Loading...
02-579CITY OF ST. PAUL FINAL ORDER ^ � f �..� � � r �` s �� . _ , `t � COUNCIL FILE NO. �'� � S� BY _ FILE NO. 18970 �' j } � � . . � VOTING WARD 7 In the Matter of improving the following streets with bituminous roadway, construct concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding, tree planting, construction of a lantern style lighting system, and doing all other work necessary to complete said improvement of East Sixth Street from Mounds Boulevard to Maria Avenue. under Preliminary The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSON YeaS NayS � Benanav ,�- Blakey � Bostrom � Coleman ,/ Harri s � Lantry ti Reiter Adopted by the Date a a Certified Passes by Council Secretary � In F�.cer By � Against Public Hearine Date - June 26. 2002 T.M.S./REAL ESTATE DIVISION �ontaM Person aud Phone Number: Glenn Picha 266-8851 Ylust be on Council Agenda by: VIust be io Council Rcsearch Office Date May 2, 2002 snsnooz �S� o�- S�9 Green Sheet Nnmber: 110492 DIRECTOR ATTORNEY TY COUNCIL ITY CLERK 1 �� OF SIGNAT�IRE PAGES __I _(CLIP ALL LOCATIONS FOR SIGNAT[JRE) REQUESTED: SIXTH STREET from Mounds to Maria. vction of new bituminous surfaced street with concrete curb and gutter, concrete driveway aprons and Iks, boulevards landscaped with sod and trees, and new lantern style lighting system. A sxnFn 1RSONAL SEHVICE CON1'RACTS MUST ANSWER TAE FOLLOWING: Has the persou/firm ever worked uoder a contract for this departmenY: YES NO Has this person/firm ever been a City employee? CIVII. SERVICE COMMISSION Public Hea1tM1 YES NO . Does this persou/firm possess a skill not normally possessed by any YES NO cmco�nnTTee v.noeaa�. currentCiryemployee? Explain all YES answers on a separate sheet and attach. �TING PROBLEM, ISSUE OPPORTIJNI7'P (Who, What, When, Where, Why?): transform this block from an extension of Interstate 94 on/off ramps to a gateway to Dayton's bluff ghborhoods and Metropolitan State University. The streets will be narrowed and parking eliminated on AGES IF APPROVED: project will improve the quality of road surface and reduce traffic noise, reduce traffic volume and spee� ng off of the freeway, create a safer pedestrian area along the roadway, and encourage traffic to Seventh IF APPROVED: as noise, dnst, and IF NOT APPROVED: will occur. The pavement will continue to deteriorate, traffic from Interstate 94 will continue to flow into the neigh6orhood, and narrow boulevards create a pedestrian hazard. vIOUNTOFTRANSACTION: $22S�OOO souxcE: Assessments, MSA, Sales Tax City I. INFORMATION: (EXpLAIN) COST/REVENUE BUDGETED (CIILCLE ONE) YES NO ACTIVTTYNUMBER: Y�J��Pt;P7 �i8rlt� h��� � ; �, , �� � 6 INTER-DEPARTMENTAL MEMO CITY OF SAINT PAUL Randy Kelly, Mayor DEPARTMENT OF PUBLIC WORKS Robert Sandquist, Director oa-s�9 RECEtVED MAR 2 6 2002 REAi. ESTATE QtVISION T0: FROM: RE: DATE: Peter White Real EState DiviSion Dan Haak �AH Public WorkS 5treet Engineering/ConStruction E. SixGh 5treet from Mounds to Maria City Project Number 02-P- March 26, 2002 Attached are a Summary of Engineering Recommendation5 and a Green 6heet for the above referenced project. Please proceed with 5etting upthefinal orderforthis project. The project number ie pending. Attachmente Responsive Services • Qualiry Facilities • EmpJo�•ee Pride ''°S� O�- s�q ... SUMMARY OF ENGINEERING RECOMMENDATIONS E. SIXTH STREET from Mounds to Maria City Project No. 02-P- Report Prepared - 3-26-02 Public Hearing - PROJECT This project is to rebuild E. Sixth Street from Mounds to Maria by constructing new bituminous surfaced street with concrete curb and gutter, concrete driveway aprons and outwalks, boulevards landscaped with sod and trees, and a new lantern style street lighting system. This project will also replace the temporary asphalt islands at Sixth, Hope and Sinnen with concrete islands. This project is a component of a long term overall community initiative to improve public safety and enhance the quality of life and aesthetics of the neighborhood and Metro State campus. EXISTING CONDITIONS The existing concrete street is aging and the boulevards are very narrow. Parking is allowed on both sides and it has one lane of traffic in each direction. Motorist consider E. Sixth Street as an extension of the Interstate 94 on/off ramps. PROPOSEDIMPROVEMENTS It is proposed to improve the aging concrete street with the construction of new bituminous surface, concrete curb and gutter, concrete driveway aprons and outwalks, lantern style lighting and boulevards landscaped with sod and trees. The roadway will be narrowed, parking eliminated on both sides and the boulevards widened. ALTERNATES To do nothing will continue to encourage motorist to use E. Sixth Street as an extension of the Interstate 94 on/off ramps. Traffic levels and noise will continue to be high. O�.-S�9 POSITIVE BENEFITS This project will improve the quality of the road surface and reduce traffic volumes, speed and noise. It will assist traffic to transition from freeway to neighborhood streets. It will enhance traffic flow at Metro State and in front of Sacred Heart Church. It wiil create a safer pedestrian area along Sixth Street and Metro Campus. It will encourage through iraffic to use Seventh Street. i4DVERSE EFFECTS Normal problems associated with construction such as noise, dust, reduced access to the block, and general disruption will be present. EFFECTS ON TREES The increased boulevard width will have a positive effect on boulevard trees. New trees will be planted as part of the boulevard restoration. TIME SCHEDULE � The project will begin in late summer of 2002 and wifl be completed by early fall of 2002. COST ESTIMATE Construction Engineering Miscellaneous PROJECT TOTAL ESTIMATED FINANCING MSA Sales Tax City Assessments PROJECT TOTAL SOURCE OF ADDITIONAL INFORMATION $ 176,000 $ 44,000 $ 5.000 $ 225,000 $ 170,000 $ 50,000 $ 5.000 $ 225,000 For additional information, contact the Project Engineer, Dan Haak, at 266-6084. �a oa�-s�, SUMMARY AND RECOMMENDATION The Department of Public Works feels that this is a necessary and worthwhile project, and the Engineering Recommendation is for approval of the project and financing. Res tfuliy s tted, "� Q%1��4� , AI Sbetka City Engineer dh 3 � ��'\��� m ` D ��� ������ � N \� \~\ �y ° �. �.-, �����,��: � 2' � �'ffi °\ \���'s . ., � ,- � '.' �4 � � p � �... ,... �� � 1 , .. �� � o -� -,� \ �� `� � �.�� �� �' _, � �� �� � , Q ; .�� o� . . �� . \� "�' - � � \\` _ � \ 9 � rn . \ s's' i.,:_ ��� ,, t :: i' ' _- �\ ^.�o `� �� , y \ '� � m. \ / Y _.- \) >� \ `�� � \ r o \� s � `� . [�\ , � N � "_ �.a�r. �� � `, n � � 'Y•� � \ -y+i<o. \� ` \ .; \ ` � �.- \^ � � ' - a ° �� �\ '$� c \ -i - � \ - s ✓ �r � �� g � W `\ � (O � \ N \ � \M � \`/ IIY Y - \\ \ .: \� �� � ' �� i �'' m� y� ;_'°�� �\� " rnm - ic � � c ,..3/ \�S�F)��/Y� �r� /°- \) v�,,. <% � •\ � � �o v - ; ' , t\ ' , � . ., o . .�-�. './ F \ � :. �\�, \' ��. ' � tt �'' \\ �\_ �\,.-. ` � � ;' ,'� �\ .:a=_ \ '� �-:�- \ ��. � \ \�\� ��: ��_- � ! � ' .✓� . C >�� �.. / _s� '� ��� �� �- .-t •.� \ `�4 A � ��~y/!'+Jt ��\�\ t A � .� x , � y .c,( � '�' ��'��� •� . �Q E �' n .� ✓ � t� p -_ .� or \ \i+ �� rn.r� '� ��y't ' / � C � y`1 � �' ` �\ ���, �!'� � .S�`�' ,\ �� :"/� ��,�s` , „ � � �. � .s`° y.' � \ ..:�^ mv �{, ��i \�� \A �� � ����' N � � / � '� �\ " V �� � � � � Y " ' �� � N , �� v � � � � n \ � ^o' `, ��3:' � d � ;� ��� � ���, ' � ` � ` � � \�� / 'v .`,� � / +" � E m �\ / ��i� ..;.r \ \ \\ ;r � s/:'� ! � ,3 �� \ a .; :�::, � \\\\ � � ' �� / % urr..>.,... � � \\ / 5/ � . m.r�< \a \/ ��5� ``� � � s � `.���': "\\ , ��� \A^ <o / � \, �..' \� � ' � ?s:a; -�, ..� ' N ::;� �� � � . � �� �tt y ., c ':. \\\ � : ��' �` A `�T' 3 \ C �d�� C� :� �/ F F:..' i." `` %. \ / aW � C : • ' � '� / !' o "�� ��.x / "` N � ` '\\ y = { �, _ �. �\.- . / :z \ / � . �. / ��. / � .. : •�� 4 \ a / '�•=. ° . / `' o' . .. ' ".N::�.:�: � � /, ,a � � '``�:::� ... � : Cj ' . ....: � ' , `� � 3 L? Fy .`� �,� \'�` �'/„ Y / � �/ : � v o r � : i �y'C � . � \ '. :�`� �, `:��' '� \ ,�. Y »`�.��'� \\ . / \� . ~ a . �`y ��:�. �� � '. . � ��. � l l � \�Tfi� ::�^13 : �. k "�. ° � ty � l � �� ., \\� ~ y � � .. . - . y\ i , \"p: r . � . �� .O : ` Z+S:o fi � r C .. J /' � � `��\,: . � �, A ,` p � M $i � f � ' � �. \ \ \.' � � � ""�v+".h x ' � Q ' � '� � � " . � :?< � , �, '�� % Q ; � , , ` �l� 1. ,; .. � � ;��_` ��� ,>, ,��z � \ . p� r `�.,� , \` � Z < � > r�`:�:�;� ` �`� �`" ,z � � � � ;::`3:;� .��: vz��'..,^ '�. ' Z W <��:j`:� ;°�*: � '2. ��,� / `, \� O O . , :'r. y,- •n' ,�/�' �•. , r L Q' .\ � a � • T< . . . � �,, N $, , ;�:: F \ , .,,. 0 sw`a�i� 4 � \a . « r �— � ��#1'::°; =X:. .„ i" �'. � >"u:;;: .. . 4 � '.�,:;. :`-a�� �a � " d .- . u' ,..t� �� � � � �'� `���.;. � ,:r � • 3! y c �� . �� . = �` J I : ' ` �,' � ���: :' LL t0 xC . y \ �. : �\ `+ � .9 ��' � � �., \ �\.^�~ i •,. � ,`�`' �� ' + ':� � '•.•. .`'. ' _______ _ � � \ ._ t y i i �� '. 'M:v , i c \ �x`Y �� aVR ., . .; ., � \ P ,: �— :,,,� `•, m .: , . _ , w ... y � .... �', "_ � � k , -� oo. .,,�, = •• , � ' . � � a _ ___ __ . . ��\\ , •. _._ 6 � c (?o se s� n '•\\:�:` �.6 •. r � > ......._.. � \ L : : 0� a.-S11 CITY OF ST. PAUI, PRELIMINARY ORDER F` i I �� i:� E t� � ._� � E �` t i `> ." : i.v � In Ia the Matter of improving the following streets with bituminous roadway, construct concrete curb and gutter, concrete driveway aprons and outwalks, boulevard sodding, tree planting, construction of a lantern style lighting system, and doing all other work necessary to complete said improvement of East Sixth Street from Mounds Boulevard to Maria Avenue. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $225,000 financed by assessments of $5,00�, MSA of $17�,000 for 2002, and City Sales Tax of $50,000. 2. That a public hearing be had on said improvement on Wednesday, 26th of June, 2002, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. 3. That notice of said public hearing be given to the persons and in Che manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cost thereof as estimated. COUNCILPERSON Yea Nay �Benanav � Blakey —� Bostrom � Coleman � Harris �/ Lantry � Reiter � Against COtTNC , FIL No . o�. - y a 3 BY� �� FILB NO. 18970 VOTING WARD 7 Adopted by the Date � \ S o b Certified Passes by Council Secretary By � � � � yor