C OF SAINT PAUL - OFFICE OF THE MAYOR
w o 4 ' ADMINLSTRATIVE ORDER
�� For
CONTRAGT CHANGE AGREEMENT N0. �,_
ADMINI5TRATIVE ORDER, Whereas, additions which proved to be neeessary to the Improvement described
.�. - - 41 � - : �. ��
knownas�-291d7 .CityProjeetNo. 9 z-s-ao 3� Prog Cnntractors, Tnc ,
Contcacta, is eomposed of the following:
1. Material cost of a 134" diameter steel casing required to provide for the
safe installation of the 96" storm sewer beneath mainline railroad tracks.
The steel casing was required because of imeapectedly poor soil conditions.
Lump Sum $40,166.97
Z. Construct bulkhead in 48" diameter sewer line.
Lwnp Sum
�
3. Reimburse City for additional engineering costs due to extended
construction period.
$ 523.00
Lwnp Swn ($ 9,673.50)
F�mding available in the Contract.
1992 CSSP
C�..9�-a� �a�
AS TO FORM
l�� 19 .�
7 �3 19 �
• 19 _
Chief + n neer
�^�' �--� � ° T � 19 `
D'uector of
Total 31,016. 7
ORDERED, That the City of Saint Paul, through its Mayor, approves the foregoing a ditions made in ac-
eordance with the speciCications in the sum of S 31,016.47 , said amount to be added to the lump sum con-
Activity # 29147
sideration named in the contract, known as� , and which amourn is to be financed from:
O
OEPARTM NT FFICE/COUNCIL DATE INITIATED
is�aN �✓
Public WorksConstrucdon Q��} 9 GREEN SH�EE�T� r,o. ��
CONTACTPERSON&PFiOP1E ' INR�AUDATE INRIAL/DATE�
�°,..,' PARTMENTDIflECTOR J G ��/'_ CINCAUNCIL
.. .• J LI70U7 �-E�H3 �� GRY ATfOflNEY C CLERK
NUMBEAFON
MUSTBEONCOUNCILAGENDABY(DATE) pWiING OBUDGETDIFECTOR IN&MGT.SERV SDIR �
� MAYOfl(Ofl0.SSISTANn 1 (anyLUeth
AL#OFSIGNATUREPAGES 5 (CLIPALLLOCAilONSWRSIGNATUH� --��_-�,q'��_ OD�ra�r�Errrac�uKT
ACTIDN PEQUESTED
Appmval of Adminisuarive Order for Con�act Change Agreement #2
GOODRICH-WESTERN OUTLET SEWER SEPAI2ATION
City Project No: 43-S-8033 Conuactor. Rogressive Contractors, Inc.
RECOMMENDATIONSI�pprde (A) w Bejec4 (F� PERSONAL SERVICE CAMRACTS MUST ANSWER THE WLLOWING �UESTIONS:
PUWNINGCOMMISSION_CNILSERVICECOMMISSION � Hasthi5pEi5oN(imeVe(wofkEdutldeiaCOtltcactfOith15d2Pafiflfen[?
� qe COMMfREE YES NO
A STAFF 2. Has tl�is persorvfirm ever been a dry employee?
— — YES NO
_ oISTqICT CAUNqL _ 3. Does ihis persoNfirm possess a skill not normall
y possessetl by any wrrent ciry employee7
SUPPORTSWHtCHCOUNCILOBJECTfYE4 YES NO
Sewer Separation Explain all yes answers on separete sheet antl attach to graen sheet
INITIATING PROBLEM, ISSUE, OPPOPTUNITV (WHO, WHAT, WHEN, WHERE, WH1�;
A large sewer pipe was to be jacked under mainline railroad tracks. Soils were much worse than anticipaated. To provide a safe me[hod,
the Coniractor provided a steel casing pipe and jacked that into place and then pushed the concrete pipe into piace. Item #1 of this Change
Agreemen[ compensates the Conuactar for the material cost of the casing. �
� '�'� "� r i: �� � `i
+a� ��,
ADVpNTAGES IF APPPOVED:
ompensate Conuactor for extra work performed at the direcpon of the Engineer. The ex[ra work was required to complete the project in a
e manner. Collect engineering fees from the Contractor resulting because contract compledon was signi�icantly delayed.
RECEIVED
OCT - 5 1994
CI �
DISADVANTAGESIFAPPROVED: " .. �
None SEP x $ 1994
���`� ��������
DISADVAN7AGE5 IF NOT APPROVED:
Difficulty paying Conuractor for work directed by the Engineer.
ALAMOUNTOFTRANSACTION$ 31,Q]6_47 COST/REVENUEBUDGETED(CIRCIEONE) YES NU
UNDING SOURCE Fundine available in oroiect. 1992 CSSP ACTIVRY NUMBEF7 2�rv
FINANCIAL INFORMATION: (EXPLAIM n��_ � / / � L i�{tt�l� �9 � ��