02-1100CITY OF ST. PAUL
FINAL ORDBR
COUNCIL FILB NO. O� � ��CO
$Y S �
FILE NO. 1 973
VOTING WARD 7
In the Matter of Improving the following streets with new bituminous roadway,
concrete curbs and gutters, concrete driveway aprons and outwalks, boulevard sodding,
tree planting, construction of a lantern style lighting system, and doing all other
work necessary to complete said improvements as part of the Edgebrook/MOrningside
Area Street Paving and Lighting Project:
Winthrop Street
Morning5ide Drive
Kipling Street
Kipling Street
Berland Place
Cardinal Place
Cardinal Avenue
Dellridge Avenue
Edgebrook Avenue
Falcon Avenue
Glenridge Avenue
Hillsdale Avenue
- From Lower Afton Road to Upper Afton Road.
- From Edgebrook Avenue to Upper Afton Road.
- From Dellridge Avenue to Upper Afton Road.
- From Hillsdale Avenue to cul-de-sac.
- From McKnight Road to cul-de-sac.
- From McKnight Road to cul-de-sac.
- From Morningside Drive to Kipling Street.
- From McKnight Road to Kipling Street.
- From Winthrop Street to McKnight Road.
- From Winthrop Street to McKnight Road.
- From Winthrop Street to MCKnight Road_
- From Winthrop Street to McKnight Road.
under Preliminary Order �'�}, .� � Q(��y approved � py , t� �0�,-
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore. be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
p �..1�00
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all e�;penses incurred therein and shall report the same to
the City Council in acoordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
�Benanav
✓Blakey
✓BOStrom
vCOleman
✓Aarri s
✓Lantry
�eiter
�In Favor
O Against
Adopted by Council: Date_ N� _ a� .'�sey.�
-`�
Certified Passed by Council Secretary
Public Hearin Date: November 20, 2002 ��. - 1�00
.M.S./REAL ESTATE DIVISION Date: October 30, 2002 reen Sheet Number: 113015
ontac[ Person and Phone Number: EPAR"CNENT DIRECI'OR Cl'IY COUNCiL
Peter White 266-8850 �
A7TOR�iEY CLF.RK
ust be on Council Agenda 6y: NOVEII1bCl" 6� ZOOZ� UDGET DIItECCOR e��cEOF Fmwricuc svcs
or Public Hearing on November 20,2002 YOR(ORASSIS7e1�� 1 ov,vca�sEnaca
OTAL # OF SIGNATURE PAGES L(CLIP ALL LOCATIONS FOR SIGNATURE)
GTIOY REQUESTED:
1. Set Public Hearing date of November 20, 2002, to discuss the EDGEBROOK/MORNINGSIDE Area �
Street Paving and Lighting Project, File No. 18973.
2. Approve said project.
COMMENDAT[OP�S:APPROVE(A)ORRE7ECC(R) gRqpNALSERVICECONTRAC['SMUSTANSWERTHEFOLLOWING:
I. Has the persoNfirm ever worked under a contraM for this department? YES n0
PIANNDNGCO�itli5510Y A STAFF
. Has this persoNfirm ever been a Ci[y employee? YES NO
crva sexv�ce coamnss�orv — �
. Does this perso�lf rm qussess a skill not normally possessed by any YES NO
current City employee?
CIB COhN11TfEE
Ez lain aIl YES answers on a se arate sheet and attach.
UPPORTS WHICH COUNCIL Better and safer streets
BJECTIVE•'
COUNCIL FYARD(S) 7 DISTRICT PLANNING COUNCIL 1
INITIATING PROBLEM, ISSUE, OPPORTUNITY (Who, What, When, Where, Why?):
This project is being proposed for construction as part of the City's Residential Street Vitality
Program.
DVANTAGES[FAPPROVED:
The reconstruction of the remaining oiled streets in the City will complete the paving of local
residential streets in this area. The new street lighting will also improve safety in the area. i
i
IS�IDVANTAGES 1F APPROVED: I
Normal problems associated with construction such as noise, dust and general disruption will
occur.
DISADVANTAGES IF tiOT APPROVED: i
The pavement structure will continue to deteriorate, maintenance costs will rise, and the level of
service provided by this street will drop.
OTAL AMOUNT OF'CRANSACTION: $2 ,043,614 COST/REVENUE BUDGETED (CIRCLE Ol�E) YES NO i
FUNDING SOURCE: 2003 CIB MSA and Assessments ACTIVITY NUMBER: i
�� �:���f�`+,'t i���t E�P �
FINANCIAL INFORMATION: (EXPLAI� !
ESTIMATED FINANCING: i
2003 Capital Improvement Bo�ds - $1,029,490 �34�� �� 2Q�
MSA - $ 483,507 �
Assessments - $ 530,317
TOTAL - $2>043,614
o�_��oo
.;.
SUMMARY OF ENGINEERING RECOMMENDATIONS
Edgebrook-Morningside Residential Street Vitality Project (Area 02)
City Project No. 03-P-8131
Report Prepared -- 9-10-02
Public Hearing -- �j-20�0'Z
PROJECT
This project is to improve the area referred to as the Edgebrook-Morningside
Residential Street Vitality Project (Area 02), by constructing new bituminous surfaced
streets with concrete curb and gutter, concrete driveway aprons and outwalks,
boulevards landscaped with sod and trees, and a new lantern style street lighting
system. In addition, appropriate sanitary sewer repairs will be made, lead water
services in the right of way will be replaced, and storm sewer and sanitary sewer
reconnections wi{I be made at the request of property owners. This project area is
surrounded by Upper Afton Road on the north, McKnight Road on the east, Lower Afton
Road on the south, and Winthrop Street on the west (see attached map).
EXISTING CONDITIONS
Alf of the residential streets in the project area are older paved streets and some have
bituminous curb. The street widths vary in this area, generally between 29' and 35'.
The street surfaces are generally in fair condition.
About half of the area has old green lanterns as the existing street lighting system. The
rest of the area, if it has any lights at all, has them mounted on NSP's wood poles.
PROPOSEDIMPROVEMENTS
It is proposed to improve the following streets with the construction of new bituminous
surfaced streets with concrete curb and gutter, concrete driveway aprons and outwalks,
and boulevards landscaped with sod and trees. In addition, appropriate sanitary sewer
repairs will be made, lead water services in the right of way wiil be replaced, and storm
sewer and sanitary sewer connections will be made at the request of property owners.
WINTHROP STREET - LOWER AFTON ROAD TO UPPER AF70N ROAD
MORNINGSIDE DRIVE - EDGEBROOK AVENUE TO UPPER AFTON ROAD
KIPLING STREET - DELLRIDGE AVENUE TO UPPER AFTON ROAD
KIPLING STREET - HILLSIDE AVENUE TO CUL-DE-SAC
BERLAND PLACE - MCKNIGHT ROAD TO CUL-DE-SAC
CAFiDiNAL PLACE - MCKNIGHT ROAD TO CUL-DE-SAC
CARDINAL AVENUE - MORNINGSIDE DRIVE TO KIPLING STREET
p�,_��oo
DELLRIDGE AVENUE - MCKNIGHT ROAD TO KIPLING STREET
EDGEBROOK AVENUE - WINTHROP STREET TO MCKNIGHT ROAD
FALCON AVENUE - WINTHROP STREET TO MCKNIGHT ROAD
GLENRIDGE AVENUE - WINTHROP STREET TO MCKNIGHT ROAD
HfLLSiDE AVENUE - W1NTFiROP STREE� TO MCKNIGHT ROAD
Decisions regarding the street widths will be made keeping in mind the right-of-way
widths, existing street widths, any relevant neighborhood issues, and the impact on
boulevard trees. New curb may be hand formed to avoid damaging boulevard trees or
their roots. Tree trimming may be necessary to facilitate construction.
Ali the streets to be paved (listed above) will also have a lantern style street lighting
system installed as part of this project.
ALTERNATES
To do nothing would be inconsistent with the Gity's commitment to improve existing
oiled and older paved streets.
POSITiVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadways will improve drivabiiity of the neighborhood,
and continue the City's efforts to improve the street system in Saint Paul. Lantern style
lighting will enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normal problems associated with construction such as noise, dust, reduced access to
the neighborhood, and general disruption will be present.
EFFECTS ON TREES
Street widths wili be selected to minimize the impact on trees. New trees will be
planted as part of the boulevard restoration.
TIME SCHEDULE
The project will begin in the spring of 2003 and will be completed by late fall of 2003.
There will be further restrictions on the amount of time work is done on individual
segments of streets.
E
p�,_1�00
COST ESTIMATE
Construction
Engineering
Misceilaneous
PROJECT TOTAL
ESTIMATED FINANCING
CIB (2003)
MSA
Assessments
PROJECT TOTAL
$ 1,578,000
$ 307,7i0
$ 157.904
$ 2,043,614
$ 1,029,490
$ 483,807
$ 530.317
$ 2,043,614
The estimated 2003 assessment rates for residential street paving and lighting are:
$28.35 per ASSESSABLE FOOT for street paving
$5.00 per ASSESSABLE FOOT for lantern style street lighting on residential
streeis
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Dan Haak, at 266-6084.
SUMMARY AND RECOMMENDATION
The Department of Public Works feeis that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
es tfull s mitted
Bob Sandquist
Director of Public Works
dah
3
oa-���o
�-
�
n_
0
�
_
�
Z
�
W
�
N
C� �
Z
Z U
�
O
�
EDGEBROOK jMORNINGSIDE
�-
_
�
z
Y
U
�
STREETS TO BE PAVED lN 2003 =
UPPER AFTON ROAD
CITY OF ST. PAIIL
PRELIMINARY ORDER
01-��
COIINCIL FILE NO. � ����
BY � 3�
FILE NO. 8973
VOTING WARD .7 _ _ _
In the Matter of Improving the following streets with new bituminous roadway,
concrete curbs and gutters, concrete driveway aprons and outwalks, boulevard sodding,
tree planting, construction of a lantern style lighting system, and doing all other
work necessary to complete said improvements as part of the Edgebrook/Morningside
Street Paving and Lighting Project_
Winthrop Street
Morningside Drive
Kipling Street
Kipling Street
Berland Place
Cardinal Place
Cardinal Avenue
Dellridge Avenue
Edgebrook Avenue
Falcon Avenue
Glenridge Avenue
Hillsdale Avenue
- From Lower Afton Road to Upper Afton Road.
- From Edgebrook Avenue to Upper Afton Road.
- From Dellridge Avenue to Uppez A£ton Road.
- From Hillsdale Avenue to cul-de-sac.
- From McKnight Road to cul-de-sac.
- From McKnight Road to cul-de-sac.
- From Morningside Drive to Kpling Street.
- From McKnight Road to Kipling Street.
- From Winthrop Street to McKnight Road.
- From Winthrop Street to McKnight Road.
- From Winthrop Street to McKnight Road.
- From Winthrop Street to McKnight Road.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is $2,043,614 financed by 2003 Capital
Improvement Bonds $1,029,490, Municipal State Aid $483,807 and Assessments
$530,317.
2. That a public hearing be had on said improvement on the 20th dav of November,
2002, at 5:30 o'clock P.M. in the Council Chambers of the City Hall and Court
House Building in the City of Saint Paul.
oy. ��oo-
a�-
a
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place o£ hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓Benanav
✓Blakey
✓Bostrom
�IColeman
,/Harris
�I,antry
�'eiter
r{ In Favor
QAgainst
Adopted by Council : Date�pa �,,,,
Certified Passed by Council Secretary
By � �� �l�v—�" �n�.
Mayor