01-585��.��.a� - 5�.�-� �, �-eQ `
CITY OF ST. PAUL
FINAL ORDER
COUN L� FIL O �� S�
By r �
Fi No._501025, 501029, S01030,501034
501038, 501040-S01042,501048
501053-501057,501066-501072
Voting Ward_l, 2, 3, 4
In the Matter of sidevralk reconstruction at the following locatioas:
501025 - Both sides Eairmount Avenue from Kenneth Street to South Prior Avenue &
West side South Prior Avenue from Fairmount Avenue to Princeton Avenue.
501029 - Both sides Goodrich Avenue from South Cretin Avenue to South Finn Street.
501030 - Both sides Goodrich Avenue from South Finn Street to South Cleveland Avenue.
501034 - Both sides Highland Parkway from South Cretin Avenue to South Finn Street.
S01038 - Both Sides James Avenue from South Wheeler Street to South Davern Street.
S01040 - Both Sides Laurel Avenue from North Pascal Street to North Albert Street
& South side Laurel Avenue from North Albert Street to North Hamline Avenue
501041 - Both sides Laurel Avenue from Dewey Street to North Fairview Avenue.
501042 - Both sides Lincoln Avenue from South Dunlap Street to Ayd Mill Road.
501048 - Both sides Randolph Avenue from Davern Street to Macalester Street.
-�- 501053 - East side South Saratoga Street from Scheffer Avenue to Hartford Avenue &
West side South Saratoga Street fromScheffer Avenue to Hartford Avenue at
641 South Saratoga Street Only. �q�� p uer -� �'„�„�� �rt ��\
C:-l� G�wn�.� \ M'� '
501054 - North side Summit Avenue from Aldine Street to North Whee7er Street.
501055 - South side Summit Avenue from South Dunlap Street to South Lexington Parkway
501056 - South side Summit Avenue from South Saratoga Street to South Pascal Street
at 1464 Summit Avenue.
501057 - Both sides Watson Avenue from South Victoria Street to View Street.
501066 - Both sides Fairmount Avenue from South Cleveland Avenue to Kenneth Street.
� 501067 - Both sides Fairmount Avenue from South Prior Avenue to South Howell Street
La & a��r ��w�� �rt, aoo\ , C;'�. C.o�cti:\ rni� .
501068 - Both sides Fairmount Avenue from South Pascal Street to South Albert Street
S01069 - Both sides James Avenue from South Pascal Street to South Albert 5treet.
501070 - Both sides South Dunlap Street from Goodrich Avenue to lincoln Avenue.
S01071 - Both sides North Milton Street from Iglehart Avenue to Concordia Avenue.
501072 - North side Summit Avenue from North Dunlap Street to North Lexington Parkway
a� -s�s
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement o£ old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths wi11 be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.SQ per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of tYte City Charter.
COL7NCILPERSONS
Yeas Nays
✓ 3�enanav
v�Iakey
vBostrom
v�oleman
�rris
�ntry
�iter
Adopted by Council: Date��� (�200�
v �
Certified Passed by Council Secretary
�In Favor By �` c�- Y—� 1�. — _ �
C7._Against ��
�"d Mayor
�����a/
+'U��
Works - Sidewalk Division
� • �� ��� NUMBEii FOR
Y flOUfiNG
t � � OROER
(GUP ALL LOCA FOR SIGNATUq�
� �,�; ��� j��
GREEN SHEET NO. 110431
INITIAUDATE INITIAVDATE
DEPARTMENiDIREGTOR ❑CT'COUNQL
CT'ATTORNEY ❑qil'CIERK �
BUDGEi DIFiECTOR ❑ FIN. & MGT. SERNCES DIR.
MAYOR (OR ASSI5fANn �1 Council Research ��
DEPT.ACCOUNTAlIr
�/ � 3 �D/
& Reconstruct Sidewalk in Wards 1, 2, 3& 4
_CML
COMMISSION
_CIB CAMMITTEE
A �A�
�
PERSONAL SERMCE CONTRAC�S MUS7 ANSWER THE FOLLOWINC. QUESTIONSI
1. Has this personffirm ever woAced untler a coni2ct fortt1is department?
YES NO
2. Hasihis persoNfirm ever been a ciry employee?
YES NO
3. Does Mis perso�rtn pos5ess a skill not nortnaly possessetl by any current ciry employee?
YES NO
Explain all yes answers on separete sheet anC attach to green sheet
(WHO, WHAT. WHEN.
The problem "defective sidewalk" was caused by multiple probiems, tree roots, poor subgrade materials, freeRhaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition wouid worsen to a state where it
would be unusa6te and subject to increased pedestrian injuries from falis and possible litigations.
WHICH GOUNGL OBJECTIVE?
S5 {.Z,3��f
IF APPROVED:
The community will benefit from this project because it wili provide safe defect free sidewalks fior its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVANTAGES IF APPROVED:
Historicatly, the sidewaik reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite che fact that up to one-haif the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, wili generate more personai injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
�$L��°�f�� ����2C
��� � � 2���
IOUNT OF TRANSACTION $
SOURCE D��M^�6
INFORMATON: (EXPL4IN)
a
ENUE BUDGETED (CIpCLE
NUMBER COl-ZT7rJ�
NO
61-Sd'S
SUMMARY OF ENGTNEERING RECOMMENDATIONS
Wazd 4
PRD.IECT.• R&CONSTRUCT SIDEWALK B.3. FAIRMOUNT AVE. from S. Cleveland Ave.
to Kenneth St.
��� INITIATING ACTION.• This order was initiated by the Director of Public Warks as public
necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAIItMOUNT AVE. from Kenneth St. to S.
Prior Ave. & W.S. S. PRIOR AVE. from Fairmount Ave. to Princeton Ave.
50 107 j� INITIATING ACTION: This order was initiated by the Director of Public Woks as public
�-- necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with h heaves, water pockets,
asphalt patches, settled, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAII2MOLJNT AVE. from S. Prior Ave. to S.
Howell St.
SDt�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This waik is powed concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. GOODRICH AVE. from S. Cretin Ave. to S.
Finn St.
�� v � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of five (5) complaints and an inspection of the walk.
0 4-StS
-2-
�o�a�o
�oI �I
�OlodfO
i���
EXISTING CONDITIONS: This walk is oid tile and poured concrete with tree heaves, settled,
cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. GOODRICH AVE. from S. Finn St. to S.
Cleveland Ave.
INITIATING ACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the waik.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.TECT: RECONSTKUCT SIDEWALK B.S. LAUREL AVE. from Dewey St. to N.
Fairview Ave.
INITIATING ACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
setded, cracked, and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. LAUREL AVE. from N. Pascal St. to N.
Albert St. & S.S. LAUREL AVE, from N. Albert St. to N. Hamline Ave.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven pane]s.
PRO.IECT.• RECON5TRUCT SIDEWALK N.S. SUMMTT AVE. from Aldine St. to N.
Wheeler St.
INITIATING ACTION: This otder was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
o i -sr.s
-3-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, and cracked panels.
oi-st'S
SUMMARY OF ENGINEERING RECONIlVIENDATIONS
Wazd 3
501o1r�
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAIRMOITNT AVE. from S. Pascal St. S.
Albert St.
INITIATING ACTIDN: This order was initiated by the Director of Public Works as public
necessity on the basis of an inspection of the walk.
Thls walk is poured concrete with tree heaves, water pockets,
501Q3`f
setded, cracked, and uneven panels.
FRO.IECT: RECONSTRUCT SIDEWALK B.S. HIGHLAND PKWY. from S. Cretin Ave. to
S. Finn St.
INITIATINGACTION: This order was initiated by the Directar of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphait patches,
SOt049
settled, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. JAMES AVE. from S. Pascal St. to S. Albert
St.
INITIATING ACTION: This order was initiated by ihe Director of Public Works as public
necessity on the basis of an inspection of the walk.
This walk is poured concrete with heaves, disintegrated, scaled,
and settied panels.
.........................................................................................................
� ( �
PROJECT: RECONSTRUCT SIDEWALK B.S. 3AMES AVE. from S. Wheeler St. to S.
Davern St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
o� -s�'.f
-2-
�0��
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven paneis.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. RANDOLPH AVE.. from Davern St. to
Macalester St.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIDNS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
.........................................................................................................
st�053
( O��
PRO.)ECT: CONSTRUCT NEW SZDEWALK & RECONSTRUCT SIDEWALK E.S. S.
SARATOGA ST. from Scheffer Ave. to Hartford Ave. & W.S. S. SARATOGA ST. from
Scheffer Ave. to Hattford Ave. aC 641 S. Saratoga St. Oniy.
INI77ATINGACTION: This order was initiated by the Director of Public works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK S.S. SUMMIT AVE. from S. Saratoga St. to S.
Pascal St. at 1464 Summit Ave. Only.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) comp]aint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, and
settled panels.
o � -s�'s
SUMMARY OF ENGINEERING RECOMII�NDATIONS
Ward 2
�1���
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. DIJNLAP ST. from Goodrich Ave. to
Lincoln Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree heaves, broken
tile, scaled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. LINCOLN AVE. from S. Dunlap St. to Ayd
Mill Rd.
!� (�'n�q INITIATING ACTION: This order was initiated by the Director of Public Works as public
� V��i necessity on the basis of five (5) compiaints and an inspection of the walk.
EXISTING CDNDITIDNS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
vDI�
PRD.TECT.• RECONSTRUCT SIDEWALK S.S. SUMMIT AVE. from S. Dunlap St. to S.
Lexington Pkwy.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) compiaint and an inspection of the walk.
This walk is poured concrete with heaved panels and aspha7t
�� �/l f
patches.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. WATSON AVE. from S. Victoria St. to View
St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessiry on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
or -s�-�
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
a � -s�f
SUMMARY OF ENGINEERING RECOMI��NDATIONS
Wazd 1
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. NIII.TON ST. from Iglehart Ave. to
Concordia Ave.
�!� I�' INITIATING ACTION: This order was initiated by the Director of Pubiic Works as public
�� necessiry on the basis of one (1) complaint, a petition with one (1) signer, and an inspecrion of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK N.S. SUMMIT AVE. from N. Dunlap St. to N.
Lexington Pkwy.
����Z INITIATING AC770N: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2} complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
a �-585
CITY OF ST. PAUL
PRELIMINARY ORDER
o�-�l`i5 ��
By
F' No.�501025, S01Q29, SQ1�30,501034,
501038, S01040-S01042,501048,
501053-501057,501066-501072
Voting Ward_1,2,3,4
Ia the Mattez o£ sidewalk reconstruction and/or aew coastructioa at the follomiag
locatioas:
5�1025 - Both sides Fairmount Avenue £rom Kenneth Street to South Prior Avenue &
West side South Prior Avenue from Fairmount Avenue yo Princeton Avenue.
S01029 - Both sides Goodrich Avenue from South Cretin Avenue to South Finn Street.
S01030 - Both sides Goodrich Avenue from 5outh Finn Street to South Cleveland Avenue.
S01034 - Both sides Highland Parkway £rom South Cretin Avenue to South Finn Street.
S01038 - Both sides James Avenue from South Wheeler Street to South Davern Street.
501040 - Both sides Laurel Avenue from North Pascal Street to North Albert Street
& South side Laurel Avenue from North Albert Street to North Hamline Avenue.
501041 - Both sides Laurel Avenue from Dewey Street to North Fairview Avenue.
501042 - Both sides Lincoln Avenue from South Dunlap Street to Ayd Mill Road.
501048 - Both sides Randolph Avenue from Davern Street to Macalester Street.
501053 - East side South Saratoga Street £rom Scheffer Avenue to Hartford Avenue &
West side South Saratoga Street Erom Scheffer Avenue to Hartford Avenue at
641 South Saratoga Street Only.
801054 - North side Summit Avenue from Aldine Street to North Wheeler Street.
501055 - South side Summit Avenue from South Punlap Street to South Lexington Parkway
5�1�56 - South side Summit Avenue from South Saratoga Street to South Pascal Street
at 1464 Summit Avenue.
501057 - Both sides Watson Avenue from South Victoria Street to View Street.
501066 - Both sides Fairmount Avenue from South Cleveland Avenue to Kenneth Street.
501067 - Both sides Fairmount Avenue from South Prior Avenue to South Howell Street.
S01068 - Both sides Fairmount Avenue £rom South Pascal Street to South Albert Street.
501069 - Both sides James Avenue from South Pascal Street to South Albert Street.
501070 - Both sides South Dunlap Street from Goodrich Avenue to Lincoln Avenue.
S01071 - Both sides North Milton Street from Iglehart Avenue to Concordia Avenue.
501072 - North side Summit Avenue from North Dunlap Street to North Lexington Parkway
a - 585
o � -`1'�5
*ESTIMATED CONSTRUCTIOA7 RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. Naw construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 15Q
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $6.09 per square foat.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1_ That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 200� Public Improvement Aid.
2. That a public hearing be had on said improvement on the 6 dav of June . 2001
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City o£ Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓B� nanav
✓Blakey
�ostrom
v�oleman
,�farri s
✓Lantry
�iter
�In Favor
0 Against
Adopted by Council: Date��p b,
Certified Passed by Council S�retary
BY �� e�- J'�Y - � - � 2 _
\
Mayor
��.��.a� - 5�.�-� �, �-eQ `
CITY OF ST. PAUL
FINAL ORDER
COUN L� FIL O �� S�
By r �
Fi No._501025, 501029, S01030,501034
501038, 501040-S01042,501048
501053-501057,501066-501072
Voting Ward_l, 2, 3, 4
In the Matter of sidevralk reconstruction at the following locatioas:
501025 - Both sides Eairmount Avenue from Kenneth Street to South Prior Avenue &
West side South Prior Avenue from Fairmount Avenue to Princeton Avenue.
501029 - Both sides Goodrich Avenue from South Cretin Avenue to South Finn Street.
501030 - Both sides Goodrich Avenue from South Finn Street to South Cleveland Avenue.
501034 - Both sides Highland Parkway from South Cretin Avenue to South Finn Street.
S01038 - Both Sides James Avenue from South Wheeler Street to South Davern Street.
S01040 - Both Sides Laurel Avenue from North Pascal Street to North Albert Street
& South side Laurel Avenue from North Albert Street to North Hamline Avenue
501041 - Both sides Laurel Avenue from Dewey Street to North Fairview Avenue.
501042 - Both sides Lincoln Avenue from South Dunlap Street to Ayd Mill Road.
501048 - Both sides Randolph Avenue from Davern Street to Macalester Street.
-�- 501053 - East side South Saratoga Street from Scheffer Avenue to Hartford Avenue &
West side South Saratoga Street fromScheffer Avenue to Hartford Avenue at
641 South Saratoga Street Only. �q�� p uer -� �'„�„�� �rt ��\
C:-l� G�wn�.� \ M'� '
501054 - North side Summit Avenue from Aldine Street to North Whee7er Street.
501055 - South side Summit Avenue from South Dunlap Street to South Lexington Parkway
501056 - South side Summit Avenue from South Saratoga Street to South Pascal Street
at 1464 Summit Avenue.
501057 - Both sides Watson Avenue from South Victoria Street to View Street.
501066 - Both sides Fairmount Avenue from South Cleveland Avenue to Kenneth Street.
� 501067 - Both sides Fairmount Avenue from South Prior Avenue to South Howell Street
La & a��r ��w�� �rt, aoo\ , C;'�. C.o�cti:\ rni� .
501068 - Both sides Fairmount Avenue from South Pascal Street to South Albert Street
S01069 - Both sides James Avenue from South Pascal Street to South Albert 5treet.
501070 - Both sides South Dunlap Street from Goodrich Avenue to lincoln Avenue.
S01071 - Both sides North Milton Street from Iglehart Avenue to Concordia Avenue.
501072 - North side Summit Avenue from North Dunlap Street to North Lexington Parkway
a� -s�s
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement o£ old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths wi11 be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.SQ per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of tYte City Charter.
COL7NCILPERSONS
Yeas Nays
✓ 3�enanav
v�Iakey
vBostrom
v�oleman
�rris
�ntry
�iter
Adopted by Council: Date��� (�200�
v �
Certified Passed by Council Secretary
�In Favor By �` c�- Y—� 1�. - �
C7._Against ��
�"d Mayor
�����a/
+'U��
Works - Sidewalk Division
� • �� ��� NUMBEii FOR
Y flOUfiNG
t � � OROER
(GUP ALL LOCA FOR SIGNATUq�
� �,�; ��� j��
GREEN SHEET NO. 110431
INITIAUDATE INITIAVDATE
DEPARTMENiDIREGTOR ❑CT'COUNQL
CT'ATTORNEY ❑qil'CIERK �
BUDGEi DIFiECTOR ❑ FIN. & MGT. SERNCES DIR.
MAYOR (OR ASSI5fANn �1 Council Research ��
DEPT.ACCOUNTAlIr
�/ � 3 �D/
& Reconstruct Sidewalk in Wards 1, 2, 3& 4
_CML
COMMISSION
_CIB CAMMITTEE
A �A�
�
PERSONAL SERMCE CONTRAC�S MUS7 ANSWER THE FOLLOWINC. QUESTIONSI
1. Has this personffirm ever woAced untler a coni2ct fortt1is department?
YES NO
2. Hasihis persoNfirm ever been a ciry employee?
YES NO
3. Does Mis perso�rtn pos5ess a skill not nortnaly possessetl by any current ciry employee?
YES NO
Explain all yes answers on separete sheet anC attach to green sheet
(WHO, WHAT. WHEN.
The problem "defective sidewalk" was caused by multiple probiems, tree roots, poor subgrade materials, freeRhaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition wouid worsen to a state where it
would be unusa6te and subject to increased pedestrian injuries from falis and possible litigations.
WHICH GOUNGL OBJECTIVE?
S5 {.Z,3��f
IF APPROVED:
The community will benefit from this project because it wili provide safe defect free sidewalks fior its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVANTAGES IF APPROVED:
Historicatly, the sidewaik reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite che fact that up to one-haif the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, wili generate more personai injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
�$L��°�f�� ����2C
��� � � 2���
IOUNT OF TRANSACTION $
SOURCE D��M^�6
INFORMATON: (EXPL4IN)
a
ENUE BUDGETED (CIpCLE
NUMBER COl-ZT7rJ�
NO
61-Sd'S
SUMMARY OF ENGTNEERING RECOMMENDATIONS
Wazd 4
PRD.IECT.• R&CONSTRUCT SIDEWALK B.3. FAIRMOUNT AVE. from S. Cleveland Ave.
to Kenneth St.
��� INITIATING ACTION.• This order was initiated by the Director of Public Warks as public
necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAIItMOUNT AVE. from Kenneth St. to S.
Prior Ave. & W.S. S. PRIOR AVE. from Fairmount Ave. to Princeton Ave.
50 107 j� INITIATING ACTION: This order was initiated by the Director of Public Woks as public
�-- necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with h heaves, water pockets,
asphalt patches, settled, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAII2MOLJNT AVE. from S. Prior Ave. to S.
Howell St.
SDt�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This waik is powed concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. GOODRICH AVE. from S. Cretin Ave. to S.
Finn St.
�� v � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of five (5) complaints and an inspection of the walk.
0 4-StS
-2-
�o�a�o
�oI �I
�OlodfO
i���
EXISTING CONDITIONS: This walk is oid tile and poured concrete with tree heaves, settled,
cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. GOODRICH AVE. from S. Finn St. to S.
Cleveland Ave.
INITIATING ACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the waik.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.TECT: RECONSTKUCT SIDEWALK B.S. LAUREL AVE. from Dewey St. to N.
Fairview Ave.
INITIATING ACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
setded, cracked, and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. LAUREL AVE. from N. Pascal St. to N.
Albert St. & S.S. LAUREL AVE, from N. Albert St. to N. Hamline Ave.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven pane]s.
PRO.IECT.• RECON5TRUCT SIDEWALK N.S. SUMMTT AVE. from Aldine St. to N.
Wheeler St.
INITIATING ACTION: This otder was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
o i -sr.s
-3-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, and cracked panels.
oi-st'S
SUMMARY OF ENGINEERING RECONIlVIENDATIONS
Wazd 3
501o1r�
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAIRMOITNT AVE. from S. Pascal St. S.
Albert St.
INITIATING ACTIDN: This order was initiated by the Director of Public Works as public
necessity on the basis of an inspection of the walk.
Thls walk is poured concrete with tree heaves, water pockets,
501Q3`f
setded, cracked, and uneven panels.
FRO.IECT: RECONSTRUCT SIDEWALK B.S. HIGHLAND PKWY. from S. Cretin Ave. to
S. Finn St.
INITIATINGACTION: This order was initiated by the Directar of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphait patches,
SOt049
settled, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. JAMES AVE. from S. Pascal St. to S. Albert
St.
INITIATING ACTION: This order was initiated by ihe Director of Public Works as public
necessity on the basis of an inspection of the walk.
This walk is poured concrete with heaves, disintegrated, scaled,
and settied panels.
.........................................................................................................
� ( �
PROJECT: RECONSTRUCT SIDEWALK B.S. 3AMES AVE. from S. Wheeler St. to S.
Davern St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
o� -s�'.f
-2-
�0��
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven paneis.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. RANDOLPH AVE.. from Davern St. to
Macalester St.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIDNS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
.........................................................................................................
st�053
( O��
PRO.)ECT: CONSTRUCT NEW SZDEWALK & RECONSTRUCT SIDEWALK E.S. S.
SARATOGA ST. from Scheffer Ave. to Hartford Ave. & W.S. S. SARATOGA ST. from
Scheffer Ave. to Hattford Ave. aC 641 S. Saratoga St. Oniy.
INI77ATINGACTION: This order was initiated by the Director of Public works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK S.S. SUMMIT AVE. from S. Saratoga St. to S.
Pascal St. at 1464 Summit Ave. Only.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) comp]aint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, and
settled panels.
o � -s�'s
SUMMARY OF ENGINEERING RECOMII�NDATIONS
Ward 2
�1���
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. DIJNLAP ST. from Goodrich Ave. to
Lincoln Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree heaves, broken
tile, scaled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. LINCOLN AVE. from S. Dunlap St. to Ayd
Mill Rd.
!� (�'n�q INITIATING ACTION: This order was initiated by the Director of Public Works as public
� V��i necessity on the basis of five (5) compiaints and an inspection of the walk.
EXISTING CDNDITIDNS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
vDI�
PRD.TECT.• RECONSTRUCT SIDEWALK S.S. SUMMIT AVE. from S. Dunlap St. to S.
Lexington Pkwy.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) compiaint and an inspection of the walk.
This walk is poured concrete with heaved panels and aspha7t
�� �/l f
patches.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. WATSON AVE. from S. Victoria St. to View
St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessiry on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
or -s�-�
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
a � -s�f
SUMMARY OF ENGINEERING RECOMI��NDATIONS
Wazd 1
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. NIII.TON ST. from Iglehart Ave. to
Concordia Ave.
�!� I�' INITIATING ACTION: This order was initiated by the Director of Pubiic Works as public
�� necessiry on the basis of one (1) complaint, a petition with one (1) signer, and an inspecrion of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK N.S. SUMMIT AVE. from N. Dunlap St. to N.
Lexington Pkwy.
����Z INITIATING AC770N: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2} complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
a �-585
CITY OF ST. PAUL
PRELIMINARY ORDER
o�-�l`i5 ��
By
F' No.�501025, S01Q29, SQ1�30,501034,
501038, S01040-S01042,501048,
501053-501057,501066-501072
Voting Ward_1,2,3,4
Ia the Mattez o£ sidewalk reconstruction and/or aew coastructioa at the follomiag
locatioas:
5�1025 - Both sides Fairmount Avenue £rom Kenneth Street to South Prior Avenue &
West side South Prior Avenue from Fairmount Avenue yo Princeton Avenue.
S01029 - Both sides Goodrich Avenue from South Cretin Avenue to South Finn Street.
S01030 - Both sides Goodrich Avenue from 5outh Finn Street to South Cleveland Avenue.
S01034 - Both sides Highland Parkway £rom South Cretin Avenue to South Finn Street.
S01038 - Both sides James Avenue from South Wheeler Street to South Davern Street.
501040 - Both sides Laurel Avenue from North Pascal Street to North Albert Street
& South side Laurel Avenue from North Albert Street to North Hamline Avenue.
501041 - Both sides Laurel Avenue from Dewey Street to North Fairview Avenue.
501042 - Both sides Lincoln Avenue from South Dunlap Street to Ayd Mill Road.
501048 - Both sides Randolph Avenue from Davern Street to Macalester Street.
501053 - East side South Saratoga Street £rom Scheffer Avenue to Hartford Avenue &
West side South Saratoga Street Erom Scheffer Avenue to Hartford Avenue at
641 South Saratoga Street Only.
801054 - North side Summit Avenue from Aldine Street to North Wheeler Street.
501055 - South side Summit Avenue from South Punlap Street to South Lexington Parkway
5�1�56 - South side Summit Avenue from South Saratoga Street to South Pascal Street
at 1464 Summit Avenue.
501057 - Both sides Watson Avenue from South Victoria Street to View Street.
501066 - Both sides Fairmount Avenue from South Cleveland Avenue to Kenneth Street.
501067 - Both sides Fairmount Avenue from South Prior Avenue to South Howell Street.
S01068 - Both sides Fairmount Avenue £rom South Pascal Street to South Albert Street.
501069 - Both sides James Avenue from South Pascal Street to South Albert Street.
501070 - Both sides South Dunlap Street from Goodrich Avenue to Lincoln Avenue.
S01071 - Both sides North Milton Street from Iglehart Avenue to Concordia Avenue.
501072 - North side Summit Avenue from North Dunlap Street to North Lexington Parkway
a - 585
o � -`1'�5
*ESTIMATED CONSTRUCTIOA7 RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. Naw construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 15Q
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $6.09 per square foat.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1_ That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 200� Public Improvement Aid.
2. That a public hearing be had on said improvement on the 6 dav of June . 2001
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City o£ Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓B� nanav
✓Blakey
�ostrom
v�oleman
,�farri s
✓Lantry
�iter
�In Favor
0 Against
Adopted by Council: Date��p b,
Certified Passed by Council S�retary
BY �� e�- J'�Y - � - � 2 _
\
Mayor
��.��.a� - 5�.�-� �, �-eQ `
CITY OF ST. PAUL
FINAL ORDER
COUN L� FIL O �� S�
By r �
Fi No._501025, 501029, S01030,501034
501038, 501040-S01042,501048
501053-501057,501066-501072
Voting Ward_l, 2, 3, 4
In the Matter of sidevralk reconstruction at the following locatioas:
501025 - Both sides Eairmount Avenue from Kenneth Street to South Prior Avenue &
West side South Prior Avenue from Fairmount Avenue to Princeton Avenue.
501029 - Both sides Goodrich Avenue from South Cretin Avenue to South Finn Street.
501030 - Both sides Goodrich Avenue from South Finn Street to South Cleveland Avenue.
501034 - Both sides Highland Parkway from South Cretin Avenue to South Finn Street.
S01038 - Both Sides James Avenue from South Wheeler Street to South Davern Street.
S01040 - Both Sides Laurel Avenue from North Pascal Street to North Albert Street
& South side Laurel Avenue from North Albert Street to North Hamline Avenue
501041 - Both sides Laurel Avenue from Dewey Street to North Fairview Avenue.
501042 - Both sides Lincoln Avenue from South Dunlap Street to Ayd Mill Road.
501048 - Both sides Randolph Avenue from Davern Street to Macalester Street.
-�- 501053 - East side South Saratoga Street from Scheffer Avenue to Hartford Avenue &
West side South Saratoga Street fromScheffer Avenue to Hartford Avenue at
641 South Saratoga Street Only. �q�� p uer -� �'„�„�� �rt ��\
C:-l� G�wn�.� \ M'� '
501054 - North side Summit Avenue from Aldine Street to North Whee7er Street.
501055 - South side Summit Avenue from South Dunlap Street to South Lexington Parkway
501056 - South side Summit Avenue from South Saratoga Street to South Pascal Street
at 1464 Summit Avenue.
501057 - Both sides Watson Avenue from South Victoria Street to View Street.
501066 - Both sides Fairmount Avenue from South Cleveland Avenue to Kenneth Street.
� 501067 - Both sides Fairmount Avenue from South Prior Avenue to South Howell Street
La & a��r ��w�� �rt, aoo\ , C;'�. C.o�cti:\ rni� .
501068 - Both sides Fairmount Avenue from South Pascal Street to South Albert Street
S01069 - Both sides James Avenue from South Pascal Street to South Albert 5treet.
501070 - Both sides South Dunlap Street from Goodrich Avenue to lincoln Avenue.
S01071 - Both sides North Milton Street from Iglehart Avenue to Concordia Avenue.
501072 - North side Summit Avenue from North Dunlap Street to North Lexington Parkway
a� -s�s
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement o£ old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths wi11 be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimated to be
approximately $4.SQ per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESIDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of tYte City Charter.
COL7NCILPERSONS
Yeas Nays
✓ 3�enanav
v�Iakey
vBostrom
v�oleman
�rris
�ntry
�iter
Adopted by Council: Date��� (�200�
v �
Certified Passed by Council Secretary
�In Favor By �` c�- Y—� 1�. - �
C7._Against ��
�"d Mayor
�����a/
+'U��
Works - Sidewalk Division
� • �� ��� NUMBEii FOR
Y flOUfiNG
t � � OROER
(GUP ALL LOCA FOR SIGNATUq�
� �,�; ��� j��
GREEN SHEET NO. 110431
INITIAUDATE INITIAVDATE
DEPARTMENiDIREGTOR ❑CT'COUNQL
CT'ATTORNEY ❑qil'CIERK �
BUDGEi DIFiECTOR ❑ FIN. & MGT. SERNCES DIR.
MAYOR (OR ASSI5fANn �1 Council Research ��
DEPT.ACCOUNTAlIr
�/ � 3 �D/
& Reconstruct Sidewalk in Wards 1, 2, 3& 4
_CML
COMMISSION
_CIB CAMMITTEE
A �A�
�
PERSONAL SERMCE CONTRAC�S MUS7 ANSWER THE FOLLOWINC. QUESTIONSI
1. Has this personffirm ever woAced untler a coni2ct fortt1is department?
YES NO
2. Hasihis persoNfirm ever been a ciry employee?
YES NO
3. Does Mis perso�rtn pos5ess a skill not nortnaly possessetl by any current ciry employee?
YES NO
Explain all yes answers on separete sheet anC attach to green sheet
(WHO, WHAT. WHEN.
The problem "defective sidewalk" was caused by multiple probiems, tree roots, poor subgrade materials, freeRhaw cycies,
service life limits, chemical additives, extreme temperature variations, etc. These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrected, the sidewalk condition wouid worsen to a state where it
would be unusa6te and subject to increased pedestrian injuries from falis and possible litigations.
WHICH GOUNGL OBJECTIVE?
S5 {.Z,3��f
IF APPROVED:
The community will benefit from this project because it wili provide safe defect free sidewalks fior its citizens. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVANTAGES IF APPROVED:
Historicatly, the sidewaik reconstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite che fact that up to one-haif the assessment is City
subsidized. Having to assess for walk reconstruction remains a controversial issue.
NOT APPROVED:
This option would allow the infrastructure of sidewalk stock to deteriorate, which in turn, wili generate more personai injury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as well as claim payouts.
�$L��°�f�� ����2C
��� � � 2���
IOUNT OF TRANSACTION $
SOURCE D��M^�6
INFORMATON: (EXPL4IN)
a
ENUE BUDGETED (CIpCLE
NUMBER COl-ZT7rJ�
NO
61-Sd'S
SUMMARY OF ENGTNEERING RECOMMENDATIONS
Wazd 4
PRD.IECT.• R&CONSTRUCT SIDEWALK B.3. FAIRMOUNT AVE. from S. Cleveland Ave.
to Kenneth St.
��� INITIATING ACTION.• This order was initiated by the Director of Public Warks as public
necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAIItMOUNT AVE. from Kenneth St. to S.
Prior Ave. & W.S. S. PRIOR AVE. from Fairmount Ave. to Princeton Ave.
50 107 j� INITIATING ACTION: This order was initiated by the Director of Public Woks as public
�-- necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with h heaves, water pockets,
asphalt patches, settled, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAII2MOLJNT AVE. from S. Prior Ave. to S.
Howell St.
SDt�� INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This waik is powed concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. GOODRICH AVE. from S. Cretin Ave. to S.
Finn St.
�� v � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of five (5) complaints and an inspection of the walk.
0 4-StS
-2-
�o�a�o
�oI �I
�OlodfO
i���
EXISTING CONDITIONS: This walk is oid tile and poured concrete with tree heaves, settled,
cracked, and uneven panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. GOODRICH AVE. from S. Finn St. to S.
Cleveland Ave.
INITIATING ACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the waik.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.TECT: RECONSTKUCT SIDEWALK B.S. LAUREL AVE. from Dewey St. to N.
Fairview Ave.
INITIATING ACTION.• This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
setded, cracked, and uneven panels.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. LAUREL AVE. from N. Pascal St. to N.
Albert St. & S.S. LAUREL AVE, from N. Albert St. to N. Hamline Ave.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven pane]s.
PRO.IECT.• RECON5TRUCT SIDEWALK N.S. SUMMTT AVE. from Aldine St. to N.
Wheeler St.
INITIATING ACTION: This otder was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
o i -sr.s
-3-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, and cracked panels.
oi-st'S
SUMMARY OF ENGINEERING RECONIlVIENDATIONS
Wazd 3
501o1r�
PRO.IECT: RECONSTRUCT SIDEWALK B.S. FAIRMOITNT AVE. from S. Pascal St. S.
Albert St.
INITIATING ACTIDN: This order was initiated by the Director of Public Works as public
necessity on the basis of an inspection of the walk.
Thls walk is poured concrete with tree heaves, water pockets,
501Q3`f
setded, cracked, and uneven panels.
FRO.IECT: RECONSTRUCT SIDEWALK B.S. HIGHLAND PKWY. from S. Cretin Ave. to
S. Finn St.
INITIATINGACTION: This order was initiated by the Directar of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
This walk is poured concrete with tree heaves, asphait patches,
SOt049
settled, and cracked panels.
PROJECT: RECONSTRUCT SIDEWALK B.S. JAMES AVE. from S. Pascal St. to S. Albert
St.
INITIATING ACTION: This order was initiated by ihe Director of Public Works as public
necessity on the basis of an inspection of the walk.
This walk is poured concrete with heaves, disintegrated, scaled,
and settied panels.
.........................................................................................................
� ( �
PROJECT: RECONSTRUCT SIDEWALK B.S. 3AMES AVE. from S. Wheeler St. to S.
Davern St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
o� -s�'.f
-2-
�0��
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven paneis.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. RANDOLPH AVE.. from Davern St. to
Macalester St.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIDNS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
.........................................................................................................
st�053
( O��
PRO.)ECT: CONSTRUCT NEW SZDEWALK & RECONSTRUCT SIDEWALK E.S. S.
SARATOGA ST. from Scheffer Ave. to Hartford Ave. & W.S. S. SARATOGA ST. from
Scheffer Ave. to Hattford Ave. aC 641 S. Saratoga St. Oniy.
INI77ATINGACTION: This order was initiated by the Director of Public works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
scaled, settled, and cracked panels.
PRO.IECT: RECONSTRUCT SIDEWALK S.S. SUMMIT AVE. from S. Saratoga St. to S.
Pascal St. at 1464 Summit Ave. Only.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) comp]aint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches, and
settled panels.
o � -s�'s
SUMMARY OF ENGINEERING RECOMII�NDATIONS
Ward 2
�1���
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. DIJNLAP ST. from Goodrich Ave. to
Lincoln Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of an inspection of the walk.
EXISTING CONDITIONS: This walk is old tile and poured concrete with tree heaves, broken
tile, scaled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. LINCOLN AVE. from S. Dunlap St. to Ayd
Mill Rd.
!� (�'n�q INITIATING ACTION: This order was initiated by the Director of Public Works as public
� V��i necessity on the basis of five (5) compiaints and an inspection of the walk.
EXISTING CDNDITIDNS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
vDI�
PRD.TECT.• RECONSTRUCT SIDEWALK S.S. SUMMIT AVE. from S. Dunlap St. to S.
Lexington Pkwy.
INITIATINGACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) compiaint and an inspection of the walk.
This walk is poured concrete with heaved panels and aspha7t
�� �/l f
patches.
PRO.TECT: RECONSTRUCT SIDEWALK B.S. WATSON AVE. from S. Victoria St. to View
St.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessiry on the basis of three (3) complaints, a petition with one (1) signer, and an inspection of
the walk.
or -s�-�
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
a � -s�f
SUMMARY OF ENGINEERING RECOMI��NDATIONS
Wazd 1
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. NIII.TON ST. from Iglehart Ave. to
Concordia Ave.
�!� I�' INITIATING ACTION: This order was initiated by the Director of Pubiic Works as public
�� necessiry on the basis of one (1) complaint, a petition with one (1) signer, and an inspecrion of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK N.S. SUMMIT AVE. from N. Dunlap St. to N.
Lexington Pkwy.
����Z INITIATING AC770N: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2} complaints and an inspection of the wa1k.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
.........................................................................................................
a �-585
CITY OF ST. PAUL
PRELIMINARY ORDER
o�-�l`i5 ��
By
F' No.�501025, S01Q29, SQ1�30,501034,
501038, S01040-S01042,501048,
501053-501057,501066-501072
Voting Ward_1,2,3,4
Ia the Mattez o£ sidewalk reconstruction and/or aew coastructioa at the follomiag
locatioas:
5�1025 - Both sides Fairmount Avenue £rom Kenneth Street to South Prior Avenue &
West side South Prior Avenue from Fairmount Avenue yo Princeton Avenue.
S01029 - Both sides Goodrich Avenue from South Cretin Avenue to South Finn Street.
S01030 - Both sides Goodrich Avenue from 5outh Finn Street to South Cleveland Avenue.
S01034 - Both sides Highland Parkway £rom South Cretin Avenue to South Finn Street.
S01038 - Both sides James Avenue from South Wheeler Street to South Davern Street.
501040 - Both sides Laurel Avenue from North Pascal Street to North Albert Street
& South side Laurel Avenue from North Albert Street to North Hamline Avenue.
501041 - Both sides Laurel Avenue from Dewey Street to North Fairview Avenue.
501042 - Both sides Lincoln Avenue from South Dunlap Street to Ayd Mill Road.
501048 - Both sides Randolph Avenue from Davern Street to Macalester Street.
501053 - East side South Saratoga Street £rom Scheffer Avenue to Hartford Avenue &
West side South Saratoga Street Erom Scheffer Avenue to Hartford Avenue at
641 South Saratoga Street Only.
801054 - North side Summit Avenue from Aldine Street to North Wheeler Street.
501055 - South side Summit Avenue from South Punlap Street to South Lexington Parkway
5�1�56 - South side Summit Avenue from South Saratoga Street to South Pascal Street
at 1464 Summit Avenue.
501057 - Both sides Watson Avenue from South Victoria Street to View Street.
501066 - Both sides Fairmount Avenue from South Cleveland Avenue to Kenneth Street.
501067 - Both sides Fairmount Avenue from South Prior Avenue to South Howell Street.
S01068 - Both sides Fairmount Avenue £rom South Pascal Street to South Albert Street.
501069 - Both sides James Avenue from South Pascal Street to South Albert Street.
501070 - Both sides South Dunlap Street from Goodrich Avenue to Lincoln Avenue.
S01071 - Both sides North Milton Street from Iglehart Avenue to Concordia Avenue.
501072 - North side Summit Avenue from North Dunlap Street to North Lexington Parkway
a - 585
o � -`1'�5
*ESTIMATED CONSTRUCTIOA7 RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. Naw construction
(where no walk existed) - 100� of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 15Q
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $6.09 per square foat.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1_ That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 200� Public Improvement Aid.
2. That a public hearing be had on said improvement on the 6 dav of June . 2001
5:30 o'clock P.M. in the Council Chambers of the City Hall and Court House
Building in the City o£ Saint Paul.
3. That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
✓B� nanav
✓Blakey
�ostrom
v�oleman
,�farri s
✓Lantry
�iter
�In Favor
0 Against
Adopted by Council: Date��p b,
Certified Passed by Council S�retary
BY �� e�- J'�Y - � - � 2 _
\
Mayor