Loading...
98-294� �L CITY OF ST. PAiJL PRELIMINARY ORDER In the Matter of OR�GINAL q �q4 COUNC IL _ By File No__ 8006,598023 Voting Ward_2 598006 - Sidewalk reconstruction on both sides Bidwell St from W Winifred St to W Delos St. 598007 - 5idewalk reconstruction on both sides of W Congress St from Bellows St to Bidwell St. 598008 - Sidewalk reconstruction on both sides W Congress St from Bidwell St to Winslow St. 598009 - Sidewalk reconstruction on both sides W Congress St from Ohio St to Bellows St_ 598010 - Sidewalk reconstruction on both sides W Congress St from Winslow Ave to Stryker Ave_ 598011 - Sidewalk reconstruction on both sides W Delos St from Bellows St to Winslow Ave. 598012 - Sidewalk reconstruction on both sides W Delos St from Winslow Ave to Hall Ave. 598013 - Sidewalk reconstruction on east side Hall Ave £rom W Delos 5t to Prospect Blvd & west side Hall Ave from W Delos St to W Colorado St. 598014 - Sidewalk reconstruction on both sides Hall Ave from W Winifred St to W Congress St. S98015 - Sidewalk reconstruction on both sides Manomin Ave from W George 5t to Cherokee Ave. 598016 - Sidewalk reconstruction on both sides Orleans St from W George St to Cherokee Ave. 598017 - Sidewalk reconstruction on both sides W Robie St from Manomin Ave to Ohio St. 598018 - Sidewalk reconstruction on the north side of W Robie 5t from Ohio St to Bellows St & south side W Robie St from Waseca St extended to Bellows St. 598019 - Sidewalk reconstruction on both sides W Robie St from winslow Ave to Stryker Ave. 59802� - Sidewalk reconstruction on both sides Stryker Ave from W Colorado St to Prospect Blvd_ 598021 - Sidewalk reconstruction on both sides Stryker Ave from W Isabel St to W Colorado St. 598022 - Sidewalk reconstruction on the west side of Winslow Ave from W George St to W Robie St. 2� o� g -���} ORlGINAL 598023 - Sidewalk reconstruction on both sides Winslow Ave from W Isabel St to Prospect Blvd. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a five (5) foot wide walk and $9.18 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. Nem construction (where no walk existed) - 100� of the actual cost estimated to be approximately $3.42 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100� of actual cost estimated to be approximately $4.62 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1 E 3 That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1998 Public Improvement Aid. That a public hearing be had on said improvement on the 3rd day of June, 1998, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice o£ said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereo£ as estimated. COUNCILPERSONS Yeas Nays Benanav ✓�lakey vE�ostrom ✓C.�o leman �arris ,�antry �iter Adopted by Council: Date . �S 4��� Certified Passed by Council Secretary �In Favor By � � Against Mayor 9��Ri reuen MAY " 9 199� rubl3c Hearing Date — June 3, 1998 RE 3-27-98 OEPARTM€NT/OFFIC�/COUNCIL DATEINITIATED GREEN SHEET No. 38572 Public Works Sidewalks 3-5-98 INITIAUOAtE iNRU�� COMAC7 PERSON d PHONE DEPAqTMEM DIRECTOH CfTY COUNCII D � Larry H. Lueth - 266-6083 A39GN � Ano�y CRY CLERK NUMBERFQR MUSTBEONCOUNCILAGENDABY(DATE) ( ��15� g $ fi � BUDpETDIflECTOfl �FIN.6MOT.SEflVICE3DI Must be in Council Reseatch Office MAVOR(OHASSISTMIT) ����� pe�� b Frida 4-3-98' ❑ ❑ TOiAl�10F&6NATUHEPA6E8 L __ (CUPIILLLACAiWNSf-0R9IUNATURE) �ASSOCIAiE EMPLAGCWNTM7T ACTIONREWE9TED +— 2� Reconstruct Sidewalk in Ward 2(See attached list) '� h� — � o� q� - ��f RECOMMENDATIONS:Approw W a�1� IPo pENSONAL SEHVICH CONTNACTS MUSTANSWER THE FOLLOWIN6 GUESTIONS: _ PLANNING COMMISSION _CNIL SEflVICE COMMISSION 1. Has �his personRi Ne Worked Undef 8 ConVaC[ fof IhiS deperptlen[? p Y e _CIB COMMffTEE _ 2 H � �'� yES� NO ��an a dry employee7 A StaFF 3. Does ihis per5on/firm possess a sWll no[ rromtally possesaed by arry current dry — — empioyee? �ISTli1CiC0UNC0. YES N� SUPPORTS WHICH COUNCIL08JECTME? Explain all yas answars on separats ahwt aM anach to grean aheat � INITIATIN� PR�HLEM, ISSUE, OPP�RNNITY (riH�, WFIAT, WHEN, WHERE, WNY): The problem "defective sidewaik" was created because of tree roots, deleterious subgrade material, alternating free/thaw cycfes, service I'rfe timits, chemical add'Aives, extreme temperature variations, atc. These problems occur on a citywide tevei and must be addressed and corrected on an annual basis. Left uncorrected, tha sidewalk condition woufd worsen to a state where k would be rendered unusabie and subjed to increased pedestrian injuries from tatis and possibie {itigations. MVAN7AGES IF APPqOVED: The communRy will banefit from this project because ft will provide safe detect free sidewalks for Bs many citizens. The sidewalk contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF APPROVED: Historicaily, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment. Simply stated, praperty owners detest assessments, and despKe the fact up to one-halt the assessment is City subsidized, it stili remains controversial. �ouncil Researc� t;ent8t MAR 2 7 1998 DISADVANTAGES IF NoT APPROVEO: , This option would allow tha intrastructura of sidewalk stcck to deteriorate, which in turn, will generate more parsonal injury suits, uftimately resulting in the expenditure of largsr dollar amounts in eventual repairs and/or�yeplacer�ent, as weli as �Iaim payouts. TOTALAMWNTOFTRANSp � � COST/HEVENUEBUDGETED(CIRCLEONE) YES No FlINDINGSWpCE 9 "�M_� 558 � = r � ACITVRYNUMBER �9$-2T751-0784-00000 FINANCIAL INFORMATION: (EXPLAIM t � � C, Cte 98 = 50;000 � �L CITY OF ST. PAiJL PRELIMINARY ORDER In the Matter of OR�GINAL q �q4 COUNC IL _ By File No__ 8006,598023 Voting Ward_2 598006 - Sidewalk reconstruction on both sides Bidwell St from W Winifred St to W Delos St. 598007 - 5idewalk reconstruction on both sides of W Congress St from Bellows St to Bidwell St. 598008 - Sidewalk reconstruction on both sides W Congress St from Bidwell St to Winslow St. 598009 - Sidewalk reconstruction on both sides W Congress St from Ohio St to Bellows St_ 598010 - Sidewalk reconstruction on both sides W Congress St from Winslow Ave to Stryker Ave_ 598011 - Sidewalk reconstruction on both sides W Delos St from Bellows St to Winslow Ave. 598012 - Sidewalk reconstruction on both sides W Delos St from Winslow Ave to Hall Ave. 598013 - Sidewalk reconstruction on east side Hall Ave £rom W Delos 5t to Prospect Blvd & west side Hall Ave from W Delos St to W Colorado St. 598014 - Sidewalk reconstruction on both sides Hall Ave from W Winifred St to W Congress St. S98015 - Sidewalk reconstruction on both sides Manomin Ave from W George 5t to Cherokee Ave. 598016 - Sidewalk reconstruction on both sides Orleans St from W George St to Cherokee Ave. 598017 - Sidewalk reconstruction on both sides W Robie St from Manomin Ave to Ohio St. 598018 - Sidewalk reconstruction on the north side of W Robie 5t from Ohio St to Bellows St & south side W Robie St from Waseca St extended to Bellows St. 598019 - Sidewalk reconstruction on both sides W Robie St from winslow Ave to Stryker Ave. 59802� - Sidewalk reconstruction on both sides Stryker Ave from W Colorado St to Prospect Blvd_ 598021 - Sidewalk reconstruction on both sides Stryker Ave from W Isabel St to W Colorado St. 598022 - Sidewalk reconstruction on the west side of Winslow Ave from W George St to W Robie St. 2� o� g -���} ORlGINAL 598023 - Sidewalk reconstruction on both sides Winslow Ave from W Isabel St to Prospect Blvd. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a five (5) foot wide walk and $9.18 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. Nem construction (where no walk existed) - 100� of the actual cost estimated to be approximately $3.42 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100� of actual cost estimated to be approximately $4.62 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1 E 3 That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1998 Public Improvement Aid. That a public hearing be had on said improvement on the 3rd day of June, 1998, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice o£ said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereo£ as estimated. COUNCILPERSONS Yeas Nays Benanav ✓�lakey vE�ostrom ✓C.�o leman �arris ,�antry �iter Adopted by Council: Date . �S 4��� Certified Passed by Council Secretary �In Favor By � � Against Mayor 9��Ri reuen MAY " 9 199� rubl3c Hearing Date — June 3, 1998 RE 3-27-98 OEPARTM€NT/OFFIC�/COUNCIL DATEINITIATED GREEN SHEET No. 38572 Public Works Sidewalks 3-5-98 INITIAUOAtE iNRU�� COMAC7 PERSON d PHONE DEPAqTMEM DIRECTOH CfTY COUNCII D � Larry H. Lueth - 266-6083 A39GN � Ano�y CRY CLERK NUMBERFQR MUSTBEONCOUNCILAGENDABY(DATE) ( ��15� g $ fi � BUDpETDIflECTOfl �FIN.6MOT.SEflVICE3DI Must be in Council Reseatch Office MAVOR(OHASSISTMIT) ����� pe�� b Frida 4-3-98' ❑ ❑ TOiAl�10F&6NATUHEPA6E8 L __ (CUPIILLLACAiWNSf-0R9IUNATURE) �ASSOCIAiE EMPLAGCWNTM7T ACTIONREWE9TED +— 2� Reconstruct Sidewalk in Ward 2(See attached list) '� h� — � o� q� - ��f RECOMMENDATIONS:Approw W a�1� IPo pENSONAL SEHVICH CONTNACTS MUSTANSWER THE FOLLOWIN6 GUESTIONS: _ PLANNING COMMISSION _CNIL SEflVICE COMMISSION 1. Has �his personRi Ne Worked Undef 8 ConVaC[ fof IhiS deperptlen[? p Y e _CIB COMMffTEE _ 2 H � �'� yES� NO ��an a dry employee7 A StaFF 3. Does ihis per5on/firm possess a sWll no[ rromtally possesaed by arry current dry — — empioyee? �ISTli1CiC0UNC0. YES N� SUPPORTS WHICH COUNCIL08JECTME? Explain all yas answars on separats ahwt aM anach to grean aheat � INITIATIN� PR�HLEM, ISSUE, OPP�RNNITY (riH�, WFIAT, WHEN, WHERE, WNY): The problem "defective sidewaik" was created because of tree roots, deleterious subgrade material, alternating free/thaw cycfes, service I'rfe timits, chemical add'Aives, extreme temperature variations, atc. These problems occur on a citywide tevei and must be addressed and corrected on an annual basis. Left uncorrected, tha sidewalk condition woufd worsen to a state where k would be rendered unusabie and subjed to increased pedestrian injuries from tatis and possibie {itigations. MVAN7AGES IF APPqOVED: The communRy will banefit from this project because ft will provide safe detect free sidewalks for Bs many citizens. The sidewalk contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF APPROVED: Historicaily, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment. Simply stated, praperty owners detest assessments, and despKe the fact up to one-halt the assessment is City subsidized, it stili remains controversial. �ouncil Researc� t;ent8t MAR 2 7 1998 DISADVANTAGES IF NoT APPROVEO: , This option would allow tha intrastructura of sidewalk stcck to deteriorate, which in turn, will generate more parsonal injury suits, uftimately resulting in the expenditure of largsr dollar amounts in eventual repairs and/or�yeplacer�ent, as weli as �Iaim payouts. TOTALAMWNTOFTRANSp � � COST/HEVENUEBUDGETED(CIRCLEONE) YES No FlINDINGSWpCE 9 "�M_� 558 � = r � ACITVRYNUMBER �9$-2T751-0784-00000 FINANCIAL INFORMATION: (EXPLAIM t � � C, Cte 98 = 50;000 � �L CITY OF ST. PAiJL PRELIMINARY ORDER In the Matter of OR�GINAL q �q4 COUNC IL _ By File No__ 8006,598023 Voting Ward_2 598006 - Sidewalk reconstruction on both sides Bidwell St from W Winifred St to W Delos St. 598007 - 5idewalk reconstruction on both sides of W Congress St from Bellows St to Bidwell St. 598008 - Sidewalk reconstruction on both sides W Congress St from Bidwell St to Winslow St. 598009 - Sidewalk reconstruction on both sides W Congress St from Ohio St to Bellows St_ 598010 - Sidewalk reconstruction on both sides W Congress St from Winslow Ave to Stryker Ave_ 598011 - Sidewalk reconstruction on both sides W Delos St from Bellows St to Winslow Ave. 598012 - Sidewalk reconstruction on both sides W Delos St from Winslow Ave to Hall Ave. 598013 - Sidewalk reconstruction on east side Hall Ave £rom W Delos 5t to Prospect Blvd & west side Hall Ave from W Delos St to W Colorado St. 598014 - Sidewalk reconstruction on both sides Hall Ave from W Winifred St to W Congress St. S98015 - Sidewalk reconstruction on both sides Manomin Ave from W George 5t to Cherokee Ave. 598016 - Sidewalk reconstruction on both sides Orleans St from W George St to Cherokee Ave. 598017 - Sidewalk reconstruction on both sides W Robie St from Manomin Ave to Ohio St. 598018 - Sidewalk reconstruction on the north side of W Robie 5t from Ohio St to Bellows St & south side W Robie St from Waseca St extended to Bellows St. 598019 - Sidewalk reconstruction on both sides W Robie St from winslow Ave to Stryker Ave. 59802� - Sidewalk reconstruction on both sides Stryker Ave from W Colorado St to Prospect Blvd_ 598021 - Sidewalk reconstruction on both sides Stryker Ave from W Isabel St to W Colorado St. 598022 - Sidewalk reconstruction on the west side of Winslow Ave from W George St to W Robie St. 2� o� g -���} ORlGINAL 598023 - Sidewalk reconstruction on both sides Winslow Ave from W Isabel St to Prospect Blvd. *ESTIMATED CONSTRUCTION RATES RESIDENTIAL RATES (One, two or three family structures) Reconstruction (replacement of old sidewalk) -$7.65 per front foot for a five (5) foot wide walk and $9.18 per front foot for a six (6) foot wide walk. All other widths will be prorated accordingly. Nem construction (where no walk existed) - 100� of the actual cost estimated to be approximately $3.42 per square foot. All corner residential properties will receive a credit up to the first 150 feet of new or reconstructed sidewalk along and abutting the "long side" of the property. MULTI-RESIDENTIAL than three family structures), NON-RESIDENTIAL RATES For new and reconstructed sidewalk; 100� of actual cost estimated to be approximately $4.62 per square foot. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1 E 3 That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is *SEE ABOVE for estimated construction rates, financed by assessments and 1998 Public Improvement Aid. That a public hearing be had on said improvement on the 3rd day of June, 1998, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice o£ said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereo£ as estimated. COUNCILPERSONS Yeas Nays Benanav ✓�lakey vE�ostrom ✓C.�o leman �arris ,�antry �iter Adopted by Council: Date . �S 4��� Certified Passed by Council Secretary �In Favor By � � Against Mayor 9��Ri reuen MAY " 9 199� rubl3c Hearing Date — June 3, 1998 RE 3-27-98 OEPARTM€NT/OFFIC�/COUNCIL DATEINITIATED GREEN SHEET No. 38572 Public Works Sidewalks 3-5-98 INITIAUOAtE iNRU�� COMAC7 PERSON d PHONE DEPAqTMEM DIRECTOH CfTY COUNCII D � Larry H. Lueth - 266-6083 A39GN � Ano�y CRY CLERK NUMBERFQR MUSTBEONCOUNCILAGENDABY(DATE) ( ��15� g $ fi � BUDpETDIflECTOfl �FIN.6MOT.SEflVICE3DI Must be in Council Reseatch Office MAVOR(OHASSISTMIT) ����� pe�� b Frida 4-3-98' ❑ ❑ TOiAl�10F&6NATUHEPA6E8 L __ (CUPIILLLACAiWNSf-0R9IUNATURE) �ASSOCIAiE EMPLAGCWNTM7T ACTIONREWE9TED +— 2� Reconstruct Sidewalk in Ward 2(See attached list) '� h� — � o� q� - ��f RECOMMENDATIONS:Approw W a�1� IPo pENSONAL SEHVICH CONTNACTS MUSTANSWER THE FOLLOWIN6 GUESTIONS: _ PLANNING COMMISSION _CNIL SEflVICE COMMISSION 1. Has �his personRi Ne Worked Undef 8 ConVaC[ fof IhiS deperptlen[? p Y e _CIB COMMffTEE _ 2 H � �'� yES� NO ��an a dry employee7 A StaFF 3. Does ihis per5on/firm possess a sWll no[ rromtally possesaed by arry current dry — — empioyee? �ISTli1CiC0UNC0. YES N� SUPPORTS WHICH COUNCIL08JECTME? Explain all yas answars on separats ahwt aM anach to grean aheat � INITIATIN� PR�HLEM, ISSUE, OPP�RNNITY (riH�, WFIAT, WHEN, WHERE, WNY): The problem "defective sidewaik" was created because of tree roots, deleterious subgrade material, alternating free/thaw cycfes, service I'rfe timits, chemical add'Aives, extreme temperature variations, atc. These problems occur on a citywide tevei and must be addressed and corrected on an annual basis. Left uncorrected, tha sidewalk condition woufd worsen to a state where k would be rendered unusabie and subjed to increased pedestrian injuries from tatis and possibie {itigations. MVAN7AGES IF APPqOVED: The communRy will banefit from this project because ft will provide safe detect free sidewalks for Bs many citizens. The sidewalk contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity. DISADVANTAGES IF APPROVED: Historicaily, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment. Simply stated, praperty owners detest assessments, and despKe the fact up to one-halt the assessment is City subsidized, it stili remains controversial. �ouncil Researc� t;ent8t MAR 2 7 1998 DISADVANTAGES IF NoT APPROVEO: , This option would allow tha intrastructura of sidewalk stcck to deteriorate, which in turn, will generate more parsonal injury suits, uftimately resulting in the expenditure of largsr dollar amounts in eventual repairs and/or�yeplacer�ent, as weli as �Iaim payouts. TOTALAMWNTOFTRANSp � � COST/HEVENUEBUDGETED(CIRCLEONE) YES No FlINDINGSWpCE 9 "�M_� 558 � = r � ACITVRYNUMBER �9$-2T751-0784-00000 FINANCIAL INFORMATION: (EXPLAIM t � � C, Cte 98 = 50;000