02-672OR�GI�AL
CITY OF ST. PAUL COUNCIL FILE N0. 07.� C•� a• 3�
FINAL ORDER By iG��f,/-��7��C/�"�
File No.S02087A
Voting Ward_ 6
Ia the Matter of aew sidewalk construction at the following locations:
S02087A - 1587 & 1595 Rflaney Avenue Only.
(Laid over from May 22, 2002)
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.49 per front foot for a five (5)
foot wide walk and $12.59 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.69 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
Eor new and reconstructed sidewalk; 1�Oo of actual cost estimated to be
approximately $6.35 per square foot.
under Preliminary order approved
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
✓$enanav
rBlakey
rBostrom
✓Eoleman
vl3arris
✓Lantry
flbscwt Reiter
Adopted by Council: Date���y�I ay a00a-"
,� •�
Certified Passed by Council S cretary
• ��� ` �
, .,_ �//� ���/,,+/
� � � .
� G�C � 6 ' `Ul. 2 2 ' -I -OZ
F.M.S./REAL ESTATE DIVISION 1�a�� June 27, 2002 Green Sheet Number:
EPARTMRNT DIItECfOR CITY COUNCII,
ontaM Person and phone Number:
ATTORNEY CLERg
Jerry Tvedt 266-6087 UDGETDIRECTOB � S-&MGT.SVC.DIl2.
YOR(ORASSLSl'AN'1) 1 OUNCD,RFCFARCg
ust be on Council A enda b:,�C, `Z..� Q2.
OTAL # OF SIGNATURE PAGES 1 (CLIP ALL LOCATIONS FOR SIGNATITRE)
CTI0I3 REQT3ESTED:
onstrust new sidewalk at 1587 & 1595 Reaney Avenue (Laid over from May 22 Council hearing)
�le #'s S02087A
COMINF.NDATIONS: APPROVE (A) OR REJECT (R) ggpNAL SERVICE CONTRACTS MUST ANSWER THE FOLLOWING:
. Has the person/firm ever worked under a coah�aM for this department? YES NO
PI.AN�IING COMMLSSION A STAFF
. Has this persodfirm ever beea a City employee? YES NO
C[ V�. $ERV ICE COMMLSS W N
. Does Utis persod£um possess a slull not normally possessed by any YES NO
cnrre¢t Ciry empl0yee?
cm convnrrree
E lain all YES answers on a se azate sheet and attach.
. UPPORTS WHICH COUNCII, OBJECTIVE?
COUNCII. WARD(S) ��— fe DLSTRICT PLANNING COUNCIL
IA1'IlVG PROBLEM, ISSUE, OPPORT(JNITY (Who, What, Wheay Where, WLy?):
he problem "defective sidewalk was caused by multiple problems. These problems occur on a citywide basis
nd must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a
tate where it would be unusable and subject to increased pedestrian injuries from falls and possible litigation.
VANTAGES IF APPROVED:
he community will benefit from this project because it will provide safe defect free sidewalks for its citizens.
he sidewalk contracts are done by private contractors generating public sector jobs as a result.
ISADVANTAGES IF APPROVED:
aving to assess for walk reconstruction remains a controversial issue.
ISADVANTAGES IF NOT APPROVED:
his option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more
ersonal injury suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well
s claim payouts..
OTAL AMOi1N7' OF TRANSACTTON: �O.00 COST/REVENUE BUDGETED (CIlLCLE ONE) YES NO
INGSOURCE: ACTIVITYN[JMBER: �Q�(`,� ��^ L'B(�j'Q�
� INANCIAL INFORMATION: (EXPLAIN) ? �� � �, � ����
D�-- G'l'�
REPORT
Date: 7une 13, 2002
Time: 11:00 a.m.
Place: Room 330 City Hali
15 West Kellogg Blvd.
LEGISLATIVE HEARING
Gerry Strathman
Legislative Hearing Officer
Anpeal of sidewalk conshucfion at 1587 Reanev Avenue
Legislative Hearing Officer recommends construction of the sidewalk.
2. Appeal of sidewalk construction at 1595 Reanev Avenue
Legislative Hearing Officer recommends construction of the sidewalk.
6i- �'i�-.
MINiTTE5 OF THE LEGISLATIVE HEARING
SIDEWALK ISSITE - 1587 and 1595 Reaney Avenues
Thursday, June 13, 2002
Room 330 Courthouse
Gerry Strathman, Legislative Hearing Officer
The meeting was called to order at 11:10 a.m.
STAFF PRESBNT: Allan Czaia, Public Works-Sidewalks
A1 Czaia reported they received a complaint in 2001 about the lack of sidewalk on Reaney
Avenue between Hazelwood and Germaine. There was some existing walk that needed repair
and the block is incomplete with sidewalk. Public Works indicated they would look at making a
proposal for repairs and complete the block at least on one side. Mr. Czaia has looked at the
block. There are large trees on the south side, which would haue to come down for a sidewalk
proposal to complete that side. That would be very costly. He opted to complete the north side
only. There are 4% houses with sidewalk and about 5%Z without. There is nothing in the way to
complete a mainline sidewalk on that side. The proposal is for the north side of Reaney between
Hazelwood and Germaine.
Gerry Strathman stated this would effect the property owners that don't have sidewalks. Mr.
Czaia responded it would effect all properties on that side. The existing sidewalks do need
repair. Everyone would be effected. Reconstruction of sidewalk is a 50% assessment rate; new
conshuction is 100%.
Mr. Strathman suimnarized: the southside is not under consideration. The people on the north
side who currently have sidewalk, may be seeing some assessment to repair those sidewalks and
those assessment would be about half. The people on the north side of Reaney who do not haue
sidewalks would have new sidewalks and be assessed the entire cost. Mr. Czaia responded yes.
Mr. Strathman asked are these typical size lots. Mr. Czaia responded some are double and some
are single.
Mr. Strathman asked about the cost of a sidewalk for a double lot. Mr. Czaia responded the
appellants shouid have received an estimate in their notification. It is around $2,000. A single
lot is about half of that. Also, it would make a difference on concrete driveways crossing
because those areas do not need sidewalks and there is a price reducrion. There is a difference
per house.
Mr. Strathman asked when this work is done. Mr. Czaia responded this fall.
Mr. 5trathman asked is this work done by contractors hired by the City. Mr. Czaia responded
yes.
Daniel Irvin, 1587 Reaney Avenue, appeazed and stated there is nothing about a sidewalk that he
D3-- 411.
LEGISLATIVE HEARING MINUTES - SIDEWALK - 1587 and 1595 Reaney Avenues Page 2
would want. He does not want to sweep it or shovel it. If Deonne Brady is upset because
drivers are going too fast, maybe another officer is needed. He has never had a problem with
people on the grass.
Mr. Strathman asked how big is his lot. Mr. Irvin responded 90 feet.
Bili Reynolds, 1595 Reaney Avenue, appeared and stated he does not have small cluldren so
sidewalks are not an issue. He is raising teenage grandldds right now. He raised three kids from
birth to graduation from high school in an area of town with no sidewalk. Kids played in the
driveway and playgrounds. He is on the comer and has 110 feet. He just put in a new black top
driveway last fall. Now, the City will take out a section that he paid for. He already has 90 feet
of a huge driveway to snow blow. Now, he will end up with 110 feet of sidewalk, less the width
of the driveway. He will be 60 years old in October. In another six to seven yeazs, he would like
to zetire. He is not looking forward to adding more work to the place. The sidewalk has no value
to kum. Safety-wise, it is a moot point. Kids are safer playing in their yards on a sidewalk than
they aze in the street or in their own driveway. Ae will not contest the safety standpoint, but he
contests having $2,900 added onto his tases over the next ten years.
Mr. Strathxnan asked is a person assessed on both sides for a corner lot. Mr. Czaia responded he
is only assessed for the short side. The amount is based on the square footage rimes the length.
His is the largest lot at 110 feet wide.
Deonne Brady, 1555 Reaney Avenue, appeared. She stated Bill has a comer lot. There is no
sidewalk on Germaine. She asked will a sidewalk go up Germaine and will he be assessed for
that. Mr. Czaia responded if there was a sidewalk proposal for the Germaine side, that would be
his long side and nonassessed.
Mr. Brady stated she called the City a year ago to ask for a sidewalk. She has little kids. There
are 22 houses, and 8 of them have children; 7 of those 8 houses have children under the age of
12. There are lots of kids in the street. There are a cluster of little children between 3 and 7
years of age. Ms. Brady has a double lot in the middle of the block that has a sidewallc for half of
the lot and no sidewalk on the other half. One of the reasons she lives in the City is because of
sidewalks. She moved from another City neighborhood and did not realize until she moved in
that there were no sidewalks for half of the block. She has never seen anyone walk on the
ground. She sees children catch the bus to go to school and they waik in the street. Kids ride
their bikes in the street. In the last 12 months there have been three traffic accidents in the
middle of the block. There are lots of speeders. A stop sign would be in order. Hauing a safe
place for people to walk is also in order. A person cannot put a price on safety. She does not
allow her children to ride their bikes in the street. She has seen a number of near misses of little
kids in the street with a car speeding by and the children getting out of the way in the nick of
time.
As for shoveling, stated Ms. Brady, she lived in a Saint Paul neighborhood for 16 years that had
sidewalks, and she had a daycare. Shoveling is good exercise. It was not a big deal. Someone
can hire a kid to shovel, too.
b�,_c.��-
LEGISLATIVE HEARING MINUTES - SIDEWALK - 1587 and 1595 Reaney Avenues Page 3
Mr. Strathman stated when he has these types of issues, he has to look to the City policy. It is
the City's standing po&cy that there will be sidewalks in residential areas. When the City has a
opportunity, Public Works's directive is to install sidewalks whenever pracrical. Public Works is
saying that sidewalks are practical in this situation. In accordance with the City's policy, he will
recommends to the City Council that they approve the installation of a sidewalk here. In fairness
to the gentlemen that do not want a sidewalk, they can come to the City Council meeting on 7une
26 and make their objections there. Also, they can talk to the Councilmember Bostrom who
represents thas area.
Mr. Irviu stated he lmows someone that does concrete work. He asked can he haue this work
done himself. Mr. Czaia responded a homeowner can at anytime reconstruct or conshuct
sidewallc in front of them. The person that does the work has to be approved, licensed, and
insured with the City because they aze out in the right-of-way. It the person is on the City's list,
he can do the work.
Gerry Strathman recommends approval.
The meeting was adjourned at 11:33 am.
rrrn
Page 1 of 1
D�-t,'ly
Nancy Anderson - Re: 1587 and 1595 Reaney Avenue
From: Jerry Tvedt <jerry.tvedt@ci.stpaul.mn.us>
To: "Racquel Naylor" <racquel.naylor@ci.stpaul.mn.us>
Date: 7/10/2002 10:01 AM
Subject: Re: 1587 and 1595 Reaney Avenue
CC: "Nancy Anderson" <nancy.anderson@ci.stpaul.mn.us>, "Scott Renstrom"
<scottsenstrom@cistpaul.mn.us>, TOM SAWYER <tom.sawyer@ci.stpaul.mn.us>
Racquel,
Last week, I asked Tom Sawyer of the Real Estate Division (266-8858) to reschedule the sidewalk
construction hearing on Reaney Avenue far the July 24th City Council Meeting.
Thank you, any questions, please call me at 266-6087.
Jerry
At 01:23 PM 7/9/2002 -0500, Racquel Naylor wrote:
Scott Rrnstrom, Council President Bostrom's Office, hu nonfied me a wuple of times about the above sidewalk issue. Do you ]mow when a
resolution would be submitted to this office for sigrianue on this item?
'I hank you in advance.
-Racquel,b-8513
file://C:\WIIVDOWS\TEMP\GW}OOOOS.HTM 7/10/2002
Page 1 of 1
� y ,_ v�1Y
Nancy Anderson -1587 and 1595 Reaney Avenue
Prom: Racquel Naylor
To: Tvedt,Jerry
Date: 7/9/2002 123 PM
Subject: 1587 and 1595 Reaney Avenue
CC: Anderson, Nancy; Renstrom, Swtt
Scott Renstrom, Council President Bostrom's Office, has notified me a couple of times about the above sidewalk issue. Do you know when a
resoluGOn would be submittetl to this office for signature on this item?
Thank you in advance.
-Racquel, 6-8573
file://C:\WINDOWS\TEMP\GW}OOOOS.HTM 7/9/2002