05-450CITY OF ST. PAUI,
FINAL ORDER
Voting
No. OS y5�"`� '�$
19014 & 19014A
In the Matter of improving the area referred to as the BARER/BELLOWS RSVP
(Residential Street Vitality Project), by constructing a new bituminous
surface streets with concrete curb and gutter, concrete driveway aprons and
outwalks, boulevards landscaped with sod and trees, and a new lantern style
lighting system, and doing all other necessary work to complete said project,
bounded by George Street on the north, Ohio Street on the west, Annapolis
Street on the south and Stryker Avenue on the east.
Also, the construction of and/or repair of sanitary sewer, storm sewer,
and/or water service connections will be made at the request of the property
owners. (File No. 19014C & 19014AC)
The streets to be improved are:
Charlton Street
Waseca Street
Waseca Street
Bellows Street
Bidwell Street
Winslow Avenue
Stryker Avenue
Stevens Street
King Street
Elizabeth Street
Baker Street
Morton Street
Morton Street
Page Street
Sidney Street
Curtice Street
Winona Street
Wyoming Street
Dodd Road
- From Annapolis Street to George Street
- From City Limits to Page Street
- From Morton Street to George Street
- From Sidney Street to George Street
- From Dodd Road to George Street
- From Dodd Road to George Street
- From Dodd Road to winifred Street
- From Ohio Street to Stryker Avenue
- From Ohio Street to Winslow Avenue
- From Bidwell Street to Stryker Avenue
- From Ohio Street to Dodd Road
- From Ohio Street to Waseca Street
- From Bellows Street to Dodd Road
- From Ohio Street to Dodd Road
- From Ohio Street to Dodd Road
- From Ohio Street to Charlton Street
- From Ohio Street to Charlton Street
- From Ohio Street to Charlton Street
- From City Limits to Stryker Avenue
os- yS�
under Preliminary Order //� �/o / approved /4/l/,CG�-, �.� �S
The Council of the City of Saint Pau1 has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTIiER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
Adopted by the Council: Date�v /�D�S
Certified Passed by the Council Secretary
� Green Sheet Green Sheet
uate mmacea: � -
,�-05 ' Green Sheet NO: 3025726
pW — Public works
; CoMad Person 8 Phone: �
Dan Haak �
268-6084
� Must Be on Council Agenda by (Date): �
� O6-APR-05 I
i C
i
i I
i I
� i
�
Assign
Number
For
Routing
Order
OS- �S p
Green Sheet Green Sheet Green Sheet Green Sheet
0 Pubiic Works Dan Haak �
1 Council ' Marv Ericksoo !
2 Citv Clerk Shari Moore
�
ToWI # of Signature Pages Zi (Clip AI� Loeations fw Signature)
wcuon Requestea:
Set date of he g to approve the orders for the BakerBellows Residential Street Vitality Project (RSVP).
19a� r9o��{A
File Nos. -�9995 & ' °�
tlations: Approve (A) or R
Planning Commission
CIB Committee
Civil Service Commission
1. Has this person/firm ever worked under a contrect for this department?
Yes No
2. Has this personffirm ever been a city employee?
Yes No
3. Does this person/firm possess a skill not normally possessed by any
current city employee?
Yes No
Explain all yes answers on separate sheet and attach to green sheet
initiating Problem, Issues, Opportunity (Who, What, When, Where, Why): �
This project is being done as part of the RSVP projects. This project will be done over a period of 2 years (2005-2006). The rates will
be the same for both yeazs.
AdvantaaeslfApproved:
General improvement of ffie right-of-way will enhance and add qualiry to the neighborhood.
DisadvantapeslfApproved:
None.
Disadvantaqes If Not Approved:
T'he pavement structure will continue to deteriorate, maintenance costs will rise and the level of service provided by these streeu will
drop.
1,4mount of 6065000
Transaction:
Fundina source: CIB, Assessments,
'� Financial information: MSA
�� (Explain)
CosURevenve Budgeted: y
Adivitv Number:
�-�!S� e �ne?ar , ^,�1 ,�r°i?
,.' ...�.,.' �
05 - y5�
�..
SUMMARY OF ENGINEERING RECOMMENDATIONS
Baker - Bellows Residential Street Vitality Project (Area 16)
City Project No. 05-P-8135
Report Prepared 3-8-05
Public Hearing --
PROJECT
This project is to improve the a�ea referred to as the Baker - Bellows Residential
Street Vitality Project (Area 16), by constructing new bituminous surfaced streets with
concrete curb and gutter, concrete driveway aprons and outwalks, boulevards
landscaped with sod and trees, and a new lantern style street lighting system. In
addition, appropriate sanitary sewer repairs will be made, lead water services in the
right of way will be replaced, and storm sewer and sanitary sewer reconnections will be
made at the request of property owners. This project area is surrounded by George
Street on the north, Stryker Avenue on the east, Annapolis Street on the south, and
Ohio Street on the west (see attached map).
EXISTING CONDITIONS
All of the residential streets in the project area are oiled or older paved streets. The
street widths vary in this area, generally between 29' and 35'. The street surfaces are
generally in fair condition.
This area has wood pole lighting.
PROPOSEDIMPROVEMENTS
It is proposed to improve the following streets with the construction of new bituminous
surfaced streets with concrete curb and gutter, concrete driveway aprons and outwalks,
and boulevards landscaped with sod and trees. In addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way will be replaced, and storm
sewer and sanitary sewer connections will be made at the request of property owners.
CHARLTON STREET — ANNAPOLIS STREET TO GEORGE STREET
WASECA STREET — CITY LIMITS TO PAGE STREET
WASECA STREET — MORTON STREET TO GEORGE STREET
BELLOWS STREET — SIDNEY STREET TO GEORGE STREET
BIDWELL STREET — DODD ROAD TO GEORGE STREET
WINSLOW AVENUE — DODD ROAD TO GEORGE STREET
STRYKER AVENUE — DODD ROAD TO WINIFRED STREET
STEVENS STREET — OH�O STREET TO STRYKER AVENUE
K1NG STREET — OHIO STREET TO W INSLOW AVENUE
os- ys�
ELIZABETH STREET — BIDWELL STREET TO STRYKER AVENUE
BAKER STREET — OHIO STREET TO DODD ROAD
MORTON STREET — OHIO STREET TO WASECA STREET
MORTON STREET — BELLOWS TO DODD ROAD
PAGE STREET — OHIO STREET TO DODD ROAD
SIDNEY STREET — OHIO STREET TO DODD ROAD
CURTICE STREET— OHIO STREET TO CHARLTON STREET
WINONA STREET — OHIO STREET TO CHARLTON STREET
WYOMING STREET - OHIO STREET TO CHARLTON STREET
DODD ROAD — CITY LIMITS TO STRYKER AVENUE
Decisions regarding the street widths will be made keeping in mind the right-of-way
widths, existing street widths, any relevant neighborhood issues, and the impact on
boulevard trees. New curb may be hand formed to avoid damaging boulevard trees or
their roots. Tree trimming may be necessary to facilitate construction.
All the streets to be paved (listed above) will also have a lantern style street lighting
system installed as part of this project.
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve existing
oiled and older paved streets.
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadways wi11 improve drivabi{ity of the neighborhood,
and continue the City's efforts to improve the street system in Saint Paul. Lantern style
lighting will enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normal problems associated with constructior
the neighborhood, and general disruption will
such as noise, dust, reduced access to
be present.
EFFECTS ON TREES
Street widths will be selected to minimize the impact on trees. New trees will be planted
as part of the boulevard restoration.
TIME SCHEDULE
The project will begin in the summer of 2005 and will be completed by the fall of 2006.
There will be further restrictions on the amount of time work is done on individual
segments of streets.
oS- yS $1
COST ESTIMATE
Construction
Engineering
Miscellaneous
PROJECT TOTAL
ESTIMATED FINANCING
CIB (2005)
MSA
Assessments
PROJECT TOTAL
$ 4,870,000
$ 995,000
$ 200.000
$ 6,065,000
$ 3,662,000
$ 1,172,000
$ 1,231,000
$ 6,065,000
The estimated 2005 assessment rates for residential street paving and lighting are:
$29.50 per ASSESSABLE FOOT for street paving
$5.21 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Dan Haak, at 266-6084.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
RespectFully submitted,
�,yN Ng.sr�
Dan Haak
Public Works
3
SAINT
PAUL
�
AAAA
�.
City of Saint Paul
Department of Public Works
Street Engineering and Construction Division
�
<
�
N
GEORGE ST.
STEVENS 5T.
KING'ST.
BAKER ST.
MORTON ST.
PAGE ST.
SIDNEY ST.
CURi10E ST.
4ANONA ST.
WYOMING ST.
ANNAPOLIS ST.
r
N
z
� o
N j
O 4
2 S
O U
� = STREETS TO BE RECONSTRUCTED
WINIFREO ST.
ROBIE ST.
GEORGE ST.
SiEVENS ST.
KING ST.
os - ys�
, E�'
ELIZABEiH ST.
BAKER ST.
MORTON ST.
�
¢ ,
J
J
Q
BAKER/BELLO WS RSVP