02-78�:
CITY OF ST. PAUL '_� i i-� ;"''. �' COUNCIL da-' �
� .+.�.e�.�_. ._...
FINAL ORDER BY
�D
FILE NO. 18958
VOTING WARD 2
In the Matter of improving St. Clair Avenue/Cliff Street from West 7th Street
to Smith Avenue with bituminous roadway, construct concrete curb and gutter,
concrete driveway aprons and outwalks, boulevard sodding, tree planting,
construction of a lantern style lighting system, and doing all other work
necessary to complete said improvement for the St. Clair Avenue/Cliff Street
PAVING AND LIGHTING PROJECT.
under Preliminary Order ��—\ 30g' approved ��-.\� � 3cio�
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON Adopted by the Date ,�,3 1
Yea Nay
✓ Benanav Certified Passes by Council Secretary
�Blakey
✓Bostrom
�Coleman
� xarris
�T�antry
�S �.�, Reiter
e
� In F=e,.ter By
� Against
� ��S�ri�
Public Hearin Date—Januar 23, 2002
'DEPARTNENf/OFFlCfJCOUNQL DAiEINITIATED GREEN SHEET
, Public Works 11l16/2001
, Inroai/Date
;CONTAGTPERSON&PHONE
' Paul St. Martin 266-6118
MUSTEEONCqUNQLAGENDAeY(DATE) 1�3�ZOO2
�S�
No. 110475
InilixVOate
DEPARTMEMDIflECTOR I 2 (Cm��Np� O�
ASSIGN
CRYATIOWJEV
NUINBER FOR
HOUfING ❑ FlNNNGALSEHVICESDIR
ORDER
❑ GTYCAERIC
❑ FlNANCIALSERV/ACCTG
❑ CAUNCIIAESEARCH
❑
❑ MAYOR(ORASSIS7ANn
❑
TOTAL # OF SIGNATURE PAGES
� (CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION REOUESTED
Improve St. Clair Averme/Cliff Street between West Seventh S[reet and Smith Avenue (City Project 02-P-1216) by grading, pavina with
bituminous, constructing curb, driveway aprons, sidewalks, railings, piacina topsoil and sodding boulevazds, constructing stormwater
drainage facilities, installing lantem style sheet lighting, tree planting, and doing all other work necessary to complete said improvement.
REGOMMENDATIONS:Approva (A) or Rejed (R)
_ CIB COMMITTEE
_ qVILSERVICECOMMISSION
A STAPF
Has thvs persoNfirtn evervrorkeC under a coMroct br Na tlepertment7
YES NO
Has fha persoNlirtn ever �een a city employee7
YE$ NO
Does this persoNfrtn possess a skll noc rwrtnaly possessetl by any cunent tlry employee?
YES NO
Is this persoNlirtn a targetetl ventloR
YES NO
on seParete sheet antl atta<h N 9[aer. sheat
INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO. WHAT, WHEN,
The existing roadway is in poor condition. The project is included in the 2002-2003 Capital Improvement Budge[.
��'�� �o�? yi�'� +��;V`L2t
_ � 3' t ,� e? ��
ADVANTAGESIFAPPROVED: V
A newly rebuilt roadway, with new curbs, lantern style sueet lighting will improve aesthedcs of the neighborhood. The proposed narrowing
of the street will allow for more green space and wider sidewalks. The roadway has been designed to accommodate bicycles. The bicycles
will "shate the road" with motor vehicles. New street lighting will also improve safety in the azea.
DISADVANTAGES IF APPROVED:
Normal problems associated with construction, such as noise, dust and general disruption will occur.
DISADVANTAGES IF NOT APPROVED:
Parking will be banned on parts of the street.
AMOUNTOFTRANSACTION$ SCCAttaChed
COST/REVENUE BUDGETED (CIRCLE ON�
ES NO
FlINDING SOURCE See Attached ACn��TY NUMBER
FINANCIALINFORMATION(EXPLAIN)
�.
� DEPARTMEN'T OF PUBLIC WORKS �a, ^�
Thomas f. Eggum. Director
�
CITY OF SAINt PAUL
Norm Coleman. Mayor
TO: Peter White
Real Estate Division
140 City Hall
FROM: Paul St. Martin ` 1�`�
Public Works Department
DATE:
SUBJECT:
November 15, 2001
Larry Lueth, Construttiors Engirseer
25 W. Fourth Street
900CityHallAnnex Telephone:651-266-6080
Saint Pau[, MN 55IO2-1660 Facsimife: 651-292-6315
r ,�
;;CC�JIJ_
r h ,
_a�
ES7'A Tf Gt %iS,� ,'.
CITY PROJECT 02-P-1216 - ST. CLAIR AVENUElCLIFF STREET
West Seventh 5treet to Smith Avenue
Attached aze a Summary of Engineering Recommendations and an azea map for this praject.
Improve St. Clair Avenue/Cliff Street between West Seventh Street
and Smith Avenue (City Project 02-P-1216) by grading, paving with
bituminous, constructing curb, driveway aprons, sidewalks, railings,
placing topsoil and sodding boulevards, constructing stormwater
drainage facilities, installing lantern style street lighting, tree planting,
and doing all other work necessary to complete said improvement.
PSM:bk
Attachment
Responsire Services • Qualry Facilides • Empinyee Pride
/. ,
O} ; W
SUNIMARY OF ENGINEERING RECOb�NDATIONS
St. Clair Avenue/Cliff Street beriveen West Seventh Street and Smith Avenue
Report Prepared -11-19-01
Public Hearing - to be scheduled
PROJECT:
Improve St. Clair AvenuelCliff Street between West Seventh Street and Smith Avenue (City Project 02-
P-1216) by grading, paving with bituminous, constructing curb, driveway aprons, sidewalks, railings,
placing topsoil and sodding boulevards, constructing stormwater drainage facilities, installing lantern
style street lighting, tree planting, and doing all other work necessary to complete said improvement.
INITIATING ACTION:
The project is included in the proposed 2002-2003 Capital Improvement Budget.
EXISTING CONDITIONS:
St. Clair Avenue/Cliff Street is a Municipal State Aid Street and is classiFied as a cotlector in St. PauPs
Transportation Policy Plan. It provides a connection between West Seventh Street (TH 5) and Smith
Avenue (TH 149). Currently the roadway canies 2 lanes of traffic and pazking is allowed on both sides of
the street. The existing roadway is a concrete pavement which was constructed in the eazly 1960's and is
in poor condition. There is very little landscaping located within the right of way due to lack of boulevazd
space. The average daily traffic(ADT) on St. Clair/Cliff Street is 6,200 vehicles per day. The roadway is
posted for a 30 mph speed limit. There is an all way stop control at the Cliff/Michigan intersection.
The width of the existing roadway and right of way varies. St. Clair Avenue beriveen West Seventh and
Ann Street is 38' wide in a 50' right of way. There are 6' wide sidewalks behind the curb. The properties
adjacent to the roadway are residential homes and condominiums with some commercial development at
the West Seventh Street intersection. The front of the houses are generally bcated 5 to 15' behind the
property line. The right of way and roadway width of St. Clair/Cliff widen as the roadway tums
northeast and follows the top of the bluff overlooking the Mississippi River Valley. Between Ann Street
and Smith Avenue, the existing roadway width varies between 40 and 44' and the right of way width is
generally 60' wide, with 5' wide sidewalks located on both sides of the roadway. The sidewalk is directly
behind the curb on the east side and there a narrow boulevard area between the sidewalk and curb on the
west side. There aze residential properties on the west side and the river bluff is on the east side. As a
separate MSA funded project, the retaining wall on Cliff Street between Superior and Smith was
reconstructed in 2001.
PROPOSEDIMPROVEMENTS
The existing roadway will be reconstructed with a fuil depth bituminous pavement.lVew curb, driveway
aprons, and outwalks will be constructed. The existing public sidewalk will be removed and replaced in
areas where street work necessitates sidewalk removal.
Provision of striped on street bicycle lanes on St. Clair/Cliff is an component of the City's Transportation
Policy Plan. Public Works has worked with the community and the St. Paul Bicyde Advisory Board to
develop a design which provides for bicyclists and meets the community's desire to narrow the roadway
to create more greenspace and calm traffic. The roadway travel lanes will be constructed generally to a
14' width to allow "share the road" signing to be installed on the roadway. This 14' width provides
enough room for a motor vehicle to share the travel lane with a bicyclist. The roadway will be signed for
"share the road", but will not be striped for bicycle lanes. In order to provide for the 14' wide lanes and
Page 1 of 2
�
�
4�'
� to provide more green space, parking will be banned on the on the south side of St. Clair and on the east
side of Cliff. Bumpouts will be constructed on St. C1aidClifFat intersecting streets. In addition,
bumpouts will be constructed and/or the roadway will be narrowed on intersecting streets where possible.
The attached drawing shows the configuration of the proposed roadway. The existing stop sign at the
Cliff Michigan intersection will be removed.
The existing guard rail located between the roadway and sidewalk on the bluff side of Cliff Street
between St. Clair and Superior will be removed and be replaced with concrete parapet wall with
omamental railing located behind the sidewalk similar to what has been constructed north of Superior
Street. The sidewalk on the bluff side of Cliff Street will be reconstructed and widened. An overlook
will be constructed in the sidewalk area. The width gained by narrowing the roadway will be landscaped.
The existing stop sign at the Ciiff Michigan intersection will be removed. A lantern style street light
system will be installed.
POSITIVE BENEFITS:
The proposed roadway design accommodate bicyclists and provide for more green space along Cliff
Street.
TIME SCHEDULE:
The project will begin in spring of 2002 and will be completed by fall of 2002.
COST ESTIMATES:
Construction
Engineering
PROJECT TOTAL
ESTIMATED FINANCING:
Municipal State Aid
CIB Funds
Assessments
PROJECT TOTAL
$ 970,000
$ 256,000
$ 1,226,000
$ 1,017,000*
$ 174,000
$ 35,000**
$ 1,226,000
*$530,000 of the MSA financing is budgeted in 2003. The Council has expressed intent to authorize
Public Works to borrow this money from the state in 2002--with repayment in 2003--so the project can be
constructed in 2002.
** Residents benefitted will be assessed $4.89 per assessable foot for lantem style street lighting.
SOURCE OF ADDITIONAL INFORMATION:
For additional information, contact the Project Engineer Paul St. Martin, at 266-6118.
SUNIIVIARY ANA RECOMMENDATION:
The Department of Public Works feels that this is a necessary a�d worthwhile project and the
Engineering Recommendation is for approval of the project and financing.
Page 2 of 2
,__
� r�~
.,
�F •• �- y -
�e'ZJ
�
.� ��
�I
CJ �
�
�
��
� '� � ��
� F
i 3
i ��� �#�' � �
- K �'t�'� I
{ .
� � � � "�
r7� A.
�� � � � . - t's �I ,.� v �r :
� O OO � ' i y,�r
.,
0 '''` � �
----
---------' -'- --'-------'.
--"----__ _ ' �
I b�!�
�� 0
, �
, �
, , �. .
, ' ,
- ----' I k}1 ,, 0 �
� , . • ��
. , �
i S `
--'--------'--------'-='---- � . �>� �------'-------
t _____'___'__'__'___'_'r__'_'-.,.-- __ _ �� _'________'___'_
�
_ z
__ ' _ i _'__'_'__'_' , �
�
1 _"" __r -''_'__"__"" ` I .
� ,
,., .
�.,
�
._ '"
,
�
,
�. . . .. � "' _ _ "'
, . �_"'.
- . _"'; ' _'___ '_____'.-___'___
'�` k-- - --
�:��` _ _ " - _ '
��'� �= �
o �, �.
_ _—� >`.
i '4 t_.. `x _
� .
}�
5 � I� u :7
i �i. T � �_____ _ ___ _ __ _ _ ' - ..
________� . .
.. ...... .. . _.
� I �i T`��:R'�'=�C ��$K .m. y `�� . M �' '
.�°p--m,�. �k.' �S:A.Gh :.': a'e 6
i I � nxA6yaR. _ ' _ _ � -- -' •L -hu
� @ - 0
_'
{ t �
i
� � _ , � � E ,��
, ,
,
o :,�
� ; I� 'Q �--
� � , � F-- � �-
❑ I "-�� }��,; � � �'
�
� ,..__._� �
� "�� ° �------1
` .., k ...
/
� i
i i..
i'
. _�� = `________`_"""_"_"1 r__'___
i
i
�
�
S
�----- �- ---
3
6�--�
n � �, ;;
-��j����°��t=�.��.
CITY OF ST. PAUL
PRELIMINARY ORDfiR
VOTING WARD
In t}xa Matter of the construction of water, sanitary sewer, storm sewer
service connections and sidewalk reconstruction, if requested by the property
owner, in conjunction with the ST. CLAIR AVENUE/CLIFF STREET PAVING AND
LIGHTING PROJECT.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
�
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is assessed at
the rate in effect at the time of installation.
2. That a public hearing be had on said improvement on Wednesday, 23th
of January, 2002, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3: That notice of said public hearing be given to the persons and in
the manner provided by the Charter, stating the time and place of
hearing, the narure of the improvement and the total cost thereof
as estimated.
COUNCIZ�PF,RSON
Yea Nay
✓ Benanav
� Blakey
,/ Bostrom
,/ Coleman
� Harris
„i Lantry
✓Reiter
� In
p Against
Adopted by the Date
� \`� ao`��
Certified Passes by Council Secretary
BY ` ' 2- � „-� r--�
Mayor
FILE NO. 18958C
�:
CITY OF ST. PAUL '_� i i-� ;"''. �' COUNCIL da-' �
� .+.�.e�.�_. ._...
FINAL ORDER BY
�D
FILE NO. 18958
VOTING WARD 2
In the Matter of improving St. Clair Avenue/Cliff Street from West 7th Street
to Smith Avenue with bituminous roadway, construct concrete curb and gutter,
concrete driveway aprons and outwalks, boulevard sodding, tree planting,
construction of a lantern style lighting system, and doing all other work
necessary to complete said improvement for the St. Clair Avenue/Cliff Street
PAVING AND LIGHTING PROJECT.
under Preliminary Order ��—\ 30g' approved ��-.\� � 3cio�
The Council of the City of Saint Paul has conducted a public hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON Adopted by the Date ,�,3 1
Yea Nay
✓ Benanav Certified Passes by Council Secretary
�Blakey
✓Bostrom
�Coleman
� xarris
�T�antry
�S �.�, Reiter
e
� In F=e,.ter By
� Against
� ��S�ri�
Public Hearin Date—Januar 23, 2002
'DEPARTNENf/OFFlCfJCOUNQL DAiEINITIATED GREEN SHEET
, Public Works 11l16/2001
, Inroai/Date
;CONTAGTPERSON&PHONE
' Paul St. Martin 266-6118
MUSTEEONCqUNQLAGENDAeY(DATE) 1�3�ZOO2
�S�
No. 110475
InilixVOate
DEPARTMEMDIflECTOR I 2 (Cm��Np� O�
ASSIGN
CRYATIOWJEV
NUINBER FOR
HOUfING ❑ FlNNNGALSEHVICESDIR
ORDER
❑ GTYCAERIC
❑ FlNANCIALSERV/ACCTG
❑ CAUNCIIAESEARCH
❑
❑ MAYOR(ORASSIS7ANn
❑
TOTAL # OF SIGNATURE PAGES
� (CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION REOUESTED
Improve St. Clair Averme/Cliff Street between West Seventh S[reet and Smith Avenue (City Project 02-P-1216) by grading, pavina with
bituminous, constructing curb, driveway aprons, sidewalks, railings, piacina topsoil and sodding boulevazds, constructing stormwater
drainage facilities, installing lantem style sheet lighting, tree planting, and doing all other work necessary to complete said improvement.
REGOMMENDATIONS:Approva (A) or Rejed (R)
_ CIB COMMITTEE
_ qVILSERVICECOMMISSION
A STAPF
Has thvs persoNfirtn evervrorkeC under a coMroct br Na tlepertment7
YES NO
Has fha persoNlirtn ever �een a city employee7
YE$ NO
Does this persoNfrtn possess a skll noc rwrtnaly possessetl by any cunent tlry employee?
YES NO
Is this persoNlirtn a targetetl ventloR
YES NO
on seParete sheet antl atta<h N 9[aer. sheat
INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO. WHAT, WHEN,
The existing roadway is in poor condition. The project is included in the 2002-2003 Capital Improvement Budge[.
��'�� �o�? yi�'� +��;V`L2t
_ � 3' t ,� e? ��
ADVANTAGESIFAPPROVED: V
A newly rebuilt roadway, with new curbs, lantern style sueet lighting will improve aesthedcs of the neighborhood. The proposed narrowing
of the street will allow for more green space and wider sidewalks. The roadway has been designed to accommodate bicycles. The bicycles
will "shate the road" with motor vehicles. New street lighting will also improve safety in the azea.
DISADVANTAGES IF APPROVED:
Normal problems associated with construction, such as noise, dust and general disruption will occur.
DISADVANTAGES IF NOT APPROVED:
Parking will be banned on parts of the street.
AMOUNTOFTRANSACTION$ SCCAttaChed
COST/REVENUE BUDGETED (CIRCLE ON�
ES NO
FlINDING SOURCE See Attached ACn��TY NUMBER
FINANCIALINFORMATION(EXPLAIN)
�.
� DEPARTMEN'T OF PUBLIC WORKS �a, ^�
Thomas f. Eggum. Director
�
CITY OF SAINt PAUL
Norm Coleman. Mayor
TO: Peter White
Real Estate Division
140 City Hall
FROM: Paul St. Martin ` 1�`�
Public Works Department
DATE:
SUBJECT:
November 15, 2001
Larry Lueth, Construttiors Engirseer
25 W. Fourth Street
900CityHallAnnex Telephone:651-266-6080
Saint Pau[, MN 55IO2-1660 Facsimife: 651-292-6315
r ,�
;;CC�JIJ_
r h ,
_a�
ES7'A Tf Gt %iS,� ,'.
CITY PROJECT 02-P-1216 - ST. CLAIR AVENUElCLIFF STREET
West Seventh 5treet to Smith Avenue
Attached aze a Summary of Engineering Recommendations and an azea map for this praject.
Improve St. Clair Avenue/Cliff Street between West Seventh Street
and Smith Avenue (City Project 02-P-1216) by grading, paving with
bituminous, constructing curb, driveway aprons, sidewalks, railings,
placing topsoil and sodding boulevards, constructing stormwater
drainage facilities, installing lantern style street lighting, tree planting,
and doing all other work necessary to complete said improvement.
PSM:bk
Attachment
Responsire Services • Qualry Facilides • Empinyee Pride
/. ,
O} ; W
SUNIMARY OF ENGINEERING RECOb�NDATIONS
St. Clair Avenue/Cliff Street beriveen West Seventh Street and Smith Avenue
Report Prepared -11-19-01
Public Hearing - to be scheduled
PROJECT:
Improve St. Clair AvenuelCliff Street between West Seventh Street and Smith Avenue (City Project 02-
P-1216) by grading, paving with bituminous, constructing curb, driveway aprons, sidewalks, railings,
placing topsoil and sodding boulevards, constructing stormwater drainage facilities, installing lantern
style street lighting, tree planting, and doing all other work necessary to complete said improvement.
INITIATING ACTION:
The project is included in the proposed 2002-2003 Capital Improvement Budget.
EXISTING CONDITIONS:
St. Clair Avenue/Cliff Street is a Municipal State Aid Street and is classiFied as a cotlector in St. PauPs
Transportation Policy Plan. It provides a connection between West Seventh Street (TH 5) and Smith
Avenue (TH 149). Currently the roadway canies 2 lanes of traffic and pazking is allowed on both sides of
the street. The existing roadway is a concrete pavement which was constructed in the eazly 1960's and is
in poor condition. There is very little landscaping located within the right of way due to lack of boulevazd
space. The average daily traffic(ADT) on St. Clair/Cliff Street is 6,200 vehicles per day. The roadway is
posted for a 30 mph speed limit. There is an all way stop control at the Cliff/Michigan intersection.
The width of the existing roadway and right of way varies. St. Clair Avenue beriveen West Seventh and
Ann Street is 38' wide in a 50' right of way. There are 6' wide sidewalks behind the curb. The properties
adjacent to the roadway are residential homes and condominiums with some commercial development at
the West Seventh Street intersection. The front of the houses are generally bcated 5 to 15' behind the
property line. The right of way and roadway width of St. Clair/Cliff widen as the roadway tums
northeast and follows the top of the bluff overlooking the Mississippi River Valley. Between Ann Street
and Smith Avenue, the existing roadway width varies between 40 and 44' and the right of way width is
generally 60' wide, with 5' wide sidewalks located on both sides of the roadway. The sidewalk is directly
behind the curb on the east side and there a narrow boulevard area between the sidewalk and curb on the
west side. There aze residential properties on the west side and the river bluff is on the east side. As a
separate MSA funded project, the retaining wall on Cliff Street between Superior and Smith was
reconstructed in 2001.
PROPOSEDIMPROVEMENTS
The existing roadway will be reconstructed with a fuil depth bituminous pavement.lVew curb, driveway
aprons, and outwalks will be constructed. The existing public sidewalk will be removed and replaced in
areas where street work necessitates sidewalk removal.
Provision of striped on street bicycle lanes on St. Clair/Cliff is an component of the City's Transportation
Policy Plan. Public Works has worked with the community and the St. Paul Bicyde Advisory Board to
develop a design which provides for bicyclists and meets the community's desire to narrow the roadway
to create more greenspace and calm traffic. The roadway travel lanes will be constructed generally to a
14' width to allow "share the road" signing to be installed on the roadway. This 14' width provides
enough room for a motor vehicle to share the travel lane with a bicyclist. The roadway will be signed for
"share the road", but will not be striped for bicycle lanes. In order to provide for the 14' wide lanes and
Page 1 of 2
�
�
4�'
� to provide more green space, parking will be banned on the on the south side of St. Clair and on the east
side of Cliff. Bumpouts will be constructed on St. C1aidClifFat intersecting streets. In addition,
bumpouts will be constructed and/or the roadway will be narrowed on intersecting streets where possible.
The attached drawing shows the configuration of the proposed roadway. The existing stop sign at the
Cliff Michigan intersection will be removed.
The existing guard rail located between the roadway and sidewalk on the bluff side of Cliff Street
between St. Clair and Superior will be removed and be replaced with concrete parapet wall with
omamental railing located behind the sidewalk similar to what has been constructed north of Superior
Street. The sidewalk on the bluff side of Cliff Street will be reconstructed and widened. An overlook
will be constructed in the sidewalk area. The width gained by narrowing the roadway will be landscaped.
The existing stop sign at the Ciiff Michigan intersection will be removed. A lantern style street light
system will be installed.
POSITIVE BENEFITS:
The proposed roadway design accommodate bicyclists and provide for more green space along Cliff
Street.
TIME SCHEDULE:
The project will begin in spring of 2002 and will be completed by fall of 2002.
COST ESTIMATES:
Construction
Engineering
PROJECT TOTAL
ESTIMATED FINANCING:
Municipal State Aid
CIB Funds
Assessments
PROJECT TOTAL
$ 970,000
$ 256,000
$ 1,226,000
$ 1,017,000*
$ 174,000
$ 35,000**
$ 1,226,000
*$530,000 of the MSA financing is budgeted in 2003. The Council has expressed intent to authorize
Public Works to borrow this money from the state in 2002--with repayment in 2003--so the project can be
constructed in 2002.
** Residents benefitted will be assessed $4.89 per assessable foot for lantem style street lighting.
SOURCE OF ADDITIONAL INFORMATION:
For additional information, contact the Project Engineer Paul St. Martin, at 266-6118.
SUNIIVIARY ANA RECOMMENDATION:
The Department of Public Works feels that this is a necessary a�d worthwhile project and the
Engineering Recommendation is for approval of the project and financing.
Page 2 of 2
,__
� r�~
.,
�F •• �- y -
�e'ZJ
�
.� ��
�I
CJ �
�
�
��
� '� � ��
� F
i 3
i ��� �#�' � �
- K �'t�'� I
{ .
� � � � "�
r7� A.
�� � � � . - t's �I ,.� v �r :
� O OO � ' i y,�r
.,
0 '''` � �
----
---------' -'- --'-------'.
--"----__ _ ' �
I b�!�
�� 0
, �
, �
, , �. .
, ' ,
- ----' I k}1 ,, 0 �
� , . • ��
. , �
i S `
--'--------'--------'-='---- � . �>� �------'-------
t _____'___'__'__'___'_'r__'_'-.,.-- __ _ �� _'________'___'_
�
_ z
__ ' _ i _'__'_'__'_' , �
�
1 _"" __r -''_'__"__"" ` I .
� ,
,., .
�.,
�
._ '"
,
�
,
�. . . .. � "' _ _ "'
, . �_"'.
- . _"'; ' _'___ '_____'.-___'___
'�` k-- - --
�:��` _ _ " - _ '
��'� �= �
o �, �.
_ _—� >`.
i '4 t_.. `x _
� .
}�
5 � I� u :7
i �i. T � �_____ _ ___ _ __ _ _ ' - ..
________� . .
.. ...... .. . _.
� I �i T`��:R'�'=�C ��$K .m. y `�� . M �' '
.�°p--m,�. �k.' �S:A.Gh :.': a'e 6
i I � nxA6yaR. _ ' _ _ � -- -' •L -hu
� @ - 0
_'
{ t �
i
� � _ , � � E ,��
, ,
,
o :,�
� ; I� 'Q �--
� � , � F-- � �-
❑ I "-�� }��,; � � �'
�
� ,..__._� �
� "�� ° �------1
` .., k ...
/
� i
i i..
i'
. _�� = `________`_"""_"_"1 r__'___
i
i
�
�
S
�----- �- ---
3
6�--�
n � �, ;;
-��j����°��t=�.��.
CITY OF ST. PAUL
PRELIMINARY ORDfiR
VOTING WARD
In t}xa Matter of the construction of water, sanitary sewer, storm sewer
service connections and sidewalk reconstruction, if requested by the property
owner, in conjunction with the ST. CLAIR AVENUE/CLIFF STREET PAVING AND
LIGHTING PROJECT.
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
�
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is assessed at
the rate in effect at the time of installation.
2. That a public hearing be had on said improvement on Wednesday, 23th
of January, 2002, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3: That notice of said public hearing be given to the persons and in
the manner provided by the Charter, stating the time and place of
hearing, the narure of the improvement and the total cost thereof
as estimated.
COUNCIZ�PF,RSON
Yea Nay
✓ Benanav
� Blakey
,/ Bostrom
,/ Coleman
� Harris
„i Lantry
✓Reiter
� In
p Against
Adopted by the Date
� \`� ao`��
Certified Passes by Council Secretary
BY ` ' 2- � „-� r--�
Mayor
FILE NO. 18958C