01-673CITY OF ST. PAUL COUNCIL FILE NO. � ��� �� 3. ��
FINAL ORDER B
Fil No.S0107 , 086-SO10 ,501092,
SO 93,5010 ,501100,50 7-501109,
fi� �� � 501111-SO1 13,501115-5 17,S01121,
tt � 501123,501 30,501137, 1138,s01144
Voting Ward_1,4,5 & 6
In the Matter of sidewalk reconstruction at the following locatioas:
501079 - Both sides North Avon Street from West Ivy Avenue to Lakeview Avenue &
North side West Ivy Avenue from North Avon Street to North Grotto Street.
501086 - Both sides Case Avenue from Cypress Street to Earl Street & North side Case
Avenue from Frank Street to Duluth Streat.
501087 - Both Sides Clear Avenue from North Hazel Street to Furness Parkway.
501088 - South side Como Avenue from North Albert Street to North Hamline Avenue.
501092 - Both Sides West Cottage Avenue from North Avon Street to North Grotto
Street.
501093 - Both S'des Cumberland Street from West Cook Avenue to West Maryland Avenue.
�..4�� cv er -�.-c ��� �-�. \ �\\ � a¢C\ �C:�C � <.c:.\ i�t`� .
501098 - North side Hatch Avenue from North Dale Street to Kent 5treet.
501100 - Both Sides East Idaho Avenue from Chamber Street to English Street.
501107 - North side Lakeview Avenue from East Como Boulevard to North Victoria
Street at 909 Lakeview Avenue Only.
501108 - Both sides Laurel Avenue from Western Avenue to Virginia Street & 5outh
side Laurel Avenue from Virginia Street to Farrington Street.
������. - �he e.c�c�rcSS "-�- 35g 1 - .w� a� ne.\ (,�tt,
501109 - North side East Magnolia Avenue from Sylvan Street to Jackson Street.
501111 - Both sides West Maryland Avenue from East Como Boulevard to North Grotto
Street.
501112 - South side West Maryland Avenue from Cumberland Street to North Western
Avenue.
501113 - Both sides Matilda Street from Front Avenue to West Lawson Avenue.
501115 - Both sides West Orange Avenue from Woodbridge Street to Rice Street.
S01116 - Both sides North Pascal Street from Englewood Avenue to Hewitt Avenue.
501117 - Both sides North Pascal Street from Frankson Avenue to West Arlington Avenue
& North side Frankson Avenue from North Pascal Street to McKinley Street.
501121 - East side North Ruth Street from East Cottage Avenue to Sherwood Avenue.
501123 - Both sides Sherburne Avenue from North St. Albans Street to North Dale
Street & East side North St. Albans Street from Sherburne Avenue to West
University Avenue.
501130 - Both sides Thomas Avenue from North Lexington Parkway to North Chatsworth
Street & East side North Oxford Street from Thomas Avenue to Lafond Avenue.
S01137 - Both sides Woodbridge Street from Hatch Avenue to West Lawson Avenue &
North side Hatch Avenue from Woodbridge Street to Albemarle Street. 0 �� 47 3
501138 - Both sides Woodbridge Street from West Orange Avenue to West Ivy Avenue.
501144 - Both sides Thomas Avenue from North Chatsworth Street to North Milton Street
& West side North Milton Street from Edmund Avenue to Thomas Avenue.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Raconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
ML7LTI-RESIDENTIAL (More than three family structures), NON RESIDENTTAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
The Council
above improvement
Charter; and
of the City of Saint Pau1 has conducted a public hearing upon the
, due notice thereof having been given as prescribed by the City
WHEAEAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas� Nays
Benanav
�lakey
�strom
�leman
�rris
�a� try
�TFeiter
Adopted by Council: Date�a7-a-qQ�
��
Certified Passed by Council Secretary
1 1n Favor By `�� a- .�H �.-,�--�
� Against ___
Mayor
1�iOfof
�ublic Works - Sidewalk Division
:O�ACT PERSON & PHONE
Jerry Tvedt (266-6087)
dUSTBEONCOUNCILAGEN�ABY(DAT� '
s��►�tR1113C�t� @F �'L�
fOTAL S OF SIGNATURE PAGES
AC�ION REQUESTED
�, Reconstruct Sidewalk & C nstru�
� � �
��
iECAMMENDATIONS: Approve (!� or Feject R)
,PLANNINGCOMMISSION _
_CIBCOMMITTEE _
? srnFF _
` OIS7RICTCOUNCIL _
>UPPORTS WHICHCOUNQLOBJECTIVE?
PERSONAL SERVICE CONiAACTS MUST ANSWER THE FOLLOWMG �UESTIONS: �
7. HasthispersoNfirtneverwo�ICedunderacomractforthisdepartrneM?
YES NO
2. Has this person/fi�m ever been a ciry employee?
YES NO
3. Daes this persoMfian possess a skM1l not noanaRy poss=_ssed by any cucrent cily erttptoyee?
YES NO
Explain all yes answers on separete sheet and attach to green sheet
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, freefthaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a ciiywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falls and possible litigations.
The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk
contracts are do�e by private contractors generating public sector jobs as a result.
Historically; the sidewalk reconstruction has created negative feedback because of construction procedures and.
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOT
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
t1�a �.�gu� 4.+
°�aAe � � ry ] � 5} y
i`?}e'# Ldli}S
�
INITIATED
GREEN
I� DEPAPMEM' DIRECTOR
I�CITYATTORNEY
I� BUDGEf DIRECIOR
� MAYOR (OR ASSISTAM'�
��; � ��--��
NO. 110434
❑CfiYCAUNCIL /��
— YlY
❑CITYCLERK ��
❑ FIN. & M6T. SERVICES DIR
� Councii ResearcF�,
LOCATIONS FOR SIGNANR�
1. 4
AMOUNT OF TRANSACTION $ t� v� c7o, � v COST/REVENUE BUDGETED (CIRCLE ONE) YES No
JGSOUBCE d�"'�`�^� t # ACINITYNUMBER C01-2T754-0784-00000
ALINFORMATION:(D�LqIN) • - �
o�_ L13
SUMMARY OF ENGINEERING RECOMNIENDATIONS
Wazd 1
PRO.)ECT: RECONSTRUCT SIDEWALK B.S. LAUREL AVE. from Westem Ave. to
Virginia St. & S.S. LAL7REL AVE. from Virginia St. to Farrington St.
G,(� �}�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
`��� � necessity on the basis of three (3) complaints and an inspection of the walk.
C�li
�'l�
Sq1130
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree heaves, broken
tile, water pockets, holes in tile, asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. SHERBURNE AVE. from N. St. Albans St.
to N. Dale St. & E.S. N. ST. ALBANS ST. from Sherburne Ave. to W. University Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
PKO.IECT: RECONSTRUCT SIDEWALK B.S. THOMAS AVE. from N. Chatsworth St. to
N. Milton St. & W.S. N. MILTON ST. from Edmund Ave. to Thomas Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. THOMAS AVE. from N. L.exington Pkwy. to
N. Chatsworth St. & E.S. N. OXFORD ST. from Thomas Ave. to Lafond Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
o►-���
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
o►-���
SUMMARY OF ENGINEERING RECOMNIENDATIONS
Wazd 4
PRO.IECT.• RECONSTRUCT SIDEWALK S.S. COMO AVE from N. Albert St. to N.
Hamline Ave.
��� INITIATINGACTION: Tlus arder was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
This walk is poured concrete with tree heaves, water pockets,
5 0'''�
SOli17
asphalt patches, scaled, settled, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. PASCAL ST. from Englewood Ave. to
Hewitt Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. PASCAL ST. from Frankson Ave. to W.
Arlington Ave. & N.S. FRANKSON AVE. from N. Pascal St. to McKinley St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
61- t��
SUMMARY OF ENGINEERING RECOMI��NDATIONS
Wazd 5
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. AVON ST. from W. Ivy Ave. to Lakeview
Ave. & N.S. W. IVY AVE. from N. Avon St. to N. Grotto St.
L/� 1(��� INITIATING ACTION: This order was initiated by the Director of Public Works as public
<J�� � �� necessity on the basis of one (1) complaint, a petition with one (1) signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
�' ��
PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. COTTAGE AVE. from N. Avon St. to N.
Grotto 5t.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints and an inspection of the wa1k.
This walk is poured concrete with tree heaves, asphalt patches,
Solp93
�� �.
settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. CUMBERLAND ST. from W. Cook Ave. to
W. Maryland Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of eleven (11) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: CONSTRDCT NEW SIDL°WALK & RECONSTRUCT SIDEWALK N.S.
HATCH AVE. from N. Aale St. to Kent St.
INITIATING ACTION: This arder was initiated by the Directar of Public Works as public
necesity on the basis of a petition with one (1) signer and an inspection of the walk.
pi_`�?�
-z-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, and settled
panels.
PRO.IECT.• RECONSTRUCT SIDEWALK N.S. LAKEVIEW AVE. from E. Como Blvd. to N.
Victoria St. at 409 Lakeview Ave. Only.
��I I� I INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured conczete with water pockets and settled panels.
PRO.IECT: RECONSTRUCT SIDEWALK N.S. E. MAGNOLIA AVE. from Sylvan St. to
Jackson St.
5�' IO/� INITIATINGACTION: This order was initiated by the Director of Public Works as public
'► necessity on the basis of fifteen (15) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
v ��I'�
SpIIIL
PROJECT: RECONSTRUCT SIDEWALK B.S. W. MARYLAND AVE. from E. Como Slvd.
to N. Grotto St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of five (5) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is pouzed concrete with tree heaves, water pockets,
asphalt patches, disintegrated, settled, cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK S.S. W. MARYLAND AVE. from Cumberland St.
to N. Western Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
o�-�n
-3-
�D1113
SU��I�
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, settled, cracked,
and uneven panels.
PRO.)ECT: RECONSTRUCT SIDEWALK B.S. MATILDA ST. from Front Ave. to W.
Lawson Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRIICT SIDEWALK B.S. W. ORANGE AVE. from Woodbridge St. to
Rice St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. WOODBRIDGE ST. from Hatch Ave. to W.
Lawson Ave. & N.S. HATCH AVE. from Woodbridge St. to Albemarle St.
5 � � 137 INITIATING ACTION: This order was initiated by the Director of Public Warks as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settied, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. WOODBI2IDGE ST. from W. Orange Ave. to
5� 1 ' �d W Ivy Ave.
t o
INITIATING ACTION: This order was initiated by the Director of Public Warks as public
necessity on the basis of five (S) complaints and an inspection of the walk.
b t - ���
�
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, and cracked panels.
4 i ����
SUMMARY OF ENGINEERING RECOMA�NDATIONS
Wud 6
PRO.IECT.� RECONSTRUCT SIDEWALK B.S. CASE AVE. from Cypress St. to Eazl St. &
N.S. CASE AVE. from Frank St. to Duluth St.
S O� ��� INITIATING ACTIOtV: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. CLEAR AVE. from N. Hazel St. to Fumess
Pkwy.
��1�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, disintegrated, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. E. IDAHO AVE. from Chamber St. to
English St.
���� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphalt patches, and
cracked panels.
PRO.IECT.• RECONSTRUCT SIDEWALK E.S. N. RUTH ST. from E. Cottage Ave. to
5���� Sherwood Ave.
0
INITIATINGACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
O l -G'13
-2-
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, scaled, settled,
cracked, and uneven panels.
CITY OF ST. PAUL
PRELIMINARY ORDER
� �- s�` 6�`�?3
COUNCIL FILE NO. _ �
By V�
File o_SO10 ,Sb C
501093 01098,
S0111 501113,
501123,501130,
Voting Ward_ 1,4,�
6-SO 8,501092,
Ol 0, 01107-S01109
115- 01117,501121
01137, 01138,501144
& 6
In the Mattar of sidewalk reconstruction and/or new construction at the following
locations:
501079 - Both sides North Avon Street from West Ivy Avenue to Lakeview Avenue &
North side West Ivy Avenue from North Avon Street to North Grotto Street.
501086 - Both sides Case Avenue from Cypress Street to Earl Street & North side
Case Avenue from Frank Street to Duluth Street.
501087 - Both sides Clear Avenue from North Hazel Street to Furness Parkway.
501088 - South side Como Avenue from North Albert Street to North Hamline Avenue.
501092 - Both sides West Cottage Avenue from North Avon Street to North Grotto
Street.
501093 - Both sides Cumberland Street from West Cook Avenue to West Maryland Avenue
501098 - North side Hatch Avenue from North Dale Street to Kent Street.
501100 - Both sides East Idaho Avenue from Chamber Street to English Street.
501107 - North side Lakeview Avenue from East Como Boulevard to North Victoria
Street at 909 Lakeview Avenue Only.
501108 - Both sides Laurel Avenue from Western Avenue to Virginia Street & South
side Laurel Avenue from virginia Street to Farrington Street.
501109 - North side East Magnolia Avenue from Sylvan Street to Jackson Street.
501111 - Both sides West Maryland Avenue from East Como Boulevard to North Grotto'
Street.
501112 - South side West Maryland Avenue from Cumberland Street to North Western
Avenue.
S01113 - Both sides Matilda Street from Front Avenue to West Lawson Avenue.
501115 - Both sides West Orange Avenue from Woodbridge Street to Rice Street.
501116 - Both sides North Pascal Street from Englewood Avenue to Hewitt Avenue.
501117 - Both sides North Pascal Street from Frankson Avenue to West Arlington Avenue
& North side Frankson Avenue from North Pascal Street to McKinley Street.
501121 - East side North Ruth Street from East Cottage Avenue to Sherwood Avenue.
501123 - Both sides Sherburne Avenue
Street & East side North St
Universrty Avenue. �' �"
50113Q - Both sides Thomas Avenue from Nozth Lexington Parkway to North Chatsworth
Street & East side North Oxford Street from Thomas Avenue to Lafond Avenue
501137 - Both sides Woodbridge Street from Hatch Avenue to West Lawson Avenue &
North side Hatch Avenue from Woodbridge Street to Albemarle Street.
501138 - Both sides Woodbridge Street from West Orange Avenue to West Ivy Avenue
S01144 - Both sides Thomas Avenue from North Chatsworth Street to North Milton Street
& West side North Milton Street from Edmund Avenue to Thomas Avenue.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
NNLTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For n w and reconstructed sidewalk; IOOg of actual cost estimated to be
approximately $6.09 per square foot.
The Council of the City of Saint Pau1 having received the report of the Mayor upon
the above improvement, and having consic2ered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
2. That a public hearing be had on said improvement on the 27�" dav of June , 2002
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place.of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas f Nays
� Benanav
�akey
� strom
vC�oleman
�E'farris
�antry
�eiter
0 �-591
from North St. Albans Street to North Dale
Albans Street from Sherburne Avenue to West
�In Favor
�Against
Adopted by Council: Date \
Certified Passed by Council Secretary
By �^ �- �� . _ �i
�
Mayor
CITY OF ST. PAUL COUNCIL FILE NO. � ��� �� 3. ��
FINAL ORDER B
Fil No.S0107 , 086-SO10 ,501092,
SO 93,5010 ,501100,50 7-501109,
fi� �� � 501111-SO1 13,501115-5 17,S01121,
tt � 501123,501 30,501137, 1138,s01144
Voting Ward_1,4,5 & 6
In the Matter of sidewalk reconstruction at the following locatioas:
501079 - Both sides North Avon Street from West Ivy Avenue to Lakeview Avenue &
North side West Ivy Avenue from North Avon Street to North Grotto Street.
501086 - Both sides Case Avenue from Cypress Street to Earl Street & North side Case
Avenue from Frank Street to Duluth Streat.
501087 - Both Sides Clear Avenue from North Hazel Street to Furness Parkway.
501088 - South side Como Avenue from North Albert Street to North Hamline Avenue.
501092 - Both Sides West Cottage Avenue from North Avon Street to North Grotto
Street.
501093 - Both S'des Cumberland Street from West Cook Avenue to West Maryland Avenue.
�..4�� cv er -�.-c ��� �-�. \ �\\ � a¢C\ �C:�C � <.c:.\ i�t`� .
501098 - North side Hatch Avenue from North Dale Street to Kent 5treet.
501100 - Both Sides East Idaho Avenue from Chamber Street to English Street.
501107 - North side Lakeview Avenue from East Como Boulevard to North Victoria
Street at 909 Lakeview Avenue Only.
501108 - Both sides Laurel Avenue from Western Avenue to Virginia Street & 5outh
side Laurel Avenue from Virginia Street to Farrington Street.
������. - �he e.c�c�rcSS "-�- 35g 1 - .w� a� ne.\ (,�tt,
501109 - North side East Magnolia Avenue from Sylvan Street to Jackson Street.
501111 - Both sides West Maryland Avenue from East Como Boulevard to North Grotto
Street.
501112 - South side West Maryland Avenue from Cumberland Street to North Western
Avenue.
501113 - Both sides Matilda Street from Front Avenue to West Lawson Avenue.
501115 - Both sides West Orange Avenue from Woodbridge Street to Rice Street.
S01116 - Both sides North Pascal Street from Englewood Avenue to Hewitt Avenue.
501117 - Both sides North Pascal Street from Frankson Avenue to West Arlington Avenue
& North side Frankson Avenue from North Pascal Street to McKinley Street.
501121 - East side North Ruth Street from East Cottage Avenue to Sherwood Avenue.
501123 - Both sides Sherburne Avenue from North St. Albans Street to North Dale
Street & East side North St. Albans Street from Sherburne Avenue to West
University Avenue.
501130 - Both sides Thomas Avenue from North Lexington Parkway to North Chatsworth
Street & East side North Oxford Street from Thomas Avenue to Lafond Avenue.
S01137 - Both sides Woodbridge Street from Hatch Avenue to West Lawson Avenue &
North side Hatch Avenue from Woodbridge Street to Albemarle Street. 0 �� 47 3
501138 - Both sides Woodbridge Street from West Orange Avenue to West Ivy Avenue.
501144 - Both sides Thomas Avenue from North Chatsworth Street to North Milton Street
& West side North Milton Street from Edmund Avenue to Thomas Avenue.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Raconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
ML7LTI-RESIDENTIAL (More than three family structures), NON RESIDENTTAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
The Council
above improvement
Charter; and
of the City of Saint Pau1 has conducted a public hearing upon the
, due notice thereof having been given as prescribed by the City
WHEAEAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas� Nays
Benanav
�lakey
�strom
�leman
�rris
�a� try
�TFeiter
Adopted by Council: Date�a7-a-qQ�
��
Certified Passed by Council Secretary
1 1n Favor By `�� a- .�H �.-,�--�
� Against ___
Mayor
1�iOfof
�ublic Works - Sidewalk Division
:O�ACT PERSON & PHONE
Jerry Tvedt (266-6087)
dUSTBEONCOUNCILAGEN�ABY(DAT� '
s��►�tR1113C�t� @F �'L�
fOTAL S OF SIGNATURE PAGES
AC�ION REQUESTED
�, Reconstruct Sidewalk & C nstru�
� � �
��
iECAMMENDATIONS: Approve (!� or Feject R)
,PLANNINGCOMMISSION _
_CIBCOMMITTEE _
? srnFF _
` OIS7RICTCOUNCIL _
>UPPORTS WHICHCOUNQLOBJECTIVE?
PERSONAL SERVICE CONiAACTS MUST ANSWER THE FOLLOWMG �UESTIONS: �
7. HasthispersoNfirtneverwo�ICedunderacomractforthisdepartrneM?
YES NO
2. Has this person/fi�m ever been a ciry employee?
YES NO
3. Daes this persoMfian possess a skM1l not noanaRy poss=_ssed by any cucrent cily erttptoyee?
YES NO
Explain all yes answers on separete sheet and attach to green sheet
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, freefthaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a ciiywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falls and possible litigations.
The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk
contracts are do�e by private contractors generating public sector jobs as a result.
Historically; the sidewalk reconstruction has created negative feedback because of construction procedures and.
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOT
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
t1�a �.�gu� 4.+
°�aAe � � ry ] � 5} y
i`?}e'# Ldli}S
�
INITIATED
GREEN
I� DEPAPMEM' DIRECTOR
I�CITYATTORNEY
I� BUDGEf DIRECIOR
� MAYOR (OR ASSISTAM'�
��; � ��--��
NO. 110434
❑CfiYCAUNCIL /��
— YlY
❑CITYCLERK ��
❑ FIN. & M6T. SERVICES DIR
� Councii ResearcF�,
LOCATIONS FOR SIGNANR�
1. 4
AMOUNT OF TRANSACTION $ t� v� c7o, � v COST/REVENUE BUDGETED (CIRCLE ONE) YES No
JGSOUBCE d�"'�`�^� t # ACINITYNUMBER C01-2T754-0784-00000
ALINFORMATION:(D�LqIN) • - �
o�_ L13
SUMMARY OF ENGINEERING RECOMNIENDATIONS
Wazd 1
PRO.)ECT: RECONSTRUCT SIDEWALK B.S. LAUREL AVE. from Westem Ave. to
Virginia St. & S.S. LAL7REL AVE. from Virginia St. to Farrington St.
G,(� �}�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
`��� � necessity on the basis of three (3) complaints and an inspection of the walk.
C�li
�'l�
Sq1130
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree heaves, broken
tile, water pockets, holes in tile, asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. SHERBURNE AVE. from N. St. Albans St.
to N. Dale St. & E.S. N. ST. ALBANS ST. from Sherburne Ave. to W. University Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
PKO.IECT: RECONSTRUCT SIDEWALK B.S. THOMAS AVE. from N. Chatsworth St. to
N. Milton St. & W.S. N. MILTON ST. from Edmund Ave. to Thomas Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. THOMAS AVE. from N. L.exington Pkwy. to
N. Chatsworth St. & E.S. N. OXFORD ST. from Thomas Ave. to Lafond Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
o►-���
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
o►-���
SUMMARY OF ENGINEERING RECOMNIENDATIONS
Wazd 4
PRO.IECT.• RECONSTRUCT SIDEWALK S.S. COMO AVE from N. Albert St. to N.
Hamline Ave.
��� INITIATINGACTION: Tlus arder was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
This walk is poured concrete with tree heaves, water pockets,
5 0'''�
SOli17
asphalt patches, scaled, settled, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. PASCAL ST. from Englewood Ave. to
Hewitt Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. PASCAL ST. from Frankson Ave. to W.
Arlington Ave. & N.S. FRANKSON AVE. from N. Pascal St. to McKinley St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
61- t��
SUMMARY OF ENGINEERING RECOMI��NDATIONS
Wazd 5
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. AVON ST. from W. Ivy Ave. to Lakeview
Ave. & N.S. W. IVY AVE. from N. Avon St. to N. Grotto St.
L/� 1(��� INITIATING ACTION: This order was initiated by the Director of Public Works as public
<J�� � �� necessity on the basis of one (1) complaint, a petition with one (1) signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
�' ��
PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. COTTAGE AVE. from N. Avon St. to N.
Grotto 5t.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints and an inspection of the wa1k.
This walk is poured concrete with tree heaves, asphalt patches,
Solp93
�� �.
settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. CUMBERLAND ST. from W. Cook Ave. to
W. Maryland Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of eleven (11) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: CONSTRDCT NEW SIDL°WALK & RECONSTRUCT SIDEWALK N.S.
HATCH AVE. from N. Aale St. to Kent St.
INITIATING ACTION: This arder was initiated by the Directar of Public Works as public
necesity on the basis of a petition with one (1) signer and an inspection of the walk.
pi_`�?�
-z-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, and settled
panels.
PRO.IECT.• RECONSTRUCT SIDEWALK N.S. LAKEVIEW AVE. from E. Como Blvd. to N.
Victoria St. at 409 Lakeview Ave. Only.
��I I� I INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured conczete with water pockets and settled panels.
PRO.IECT: RECONSTRUCT SIDEWALK N.S. E. MAGNOLIA AVE. from Sylvan St. to
Jackson St.
5�' IO/� INITIATINGACTION: This order was initiated by the Director of Public Works as public
'► necessity on the basis of fifteen (15) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
v ��I'�
SpIIIL
PROJECT: RECONSTRUCT SIDEWALK B.S. W. MARYLAND AVE. from E. Como Slvd.
to N. Grotto St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of five (5) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is pouzed concrete with tree heaves, water pockets,
asphalt patches, disintegrated, settled, cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK S.S. W. MARYLAND AVE. from Cumberland St.
to N. Western Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
o�-�n
-3-
�D1113
SU��I�
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, settled, cracked,
and uneven panels.
PRO.)ECT: RECONSTRUCT SIDEWALK B.S. MATILDA ST. from Front Ave. to W.
Lawson Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRIICT SIDEWALK B.S. W. ORANGE AVE. from Woodbridge St. to
Rice St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. WOODBRIDGE ST. from Hatch Ave. to W.
Lawson Ave. & N.S. HATCH AVE. from Woodbridge St. to Albemarle St.
5 � � 137 INITIATING ACTION: This order was initiated by the Director of Public Warks as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settied, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. WOODBI2IDGE ST. from W. Orange Ave. to
5� 1 ' �d W Ivy Ave.
t o
INITIATING ACTION: This order was initiated by the Director of Public Warks as public
necessity on the basis of five (S) complaints and an inspection of the walk.
b t - ���
�
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, and cracked panels.
4 i ����
SUMMARY OF ENGINEERING RECOMA�NDATIONS
Wud 6
PRO.IECT.� RECONSTRUCT SIDEWALK B.S. CASE AVE. from Cypress St. to Eazl St. &
N.S. CASE AVE. from Frank St. to Duluth St.
S O� ��� INITIATING ACTIOtV: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. CLEAR AVE. from N. Hazel St. to Fumess
Pkwy.
��1�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, disintegrated, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. E. IDAHO AVE. from Chamber St. to
English St.
���� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphalt patches, and
cracked panels.
PRO.IECT.• RECONSTRUCT SIDEWALK E.S. N. RUTH ST. from E. Cottage Ave. to
5���� Sherwood Ave.
0
INITIATINGACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
O l -G'13
-2-
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, scaled, settled,
cracked, and uneven panels.
CITY OF ST. PAUL
PRELIMINARY ORDER
� �- s�` 6�`�?3
COUNCIL FILE NO. _ �
By V�
File o_SO10 ,Sb C
501093 01098,
S0111 501113,
501123,501130,
Voting Ward_ 1,4,�
6-SO 8,501092,
Ol 0, 01107-S01109
115- 01117,501121
01137, 01138,501144
& 6
In the Mattar of sidewalk reconstruction and/or new construction at the following
locations:
501079 - Both sides North Avon Street from West Ivy Avenue to Lakeview Avenue &
North side West Ivy Avenue from North Avon Street to North Grotto Street.
501086 - Both sides Case Avenue from Cypress Street to Earl Street & North side
Case Avenue from Frank Street to Duluth Street.
501087 - Both sides Clear Avenue from North Hazel Street to Furness Parkway.
501088 - South side Como Avenue from North Albert Street to North Hamline Avenue.
501092 - Both sides West Cottage Avenue from North Avon Street to North Grotto
Street.
501093 - Both sides Cumberland Street from West Cook Avenue to West Maryland Avenue
501098 - North side Hatch Avenue from North Dale Street to Kent Street.
501100 - Both sides East Idaho Avenue from Chamber Street to English Street.
501107 - North side Lakeview Avenue from East Como Boulevard to North Victoria
Street at 909 Lakeview Avenue Only.
501108 - Both sides Laurel Avenue from Western Avenue to Virginia Street & South
side Laurel Avenue from virginia Street to Farrington Street.
501109 - North side East Magnolia Avenue from Sylvan Street to Jackson Street.
501111 - Both sides West Maryland Avenue from East Como Boulevard to North Grotto'
Street.
501112 - South side West Maryland Avenue from Cumberland Street to North Western
Avenue.
S01113 - Both sides Matilda Street from Front Avenue to West Lawson Avenue.
501115 - Both sides West Orange Avenue from Woodbridge Street to Rice Street.
501116 - Both sides North Pascal Street from Englewood Avenue to Hewitt Avenue.
501117 - Both sides North Pascal Street from Frankson Avenue to West Arlington Avenue
& North side Frankson Avenue from North Pascal Street to McKinley Street.
501121 - East side North Ruth Street from East Cottage Avenue to Sherwood Avenue.
501123 - Both sides Sherburne Avenue
Street & East side North St
Universrty Avenue. �' �"
50113Q - Both sides Thomas Avenue from Nozth Lexington Parkway to North Chatsworth
Street & East side North Oxford Street from Thomas Avenue to Lafond Avenue
501137 - Both sides Woodbridge Street from Hatch Avenue to West Lawson Avenue &
North side Hatch Avenue from Woodbridge Street to Albemarle Street.
501138 - Both sides Woodbridge Street from West Orange Avenue to West Ivy Avenue
S01144 - Both sides Thomas Avenue from North Chatsworth Street to North Milton Street
& West side North Milton Street from Edmund Avenue to Thomas Avenue.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
NNLTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For n w and reconstructed sidewalk; IOOg of actual cost estimated to be
approximately $6.09 per square foot.
The Council of the City of Saint Pau1 having received the report of the Mayor upon
the above improvement, and having consic2ered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
2. That a public hearing be had on said improvement on the 27�" dav of June , 2002
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place.of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas f Nays
� Benanav
�akey
� strom
vC�oleman
�E'farris
�antry
�eiter
0 �-591
from North St. Albans Street to North Dale
Albans Street from Sherburne Avenue to West
�In Favor
�Against
Adopted by Council: Date \
Certified Passed by Council Secretary
By �^ �- �� . _ �i
�
Mayor
CITY OF ST. PAUL COUNCIL FILE NO. � ��� �� 3. ��
FINAL ORDER B
Fil No.S0107 , 086-SO10 ,501092,
SO 93,5010 ,501100,50 7-501109,
fi� �� � 501111-SO1 13,501115-5 17,S01121,
tt � 501123,501 30,501137, 1138,s01144
Voting Ward_1,4,5 & 6
In the Matter of sidewalk reconstruction at the following locatioas:
501079 - Both sides North Avon Street from West Ivy Avenue to Lakeview Avenue &
North side West Ivy Avenue from North Avon Street to North Grotto Street.
501086 - Both sides Case Avenue from Cypress Street to Earl Street & North side Case
Avenue from Frank Street to Duluth Streat.
501087 - Both Sides Clear Avenue from North Hazel Street to Furness Parkway.
501088 - South side Como Avenue from North Albert Street to North Hamline Avenue.
501092 - Both Sides West Cottage Avenue from North Avon Street to North Grotto
Street.
501093 - Both S'des Cumberland Street from West Cook Avenue to West Maryland Avenue.
�..4�� cv er -�.-c ��� �-�. \ �\\ � a¢C\ �C:�C � <.c:.\ i�t`� .
501098 - North side Hatch Avenue from North Dale Street to Kent 5treet.
501100 - Both Sides East Idaho Avenue from Chamber Street to English Street.
501107 - North side Lakeview Avenue from East Como Boulevard to North Victoria
Street at 909 Lakeview Avenue Only.
501108 - Both sides Laurel Avenue from Western Avenue to Virginia Street & 5outh
side Laurel Avenue from Virginia Street to Farrington Street.
������. - �he e.c�c�rcSS "-�- 35g 1 - .w� a� ne.\ (,�tt,
501109 - North side East Magnolia Avenue from Sylvan Street to Jackson Street.
501111 - Both sides West Maryland Avenue from East Como Boulevard to North Grotto
Street.
501112 - South side West Maryland Avenue from Cumberland Street to North Western
Avenue.
501113 - Both sides Matilda Street from Front Avenue to West Lawson Avenue.
501115 - Both sides West Orange Avenue from Woodbridge Street to Rice Street.
S01116 - Both sides North Pascal Street from Englewood Avenue to Hewitt Avenue.
501117 - Both sides North Pascal Street from Frankson Avenue to West Arlington Avenue
& North side Frankson Avenue from North Pascal Street to McKinley Street.
501121 - East side North Ruth Street from East Cottage Avenue to Sherwood Avenue.
501123 - Both sides Sherburne Avenue from North St. Albans Street to North Dale
Street & East side North St. Albans Street from Sherburne Avenue to West
University Avenue.
501130 - Both sides Thomas Avenue from North Lexington Parkway to North Chatsworth
Street & East side North Oxford Street from Thomas Avenue to Lafond Avenue.
S01137 - Both sides Woodbridge Street from Hatch Avenue to West Lawson Avenue &
North side Hatch Avenue from Woodbridge Street to Albemarle Street. 0 �� 47 3
501138 - Both sides Woodbridge Street from West Orange Avenue to West Ivy Avenue.
501144 - Both sides Thomas Avenue from North Chatsworth Street to North Milton Street
& West side North Milton Street from Edmund Avenue to Thomas Avenue.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Raconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
ML7LTI-RESIDENTIAL (More than three family structures), NON RESIDENTTAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
The Council
above improvement
Charter; and
of the City of Saint Pau1 has conducted a public hearing upon the
, due notice thereof having been given as prescribed by the City
WHEAEAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas� Nays
Benanav
�lakey
�strom
�leman
�rris
�a� try
�TFeiter
Adopted by Council: Date�a7-a-qQ�
��
Certified Passed by Council Secretary
1 1n Favor By `�� a- .�H �.-,�--�
� Against ___
Mayor
1�iOfof
�ublic Works - Sidewalk Division
:O�ACT PERSON & PHONE
Jerry Tvedt (266-6087)
dUSTBEONCOUNCILAGEN�ABY(DAT� '
s��►�tR1113C�t� @F �'L�
fOTAL S OF SIGNATURE PAGES
AC�ION REQUESTED
�, Reconstruct Sidewalk & C nstru�
� � �
��
iECAMMENDATIONS: Approve (!� or Feject R)
,PLANNINGCOMMISSION _
_CIBCOMMITTEE _
? srnFF _
` OIS7RICTCOUNCIL _
>UPPORTS WHICHCOUNQLOBJECTIVE?
PERSONAL SERVICE CONiAACTS MUST ANSWER THE FOLLOWMG �UESTIONS: �
7. HasthispersoNfirtneverwo�ICedunderacomractforthisdepartrneM?
YES NO
2. Has this person/fi�m ever been a ciry employee?
YES NO
3. Daes this persoMfian possess a skM1l not noanaRy poss=_ssed by any cucrent cily erttptoyee?
YES NO
Explain all yes answers on separete sheet and attach to green sheet
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materials, freefthaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a ciiywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition would worsen to a state where it
would be unusable and subject to increased pedestrian injuries from falls and possible litigations.
The community will benefit from this project because it will provide safe defect free sidewalks for its citizens. The sidewalk
contracts are do�e by private contractors generating public sector jobs as a result.
Historically; the sidewalk reconstruction has created negative feedback because of construction procedures and.
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOT
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
t1�a �.�gu� 4.+
°�aAe � � ry ] � 5} y
i`?}e'# Ldli}S
�
INITIATED
GREEN
I� DEPAPMEM' DIRECTOR
I�CITYATTORNEY
I� BUDGEf DIRECIOR
� MAYOR (OR ASSISTAM'�
��; � ��--��
NO. 110434
❑CfiYCAUNCIL /��
— YlY
❑CITYCLERK ��
❑ FIN. & M6T. SERVICES DIR
� Councii ResearcF�,
LOCATIONS FOR SIGNANR�
1. 4
AMOUNT OF TRANSACTION $ t� v� c7o, � v COST/REVENUE BUDGETED (CIRCLE ONE) YES No
JGSOUBCE d�"'�`�^� t # ACINITYNUMBER C01-2T754-0784-00000
ALINFORMATION:(D�LqIN) • - �
o�_ L13
SUMMARY OF ENGINEERING RECOMNIENDATIONS
Wazd 1
PRO.)ECT: RECONSTRUCT SIDEWALK B.S. LAUREL AVE. from Westem Ave. to
Virginia St. & S.S. LAL7REL AVE. from Virginia St. to Farrington St.
G,(� �}�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
`��� � necessity on the basis of three (3) complaints and an inspection of the walk.
C�li
�'l�
Sq1130
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree heaves, broken
tile, water pockets, holes in tile, asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. SHERBURNE AVE. from N. St. Albans St.
to N. Dale St. & E.S. N. ST. ALBANS ST. from Sherburne Ave. to W. University Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
PKO.IECT: RECONSTRUCT SIDEWALK B.S. THOMAS AVE. from N. Chatsworth St. to
N. Milton St. & W.S. N. MILTON ST. from Edmund Ave. to Thomas Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. THOMAS AVE. from N. L.exington Pkwy. to
N. Chatsworth St. & E.S. N. OXFORD ST. from Thomas Ave. to Lafond Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
o►-���
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
o►-���
SUMMARY OF ENGINEERING RECOMNIENDATIONS
Wazd 4
PRO.IECT.• RECONSTRUCT SIDEWALK S.S. COMO AVE from N. Albert St. to N.
Hamline Ave.
��� INITIATINGACTION: Tlus arder was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
This walk is poured concrete with tree heaves, water pockets,
5 0'''�
SOli17
asphalt patches, scaled, settled, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. PASCAL ST. from Englewood Ave. to
Hewitt Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. PASCAL ST. from Frankson Ave. to W.
Arlington Ave. & N.S. FRANKSON AVE. from N. Pascal St. to McKinley St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
61- t��
SUMMARY OF ENGINEERING RECOMI��NDATIONS
Wazd 5
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. AVON ST. from W. Ivy Ave. to Lakeview
Ave. & N.S. W. IVY AVE. from N. Avon St. to N. Grotto St.
L/� 1(��� INITIATING ACTION: This order was initiated by the Director of Public Works as public
<J�� � �� necessity on the basis of one (1) complaint, a petition with one (1) signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
�' ��
PRO.IECT: RECONSTRUCT SIDEWALK B.S. W. COTTAGE AVE. from N. Avon St. to N.
Grotto 5t.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints and an inspection of the wa1k.
This walk is poured concrete with tree heaves, asphalt patches,
Solp93
�� �.
settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. CUMBERLAND ST. from W. Cook Ave. to
W. Maryland Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of eleven (11) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: CONSTRDCT NEW SIDL°WALK & RECONSTRUCT SIDEWALK N.S.
HATCH AVE. from N. Aale St. to Kent St.
INITIATING ACTION: This arder was initiated by the Directar of Public Works as public
necesity on the basis of a petition with one (1) signer and an inspection of the walk.
pi_`�?�
-z-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, scaled, and settled
panels.
PRO.IECT.• RECONSTRUCT SIDEWALK N.S. LAKEVIEW AVE. from E. Como Blvd. to N.
Victoria St. at 409 Lakeview Ave. Only.
��I I� I INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured conczete with water pockets and settled panels.
PRO.IECT: RECONSTRUCT SIDEWALK N.S. E. MAGNOLIA AVE. from Sylvan St. to
Jackson St.
5�' IO/� INITIATINGACTION: This order was initiated by the Director of Public Works as public
'► necessity on the basis of fifteen (15) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, and cracked panels.
v ��I'�
SpIIIL
PROJECT: RECONSTRUCT SIDEWALK B.S. W. MARYLAND AVE. from E. Como Slvd.
to N. Grotto St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of five (5) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is pouzed concrete with tree heaves, water pockets,
asphalt patches, disintegrated, settled, cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK S.S. W. MARYLAND AVE. from Cumberland St.
to N. Western Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
o�-�n
-3-
�D1113
SU��I�
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, settled, cracked,
and uneven panels.
PRO.)ECT: RECONSTRUCT SIDEWALK B.S. MATILDA ST. from Front Ave. to W.
Lawson Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRIICT SIDEWALK B.S. W. ORANGE AVE. from Woodbridge St. to
Rice St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. WOODBRIDGE ST. from Hatch Ave. to W.
Lawson Ave. & N.S. HATCH AVE. from Woodbridge St. to Albemarle St.
5 � � 137 INITIATING ACTION: This order was initiated by the Director of Public Warks as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settied, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. WOODBI2IDGE ST. from W. Orange Ave. to
5� 1 ' �d W Ivy Ave.
t o
INITIATING ACTION: This order was initiated by the Director of Public Warks as public
necessity on the basis of five (S) complaints and an inspection of the walk.
b t - ���
�
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, and cracked panels.
4 i ����
SUMMARY OF ENGINEERING RECOMA�NDATIONS
Wud 6
PRO.IECT.� RECONSTRUCT SIDEWALK B.S. CASE AVE. from Cypress St. to Eazl St. &
N.S. CASE AVE. from Frank St. to Duluth St.
S O� ��� INITIATING ACTIOtV: This order was initiated by the Director of Public Works as public
necessity on the basis of four (4) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. CLEAR AVE. from N. Hazel St. to Fumess
Pkwy.
��1�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, disintegrated, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. E. IDAHO AVE. from Chamber St. to
English St.
���� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphalt patches, and
cracked panels.
PRO.IECT.• RECONSTRUCT SIDEWALK E.S. N. RUTH ST. from E. Cottage Ave. to
5���� Sherwood Ave.
0
INITIATINGACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
O l -G'13
-2-
EXISTING CONDITIONS: This walk is poured concrete with asphalt patches, scaled, settled,
cracked, and uneven panels.
CITY OF ST. PAUL
PRELIMINARY ORDER
� �- s�` 6�`�?3
COUNCIL FILE NO. _ �
By V�
File o_SO10 ,Sb C
501093 01098,
S0111 501113,
501123,501130,
Voting Ward_ 1,4,�
6-SO 8,501092,
Ol 0, 01107-S01109
115- 01117,501121
01137, 01138,501144
& 6
In the Mattar of sidewalk reconstruction and/or new construction at the following
locations:
501079 - Both sides North Avon Street from West Ivy Avenue to Lakeview Avenue &
North side West Ivy Avenue from North Avon Street to North Grotto Street.
501086 - Both sides Case Avenue from Cypress Street to Earl Street & North side
Case Avenue from Frank Street to Duluth Street.
501087 - Both sides Clear Avenue from North Hazel Street to Furness Parkway.
501088 - South side Como Avenue from North Albert Street to North Hamline Avenue.
501092 - Both sides West Cottage Avenue from North Avon Street to North Grotto
Street.
501093 - Both sides Cumberland Street from West Cook Avenue to West Maryland Avenue
501098 - North side Hatch Avenue from North Dale Street to Kent Street.
501100 - Both sides East Idaho Avenue from Chamber Street to English Street.
501107 - North side Lakeview Avenue from East Como Boulevard to North Victoria
Street at 909 Lakeview Avenue Only.
501108 - Both sides Laurel Avenue from Western Avenue to Virginia Street & South
side Laurel Avenue from virginia Street to Farrington Street.
501109 - North side East Magnolia Avenue from Sylvan Street to Jackson Street.
501111 - Both sides West Maryland Avenue from East Como Boulevard to North Grotto'
Street.
501112 - South side West Maryland Avenue from Cumberland Street to North Western
Avenue.
S01113 - Both sides Matilda Street from Front Avenue to West Lawson Avenue.
501115 - Both sides West Orange Avenue from Woodbridge Street to Rice Street.
501116 - Both sides North Pascal Street from Englewood Avenue to Hewitt Avenue.
501117 - Both sides North Pascal Street from Frankson Avenue to West Arlington Avenue
& North side Frankson Avenue from North Pascal Street to McKinley Street.
501121 - East side North Ruth Street from East Cottage Avenue to Sherwood Avenue.
501123 - Both sides Sherburne Avenue
Street & East side North St
Universrty Avenue. �' �"
50113Q - Both sides Thomas Avenue from Nozth Lexington Parkway to North Chatsworth
Street & East side North Oxford Street from Thomas Avenue to Lafond Avenue
501137 - Both sides Woodbridge Street from Hatch Avenue to West Lawson Avenue &
North side Hatch Avenue from Woodbridge Street to Albemarle Street.
501138 - Both sides Woodbridge Street from West Orange Avenue to West Ivy Avenue
S01144 - Both sides Thomas Avenue from North Chatsworth Street to North Milton Street
& West side North Milton Street from Edmund Avenue to Thomas Avenue.
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. Al1 other widths will be prorated accordingly. Naw construction
(where no walk existed) - 1000 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
NNLTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For n w and reconstructed sidewalk; IOOg of actual cost estimated to be
approximately $6.09 per square foot.
The Council of the City of Saint Pau1 having received the report of the Mayor upon
the above improvement, and having consic2ered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 2000 Public Improvement Aid.
2. That a public hearing be had on said improvement on the 27�" dav of June , 2002
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place.of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas f Nays
� Benanav
�akey
� strom
vC�oleman
�E'farris
�antry
�eiter
0 �-591
from North St. Albans Street to North Dale
Albans Street from Sherburne Avenue to West
�In Favor
�Against
Adopted by Council: Date \
Certified Passed by Council Secretary
By �^ �- �� . _ �i
�
Mayor