06-279CITY OF ST. PAUL
FINAL ORDER
COUNCIL $ILE NO. _�� � ���
/ ��n
By �' ` / I
v�
File No
5
S�
Voting
In the Matter of improving the area referred to as the ORANGE/PARK RSVP
(Residential Street Vitality Project), by constructing a new bituminous
surface streets with concrete curb and gutter, concrete driveway aprons and
outwalks, boulevards landscaped with sod and trees, and a new lantern style
lighting system, and doing all other necessary work to complete said project.
Bounded by the railroad on the north, Rice Street on the west, Maryland
Avenue on the south and Jackson Street on the east.
Also, the construction of and/or repair of sanitary sewer, storm sewer,
and/or water service connections will be made at the request of the property
owners.
The streets to be improved are:
Ivy Avenue
Hyacinth Avenue
Orange Avenue
Hawthorne Avenue
Park Street
Sylvan Street
Hawthorne Avenue
Abell Street
- From Rice Street to Sylvan Street
- From Rice Street to Sylvan Street
- From Rice Street to Sylvan Street
- From Rice Street to Sylvan Street
- From Maryland Avenue to Ivy Avenue
- From Maryland Avenue to Ivy Avenue
- From Abell Street to the Cul-de-Sac
- From Maryland Avenue to Hawthorne Avenue
under Preliminary Order ��_//0 ° approved
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter . � � r �-1�
Adopted by the Council: Date:�1�G��/Xiv
Certified Passed by the Council Secretary
By �
, %�
Mayor
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet �
_ . - .. ��/�s%�i �� '� t tl
PW – Public Works
Contact Person & Phone:
Daniei Haak
266-6084
Must Be on Council Agenda by (Date):
01-FEB-06
ContractType:
OT-01FiER (DOESNT FRANY
CAiEGORY)
Date Ini[iated:
,�-.,A� Green Sheet NO: 3029416
- '
Assign
Number
For
Routing
Order
UepafQflEltt Seni IO Ye60f1 IOI03W82e
. q,
onncil Eric6son
' CTerlc hari Aioore
b��
Total # of Signature Pages _(Clip NI Locations for Signature)
Action Requested:
Orange-Park RSVP: Construction of new bituminous surfaced streets with concrete curb and gutter, concrete driveway aprons and
outwalks, boulevards ]andscaped with sod and uees, a new laNem style street lighting system, lead water seivice replacemerns, and
>anitary sewer repaiis in the area called Orange-Park RSVP.
File No. 19025
u�tions: Appro�e (A) or Reject (R):
Planning Commission
GB Committee
Ciuil Service Commission
rersona� service convac[s mus[wnswerme ronowmg uuesnons:
1. Has this persoNfirtn e�er worked u�Wer a coMract for this department?
Yes No
2. Has this persoNfirm e�er been a city employee?
Yes No
3. Does this persoNfirtn possess a skili not normally possessed by arry
curreM city employee?
Yes No
ExpWin all yes answers on separate sheet and altach to green sheet
Initiating Problem, issues, Opportunity (Who, What, When, Where, Why):
This project is being completed as part of the Residenlial Sh�eet Vitality Pmgam (RSVP). This is one of four RS VP projects selected
for 2006 construclion by Public Works and approved by the Long-Range Capital Improvement Budget Committee and the City
Council.
Advantages IfApproved:
General improvement of the right-of-way will enhance and add quality to the neighborhood. The newly rebuilt madways will improve
drivability of the neighborhood, and contimie the City's efforts to impmve the street system in Saint Paul. Street oiling in this
neighborhood will be eliminated. Lantern-style street ligl�vng will also enliance neighborhood safety and aesthetics.
DisadvantageslfApprovetl:
Notmal problems associated cvith construction, such as noise, dust, and general disruption will occur.
Disadvantapes If Not Approved:
The pavemem shucture will coirtinue to deteriorate, maiiRenance costs will rise, and the level of seivice pmvided by these streets will
�P�
Total Amount of
Trensaction:
Funding Source:
Financial Information:
(Explain)
$1,900,000
CIB & Assessments
CosURevenue Budgeted: y
Activity Number.
��'.�� '?� (
+' i II*�:
Ob���
.�_ �
SUMMARY OF ENGINEERING RECOMMENDATIONS
Orange - Park Residential Street Vitality Project (Area 34)
City Project No. 06-P-8138
Report Prepared 1-4-06
Public Hearing --
PROJECT
This project is to improve the area referred to as the Orange - Park Residential Street
Vitality Project (Area 34), by constructing new bituminous surfaced streets with
concrete curb and gutter, concrete driveway aprons and outwalks, boulevards
landscaped with sod and trees, and a new lantern style street lighting system. In
addition, appropriate sanitary sewer repairs will be made, lead water services in the
right of way will be replaced, and storm sewer and sanitary sewer reconnections will be
made at the request of property owners. This project area is surrounded by the railroad
tracks on the north, Jackson Street on the east, Maryland Avenue on the south, and
Rice Street on the west (see attached map).
EXISTING CONDITIONS
All of the residential streets in the project area are oiled or older paved streets. The
street widths vary in this area, generally between 29' and 35'. The street surfaces are
generally in fair condition.
This area has wood pole lighting.
PROPOSEDIMPROVEMENTS
It is proposed to improve the following streets with the construction of new bituminous
surFaced streets with concrete curb and gutter, concrete driveway aprons and ouiwalks,
and boulevards landscaped with sod and trees. In addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way will be replaced, and storm
sewer and sanitary sewer connections will be made at the request of property owners.
IVY AVENUE — RICE STREET TO SYLVAN STREET
HYACINTH AVENUE — RICE STREET TO SYLVAN STREET
ORANGE AVENUE — RICE STREET TO SYLVAN STREET
HAWTHORNE AVENUE — RICE STREET TO SYLVAN STREET
PARK STREET — MARYLAND AVENUE TO IVY AVENUE
SYLVAN STREET — MARYLAND AVENUE TO IVY AVENUE
HAWTHORNE AVENUE — ASELL STREET TO CUL-DE-SAC
ABELL STREET — MARYLAND AVENUE TO HAWTHORNE AVENUE
��,z1`I
Decisions regarding the street widths will be made keeping in mind the right-of-way
widths, existing street widths, any relevant neighborhood issues, and the impact on
boulevard trees. New curb may be hand formed to avoid damaging boulevard trees or
their roots. Tree trimming may be necessary to facilitate construction.
All the streets to be paved (listed above) will also have a lantern style street lighting
system installed as part of this project.
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve existing
oiled and older paved streets.
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadways will improve drivability of the neighborhood,
and continue the City's efforts to improve the street system in Saint Paul. Lantern style
lighting will enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normal problems associated with construction such as noise, dust, reduced access to
the neighborhood, and general disruption will be present.
EFFECTS ON TREES
Street widths wil{ be selected to minimize the impact on trees. New trees will be planted
as part of the boulevard restoration.
TIME SCHEDULE
The project will begin in the spring of 2006 and will be completed by the fall of 2006.
There will be further restrictions on the amount of time work is done on individual
segments of streets.
COST ESTIMATE
Construction
Engineering
Miscellaneous
PROJECT TOTAL
$ 1,500,000
$ 292,500
$ 107.500
$ 1,900,000
2
,�� ��1
ESTIMATED FINANCING
CIB (2006)
Assessments
PROJECT TOTAL
$ 1,475,000
$ 425.000
$ 1,900,000
The 2006 assessment rates for residential street paving and lighting are:
$30.41 per ASSESSABLE FOOT for street paving
$5.37 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Dan Haak, at 266-6084.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
Respec#ully submitted,
Dan Haak
Public Works
3
City of Saint Paul b� -Z1�
Department of Public Works
Street Engineering and Construction Division
�
�
� �
r
�
w W
3 Y
¢ ¢
2 f
I W AVE.
HYACINTH AVE.
ORANGE AVE.
HAWTHORNE AVE.
MARYLAND AVE.
r
� N
�
~ N Z N O
N Q J N
W � 1 w X
� a � a �
�= STREETS TO BE RECONSTRUCTED IN 2006
2006
ORANGE/PARK RSVP
06—P-8138
Project Area 34
� �� 5
3 C� �c��,,c.l��
We the Undersigned do not want to Participate in any project which would
assess our properties, including but not Iimited to paving, installing curbs,
driveway aprons and out walks, lighting, or plantings.
Name
�
�
ta �i'�:,.1 v
�r s�
�S�
Phone #
�S� - /��°9 ��i�> s
�S/ ��� ��r3
�o/Z �D 3 S C
r S�_ �.�.��- `i�.� 3
� S�/- cl�i 7- 6.�'a 7
S/ - yfr� - �a� �
.�
�
�
���
���'
%i�i %17
J �d
, -
Address
seiEe ��e� 91�ralsra sb�easbts9 t�:. 999Z/9H/E0
o�-a�9
VJe the Undersigned do not want to Participate in any project which would
assess our properties, including but not limited to paving, installing curbs,
driveway aprons and out walks, lighting, or plantings.
Name Address Phone #
(�b �� II�U.�o/�91 k � 1��� t)r(ir�o �(nSt� �>�fJ-��:��
,�
l�
��� E 1- � �> ��
� � 1� F; %�`���N
� � 9'�l + 109� h
�
��, �S 1- �9_4-t�`1 '7
: i�i ��l �e .(�l- (� Erj — l�//-�
" l
Z����{,--��'(`" f�q --�/-9��
�- us-��-z� � , �«�,Jz.�-��,
� r 4YLI -�1ss`
���� �RU-.�.yba .� .
�������5
�,
�� �7
caina �nr,a 9I'7TNISIQ £7E688bTS9
r�
��.3
_��( .s-
3k31
- �5.�// 7 &�r ���f
�j �;' 7 1-S ��,5 � - �f ss
� :� �t l.�f Ls��i -ySz
��� as��
TL T9 4EaZ/99/E0
;
c� a��
We the Undersigned do not want to Participate in any project which would
assess our properties, including but not Iimited to paving, installing curbs,
driveway aprons and out walks, lighting, or plantings.
,
/
Name Address Phone #
��1 �J � cf_ C.� L� m�-f-z �FS`i I-I-r� cuFh �,�n� cfi�t%� ! � 1 �, �/ -���-
rr`r, J��'«Gr*ii �IH f1�re��C!rna��a•c �v��` (C��-1.��4_<
�
�
e �
7 (<i : �i
r �/`1 ess�. �f�� � �
���.�n l�S� - �l�50
c%�c-�- -
�
_ /'�kn t:.
9--��./�
���
y 130 S� (vd.H�t
T
'" �S/'f�9�5q �P
�i(��c� ¢i L.� �' J-�i � `�5
7n�n�ln tZ / L���' �� ��
'� ���t :S�'��.3�
�S�rSE
y --/ o a. �
Y�9 _
9���
���
Y�'�' `7�rp�
�_G,�,
S9/59 39Vd 91�Ib1SIQ Eb6988b'[S9 LZ.�T9 Sa9Z/99/E�
-- � G � iZ I� J 6}'G �� �.� c„� r�9u��i-frJ�tr�-
�'� s .,��(/ � �`.� f1.2 .Z�/y r�G�G �!J �
� -� --
� a15
� sC�
V1e the Undersigned do not want to Parlicipate in any pFO;ject which would
!.�,��r ��!;•� .- _ Eassa§s:n��r;op�r� not��imiier�.t�z pa�i�cg',>anstaF�ing°��bs,...:�=s-�.a>,.;,�:;ti ;:�M.
driveway aprons arid out wallcs, lighting, or plautings; ��� �' � -
.��-
I�f-
Phone #
�w!� r
�I(/.�. ��u<<.�
� r
, �
_ �, .] ._ s � L...
61a- �03 -a-
� � r�r67
(�5� aat�� da-y
�Si—`��y-3g3�1 e��
;.�(-3�,s— c;b�c�
_. .. _._.._ � .............. .... _...�
- � --- ---, -- - ---..... . . _...._._.._. ---..._ ... �
- -- ____:_: _�. _.....----_....
... ...
. _....--...._. --- -�---..
cqi�q �nr„� 91�Ib15IQ EbE988bTS9 TZ�TO 999Z/99/EZ