Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
95-152+ /.
� �
CITY OF ST. PAIIL
PgELIMIHAgY OBDSB
ORIGIN��.
�-� �
FIL xo. ; 5 —l5�.
.
�
18785
AA 2
In the Hatter of Improve Annapolis Street between Stickney Street and
Concord Street (City Project P-8097) by grading, paving with bituminous,
constructing concrete curb and gutter, driveway aprons, walks, placing
topsoil and sodding boulevards, constructing storm sewer, installing lantern
style street lighting and doing all other work necessary to complete said
improvement.
The Council of the City of Saint Paul having received the report of
the Mayor upon the above improvement, and having considered said report,
hereby resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $65,680
financed by Capital Improvement Bonds $51,680. and Assessments
$14,000.
2. That a public hearing be had on said improvement on the 12th
day of April, 1995 , at 3:30 o'clock P.M., in the Council
Chambers of the City Hall and Court House Building in the City of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCILPERSONS
Yeas� Nays
� $3'akey
3�(`s�"1 IIlIll
p/� rin
yyy ���''' ris
�ard
� ttman
u n e pllAl l.(L!C@
public hearing be given to
by the Charter, stating the
of the improvement and the
r�' �� teue�
"1'i* - •�`
�In Favor
� Against
the persons and in
time and place of
total cost thereof
Adopted by Council: Date_ �''��
CertifiedPassedby CouncilSecretary
By
/Jtc_
� �
Mayor
�IRR 11 �995
Date -
ic Works Department
�CT PFASON d PHONE
St. Martin 266-6118
in
12. 1
RE 2-3-95
1 /20/95
GREEN SHEET
INITIAVDA7E
DEPAHTMENT DIRECTOF
CITV ATTORNEV
OBUDGETDIflEC70F
n MAYOR (OR PSS�STANn
TOTAL # OF SIGNATURE PAGES � (CLIP ALL LOCATIONS FOR
95-1s�.
No.29946
CITYCOUNCIL — I
CIiY C�EftK
FIN. 8 MGT. SERVICES DIR__ __ _
Coundl Research
DEPARTMENTALACCOUNTANT
Improve ANNAPOLIS STREET between Stickney Street and Concord Street (Cfty Project 95-P-8097) by grading, paving
with bftuminous, constructing concrete curb and gutter, driveway aprons, waiks, placing topsoil and sodding boulevards,
constructing stortn sewer, installing lantern style street lighting and doing all other work necessary to complete said
......._.......,,_, — - -- - -- `-° t.k� al�e-zo - . File No. 18785 �
�MMENDATIONS: Approve (A) a Rejed (ft)
PLANNINGCOMMISSION _CMLSERVICECOMMISSION
CIBCOMMRTEE _
STnFF
oismicTCOUNa�- 3
SUPPORTS WHICHCOUNCILOBJECTIVE4
Neighborhoods Ward 2
PERSONAL SERVICE COMRACTS MUST ANSWEfi THE FOLLOWING �UESTIONS:
7. Has ihis persoNfirm ever worked under a mnuact for ihls departrnenC?
VES NO
2. Has ihis {YES Nfir Ne been a ciry emPloyee?
3. Ooes this pes oNfi N possess a sltiii no[ normally possed by any wrrent c�ry employee?
Y O
E�cplain all yes answers on saparate sheet and attach to green sheet
This improvement is part of a proposed Contract by the City of South St. Paul. It is part of a larger combined sewer separation
and street paving project. In 1994 they approached the City of Saint Paul in order to obtain design approval and agreement
on cost sharing for the work to be done wfthin Saint Paul (the North side of Annapolis). This has now been accomplished.
The project will be advertised and the Contract wili be let by the City of South St. Paul.
A newly rebuift roadway will improve the drivability of this street and continue our efforts to improve the street system in
Saint Paul. The new street ighting will also improve safety in the area.
Normal problems associated with construction, such as noise, dust, and general disruption wiii occur.
�;l2t€s�GE� �a3i��! ��
f E� G 3 [�55
The City will lose this opportunity to successfully participate in a joint effort to improve a border street.
S 65,680
COST / REVENUE BUDGETED (CHECK ONE)
NO
souqcE CIB, ASSESSMENTS ACTIVffYNUMBER
MFORMATION: (EXPLAIN)