07-750CITY OF ST. PAUL
FINAI, ORDER
Voting ward
i• � �
Y
�
See Below
2
Green Sheet No._3041302
In the Matter o£ the following:
File No. Project Description
S0711 Reconstructing sidewalk on the north side of
from Wacouta Street to Wall Street and west
Fifth Street East to Sixth Street East.
FIFTH STREET EAST
side WALL STREET from
S0712 Reconstructing sidewalk on the south side FOURTH STREET EAST from
Jackson Street to Sibley Street and west side SIBLEY STREET from
Kellogg Boulevard East to Fourth Street East.
under Preliminary Order approved
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard a11 persons, objections and
recommendations pertaining to said proposed improvement and has fu11y
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers sha11 calculate a11 expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
Yeas Na Absent
Benanav ✓
Bostrom ✓
Harris ✓
Hel en ,/
Lantry ✓
Mont omery ✓
Thune �/
fs
Adopted by the Council: Date: °/1a`/�? Jv7
Certified Passed by the Council Secretary
BY // //�i. ` •
/ ( � ��c..e /$� ,�7YJ7 �i� ��7J�,�J�
Mayor
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheei �
�7
PN/ —Public Wmks
2&JUN-07
Green Sheet NO: 3041302
Con[act Person & Phone:
Man Czaia
266-61D8
Doe. Type: OTI-{ER AGREEMEKUCONTF
E-0ocument Required: Y
Documettt Comact: John Saumweber
Contaet Phone: 266-8851
�
ASSIQA
Number
Foa
Routing
Order
Tota{ � of Stgnature P� _(Clip All LoeatSons tor Signature)
2 Cferk Sha�i Maore
Set up preliminary hearing to reconstruct sidewalk in W ard 2(City Pro,}ect 07-M-0680}.
�ZL� ivos� Sv7 � s o
Planning Commission
CIB Committee
Civii Service Commission
1. Has this persoNfiem ever wariced a�der a contract for this department'?
Yes No
2. Has fhis person/fimt ever been a city employee?
Yes No
3. Does this personJfirm possess a skill not normalty possessed by any
cunent city employee?
Yes IVo
Explain all yes answers on separe� sheet and attach to green sheet
Initiating Problem, lssues, Opportunity (Who, What, When, Where, Why):
The problem "defective sidewalk" was caused by multiple pmblems, tree roots, poor subgade materials, free/thaw cycles, service life
limits, chemical additives, extreme temperature variations, etc. These pzoblems occw on a citywide basis and must be addressed and
corrected annually. Left uncorrected, the sidewalk condidon would worsen to a state where it would be unusable and subject to
increased pedestrian injuries from falls and possible litigadons.
Advantages !f Approved:
The commimity will benefit from this project because it wIll provide safe defect free sidewalks for its citizens. The sidewalk contracts
are done by private contractors generaflng pub]ic sector jobs as a result
Disadvantages If Approved:
Historically, the sidewalk reconstruction has created negative feedback because of construction procedures and assessments. Having
to assess for walk reconstrucflon remains a conhoveisial issue.
Disativantages N Noi Approved: �
This option would allow the infrastructure of sidewalk stnck w deteriorate, which in tum, will generate more pe�onal injury suits,
resulting in the expenditure of lazger dollaz amounts in repairs and replacement, as well as claim payoars.
u iau�vum rn
Trensaction: �' .ODO
CosVRevenue Budgeted:. y
Funding Source: CIB, Other, Assessments
Finaneial Information:
(Explain)
Activity Number: C07-2T760-0784-p0000
June 28, 2007 7:49 PM Page 1 _� __ ,
o� -� �
SLIMMARY OF ENGINEE:RING RECOMiVIENDATION5
Ward 2
S �/ PROJECT: RECONSTRUCT SIDEWAL% N.S. E. FIFTH ST. from Wacouta St. to
� Wall St. & W.S. WALL ST. from E. Fifth St. to E. S'vcth St.
INITIATINGACTION.• This order was uririated by the Director of Public Warks as
public necessity on the basis of an inspection of the watk.
EXISTING CONDITIONS: This wallc is poured concrete with asphalt patches, heaved,
settled, and cracked panels.
S �71 Z PROJECT: RECONSTRUCT SIDEWfILK S.S. E. FOURTH ST. from Jackson St. to
Sibley St. & W.S. SIBLEY ST. from E. Kellogg Blvd. to E. Fourth St.
INITIATINGACTION: This order was initiated by the Director of Public Works as
public necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with undulated and settled
panels.
...................................................................................