In the Matter of Blocking up of building opening (trap door) and casting a
new sidewalk at 480 North Robert Street.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstrnction (replacement of old sidewalk) —$7.04 per front foot for a
five (5) foot wide walk and $8.46 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. Hev constrnction
(where no walk existed) — 100Y of the actual cost estimated to be
approximately $3.15 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI—RESIDENTIAL(MOre than three family structures), NON—RESIDENTIAL RATES
For new and reconstructed sidewalk; 100% of actual cost estimated to be
approximately $4.25 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is *SEE ABOVE
for estimated construction rates, financed by assessments and
1995 Public Improvement Aid.
2. That a public hearing be had on said improvement on the 16th day
of August, 1995 , at 3:30 o`clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public
the manner provided by the
hearing, the nature of the
as estimated.
COUNCILPERSONS
Yeas Nays
B akey
��rimm
✓�uerin
1/
gard
R� ttman
v'Lhune
3PIRf IQi1CR
JUL � 11995
hearing be given to the persons and in
Charter, 'stating the time and place of
improvement and the total cost thereof
Adopted by Council: Date�\���t,�
\
Certified Passedby Counci Secretary
�In Favor By Aj
<%
� Against �/�� ���� _//.,f`
1'
Mayor
Public Hearing Date — August 16, 1995 RE 6-9-95 9s � 7b
DEPAFTMENT/OfFICFJCAUNCIL DATEINITIAiED GRE�N SHEET No. �1591
Public Works Sidewalks 5-26-95 INITIAVDATE INI7IAUOATE
CONTACTPERSONBPHONE �DEPAFiTMENiDiRECTOR ' �CIT'COUNCIL
ThomasP.Keefe-266-G121 N A �MB� Pop �CITYATTORNEY �CI7YCLEflK
MUSTBEONCOUNCILAGENDABY(DATE7 (_'L$ rj ROUTING �g�Jp�E7DiflECTOR �FIN.8MGT.SERVICESDIR
Must be in Council Research Office �� MAVOR(ORASS�STANn 10Coundl Fiesearch
no later than noon Frida 6-16-95 ❑
TOTAL�OF&GNATUREPAGES 1 _(CIIPALLLOCAiIONSFOR5IGNATURE) � ASSOCIATE � DEPAR NTALACWUNTANT
ACTION FEOUESTED �a '
Block Up Building Opening & Cast New Walk in Ward 2(See attached list)
File No. 595105
RECAMMENDA710NS: Approve (!q or Reject (F� PERSONAL SERVICE COMFiACTS MUST ANS WEH THE FOLLOWING �UESTIONS:
PIANNING CAMMISSION ` CNIL SERVICE CAMMISSION 7- Has [his peEs Ne worked under a con[rac[ fo� tlus departrnent?
Y
CIB COhtMi7iEE 2. Has ihis persoNfirm ever been a ciry employee?
— — YES NO
A STAFF , 3. Does this persoNfirm possess a skill not normaily possessed by any current ciry
— employee?
�ISTRICTfAUNCII — 17 YES NO
SUPPOflTS WHIGH COUNCIL OBdECTNE7 Explain all yes answers on sepafate sheet and attach to green sheet
Neighborhoods Ward 2
INITIATING PROBLEM, ISSUE, OPPOfliUNITV (WHO, WHAT, WHEN, WHERE, WH1�: -
The problem "defective sidewalk" was created because of tree roots, deleterious subgrade material, alternating freefthaw cycles,
service I'rfe limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide level and must be
addressed and corrected on an annual basis. Left uncorrected, the sidewalk condition would worsen to a state where it would be
rendered unusable and subjed to increased pedestrian injuries from falis and possible litigations.
A�VANTAGESIFAPPROVED:
The community will benefit from this project because it will provide safe detect free sidewalks for its many citizens. The sidewalk
contracts are executed by private contractors, so it follows that private sector jobs are created as a result of this activity.
�i��s��� �
�'a (A.S � a S�C4�
�,� �
DISADVANTAGES IF APPflOVED:
Historically, the sidewalk reconstructions have created negative feedback in the area of construction procedure and assessment.
Simply stated, property owners detest assessments, and despite the fact up to one-half the assessment is City subsidized, it still
remains controversial.
DISADVANTAGES IF NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury suits,
ultimately resulting in the expenditure of larger doliar amounts in eventual repairs and/or replacement, as well as claim payouts.
TOTALAMOUNTOFTRANSACiIONi �.�OO.00 COST/REVENUEBUDGETED(CIHCLEONE) YES NO
FUNDINGSOUHCE 95—M—o664 A, PIA 95 = 515,000 ACITVITYNUMBEH Cg5-2T727-0784-27ot0
FINANCIAL INFORMATION: (EXPV IN) B� pST = 4 7 6 � OOO
C. Cl6 95 = 50,000