In the Matter o£ improving Minnehaha Avenue from Dale Street to Arundel
Street by constructing a new bituminous surfaced street with concrete curb
and gutter, concrete driveway aprons, boulevards landscaped with sod and
trees, installation of a lantern style street lighting system, construction
of a new storm sewer system and doing all other necessary work to complete
said project.
Also, the construction of and/or repair of sanitary sewer, storm sewer and
water service connections will be made at the request of the property owners.
under Preliminary Order �� � �J� approved
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and sha11
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
Adopted by the Council: Date: �/ l/G
Certified Passed by the Council Secretary
By �' d
i� n ,
�—
Mayor
� Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet Green Sheet �
Pw - r�li� wmxs
Contac[ Person & Phone:
Barb Mundahi
266-6'112
Must Be on Counc�l Agenda by (Date):
01-FEB-06
Contract Type:
OT-0lHER (DOESrfT FRANY
CA7EGORY)
Date Infiated:
o3-�ataos
� '
Assign
Number
For
Routing
Order
lilp
Green Sheet NO: 3029273
ueparmie�rc senc�orerson mrtauua[e
o 'c W A
1 onnc� MARY ERiCKSON
2 ' Clerl: SHARI MOORE
Total # of Signature Pages _(Cfip All Locations for SignaWre)
Action Requested:
Minnel�at�a Avemie Paving Pmject - Construction of a new bitnminous surfaced street with concrete cwb and gutter, concrete
driveway aprons, boulevards landscaped with sod and trees, a new lantem-style s[reet ligUting system, revised storm sewer system
and sanitazy sewer repairs, and the addition of center IeR-tum lanes and designated bike lanes on Miunehaha from Dale to Arundel.
File No. 19022
Recommendations: Approee (A) or Rejed (R):
Planning Commission
CIB Committee
Citil Service Commission
1. Has this persoNfirm eeer wvrked under a coMract for this departmeM?
Yes No
2. Has this persoNfirm e�er been a cky employee?
Yes No
3. Does this persoNfirm possess a skill not nortnally possessed by any
current city employee?
Yes No
Explain all yes answers on separete sheet and attach to green sheet
initiating Problem, issues, Opportunity (Whq What, Whert, Where, Why):
Miimeiiat�a Avenue is an older pavefl MSt� route that is in fair conditioq with wood pole lighting. The existing street width (44� is not
wide'enough to accommodate bike lanes and Wm lanes for the increased tiaffic for the Great Northem Business Center and future
Pierce Bufler Route access.
`AdvantageslfApproved:
The aewly rebuilt roadway will impmve drivability of tt� neighborhood and con$nue the City's efforts to improve the street system in
Saint Paul. A center left-tum lane will accommodate the new residents of the Great Northem Business Center. Lantern-style lighti �ns
will enUance neighborhood safety and aesthe[ics.
Disadvantages H Approved:
Normal problems associated with construction such as iroise, dust, and general disruption wilI occur.
Disadvantapes If Not Approved:
The pavement stmctm� wilY continue to deteriorate; maitrtem�nce costs will rise; and the level of service pmvided by these sUZets will
drop.
Total Artaunt of
TransacBon:
Funding Source:
Financial Infortnation:
(Explain)
$790, 000
MSA, Assessments
roirowmg ciuesnons:
CostlRevenue Budgeted: y
Activity Number:
Vu'i."�"9t�, ��n �„�,'�?�Se9?
C. , �: �' r
�c' Za�
SUMMARY OF ENGINEERING RECOMMENDATIONS
Minnehaha Avenue Paving Project
City Project No. O6-P-1288
Report Prepared -- 11-29-05
Public Hearing --
PROJECT
This project is to improve Minnehaha Avenue from Dale Street to Arundel Street by
constructing a new bituminous surfaced street with concrete curb and gutter, concrete
driveway aprons and outwalks, boulevards landscaped with sod and trees, and a new
lantern style street lighting system. In addition, appropriate sanitary sewer repairs will
be made, lead water services in the right of way will be replaced and storm and sanitary
sewer reconnections will be made at the request of property owners.
EXISTING CONDITIONS
Minnehaha Avenue is an older concrete street that is in fair condition. The existing
street width is 44' and has wood pole lighting. The new Great Northern Business Center
development by the Port Authority on the north side of Minnehaha from Dale to Arundel
is currently under construction.
PROPOSEDIMPROVEMENTS
It is proposed to improve Minnehaha Avenue with the construction of a new bituminous
surfaced street with concrete curb and gutter, concrete driveway aprons and outwalks,
and boulevards landscaped with sod and trees. In addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way will be replaced and storm
and sanitary sewer reconnections will be made at the request of property owners.
The proposed street width is 53' to allow for one lane of traffic in each direction, a
center left turn lane, bike lanes in each direction and parking on the south side. The
new street and lane configuration will better handle the additional traffic generated by
the Port Authority development. Minnehaha Avenue will have a lantern style street
lighting system installed as part of this project. New curb may be hand fiormed to avoid
damaging boulevard trees or their roots.
�.-��
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve existing
oiled and older paved streets.
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadway will improve drivability of the neighborhood,
and continue the Cit�s efforts to improve the street system in Saint Paul. A center left
turn lane will accommodate the new businesses of the Great Northern Business Center.
Lantern style lighting will enhance neighborhood safiety and esthetics.
ADVERSE EFFECTS
Normal problems associated with construction such as noise, dust, reduced access to
the neighborhood, and general disruption will be present.
EFFECTS ON TREES
Existing trees on the south side of Minnehaha Avenue are unlikely to be effected. New
trees will be planted on both sides of the street as part of the boulevard restoration.
TIME SCHEDULE
The project will begin in the spring of 2006 and will be completed by the fall of 2006.
COST ESTIMATE
Construction
Engineering
Miscellaneous
$ 600,000
$ 150,000
$ 40.000
PROJECT TOTAL
$ 790,000
ESTIMATED FINANCING
MSA
Assessments
$ 600,000
$ 190.000
PROJECT TOTAL
$ 790,000
2
ot,e-
The estimated 2006 assessment rates for residential street paving and lighting are:
$30.41 per ASSESSABLE FOOT for street paving
$5.37 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Barb Mundahl, at 266-6112.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
RespectFully submitted,
Barbara Mundahl
Public Works
3
c�- z�a
���'�Uo �uUo C
�.� C� 0�� ��, .�E C
VPNBUREN� �� VANBIIftEN ���� AYE �
BLAIR � � � HLPI0. � �^ � � PVE �
� IRFNlO �����^�L�J�� PVE �
TX[44AS �^ � � `� � � � AVE. �p�p ` �
EDMUNO � � � � � � � PVE, r
CHF0.LES I 1� � �I lO��� PVE �
1
SXERBURNE °� � 52 � � � � � a PVE �
� � z AURORF
� � IULLER
� INGlfl1ART
� MRftSHPLL
���
iq Q Q �
�'
SELBY/MINN��/VICTORIA 2006
MUNICIPAL STATE AID TO BE PAVED - 0.8 MILES
Erickson - 3!1 Agenda Item 06-214
U(�-�I
From: "Wams, Benita B- Eagan, MN" <benita.b.wams@usps.gov>
To: <�rd1@ci.stpaul.mn.us>, <ward4@ci.stpaul.mn.us>, <ward3@ci.stpaul.mn.us>,
<ward5@ci.stpaul.mn.us>, <ward6@ci.stpaui.mn.us>, <ward7@ci.stpaul.mn.us>,
<ward2@ci.stpaul.mn. us>
Date: 3/1/2006 11:0221 AM
Subject: 3/1 Agenda Item 06-214
Please enter this message into the official record for the March 1
Public Hearing on agenda item 06-214, Minnehaha street reconstruction
(File No. 19022).
The last part of the description for this item on the agenda reads,
"...all other work necessary to complete the project." This portion of
Minnehaha Avenue, between Dale and Arundel, is listed as a bicycle route
in the Transportation Chapter of the City of St. Paul Comprehensive
Plan, and is scheduled to have on-street bicycle lanes along this route.
It is City policy to implement bicycle infrastructure when streets are
reconstructed. This project cannot be considered complete without
bicycle lanes, and all appropriate signs and markings designating the
lanes for bicycle use. I wish to be sure that sufficient funds have
been allocated to this project to fully implement the bicycle
infrastructure.
This portion of Minnehaha Avenue is a county road (33) and in the past
bicycle lanes have bee� painted on a county road but the funding was not
available to properly sign and mark the lanes. This was the case with
all of Pierce Butler Route. I appreciate the efforts of the City
Council to provide the funding to corcect this deficiency, and look
forward to seeing the signs placed there later this year. Meanwhile, I
don't wish to see this kind of oversight repeated. Please be sure that
the cost estimate provided for this project includes "...all other work
necessary to complete the project," to include the bicycle lanes their
appropriate signs and markings.
Benita Warns
1440 Lafond Avenue
St. Paul, MN 55104-2438
651-641-1037(eve/weekend)
651-681-2196(weekdays)
CC: <�anice.Rettman@co.ramsey.mn.us>, <Toni.Carter@co.ramsey.mn.us>,
<warns@pclink.com>