95-830LL
CITY OF SY. PAIIL
PES7.I�SIHAHY OE11E8
OR�Gi���A'
ay
COIIHCII. FILg NO
�
9's-S3D
Zn the �iatter of Improve the following brick streets as outlined:
P.EAAOOD PABP.AAY — Around the circle and from the circle to St. Albans Street
by reconstructing the roadway surface with salvaged existing brick and
supplemental brick; reconstruction of the sidewalk and integral curb around
the circle — straight curb around the park and leave the eaisting sidewalk
and integral curb on Renwood Parkway from the circle to St. Albans Street;
new concrete drivewap aprons; storm sewer construction around the circle;
replace the existing sanitary sewer and service connections around the circle
and do all other work necessary to complete said improvement.
MAIDSN LAHE — From Selby Avenue to Nina Street by reconstructing the roadway
surface with salvaged existing brick and supplemental brick; install granite
curb where there is not already curb on the private side of the progerty
line; install a lantern style lighting system; constructing a storm sewer and
do all other work necessary to complete said improvement.
VIxGIHIA STBEST — From Summit Avenue to Selby Avenue by reconstructing the
roadway surface with salvaged and supplemental brick; reset the existing
granite curb; construct concrete drivewap aprons where there is not an
existing brick apron; relay existing brick aprons; construct concrete
outwalks; sod boulevards; constructing a storm sewer and do all other work
necessary to complete said improvement.
The Council
the Mayor upon the
hereby resolves:
auai reuen
AUG 1219g5
9s�3a
of the City of Saint Paul having received the report of
above improvement, and having considered said report,
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $644,013.38
financed by 1995 Intermodal Surface Transportation Enhancement
Act STP Funds $304,220, 1995 Capital Improvement Bonds $39,453.53,
Sewer Revenue Bonds $166,881 and Assessments $133,458.85.
2. That a public hearing be had on said improvement on the 13th
day of_September, 1995, at 3:30 o'clock P.M., in the Council
Chambers of the City Hall and Court House Building in the City of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCILPERSONS
Yeas /' Nays
��
1/� imm
t/G erin
�rris
Megard
�ettman
Thune
public hearing be given to the persons and in
by the Charter, stating the time and place of
of the improvement and the total cost thereof
� i� \ _ Adopted by Council: Date �\����
1�Se.v�T C
Certified Passed by Counci S retary
� �In Favor
� �Against
�o , ,Absev��
By
GL`
Mayor
9.�-�.�0
Public Hearing Date - September 13, 1995 RE 7-7-95 ��-��� '� 3� `$�
OEPAR MENT/OFFICe/COUNCIL ATE INITIATEp �
Publi ::worx� 6/23/95 GREEN SHEET , r,o-�-3
INRIAUDATE ITIAUDATE
CONTACTPERSONdPHONE
LisaFalk �(�-5117 AS9GN ❑�PAR�ENTDIR'cCTOfl ❑^ CINCAUNCIL
NUMBFRWR ❑CITYATTORNEY L, qNCLERK
MUSTBEONCOUNCILACaENDABY(DA'f� 7—'z(-9 ROUTtNG �BUWETDIRECTOR O FINbNGT.SERViCESDIR
Must be in Council Research 0£'c �R OMAYOfl(ORASSISTAfJ� -� C011RCiS R25C3iC}i
no-later than noo Frida - -
TOTAL # OF S�GNATURE PAGES 1 (GL1P ALL LOGATONS FOR SIGNATURE� � ASSCCIATE _ ❑ OEPARTMEN"f ACWUM _._
ACTION FEOUESTED
Constiuct brick streeu a storm sewer system. water and sewer service connections and reconnecdons, sanitary sewer repaas, and other street
improvements in the Brick Street Pavin� proiect azea including parts of Kenwood PazkwaY Maiden Lane, and Vir�inia Street.
File No. 18795, �
RECOMMENDAnONS: Approve (t.) or Rejett (f� pERSONAL SERVICE CONTRACTS MUST ANSWEfi THE FOLLOWING QUESTIONS:
PLANNINGCOMMISSION_CIVILSERVICECAMMISSION �. HasfiispersoNfirmeverworkedunderawnvactforthisdepartment?
CI8 COMMITTEE YES NO
A STAFF 2. Has this persoNfirm ever been a tiry empl0yee?
p � YES NO
DISTRIGT COUNpL— c� h 3. Dces this perso�rm possess a skill not norma7ly possessed by any current ciry employee?
SUPPORTSWHICHCAUNCILOBJECTIVE? YES NO
Explain all yes answets on separete sheet and ariach to green sheet
ATeighborhoods Wards 1 & 2
INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT. WHEN, WHERE, WH1�:
Conswction of storm sewers, in accArdance with the Ciry's plan to saparate all combined sewers, requires the reconsuvcuon of the sveeu.
COU�'tC'� �+vS��(i�i �6il��f
JUL 07 1995
ADVANTAGESIFAPPROVED:
The conswction of the storm sewers will reduce combined sewage overflow to the Mississippi Ftiver during rains.
Reconstructing the streeu at ihe sarne time saves money and inconvenience to the property owners. All three of these streets are in pooc
condition and need reconstruction. These neighborhoods will be enhanced by the improvement of the streeu.
This project will maintain the historic chazacter of the neighborhood.
DiSADVAN7AGES IF APPROVED:
The coscs to both the property owners and the City will be higher [han if the streets were reconswcted with asphalt surfaces.
DISADVANTAGES IF NOT APPROVED:
This is pazi of the City's National Polluaon Dischazge Elimination System (NPDES) Permit Not proceeding with this work may resalt in
penalties.
These streets aze in need of improvement, and the neighborhoods now expect that their streets will be reconstructed at the lime the sewers are
constructed.
Over 5300,000 in Federal (ISTEA) funds would be fodeited.
TOTALAMOUMOFTRANSACTIONS CO57tREVENUEBUDGE7EDiCIRCLE01 yES No
PUN�INGSOURCE (seeNOTEbe7ow) ACTIVITYNUMBER
FINANCIAL W FOPMATION: (EXPIA�N)
NOTE: See Snmtnazy of £ngineering Recommendations for financing information.