01-587CITY OF ST. PAUL
EINAL ORDER
COUNCIL FILE NO. O� � S��J
BY
FILE NO. 599086 �� _
VOTING WARD
In the Matter of side+'ralk reconstzuction at the following locations:
S99086 - South Side Prince Street from Broadway Street to 225 feet easterly.
under Preliminary Order Ql —�`� O approved o
The Council of the City of 5aint Paul has conducted a pu lic hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Pau1 does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion oP said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON Adopted by the Date � ��__,
Yeas Nay
�Benanav
✓Blakey
�ostrom�
✓Coleman
✓Harris
� and�p�
✓Reiter
Prince 599086
�
�
� In �«r BY
� Against
Certified Passes by Council Secretary
—�_\ � a - J
G I I I���
� l�, Mayor
�
Public HearinQ Date —
Pub]i��Vorks Street Design/Construc[ion
Larry H. Lueth 266-6083
MUSTBEONCOUNCILAGENDABY(DATt� SJI6E ZOOI
Must be in Council Research 5/4j01
¢116��; � GREEN SHEET
pEPARTMENT DIREGTOR
A551GN
CffYATTOflNEY
NUMBERFOR
pOUi1NG ❑ FINANCIALSEftVICESDIR.
ORDER
gst
No. 110455
mnwma�e
CITYCAUNdL L`�
❑ cmc�RK
❑ fINANCIAISERV/ACCTG
� CAUNCIIRESEARCH
❑
❑ MAYOR(OFASSISTANn
❑
TOTAL # OF SIGNATURE PAGES
(CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION RE�UESTED
Reconsttuct Sidewalk SOUTH SIDE OF PRINCE STREET, from Broadway to 225' Easterly.
RECOMMENDATIONS:Approve (/.) or Reject (R)
PLANNING COMMISSION
�_ CIB CAMMI7TEE
__ CIVIISERVICECOMMISSION
A STAFF
Haz ihis persoNhrtn evet wodceU undar a corrtract for this department?
YES NO
Has Inis persw✓i(rm ever been a city empbyee?
YES NO
Dces ihis persoNfirtn possess a SkAI not nom�aly possessetl Cy any cu�rer�t ciry employee?
YES tJ�
Is this persoNfimn a targete0 vendoR
YE$ NO
y¢s answen on seperam sFeat and eHach to gmen sheet
' The problem " deFective sidewalk" is a result of aging structural walk. In conjunction with the walk reconstruction, the areaway wil] be
' abandoned, the loading dock facility reconsavcted, a patio type azea for outdoor dining constructed, and ornamental railing instalied.
ADYANTAGESIFAPPROYED:
The community will benefit greatly from this project because it will provide safe sidewalk for its citizens. The supplemental amenities will
benefit the adjacent Northern Warehouse Building and create a pedestrian friendly azea in Lowertown.
: DISADVANiAGES IF APPROVED:
None, as the adjacent property ovmer is in favor of the ptoject and the project is financed with assessments.
'� DISADVAMAGES IP NOT APPROVED:
i The structural walk will continue to deteriorate resulting in huard to the pedestrian.
�707AL AMOUNT OF TRANSACTfOh S dfNl nn(1 fq COSTIREVENUE BUOGETE� (CIRCLE ONE) YES No �
�FUNOINGSOURCE ���men[s ACTNff1'NUMBER C99-2T697-0784-2�013
' FtNANC1AL IPlFORMATION (E%PLAINJ WUd � P s„>P�
�'��� ;� � 2��1
Summa�y of Engineering Recommendations
Report Prepared - November, 2000
Finai Order Hearing
PROJECT
bl - SU?
Sidewalk reconstcuction related work along the south side of Prince Street easterly of Broadway Sueet adjacent to
the Northem Wazehouse Building. The Northem Wazehouse Building property is described as: L,ots I, 2, 3, and 4
in Block 61 of Kittson's Addirion to Saint Paul; together with that part of the adjacent alley that accrued thereto by
reason of the vacation thereof; together with that part of Pine Street, as vacated, that accured thereto by teason of
the vacation thereof.
IhTITIATING ACTION:
This improvement was initiated by the Northem Wazehouse Building owner upon request by the Ciry of Saint Paul.
EXISTING CONDITIONS
The existing structural walk azea serves as a roof for the azeaway beneath and as a raised loading dock facility for
the adjacent Northern Wazehouse Building. The existing sevctural walk is in poor condition and must be
reconstrvcted.
PROPOSED IMPROVEMENT:
Reconstruct public sidewalk and related work along ihe south side of Prince Street easterly of Broadway Street
adjacent to the Northern Warehouse Building. The related work includes demolifion oF the existing azeaway (vault
area beneath the sidewallc ) and loading dock facility, removal of assorted utilities from the areaway, removal of
underground fuel tanlc from that azeaway, construction of closure walls in basement of adjacent building filling of
the areaway with granular material, reconstrucfion of loading azea, installation of ornamental railing along sidewalk
plaza azea, and conshuction of stairway up to main building entrance on Prince Street.
ESTIMATED COST AND FINANCING:
Estunated Conshvction Cost
Engineering/Administration
Misc. & City Force Work
Financing Service Fee
Estimated Total ExpendiYures
$300,000.00
$ 20,000.00
$ 5�,000.00
$ 23 000.00
$A00,000.00
Financing - Assessments
INFORMATIONAL MEETING:
Have met with the one property owner affected.
SOURCE OF ADDITIONAL INFORMATION:
Contact Lazry Lueth at 651-266-6083
SUMMARY OF RECOMMENDATIONS
This project will greatly improve ffie appearance and safety of the walk and will create a pedestrian friendly plaza
area , thus the Department of Public Works recommends approval of the project.
Respectfully submitted,
� ��� Larry H. Luefl ; j i
Assistant City Engineer
. y ,
� /
, �
�
S7 ' �'`�J
S �
.
��
`sJ
�
\' �
/ /°��
�
\�
� 3 �
� �, /� � oa ��.
tJ
. �4 f
� 5 ��p�'��� Q �"��
Q
.�' 4.
�� ' 6 Y �
�Y�
6 e
� . - � i � � � 9
i �
� ,, \ �.
o� ,
� � � � �
z � ,�O � .
: � � �
. �
' . i 5' �� ` �,'
% �� Q�
\ � � �� �' � � � � � � tA
.
, � . V �.
• �\ � (�i � � i �. �o
-0 \ �¢� 3 �� I ��
v �
. \ 4 . � � �\ J e �,� � � Z d
o �� o
� m o —► �.
� < � �
� - � � � � \
\ ` � ���4�� � Q \ \\ � � 6
/ �' i � € G
/ n� . e ' \ Q . g�2
. ( r `_ � � o \ ' i8 �\� 9 /
� \';�`�./�•. ` � �;�,Z'�y��� ,_. \ (� ~� '
'�° � ' S�
�/ `� � � � / � .. .
• � �` ' , \
( � � �
, .. �
. � .. •: ,
,� ., h' o ,s •.•• \ S
' \� \"�, y �. (', , { � \� �
� ;, � i 2 \ � � .�,� � \
�
i� � � ° ' s, 9 � '� .� ;
� �
� � � c `�, \ �i' O � dp � � � �
• o �S � � '`� ' � G � �'� ��� •s
� ... � � "�, C' r �\ m _ �
� , � s �' o o !�, ?•�
' �� � ss3 �� '�. \ � . ° yr y p�F G °� � � �.
/;� �`� � \ � �f,'"� �� �A� �� \ � \�
:�
� � - � � 5� �2 �� �
� Y' � S o �� A �� � �
r' � �� -� ��� 'o � �
� ��'� ,, '� � i i � �
\ ... �
\\ � " � �. y O � • __ _����
- .°� �( � Q rv � x , L +fl , / '..- �%
� , �' \ Q .v� .�
\ � `> '� � ^ i� � �� 5 ` '� � �`
. C \ p �-.
t y' „ � '' �
° i� � `�YC � y �o°� /. , `.�`
� • :< i .4 `� / S 0 ti C• �. � T.
\ , , �i � ` \ � \ \ � � ., � � 0 ` � �
` '.��\ _ 2 \�` ^\� � ` �y i\\ �,`\ \ � � , ��t N , c � NC'
i \ ,. `\ m , \' ,� _ �. � �.�3'��
� � ' ` �` _ \ � • � � o'. �'` C
� a\ 1 \\ � \ � ' \ �ir � / � `, \
+ 1 � 1 ` `� ` <��>f `�! oa \,'� `P. .
� ��\�� �, � � � ,, � . . �° � ,.� , ,
,\ \ � \ , , �/ - '�� op�t'\�.r°. � ` @a, �v � 4 �
', \ �. '� .S e- °: c. � � �
CZTY OF ST. PAVL
PRELIMINARY ORDER
0�-587
covx L �s 01� y�R
BY
FILE NO. 599086 ab -
VOTING WARD
In the Matter of sidewalk reconstruction at the following locations:
599086 - South Side Prince Street from Broadway Street to 225 feet easterly.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $400,000
financed by assessments.
2. That a public hearing be had on said improvement on Wednesday,
the 6th of June. 2001, at 5:30 o'clock P.M., in the Council
Chambers of the City Hall and Court House Building in the City of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCZI,PEFtSON
Yea
✓Benanav
�/ Blakey
� Bostrom
� Coleman
public hearing be given to
by the Charter, stating the
of the improvement and the
the persons and in
time and place of
total cost thereof
Adopted by the Date �
�e
Nay
�artified Passes hy Council Secretary
� Ill Favo gy � -� I� � '�
� i� .
,/ Harris � Against
-��I.an'�"ry Mayor
7 Reiter
(Prince_S99086)
CITY OF ST. PAUL
EINAL ORDER
COUNCIL FILE NO. O� � S��J
BY
FILE NO. 599086 �� _
VOTING WARD
In the Matter of side+'ralk reconstzuction at the following locations:
S99086 - South Side Prince Street from Broadway Street to 225 feet easterly.
under Preliminary Order Ql —�`� O approved o
The Council of the City of 5aint Paul has conducted a pu lic hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Pau1 does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion oP said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON Adopted by the Date � ��__,
Yeas Nay
�Benanav
✓Blakey
�ostrom�
✓Coleman
✓Harris
� and�p�
✓Reiter
Prince 599086
�
�
� In �«r BY
� Against
Certified Passes by Council Secretary
—�_\ � a - J
G I I I���
� l�, Mayor
�
Public HearinQ Date —
Pub]i��Vorks Street Design/Construc[ion
Larry H. Lueth 266-6083
MUSTBEONCOUNCILAGENDABY(DATt� SJI6E ZOOI
Must be in Council Research 5/4j01
¢116��; � GREEN SHEET
pEPARTMENT DIREGTOR
A551GN
CffYATTOflNEY
NUMBERFOR
pOUi1NG ❑ FINANCIALSEftVICESDIR.
ORDER
gst
No. 110455
mnwma�e
CITYCAUNdL L`�
❑ cmc�RK
❑ fINANCIAISERV/ACCTG
� CAUNCIIRESEARCH
❑
❑ MAYOR(OFASSISTANn
❑
TOTAL # OF SIGNATURE PAGES
(CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION RE�UESTED
Reconsttuct Sidewalk SOUTH SIDE OF PRINCE STREET, from Broadway to 225' Easterly.
RECOMMENDATIONS:Approve (/.) or Reject (R)
PLANNING COMMISSION
�_ CIB CAMMI7TEE
__ CIVIISERVICECOMMISSION
A STAFF
Haz ihis persoNhrtn evet wodceU undar a corrtract for this department?
YES NO
Has Inis persw✓i(rm ever been a city empbyee?
YES NO
Dces ihis persoNfirtn possess a SkAI not nom�aly possessetl Cy any cu�rer�t ciry employee?
YES tJ�
Is this persoNfimn a targete0 vendoR
YE$ NO
y¢s answen on seperam sFeat and eHach to gmen sheet
' The problem " deFective sidewalk" is a result of aging structural walk. In conjunction with the walk reconstruction, the areaway wil] be
' abandoned, the loading dock facility reconsavcted, a patio type azea for outdoor dining constructed, and ornamental railing instalied.
ADYANTAGESIFAPPROYED:
The community will benefit greatly from this project because it will provide safe sidewalk for its citizens. The supplemental amenities will
benefit the adjacent Northern Warehouse Building and create a pedestrian friendly azea in Lowertown.
: DISADVANiAGES IF APPROVED:
None, as the adjacent property ovmer is in favor of the ptoject and the project is financed with assessments.
'� DISADVAMAGES IP NOT APPROVED:
i The structural walk will continue to deteriorate resulting in huard to the pedestrian.
�707AL AMOUNT OF TRANSACTfOh S dfNl nn(1 fq COSTIREVENUE BUOGETE� (CIRCLE ONE) YES No �
�FUNOINGSOURCE ���men[s ACTNff1'NUMBER C99-2T697-0784-2�013
' FtNANC1AL IPlFORMATION (E%PLAINJ WUd � P s„>P�
�'��� ;� � 2��1
Summa�y of Engineering Recommendations
Report Prepared - November, 2000
Finai Order Hearing
PROJECT
bl - SU?
Sidewalk reconstcuction related work along the south side of Prince Street easterly of Broadway Sueet adjacent to
the Northem Wazehouse Building. The Northem Wazehouse Building property is described as: L,ots I, 2, 3, and 4
in Block 61 of Kittson's Addirion to Saint Paul; together with that part of the adjacent alley that accrued thereto by
reason of the vacation thereof; together with that part of Pine Street, as vacated, that accured thereto by teason of
the vacation thereof.
IhTITIATING ACTION:
This improvement was initiated by the Northem Wazehouse Building owner upon request by the Ciry of Saint Paul.
EXISTING CONDITIONS
The existing structural walk azea serves as a roof for the azeaway beneath and as a raised loading dock facility for
the adjacent Northern Wazehouse Building. The existing sevctural walk is in poor condition and must be
reconstrvcted.
PROPOSED IMPROVEMENT:
Reconstruct public sidewalk and related work along ihe south side of Prince Street easterly of Broadway Street
adjacent to the Northern Warehouse Building. The related work includes demolifion oF the existing azeaway (vault
area beneath the sidewallc ) and loading dock facility, removal of assorted utilities from the areaway, removal of
underground fuel tanlc from that azeaway, construction of closure walls in basement of adjacent building filling of
the areaway with granular material, reconstrucfion of loading azea, installation of ornamental railing along sidewalk
plaza azea, and conshuction of stairway up to main building entrance on Prince Street.
ESTIMATED COST AND FINANCING:
Estunated Conshvction Cost
Engineering/Administration
Misc. & City Force Work
Financing Service Fee
Estimated Total ExpendiYures
$300,000.00
$ 20,000.00
$ 5�,000.00
$ 23 000.00
$A00,000.00
Financing - Assessments
INFORMATIONAL MEETING:
Have met with the one property owner affected.
SOURCE OF ADDITIONAL INFORMATION:
Contact Lazry Lueth at 651-266-6083
SUMMARY OF RECOMMENDATIONS
This project will greatly improve ffie appearance and safety of the walk and will create a pedestrian friendly plaza
area , thus the Department of Public Works recommends approval of the project.
Respectfully submitted,
� ��� Larry H. Luefl ; j i
Assistant City Engineer
. y ,
� /
, �
�
S7 ' �'`�J
S �
.
��
`sJ
�
\' �
/ /°��
�
\�
� 3 �
� �, /� � oa ��.
tJ
. �4 f
� 5 ��p�'��� Q �"��
Q
.�' 4.
�� ' 6 Y �
�Y�
6 e
� . - � i � � � 9
i �
� ,, \ �.
o� ,
� � � � �
z � ,�O � .
: � � �
. �
' . i 5' �� ` �,'
% �� Q�
\ � � �� �' � � � � � � tA
.
, � . V �.
• �\ � (�i � � i �. �o
-0 \ �¢� 3 �� I ��
v �
. \ 4 . � � �\ J e �,� � � Z d
o �� o
� m o —► �.
� < � �
� - � � � � \
\ ` � ���4�� � Q \ \\ � � 6
/ �' i � € G
/ n� . e ' \ Q . g�2
. ( r `_ � � o \ ' i8 �\� 9 /
� \';�`�./�•. ` � �;�,Z'�y��� ,_. \ (� ~� '
'�° � ' S�
�/ `� � � � / � .. .
• � �` ' , \
( � � �
, .. �
. � .. •: ,
,� ., h' o ,s •.•• \ S
' \� \"�, y �. (', , { � \� �
� ;, � i 2 \ � � .�,� � \
�
i� � � ° ' s, 9 � '� .� ;
� �
� � � c `�, \ �i' O � dp � � � �
• o �S � � '`� ' � G � �'� ��� •s
� ... � � "�, C' r �\ m _ �
� , � s �' o o !�, ?•�
' �� � ss3 �� '�. \ � . ° yr y p�F G °� � � �.
/;� �`� � \ � �f,'"� �� �A� �� \ � \�
:�
� � - � � 5� �2 �� �
� Y' � S o �� A �� � �
r' � �� -� ��� 'o � �
� ��'� ,, '� � i i � �
\ ... �
\\ � " � �. y O � • __ _����
- .°� �( � Q rv � x , L +fl , / '..- �%
� , �' \ Q .v� .�
\ � `> '� � ^ i� � �� 5 ` '� � �`
. C \ p �-.
t y' „ � '' �
° i� � `�YC � y �o°� /. , `.�`
� • :< i .4 `� / S 0 ti C• �. � T.
\ , , �i � ` \ � \ \ � � ., � � 0 ` � �
` '.��\ _ 2 \�` ^\� � ` �y i\\ �,`\ \ � � , ��t N , c � NC'
i \ ,. `\ m , \' ,� _ �. � �.�3'��
� � ' ` �` _ \ � • � � o'. �'` C
� a\ 1 \\ � \ � ' \ �ir � / � `, \
+ 1 � 1 ` `� ` <��>f `�! oa \,'� `P. .
� ��\�� �, � � � ,, � . . �° � ,.� , ,
,\ \ � \ , , �/ - '�� op�t'\�.r°. � ` @a, �v � 4 �
', \ �. '� .S e- °: c. � � �
CZTY OF ST. PAVL
PRELIMINARY ORDER
0�-587
covx L �s 01� y�R
BY
FILE NO. 599086 ab -
VOTING WARD
In the Matter of sidewalk reconstruction at the following locations:
599086 - South Side Prince Street from Broadway Street to 225 feet easterly.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $400,000
financed by assessments.
2. That a public hearing be had on said improvement on Wednesday,
the 6th of June. 2001, at 5:30 o'clock P.M., in the Council
Chambers of the City Hall and Court House Building in the City of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCZI,PEFtSON
Yea
✓Benanav
�/ Blakey
� Bostrom
� Coleman
public hearing be given to
by the Charter, stating the
of the improvement and the
the persons and in
time and place of
total cost thereof
Adopted by the Date �
�e
Nay
�artified Passes hy Council Secretary
� Ill Favo gy � -� I� � '�
� i� .
,/ Harris � Against
-��I.an'�"ry Mayor
7 Reiter
(Prince_S99086)
CITY OF ST. PAUL
EINAL ORDER
COUNCIL FILE NO. O� � S��J
BY
FILE NO. 599086 �� _
VOTING WARD
In the Matter of side+'ralk reconstzuction at the following locations:
S99086 - South Side Prince Street from Broadway Street to 225 feet easterly.
under Preliminary Order Ql —�`� O approved o
The Council of the City of 5aint Paul has conducted a pu lic hearing
upon the above improvement, due notice thereof having been given as
prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and
recommendations pertaining to said proposed improvement and has fully
considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Pau1 does hereby order
that the above-described improvement be made, and the proper City officers
are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion oP said improvement, the
proper City officers shall calculate all expenses incurred therein and shall
report the same to the City Council in accordance with Chapter 14 of the City
Charter.
COUNCILPERSON Adopted by the Date � ��__,
Yeas Nay
�Benanav
✓Blakey
�ostrom�
✓Coleman
✓Harris
� and�p�
✓Reiter
Prince 599086
�
�
� In �«r BY
� Against
Certified Passes by Council Secretary
—�_\ � a - J
G I I I���
� l�, Mayor
�
Public HearinQ Date —
Pub]i��Vorks Street Design/Construc[ion
Larry H. Lueth 266-6083
MUSTBEONCOUNCILAGENDABY(DATt� SJI6E ZOOI
Must be in Council Research 5/4j01
¢116��; � GREEN SHEET
pEPARTMENT DIREGTOR
A551GN
CffYATTOflNEY
NUMBERFOR
pOUi1NG ❑ FINANCIALSEftVICESDIR.
ORDER
gst
No. 110455
mnwma�e
CITYCAUNdL L`�
❑ cmc�RK
❑ fINANCIAISERV/ACCTG
� CAUNCIIRESEARCH
❑
❑ MAYOR(OFASSISTANn
❑
TOTAL # OF SIGNATURE PAGES
(CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION RE�UESTED
Reconsttuct Sidewalk SOUTH SIDE OF PRINCE STREET, from Broadway to 225' Easterly.
RECOMMENDATIONS:Approve (/.) or Reject (R)
PLANNING COMMISSION
�_ CIB CAMMI7TEE
__ CIVIISERVICECOMMISSION
A STAFF
Haz ihis persoNhrtn evet wodceU undar a corrtract for this department?
YES NO
Has Inis persw✓i(rm ever been a city empbyee?
YES NO
Dces ihis persoNfirtn possess a SkAI not nom�aly possessetl Cy any cu�rer�t ciry employee?
YES tJ�
Is this persoNfimn a targete0 vendoR
YE$ NO
y¢s answen on seperam sFeat and eHach to gmen sheet
' The problem " deFective sidewalk" is a result of aging structural walk. In conjunction with the walk reconstruction, the areaway wil] be
' abandoned, the loading dock facility reconsavcted, a patio type azea for outdoor dining constructed, and ornamental railing instalied.
ADYANTAGESIFAPPROYED:
The community will benefit greatly from this project because it will provide safe sidewalk for its citizens. The supplemental amenities will
benefit the adjacent Northern Warehouse Building and create a pedestrian friendly azea in Lowertown.
: DISADVANiAGES IF APPROVED:
None, as the adjacent property ovmer is in favor of the ptoject and the project is financed with assessments.
'� DISADVAMAGES IP NOT APPROVED:
i The structural walk will continue to deteriorate resulting in huard to the pedestrian.
�707AL AMOUNT OF TRANSACTfOh S dfNl nn(1 fq COSTIREVENUE BUOGETE� (CIRCLE ONE) YES No �
�FUNOINGSOURCE ���men[s ACTNff1'NUMBER C99-2T697-0784-2�013
' FtNANC1AL IPlFORMATION (E%PLAINJ WUd � P s„>P�
�'��� ;� � 2��1
Summa�y of Engineering Recommendations
Report Prepared - November, 2000
Finai Order Hearing
PROJECT
bl - SU?
Sidewalk reconstcuction related work along the south side of Prince Street easterly of Broadway Sueet adjacent to
the Northem Wazehouse Building. The Northem Wazehouse Building property is described as: L,ots I, 2, 3, and 4
in Block 61 of Kittson's Addirion to Saint Paul; together with that part of the adjacent alley that accrued thereto by
reason of the vacation thereof; together with that part of Pine Street, as vacated, that accured thereto by teason of
the vacation thereof.
IhTITIATING ACTION:
This improvement was initiated by the Northem Wazehouse Building owner upon request by the Ciry of Saint Paul.
EXISTING CONDITIONS
The existing structural walk azea serves as a roof for the azeaway beneath and as a raised loading dock facility for
the adjacent Northern Wazehouse Building. The existing sevctural walk is in poor condition and must be
reconstrvcted.
PROPOSED IMPROVEMENT:
Reconstruct public sidewalk and related work along ihe south side of Prince Street easterly of Broadway Street
adjacent to the Northern Warehouse Building. The related work includes demolifion oF the existing azeaway (vault
area beneath the sidewallc ) and loading dock facility, removal of assorted utilities from the areaway, removal of
underground fuel tanlc from that azeaway, construction of closure walls in basement of adjacent building filling of
the areaway with granular material, reconstrucfion of loading azea, installation of ornamental railing along sidewalk
plaza azea, and conshuction of stairway up to main building entrance on Prince Street.
ESTIMATED COST AND FINANCING:
Estunated Conshvction Cost
Engineering/Administration
Misc. & City Force Work
Financing Service Fee
Estimated Total ExpendiYures
$300,000.00
$ 20,000.00
$ 5�,000.00
$ 23 000.00
$A00,000.00
Financing - Assessments
INFORMATIONAL MEETING:
Have met with the one property owner affected.
SOURCE OF ADDITIONAL INFORMATION:
Contact Lazry Lueth at 651-266-6083
SUMMARY OF RECOMMENDATIONS
This project will greatly improve ffie appearance and safety of the walk and will create a pedestrian friendly plaza
area , thus the Department of Public Works recommends approval of the project.
Respectfully submitted,
� ��� Larry H. Luefl ; j i
Assistant City Engineer
. y ,
� /
, �
�
S7 ' �'`�J
S �
.
��
`sJ
�
\' �
/ /°��
�
\�
� 3 �
� �, /� � oa ��.
tJ
. �4 f
� 5 ��p�'��� Q �"��
Q
.�' 4.
�� ' 6 Y �
�Y�
6 e
� . - � i � � � 9
i �
� ,, \ �.
o� ,
� � � � �
z � ,�O � .
: � � �
. �
' . i 5' �� ` �,'
% �� Q�
\ � � �� �' � � � � � � tA
.
, � . V �.
• �\ � (�i � � i �. �o
-0 \ �¢� 3 �� I ��
v �
. \ 4 . � � �\ J e �,� � � Z d
o �� o
� m o —► �.
� < � �
� - � � � � \
\ ` � ���4�� � Q \ \\ � � 6
/ �' i � € G
/ n� . e ' \ Q . g�2
. ( r `_ � � o \ ' i8 �\� 9 /
� \';�`�./�•. ` � �;�,Z'�y��� ,_. \ (� ~� '
'�° � ' S�
�/ `� � � � / � .. .
• � �` ' , \
( � � �
, .. �
. � .. •: ,
,� ., h' o ,s •.•• \ S
' \� \"�, y �. (', , { � \� �
� ;, � i 2 \ � � .�,� � \
�
i� � � ° ' s, 9 � '� .� ;
� �
� � � c `�, \ �i' O � dp � � � �
• o �S � � '`� ' � G � �'� ��� •s
� ... � � "�, C' r �\ m _ �
� , � s �' o o !�, ?•�
' �� � ss3 �� '�. \ � . ° yr y p�F G °� � � �.
/;� �`� � \ � �f,'"� �� �A� �� \ � \�
:�
� � - � � 5� �2 �� �
� Y' � S o �� A �� � �
r' � �� -� ��� 'o � �
� ��'� ,, '� � i i � �
\ ... �
\\ � " � �. y O � • __ _����
- .°� �( � Q rv � x , L +fl , / '..- �%
� , �' \ Q .v� .�
\ � `> '� � ^ i� � �� 5 ` '� � �`
. C \ p �-.
t y' „ � '' �
° i� � `�YC � y �o°� /. , `.�`
� • :< i .4 `� / S 0 ti C• �. � T.
\ , , �i � ` \ � \ \ � � ., � � 0 ` � �
` '.��\ _ 2 \�` ^\� � ` �y i\\ �,`\ \ � � , ��t N , c � NC'
i \ ,. `\ m , \' ,� _ �. � �.�3'��
� � ' ` �` _ \ � • � � o'. �'` C
� a\ 1 \\ � \ � ' \ �ir � / � `, \
+ 1 � 1 ` `� ` <��>f `�! oa \,'� `P. .
� ��\�� �, � � � ,, � . . �° � ,.� , ,
,\ \ � \ , , �/ - '�� op�t'\�.r°. � ` @a, �v � 4 �
', \ �. '� .S e- °: c. � � �
CZTY OF ST. PAVL
PRELIMINARY ORDER
0�-587
covx L �s 01� y�R
BY
FILE NO. 599086 ab -
VOTING WARD
In the Matter of sidewalk reconstruction at the following locations:
599086 - South Side Prince Street from Broadway Street to 225 feet easterly.
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $400,000
financed by assessments.
2. That a public hearing be had on said improvement on Wednesday,
the 6th of June. 2001, at 5:30 o'clock P.M., in the Council
Chambers of the City Hall and Court House Building in the City of
Saint Paul.
3. That notice of said
the manner provided
hearing, the nature
as estimated.
COUNCZI,PEFtSON
Yea
✓Benanav
�/ Blakey
� Bostrom
� Coleman
public hearing be given to
by the Charter, stating the
of the improvement and the
the persons and in
time and place of
total cost thereof
Adopted by the Date �
�e
Nay
�artified Passes hy Council Secretary
� Ill Favo gy � -� I� � '�
� i� .
,/ Harris � Against
-��I.an'�"ry Mayor
7 Reiter
(Prince_S99086)