to Stanford Avenue.
500011 - North side St. Clair Avenue from South Fairview Avenue to South Wheeler
Street & East side South Fairview Avenue from St. Clair Avenue to Sargent
Avenue.
500012 - Both sides Watson Avenue from South Griggs Street to Edgcumbe Road.
500013 - Both sides Wellesley Avenue from Kenneth Street to South Prior Avenue.
500014 - Both sides South Wheeler Street from Princeton Avenue to Goodrich Avenue.
do � 3aq
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$9.65 per front foot for a
five (5) foot wide walk and $11.58 per front foot for a six (6) foot wide
walk. A11 other widths will be prorated accordingly. New construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.32 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $5.84 per square foot.
The Council of the City o£ Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
2. That a public hearing be had on said improvement on
5:30 o'clock P.M. in the Council Chambers of the
Building in the City of Saint Paul.
�o'� d4.�, i`���„
the � of 2000
City Hall and Court House
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
,�.x„i.'E�enanav
B]_akey
✓Bostrom
✓(_`oleman
✓�3arris
�antry
/�Reiter
Adopted by Council: Date���
Certified Passed by Council Secretary
�In Favor By ti ��.. �/�-���+-�/
_�Against �/'ui/`�
� % ' " - _ Mayor'
� ��(15c� �
dP' � i ��'b'tJ�
: Works - Sidewalk Division
T PEFSON & PF10NE
TVEdI (ZBE-BOS�
, EONCOUNqLAGENDABY(DA'f� .,
PAGES
SHEET
—INITIALIDATE
NO. �02745
MfTIAVDATE
❑ CRV CAUNCIL
❑CfiYCIERK ��
❑ FlN. d MGT. SFAVICES dR
� Council Research
� � DEPT. AL IYr 211
I� DEPARiMEM DIRECTOR
� CITY ATTOflNEY
� &1DGET DIRECTOR
� MAYOR (OF ASSISTANi)
PoR SIGN�NR�
strud Sidewaik in Ward 3(See attached list)
�. �5 90000L- 50001�
=NDATONS. Appm�e (A) w Rejeq (R)
NNINGCOMMISSION ph�SEflVICECdAMISSION
as conttnrrr�
5�AFF
PERSONAL SEiiVICE CONTRACTS MUST ANSWER THE FOLLON7NG QUESTIONS:
7. HasMispersoNfirtneverworkedunderacontrac[forihistlepartment?
VES NO
2. Has Mis perso�rtn ever been a crty empbyee?
YES NO
3. Does mis persoNfirm possess a skin rwt nortnany possessetl by any wrrent dry empbyee?
YES NO
Explain ail yes a�wers on separate sheet a�M attaeh to grnen sheet
OPPORRINRV (WHO. WHAT, WHEN, WHERE, WHY):
The problem "defective sidewalk° was caused by multiple problems, tree roots, poor subgrade materials, freeRhaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorcected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falis and possible litigations.
IFAPPROVED:
The community will benefit from this project because it wiN provide safe defect free sidewalks for its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
Historically, the sidewalk reconstructions have created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
C�;� �;::i i�:;s�a,;.� Canter
t �;;� � � 20�Q
This option would allow the infrastructure of sidewalk stock to deteriorate, which in tum, wili generate more personal injury
suits, resuiting in the expendRure of larger dollar amounts in repairs and replacement, as weil as claim payouts.
Ci4GRC� PiES@3fC�1 �°�Y42r
I�i�� V U £UFlL
AMOUNTOFTRANSACT10N5 03�o//,OV COST/REVENUEBUDGETED(GIRCLEONE) YES xo
iGSOURCE �� . ` f ACRVT'NUMBER C00-2T753-0784-00000
ALINFORMATION:(IXPWN) � � �
C, CIB oo = 50,000