98-439��
CITY OF 5T. PAUI, COUN IL FzLE . 98-Y39
�
PRELIMINARY ORDER By
Fi1e o. S9 082 thru 598084
Voti g Ward 5
In the Matter o£ sidewalk reconstruction at the Eollowing locations:
598082 - North side W Rose Ave from Farrington St to Virginia St
West side Farrington St from W Rose Ave to W Maryland Ave and
West side Farrington St Prom W Geranium Ave to W Rose Ave
598083 - North side W Rose Ave £rom Matilda St to Albemarle St
South side W Rose Ave from Matilda St to Woodbridge St and
West side Woodbridge St from W Rose Ave to W Maryland Ave
598084 - Both sides Virginia St from W Jessamine Ave to W Rose Ave
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$7.65 per front foot £or a
five (5) foot wide walk and $9.18 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
{where no walk existed) - 100� of the actual cost estimated to be
approximately $3.42 per square foot.
All corner residential properties wi11 receive a credit up to the first 150
feet o£ new or reconstructed sidewalk along and abutting the "long side" o£
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $4.62 per square foot.
3� �
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1
That the said report and the same is hereby approved with no alternatives,
and that the estimated cost thereof is *SEE ABOVE £or estimated construction
rates, financed by assessments and 1998 Public Smprovement Aid.
Gl
That a public hearing be had on said improvement on the 24th dav of June, 1998
at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House
Building in the City of Saint Pau1.
That notice o£ said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereoP as estimated.
COUNCILPERSONS
°as Nays
�nanav
✓Blakey
�strom
�G6leman
,�H�rris
�ntry
��`iter
PIIR� fCper.
-�r i 31ss�
JiAi1^�Q..
Adopted by Council: Date ' ` ���
Certified Passed by Council Secretary
2 1n Favor By �
CJ Against
Mayor
Pubiic Works Sidewalks
�-�-y� % y.�y
GREEN SHEET No.
_arry H. Lueth� 2666083 assicn ���E�M�DI,I7ECTOA
Numa�rt we
AUSTBEONCOUtKILAGENDA6Y{OAT� 5-20-98 Ra� auocEroiascmFt
For Public Hearing on 6-24-98 �MAYOR(ORASSISTMCf)
fOTALt OF SIGNATUHE PAGE8 _ S _(CUP ALL LOCATONS FOR SIGNANfl� n ASSOCIATE
Reconstruct Sidewalk in Ward 5(See attached list)
b MGT, SERVICES
q� - u3�
�CN9. SERVICE GOAiFi1SSbN
CIB COMMITfEE
STAFF
YM%�iCW�p.OBJECTNE?
PERSONAL SERYICE COMRACfS NUST ANSWER THE FOI.LON7NG QUESTIONS_
7. Has thisp���t� rtn ever worked undel a contract for this departrnent?
EY 5 NO
2. }ias thisper Bver been a dry employee?
EY S��NO
3. Dces this persorvfrm possess a skif� not mrmalty possessed by arry cunent ciry
employee?
YES NQ
Eaplain tll yas aruMwn on s+poM� ahaN aM attaMto gnan shwt
The problem "defecYrve sidewaik" was created because of Vee mots, defeterious subgrade materiai, altemating freeRhaw cycles,
service 1'rfe limBs, chemical add'Rives, extreme temperature variations, etc. These proWems ocxur on a citywide level and must be
addressed and coriected on an annuai basis. Left uncorrected, the sidewaik condRion would worsen to a state where it would be
rendered unusable and subject ro increased pedestrian injuries trom fa4ls and possble litigations.
Tha communfty wili benefd from this project because ii wi{I provide safe detect free sidewafks for its many cftizens. The sidewalk
caMracts are executed by private coMractors, sp it faliows that private sector pbs are created as a resuR ot this activtty.
iF APPROVED:
liistorieally, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment.
Simply siated, property owners datest assessmeMs, and despite the tacl up to one-halt ihe assessmeM is City subsidized, it still
remains corttroversial.
This option wouid ailow the infrastructure of sidewalk stock to deteriorate, which in tum, wili geoerate more personal injury suits,
ukimately resulting +n the expenddure of larger dollar amounts in eventua{ repairs andlor replacemerrt, wait'as Eiaim payouts.
� �38�8�6Ch. Cr�ntP;�
MAY 111998
7TAL AMWNT OFTRAtiSACTIOH S
JNDWGSOURCE 98 -ri-o668
OANCIAL WFORMATION: (EXPLAII�ry
A� Y[A ytf = 4]tf�A�O
B, AST = 325�000
C� Ct8 98 = 50,OOQ
COST7AEYENUE BUDGETED (CipCLE ONE)
ACTNRY NUMBER
L:]
� .
��
CITY OF 5T. PAUI, COUN IL FzLE . 98-Y39
�
PRELIMINARY ORDER By
Fi1e o. S9 082 thru 598084
Voti g Ward 5
In the Matter o£ sidewalk reconstruction at the Eollowing locations:
598082 - North side W Rose Ave from Farrington St to Virginia St
West side Farrington St from W Rose Ave to W Maryland Ave and
West side Farrington St Prom W Geranium Ave to W Rose Ave
598083 - North side W Rose Ave £rom Matilda St to Albemarle St
South side W Rose Ave from Matilda St to Woodbridge St and
West side Woodbridge St from W Rose Ave to W Maryland Ave
598084 - Both sides Virginia St from W Jessamine Ave to W Rose Ave
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$7.65 per front foot £or a
five (5) foot wide walk and $9.18 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
{where no walk existed) - 100� of the actual cost estimated to be
approximately $3.42 per square foot.
All corner residential properties wi11 receive a credit up to the first 150
feet o£ new or reconstructed sidewalk along and abutting the "long side" o£
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $4.62 per square foot.
3� �
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1
That the said report and the same is hereby approved with no alternatives,
and that the estimated cost thereof is *SEE ABOVE £or estimated construction
rates, financed by assessments and 1998 Public Smprovement Aid.
Gl
That a public hearing be had on said improvement on the 24th dav of June, 1998
at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House
Building in the City of Saint Pau1.
That notice o£ said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereoP as estimated.
COUNCILPERSONS
°as Nays
�nanav
✓Blakey
�strom
�G6leman
,�H�rris
�ntry
��`iter
PIIR� fCper.
-�r i 31ss�
JiAi1^�Q..
Adopted by Council: Date ' ` ���
Certified Passed by Council Secretary
2 1n Favor By �
CJ Against
Mayor
Pubiic Works Sidewalks
�-�-y� % y.�y
GREEN SHEET No.
_arry H. Lueth� 2666083 assicn ���E�M�DI,I7ECTOA
Numa�rt we
AUSTBEONCOUtKILAGENDA6Y{OAT� 5-20-98 Ra� auocEroiascmFt
For Public Hearing on 6-24-98 �MAYOR(ORASSISTMCf)
fOTALt OF SIGNATUHE PAGE8 _ S _(CUP ALL LOCATONS FOR SIGNANfl� n ASSOCIATE
Reconstruct Sidewalk in Ward 5(See attached list)
b MGT, SERVICES
q� - u3�
�CN9. SERVICE GOAiFi1SSbN
CIB COMMITfEE
STAFF
YM%�iCW�p.OBJECTNE?
PERSONAL SERYICE COMRACfS NUST ANSWER THE FOI.LON7NG QUESTIONS_
7. Has thisp���t� rtn ever worked undel a contract for this departrnent?
EY 5 NO
2. }ias thisper Bver been a dry employee?
EY S��NO
3. Dces this persorvfrm possess a skif� not mrmalty possessed by arry cunent ciry
employee?
YES NQ
Eaplain tll yas aruMwn on s+poM� ahaN aM attaMto gnan shwt
The problem "defecYrve sidewaik" was created because of Vee mots, defeterious subgrade materiai, altemating freeRhaw cycles,
service 1'rfe limBs, chemical add'Rives, extreme temperature variations, etc. These proWems ocxur on a citywide level and must be
addressed and coriected on an annuai basis. Left uncorrected, the sidewaik condRion would worsen to a state where it would be
rendered unusable and subject ro increased pedestrian injuries trom fa4ls and possble litigations.
Tha communfty wili benefd from this project because ii wi{I provide safe detect free sidewafks for its many cftizens. The sidewalk
caMracts are executed by private coMractors, sp it faliows that private sector pbs are created as a resuR ot this activtty.
iF APPROVED:
liistorieally, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment.
Simply siated, property owners datest assessmeMs, and despite the tacl up to one-halt ihe assessmeM is City subsidized, it still
remains corttroversial.
This option wouid ailow the infrastructure of sidewalk stock to deteriorate, which in tum, wili geoerate more personal injury suits,
ukimately resulting +n the expenddure of larger dollar amounts in eventua{ repairs andlor replacemerrt, wait'as Eiaim payouts.
� �38�8�6Ch. Cr�ntP;�
MAY 111998
7TAL AMWNT OFTRAtiSACTIOH S
JNDWGSOURCE 98 -ri-o668
OANCIAL WFORMATION: (EXPLAII�ry
A� Y[A ytf = 4]tf�A�O
B, AST = 325�000
C� Ct8 98 = 50,OOQ
COST7AEYENUE BUDGETED (CipCLE ONE)
ACTNRY NUMBER
L:]
� .
��
CITY OF 5T. PAUI, COUN IL FzLE . 98-Y39
�
PRELIMINARY ORDER By
Fi1e o. S9 082 thru 598084
Voti g Ward 5
In the Matter o£ sidewalk reconstruction at the Eollowing locations:
598082 - North side W Rose Ave from Farrington St to Virginia St
West side Farrington St from W Rose Ave to W Maryland Ave and
West side Farrington St Prom W Geranium Ave to W Rose Ave
598083 - North side W Rose Ave £rom Matilda St to Albemarle St
South side W Rose Ave from Matilda St to Woodbridge St and
West side Woodbridge St from W Rose Ave to W Maryland Ave
598084 - Both sides Virginia St from W Jessamine Ave to W Rose Ave
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$7.65 per front foot £or a
five (5) foot wide walk and $9.18 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
{where no walk existed) - 100� of the actual cost estimated to be
approximately $3.42 per square foot.
All corner residential properties wi11 receive a credit up to the first 150
feet o£ new or reconstructed sidewalk along and abutting the "long side" o£
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $4.62 per square foot.
3� �
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1
That the said report and the same is hereby approved with no alternatives,
and that the estimated cost thereof is *SEE ABOVE £or estimated construction
rates, financed by assessments and 1998 Public Smprovement Aid.
Gl
That a public hearing be had on said improvement on the 24th dav of June, 1998
at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House
Building in the City of Saint Pau1.
That notice o£ said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereoP as estimated.
COUNCILPERSONS
°as Nays
�nanav
✓Blakey
�strom
�G6leman
,�H�rris
�ntry
��`iter
PIIR� fCper.
-�r i 31ss�
JiAi1^�Q..
Adopted by Council: Date ' ` ���
Certified Passed by Council Secretary
2 1n Favor By �
CJ Against
Mayor
Pubiic Works Sidewalks
�-�-y� % y.�y
GREEN SHEET No.
_arry H. Lueth� 2666083 assicn ���E�M�DI,I7ECTOA
Numa�rt we
AUSTBEONCOUtKILAGENDA6Y{OAT� 5-20-98 Ra� auocEroiascmFt
For Public Hearing on 6-24-98 �MAYOR(ORASSISTMCf)
fOTALt OF SIGNATUHE PAGE8 _ S _(CUP ALL LOCATONS FOR SIGNANfl� n ASSOCIATE
Reconstruct Sidewalk in Ward 5(See attached list)
b MGT, SERVICES
q� - u3�
�CN9. SERVICE GOAiFi1SSbN
CIB COMMITfEE
STAFF
YM%�iCW�p.OBJECTNE?
PERSONAL SERYICE COMRACfS NUST ANSWER THE FOI.LON7NG QUESTIONS_
7. Has thisp���t� rtn ever worked undel a contract for this departrnent?
EY 5 NO
2. }ias thisper Bver been a dry employee?
EY S��NO
3. Dces this persorvfrm possess a skif� not mrmalty possessed by arry cunent ciry
employee?
YES NQ
Eaplain tll yas aruMwn on s+poM� ahaN aM attaMto gnan shwt
The problem "defecYrve sidewaik" was created because of Vee mots, defeterious subgrade materiai, altemating freeRhaw cycles,
service 1'rfe limBs, chemical add'Rives, extreme temperature variations, etc. These proWems ocxur on a citywide level and must be
addressed and coriected on an annuai basis. Left uncorrected, the sidewaik condRion would worsen to a state where it would be
rendered unusable and subject ro increased pedestrian injuries trom fa4ls and possble litigations.
Tha communfty wili benefd from this project because ii wi{I provide safe detect free sidewafks for its many cftizens. The sidewalk
caMracts are executed by private coMractors, sp it faliows that private sector pbs are created as a resuR ot this activtty.
iF APPROVED:
liistorieally, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment.
Simply siated, property owners datest assessmeMs, and despite the tacl up to one-halt ihe assessmeM is City subsidized, it still
remains corttroversial.
This option wouid ailow the infrastructure of sidewalk stock to deteriorate, which in tum, wili geoerate more personal injury suits,
ukimately resulting +n the expenddure of larger dollar amounts in eventua{ repairs andlor replacemerrt, wait'as Eiaim payouts.
� �38�8�6Ch. Cr�ntP;�
MAY 111998
7TAL AMWNT OFTRAtiSACTIOH S
JNDWGSOURCE 98 -ri-o668
OANCIAL WFORMATION: (EXPLAII�ry
A� Y[A ytf = 4]tf�A�O
B, AST = 325�000
C� Ct8 98 = 50,OOQ
COST7AEYENUE BUDGETED (CipCLE ONE)
ACTNRY NUMBER
L:]
� .