In the Hatter of Improve Hoyt Avenue bet.ween Victoria Street and Avon Street
by grading, paving with bituminous, constructing concrete curb and gutter,
driveway aprons, walks, placing topsoil and sodding boulevards, constructing
storm sewer, installing lantern style street lighting and doing all other
work necessary to complete said improvement.
The Council of the City of Saint Paul having received the report of
the Mayor upon the above improvement, and having considered said report,
hereby resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $173,500
financed by Municipal State Aid $166,000. and Assessments
$7,500.
2. That a public hearing be had on said improvement on the 19th
day of July, 1995 , at 3:30 o`clock P.M., in the Council
Chambers of the City Hall and Court ftouse Building in the City of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCILPERSONS
Yeas/� Nays
i/�-lakey
`�� i mm
✓ �nerin
�/�arris
✓I�,e-g a r d
i�Rettman
Thune
�I iP! I$il�n
public hearing be given to the persons and in
by the Charter, stating the time and place of
of the improvement and the total cost thereof
�bs�r�
�In Favor
�Against
`� 1 �bsz��'
'u� �0 7ss�
Adopted by Council: Date
Certified Passed by CouncilS retary
Public
ic Works Department
�CT PERSON & PHONE t �
St. Martin 266-6118 `�5
TOTAL # OF SIGNATURE
5-12-95
REEN SHEET
DIRECTOR
ALL LOCATIONS FOR
%S'�`f .�.
No.315 8 2
crtrcourra� _
cmaenK _
FPI. & MGT. SERVICES
COUtICII R2522fCIl
OEPARlM ENTAL AC W UNTANT
Improve HOYT AVENUE between Victoria Street and Avon Street by grading, paving with bituminous, constructing
concrete curb and gutter, driveway aprons, walks, piacing topsoil and sodding bouievards, constructing storm sewer,
installing iantem styte street lighting and doing ail other work necessary to complete said improvement. File No. 18780 B
)MMENDATIONS: Aqxwe (A) tt Rejad (R) pEFi50NAL SERVICE CONiHACTS NUST ANSWER THE FOLLOWING �UESTIONS:
%ANNINGCAMMISSION CMLSFAVICECOMMISSION 1. Hasthisperson/firmevervrorkedunderawntractforthisdepartmenC?
aBCOMMm� _ YES NO
2 Has this �sS �� NO� �n a ciry employee?
STAFF
DISTAICT CAUNCIL —].O 3. Daes ihis orvfirN possess a skill not nortnally possed by any curcent ciry employee?
O
rArc w�,mu muucn naicr.rnFO Explain all yes answero on separate sheet and attach to green sheet
Neighborhoods Ward 5
Hoyt Avenue between Hamline and Grotto is a bus route. Hoyt Avenue between Hamiine and �ctoria will be reconstructed in I
1995 with MSA Funds. It is proposed to add Hoyt Avenue between Victoria and Grotto to the MSA System. Hoyt between
Avon and Grotto is already paved. Hoyt between Victoria and Avon is an oiled street which is in poor condition.
It is proposed to pave Hoyt between Victoria and Avon to complete the paving of the bus route.
A newfy rebuift roadway, wfth new curb and gutter, will restore the drivability of this street and continue our etforts to improve
the street system in Saint Paul. The new street lighting will also improve safety in the area.
Normal problems associated with construction, such as noise, dust, and general disruption wiil occur.
Yv�BaSiivi9 ��i}li?.54"•a �
�FiXi�� �. ,.�a $`.%�J
The driving surface will continue to deteriorate, maintenance wsts wiii rise, and the Ievel of service provided by this street will
drop.
AMOUM OF TRANSACTION $ 173,500
COST/ REVENUE BUDGETED (CHECK ONE) YES � NO
FUNDINGSOURCE MSA ,ASSESSMENTS ACTIVITYNUMBER
FINANCIALINFORMATION:(EXPLAIN)