Loading...
07-750CITY OF ST. PAUL FINAI, ORDER Voting ward i• � � Y � See Below 2 Green Sheet No._3041302 In the Matter o£ the following: File No. Project Description S0711 Reconstructing sidewalk on the north side of from Wacouta Street to Wall Street and west Fifth Street East to Sixth Street East. FIFTH STREET EAST side WALL STREET from S0712 Reconstructing sidewalk on the south side FOURTH STREET EAST from Jackson Street to Sibley Street and west side SIBLEY STREET from Kellogg Boulevard East to Fourth Street East. under Preliminary Order approved The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard a11 persons, objections and recommendations pertaining to said proposed improvement and has fu11y considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers sha11 calculate a11 expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. Yeas Na Absent Benanav ✓ Bostrom ✓ Harris ✓ Hel en ,/ Lantry ✓ Mont omery ✓ Thune �/ fs Adopted by the Council: Date: °/1a`/�? Jv7 Certified Passed by the Council Secretary BY // //�i. ` • / ( � ��c..e /$� ,�7YJ7 �i� ��7J�,�J� Mayor � Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheei � �7 PN/ —Public Wmks 2&JUN-07 Green Sheet NO: 3041302 Con[act Person & Phone: Man Czaia 266-61D8 Doe. Type: OTI-{ER AGREEMEKUCONTF E-0ocument Required: Y Documettt Comact: John Saumweber Contaet Phone: 266-8851 � ASSIQA Number Foa Routing Order Tota{ � of Stgnature P� _(Clip All LoeatSons tor Signature) 2 Cferk Sha�i Maore Set up preliminary hearing to reconstruct sidewalk in W ard 2(City Pro,}ect 07-M-0680}. �ZL� ivos� Sv7 � s o Planning Commission CIB Committee Civii Service Commission 1. Has this persoNfiem ever wariced a�der a contract for this department'? Yes No 2. Has fhis person/fimt ever been a city employee? Yes No 3. Does this personJfirm possess a skill not normalty possessed by any cunent city employee? Yes IVo Explain all yes answers on separe� sheet and attach to green sheet Initiating Problem, lssues, Opportunity (Who, What, When, Where, Why): The problem "defective sidewalk" was caused by multiple pmblems, tree roots, poor subgade materials, free/thaw cycles, service life limits, chemical additives, extreme temperature variations, etc. These pzoblems occw on a citywide basis and must be addressed and corrected annually. Left uncorrected, the sidewalk condidon would worsen to a state where it would be unusable and subject to increased pedestrian injuries from falls and possible litigadons. Advantages !f Approved: The commimity will benefit from this project because it wIll provide safe defect free sidewalks for its citizens. The sidewalk contracts are done by private contractors generaflng pub]ic sector jobs as a result Disadvantages If Approved: Historically, the sidewalk reconstruction has created negative feedback because of construction procedures and assessments. Having to assess for walk reconstrucflon remains a conhoveisial issue. Disativantages N Noi Approved: � This option would allow the infrastructure of sidewalk stnck w deteriorate, which in tum, will generate more pe�onal injury suits, resulting in the expenditure of lazger dollaz amounts in repairs and replacement, as well as claim payoars. u iau�vum rn Trensaction: �' .ODO CosVRevenue Budgeted:. y Funding Source: CIB, Other, Assessments Finaneial Information: (Explain) Activity Number: C07-2T760-0784-p0000 June 28, 2007 7:49 PM Page 1 _� __ , o� -� � SLIMMARY OF ENGINEE:RING RECOMiVIENDATION5 Ward 2 S �/ PROJECT: RECONSTRUCT SIDEWAL% N.S. E. FIFTH ST. from Wacouta St. to � Wall St. & W.S. WALL ST. from E. Fifth St. to E. S'vcth St. INITIATINGACTION.• This order was uririated by the Director of Public Warks as public necessity on the basis of an inspection of the watk. EXISTING CONDITIONS: This wallc is poured concrete with asphalt patches, heaved, settled, and cracked panels. S �71 Z PROJECT: RECONSTRUCT SIDEWfILK S.S. E. FOURTH ST. from Jackson St. to Sibley St. & W.S. SIBLEY ST. from E. Kellogg Blvd. to E. Fourth St. INITIATINGACTION: This order was initiated by the Director of Public Works as public necessity on the basis of an inspection of the walk. EXISTING CONDITIONS: This walk is poured concrete with undulated and settled panels. ...................................................................................