06-215CITY OF ST. PAUL
FINAI, ORDER
� i ��Lit�/l./1s�n� �/���lo
COUNCIL FILE NO. VlS� ��
S I 2-�
v
File No. 9023
Voting
In th Matter of improving Selby Avenue from Victoria Street to Avon Street
by con ructing a new bituminous surfaced street with concrete curb and
gutter, ncrete driveway aprons, boulevards landscaped with sod and trees,
installati of a lantern style street lighting system, construction of a new
storm sewer ystem and doing all other necessary work to complete said
project.
Also, the cons
water service �
Also, the construc
Parkway to Victoria
on of and/or repair of sanitary sewer, storm sewer and
:ions will be made at the request of the property owners.
of center islands on Selby Avenue from Lexington
under Preliminary Orde�
The Council of the Ci
upon the above improvement
prescribed by the City ChartE
of Saint Paul
due notice
� and
approved
has conducted a public hearing
thereof having been given as
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to sai proposed improvement and has fully
considered the same; now, therefore, e it
RESOLVED, That the Council of the 'ty of Saint Paul does hereby order
that the above-described improvement be m de, and the proper City officers
are hereby directed and authorized to proce with the improvement; and be it
FURTHER RESOLVED, That upon the comple �on of said improvement, the
proper City officers shall calculate all expens s incurred therein and shall
report the same to the City Council in accordanc with Chapter 14 of the City
Charter.
Adopted by the
Certified Passed by the
� . ��. .� I ..
Secretary
���o70d,E
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet �
PW — rublioworks
Contact Person 8 Phone:
Barb Mundahl
2666112
Ot-FEB-06
Contract Type:
OT-0lHER (DOESN7 FRANY
CATEGORY)
Date Initia
;�F'.Ak1�i�::7
� '
Assign
Number
For
Routing
Order
�'Z.��
Green Sheet NO: 3029271
UepaftrflCM SemTOPerson Inl[�al/Date
o - c w
1 omn7 MARY ERICKSON
2 ' C9erk SAARI MOORE
Total # of Signature Pages _(Clip NI Locations for SignaW re)
Action Requested: .
Constmction of a new bitwninous surfaced street with concrete aub, gutter, and bumpouts at imersections; wncrete driveway
aprons; boulevazds landscaped with sod and trees; new lamern-sryle street lighting system; revised storm and sanitary sewer system
and repairs on Selby Avemie from Victoria Street to Avon Street
File No. 19023
Recommendations: Appro�e (A) or
Planning Commission
CIB Committee
CiHI Service Commission
Questions:
1. Has this person/firtn e�er worked untler a coMract forthis departmeM?
Yes No
2. Has this person/firm eeer been a city empioyee?
Yes No
3. Does this persoNfirtn possess a skill not nortnalty possessed by any
curtent city employee?
Yes No
Explain all yes answers on separate sheet and attach to green sheet
Initiating Problem, Issues, Opportunity (Who, What, When, Where, Why):
Selby Avenue is an older paved MSA route that is in good condition. The Selby Avenue Business Commuruty would like to nazrow
the street and make Selby Avenue more pedestrian friendly.
Advantaqes tt Approved:
General improvemeM of the public right-of-way will euhance and add quality to the neighborhood. The newly rebuik roadway wi
impmve drivabiliry of the neighborhood and continue the City's efforts to improve the street system in Saint Paul. Lantern-style
lighting will enhance neighborhood safety and aesthelics.
Disadvantages RApproved:
Nornial pmblems associated with consuuction such as noise, dust, and ge�reral disiuption will occur.
Disadvantaqes If Not Approved:
To do notlring would be inconsistem with the City's commitmem to improve existing older paved streets and against the wishes of the
Selby Avenue Business Community.
ioWl Amount of
Trensaction:
Funding Source:
Financial Information:
(Explain)
$1,400,000
MSA, Assessments
CosNRevenue Budgeted: �(
Activity Number.
^o z
.z.M;? ��e��arrh �:��s�.,
x . r rr
�-'L� 5
SUMMARY OF ENGINEERING RECOMMENDATIONS
Selby Avenue Paving Project
City Project No. 06-P-1287
Report Prepared -- 1-5-06
Public Hearing --
PROJECT
This project is to improve Selby Avenue from Victoria Street to Avon Street by
constructing a new bituminous surfaced street with concrete curb and gutter, concrete
driveway aprons and outwalks, boulevards landscaped with sod and trees, and a new
lantern style street lighting system. In addition, appropriate sanitary sewer repairs will
be made, lead water services in the right of way will be replaced and storm and sanitary
sewer reconnections will be made at the request of property owners.
This project also includes the addition of center islands on Selby Avenue from
Lexington Parkway to Victoria Street.
EXISTING CONDITIONS
Selby Avenue is an older paved street that is in good condition. The existing street
width is 44'.
PROPOSEDIMPROVEMENTS
!t is proposed to narrow the roadway from Victoria Street to Avon Street to the MSA
standard of 38' and install 6' bumpouts at Avon Street and Fisk Street. The boulevards
will be landscaped with sod and trees. The single lanterns and davit arm light poles will
be replaced with twin arm lanterns. In addition, appropriate sanitary sewer repairs will
be made, lead water services in the right of way will be replaced, and storm sewer and
sanitary sewer connections will be made at the request of property owners.
The existing curb and roadway on Selby Avenue from Lexington Parkway to Victoria
Street was recently installed and is in good condition. It is proposed to build center
islands for this length of street and leave the existing curb and pavement intact.
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve existing
older paved streets and against the wishes of the Selby Avenue Business Community.
v��Z�s
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadway will improve drivability of the neighborhood,
and continue the Cit�s efforts to improve the street system in Saint Paul. Lantern style
lighting will enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normal problems associated with construction such as noise, dust, reduced access to
the neighborhood, and general disruption will be present.
EFFECTS ON TREES
New trees will be planted as part of the boulevard restoration.
TIME SCHEDULE
The project will begin in the spring of 2006 and will be completed by tfie fall of 2006.
COST ESTIMATE
Construction
Engineering
Miscellaneous
PROJECT TOTAL
ESTIMATED FINANCING
MSA
Assessments
PROJECT TOTAL
$ 1,000,000
$ 250,000
$ 150,000
$ 1,400,000
$ 1,330,000
$ 70,000
$ 1,400,000
The estimated 2006 assessment rates for residential street paving and lighting are:
$30.41 per ASSESSABLE FOOT for street paving
$5.37 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
(�,-2lS
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Barb Mundahl, at 266-6112.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
RespectFully submitted,
Barbara Mundahl
Public Works
0(a-Ll5
iXONPS � �
EOXON➢ � �
���
�
o Nuuou � uc
��� ���E,�, avE . y OC
�� VANBIREN ���^� PVE �
�� BLPIR � °�`�� AVE �
������� AVE �
����� AVE. .'IAp(p 1 �
'#
������� PVE r
L
������ PVE. �
52 �� ��� a nVE. �+
L
000�
a000 a�E.
C�OC
�A p o �
S`LBY/MINNEHAHA/VICTORIA 2006
MUNICIPAL STATE AID TO BE PAVED - 0.8 MILES
MUNICIPAL STATE AID - CHANNELIZATION � 0.5 MILES
Deparhnent of Public Works
Real Estate Section
1000 City Hall Annez
Saint Pau� MN SS102
�� - a/S
Phone: (651) 266-8858
Fax: (651) 266-8855
CITY OF SAINT PAUL
Christopher B. Coleman, Mayor
March 3, 2006
Re: Improving Selby Avenue from Victoria Street to Avon Street by constructing a new
bituminous surfaced street with concrete curb and gutter, concrete driveway aprons, boulevards
landscaped with sod and trees, installation of a lantem style street lighting system, construction of
a new storm sewer system and doing all other necessary work to complete said project.
F51e No. 19023
Deaz Property Owner,
The above project was approved by the City CouncIl on March 1, 2006. However, after the
hearing, it was discovered that there was an error in the order and it will be withdrawn. This does
not mean the project is being cancelled. Another public hearing will be held in April. You will be
notified ofthis heazing.
John H. Saumweber
Real Estate Section
651-266-8851
AA-ADA-EO Employer