07-167CITY OF ST. PAUL
FSNAI, ORDER
No. d7 7
, �
File N¢. 1903
voting
Green Sheet No. �-�`��y/
In the Matter of installation of a 3-Globe Style, above standard street
lighting system on the south side of Tenth Street from Wabasha Street to
St. Peter Street.
Also,
In the Matter of the Operation Costs of the Above Standard Street Lighting
System for 2007.
under Preliminary Orcler D�-as approved
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
Adopted by the Council: Date: ����� �
Certified Passed by the Council Secretary
BY__C%'�1L�/
�
Mayor
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet �
n�_/2/ l� O ��7
p�l/ — Pubtic works
Contac[ Person & Phorre:
Brian V'rtek
2ss-szs
Must Be on Council A9en
Doc. Type: OTHER (WES14T FfS ANY C
E-DxumentRequired: +�Y
DocumeM Contaet: &ien-kitek �a��
0�-NOV-06
�
Assign
Number
For
Routing
Order
Contaet Pho�: 266�2Gii $$$j I I
Total # of Signature Pages _(Clip All Loeations tor Signature)
Green Sheet NO: 3034191
o •�wo.�s 1 r�s�nsa« �
1 cil MazyErickson
2 'tv Qak I Sbari Moore I
Set date of public hearing to approve installation, operation and maintenance assessments for above standard 3-globe style sffee[
lighting system for the south side of Tenth St. between Wabasha Street and St. Peter Street. File No. 19035
iaanons: t�pprove �r{) or r+
Planning Commission
CIB Committee
Givil Service Commission
1. Has this personffirm ever worked under a contract for this department?
Yes No
2. Has this person/firm ever been a ciry employee?
Yes No
3. Does this person/firm possess a skill not normally possessed by any
current city employee?
Yes No
E�cplain ali yes answere on separete sheet and attach to green sheet
initiating Problem, lssues, Opportunity (Who, What, When, Where, Why):
Downtown Distdct Council requested upgrading the lighting on [he southside of Tenth Street.
AtivaMages If Approvetl:
Lightiug installation will proceed.
Disadvantages If Approved:
None identified to date.
Disativantages If Not Approved:
The lighting project will not proceed.
-- Trensaetion: $28,000
Funding Source: ASS2SSfil@l1tS
Finaneial Information:
(Explain)�
Cost/Revenue Budgeted:
AMivity Number:
€��x�39S�?� ���°�`Y�`�9
_E � .. . ��.�..
December 20, 2006 1023 AM Page 1
D 7/� 7
SUMMARY OF ENGINEERING RECOMMENDATIONS
TENTH STREET WASASHA TO ST. PETER
Above Standard Street Lighting System Construction
November 8, 2006
Project
Installation of 3-Globe Style Street Lighting System on the south side of Tenth Street
between Wabasha Street and St. Peter Street.
Initiating Action
The project was initiated by members of the Downtown District Council. The Downtown
District Council representative has obtained signed Waivers of Notification and Waivers
of Right of Appeal for the abutting properties.
Proposed Improvements
It is proposed to install 4 three globe lights on the south side of Tenth Street between
Wabasha Street and St. Peter Street_
District Energy is currently working in the area and has agreed to coordinate
construction to accommodate the above scale lighting construction into their schedule.
This will reduce the cost of the lighting improvements for the property owners.
The area will be included in the Wabasha — St. Peter Maintenance Area.
Positive Benefits
The new light installation will match the surrounding street light system.
Adverse Effects
None.
Time Schedule
Work to be completed late fall 2006
Cost Estimate
Labor and materials
Operation & Maintenance
$28,800
$ 1,060peryear
Estimated Financing
Assessments
Proposed Assessments
Estimated
�, ::��
Above Standard Assessment $96.00 per assessable foot.
Yearly Operation & Maintenance Assessment $3,78 per assessable foot.
07���
Source of Additionai Information
Brian Vitek at 266-6256
Summary and Recommendations
The Department of Public Works believes this is a necessary and worthwhile project
and the Engineering Recommendation is for approval of the project.