01-582CITY OF ST. PAUL
FINAL ORDER
1
1 p.
By �% �/ �Cl `�
File No._SO 019, S01020, S01028,S01046
501058, 501061-501065
Voting Ward_1, 2, 3, 4
In the Matter of sidewalk reconstxuction at the following locations:
501019 - Both sides Amherst Street from St. Clair Avenue to Princeton Avenue.
501020 - Both sides Amherst Street from Princeton Avenue to Goodrich Avenue & Both
sides Goodrich Avenue from South Wheeler Street to Amherst Street.
501028 - Both sides Ford Parkway from Davern Street to Macalester Street.
501046 - Both sides North Oxford Street from Portland Avenue to Ashland Avenue.
501058 - Both Sides South Wheeler Street from St. Clair Avenue to Princeton Avenue.
501061 - Both Sides South Saratoga Street from Hartford Avenue to Niles Avenue.
501062 - East side North Lexington Parkway from Summit Avenue to Portland Avenue
& North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501063 - Both sides South Saratoga Street from Niles Avenue to Randolph Avenue.
501064 - Both sides North Oxford Street from Summit Avenue to Portland Avenue &
North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501065 - East side Keston Street from Commonwealth Avenue to Carter Avenue at 1280
& 1286 Keston Street Only.
oi- SS2-
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimatecl to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESSDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
_ �
The Council of the City of Saint Paul has conducted a publi'E hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, Tha� upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
Benanav
f Blakey
✓Bostrom
✓Coleman
f arris
r/Lantry
//Iteiter
Adopted by Council: Date�3-�c�
Certified Passed by Council Secretary
� In Favor
� Against
, Nl�Sei�.�
��a6L1C
W orks - Sidewalk pivision
GREEN
R�.� 5f��01
T NO. 102775
PHONE I� DEPARTMEPIr DIFEGTOF
NUNBERFOR I�
- ] . ASSIGN CfTYATTORNEY
L AGENDA BY (DAiE}��� 1 ( �I`ttl !, O D p � gUIX'iEf DIRECTOR
��11� 117�1 F. N(� \ 111IV�+ �Ot U Il l l. �lMVOR (OFi ASSISTANr)
PAGES _ (GLJPALLLOCATIONSFORSIGNATUREy
Sidewa& in W ards t, 2, 3& 4
STAFP
COUNEIL
CH CAUNCIL OBJECTIVE?
CfiY COUNdL Q � I
CITV CLEFK
FIN.B MGT. SERVICES DIR
Council Research
� / I�ERSONAlSER'�ICECOMRACTSMUSTANSWERTHEFOLLOWMGUUESTIONS:
CMLSERVICECOMMISSION 1. Hasthisperso�rtneverworkedunderacoM2ctforihisdepaNnent?
YES NO
� 2. Has Uvs pecsoNfum ever been a ciTy emPbyee?
VES NO
- 3. Dces Mis persoNfirtn possess a skill not rwrtnally possessed by a�ry current ciry employee?
YES NO
Explain all yes answers on separate sheet aM attach to green sheet
WHAT. WHEN, WHERE,
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materiais, freeRhaw cycles,
service life limits, chemical additives, extreme temperature variatio�s, eta These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrecFed, the sidewalk condition wouid worsen to a state where it
woutd be unusable and subject to increased pedestrian injuries from falls and possible litigations.
IF APPqOVED:
The community will benetit from ihis project because it wiii provide safe defect free sidewalks for its citize�s. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVAMAGES IF APPROVED:
Historically, the sidewalk recortstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess foe walk reconstruction remains a controversial issue.
IF NOT APPROVED:
This option woufd allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal�njury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as weil as claim payouts.
�B38�iC�3 v�91�2!°
��l` � '7 2�01
IANSACTION $ /�M1 � 17 1, b/ COSLREVENUE BUDGETED (CIRCLE ONE) YES No
67TM-0672 A. PlA = b70 OQO ACfTVffYNUMBER C01-2T754-0784-00 00
(EXPLAIN) B, AST = 3 0,000 _
oi•sta
SUMMARY OF ENGINEERING RECOMNIENDATION
Wazd 1
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. OXFORD ST. from Portland Ave. to
Ashland Ave.
�'�� I�NITIATING ACTIDN: This order was initiated by the Director of Public works as public
�� Vnecessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, cracked, and uneven panels.
o�-sa��
SLTMMARY OF ENGINEERING REC011�VIENDATIONS
1.+��►a
PRO.IECT: RECONSTRUCT SIDEWALK E.S. N. LEXINGTON PKWY. from Summit Ave.
to Portland Ave. & N.S. SUMMTT AVE. from N. Lexington Pkwy. to N. Oxford St.
5 D1�� INITIATINGACTION: This order was initiated by the Director of Public works as public
necessity on the basis of four (4) complaints, a petition with one (1)signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
setded, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. OXFORD ST. from Summit Ave. to
Portland Ave. & S.S. PORTLAND AVE. from N. Lexington Pkwy. to N. Oxford St.
�`Oby INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, and cracked panels.
o�- sg�-
SUMMARY OF ENGINEERING RECONIlVIENDATIONS
C�.+f3fsc�'
PRO.IECT: RECONSTRUCT SIDEWALK B.S. AMHERST ST. from Princeton Ave. to
Goodrich Ave. & B.S. GOODRICH AVE. from S. Wheeler St. to Amherst St.
5 �(D�y INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. AMHERST ST. from 5t. Clair Ave. to
Princeton Ave.
�! O' � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is old tile and poured concrete with broken tile, water
pockets, asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRIICT SIDEWALK B.S. FORD PKWY. from Davern St. to Macalester
St.
50 � O7Q INITIATING ACTION: This order was initiated by the Director of Public Warks as public
�-'� necessity on the basis of five (5) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
setfled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. SARATOGA ST. from Hartford Ave. to
��'�' Niles Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
ai�s�'�
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. SARATOGA ST. from Niles Ave. to
Randolph Ave.
��(� INITIATING ACTION.• This order was initiated by the Director of Public Works as public
V°V necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. S. WHEELER ST. from St. Clair Ave. to
Princeton Ave.
�05$ INITIATINGACTION: This order was initiated by the Director of Yublic Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, disintegrated, scaled, settled, cracked, and uneven panels.
oi-sr�
SUMMARY OF ENGINEERING RECOMMENDATION
Wazd 4
PRO.IECT: RECONSTRUCT SIDEWALK E.S. KESTON ST. from Commonwealth Ave. to
Carter Ave. at 1280 & 1286 Keston St. Only.
5 �' D � INITIATING ACTION: This order was initiated by the Director of Public works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
This walk is poured concrete with water pockets, asphalt patches,
and setded panels.
CITY OF ST. PAUL
PRELIMINARY ORDER
��
�o�� No. °`-y D I- 5 g�
By
File No._501019, S01020, S01028,501046,
501058, 501061-501065
Voting Ward_1,2,3,4
Ia the Matter of sidewalk recoastxuction aad/or aem coastructioa at the follocviag
locations:
501019 - Both sides Amherst Street from St. Clair Avenue to Princeton Avenue.
501020 - Both sides Amherst Street from Princeton Avenue to Goodrich Avenue & Both
sides Goodrich Avenue from South Wheeler Street to Amherst Street.
501028 - Both sides Ford Parkway from Davern Street to Macalester Street.
501046 - Both sides North Oxford Street from Portland Avenue to Ashland Avenue.
501058 - Both sides South Wheeler Street from St. Clair Avenue to Princeton Avenue.
501061 - Both sides South Saratoga Street from Hartford Avenue to Niles Avenue.
S01062 - East side North Lexington Parkway from Summit Avenue to Portland Avenue
& North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501063 - Both sides South Saratoga Street from Niles Avenue to Randolph Avenue.
501064 - Both sides North Oxford Street from Summit Avenue to Portland Avenue &
North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501065 - East side Keston Street from Commonwealth Avenue to Carter Avenue at 1280
& 1286 Keston Street Only.
o, -�� � ��
01
*ESTIMATED CONSTRUCT20N RATES
RESIDENTIAL RATES (One, two or three family structures)
Recoastructioa (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New coastructioa
(where no walk existed) - 1008 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $6.09 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 200i Public Improvement Aid.
2. That a public hearing be had on said improvement on the 6t" dav of June . 2001
5:30 o'clock P.M in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
3. That notice o£ said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place o£ hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
�lakey
, /BOStrom
✓Coleman
✓Harris
i�antry
�iter
Adopted by Council: Date aQd�
Certified Passed by Council Se etary
�In Favor By a
�Against
Mayor
CITY OF ST. PAUL
FINAL ORDER
1
1 p.
By �% �/ �Cl `�
File No._SO 019, S01020, S01028,S01046
501058, 501061-501065
Voting Ward_1, 2, 3, 4
In the Matter of sidewalk reconstxuction at the following locations:
501019 - Both sides Amherst Street from St. Clair Avenue to Princeton Avenue.
501020 - Both sides Amherst Street from Princeton Avenue to Goodrich Avenue & Both
sides Goodrich Avenue from South Wheeler Street to Amherst Street.
501028 - Both sides Ford Parkway from Davern Street to Macalester Street.
501046 - Both sides North Oxford Street from Portland Avenue to Ashland Avenue.
501058 - Both Sides South Wheeler Street from St. Clair Avenue to Princeton Avenue.
501061 - Both Sides South Saratoga Street from Hartford Avenue to Niles Avenue.
501062 - East side North Lexington Parkway from Summit Avenue to Portland Avenue
& North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501063 - Both sides South Saratoga Street from Niles Avenue to Randolph Avenue.
501064 - Both sides North Oxford Street from Summit Avenue to Portland Avenue &
North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501065 - East side Keston Street from Commonwealth Avenue to Carter Avenue at 1280
& 1286 Keston Street Only.
oi- SS2-
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimatecl to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESSDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
_ �
The Council of the City of Saint Paul has conducted a publi'E hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, Tha� upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
Benanav
f Blakey
✓Bostrom
✓Coleman
f arris
r/Lantry
//Iteiter
Adopted by Council: Date�3-�c�
Certified Passed by Council Secretary
� In Favor
� Against
, Nl�Sei�.�
��a6L1C
W orks - Sidewalk pivision
GREEN
R�.� 5f��01
T NO. 102775
PHONE I� DEPARTMEPIr DIFEGTOF
NUNBERFOR I�
- ] . ASSIGN CfTYATTORNEY
L AGENDA BY (DAiE}��� 1 ( �I`ttl !, O D p � gUIX'iEf DIRECTOR
��11� 117�1 F. N(� \ 111IV�+ �Ot U Il l l. �lMVOR (OFi ASSISTANr)
PAGES _ (GLJPALLLOCATIONSFORSIGNATUREy
Sidewa& in W ards t, 2, 3& 4
STAFP
COUNEIL
CH CAUNCIL OBJECTIVE?
CfiY COUNdL Q � I
CITV CLEFK
FIN.B MGT. SERVICES DIR
Council Research
� / I�ERSONAlSER'�ICECOMRACTSMUSTANSWERTHEFOLLOWMGUUESTIONS:
CMLSERVICECOMMISSION 1. Hasthisperso�rtneverworkedunderacoM2ctforihisdepaNnent?
YES NO
� 2. Has Uvs pecsoNfum ever been a ciTy emPbyee?
VES NO
- 3. Dces Mis persoNfirtn possess a skill not rwrtnally possessed by a�ry current ciry employee?
YES NO
Explain all yes answers on separate sheet aM attach to green sheet
WHAT. WHEN, WHERE,
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materiais, freeRhaw cycles,
service life limits, chemical additives, extreme temperature variatio�s, eta These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrecFed, the sidewalk condition wouid worsen to a state where it
woutd be unusable and subject to increased pedestrian injuries from falls and possible litigations.
IF APPqOVED:
The community will benetit from ihis project because it wiii provide safe defect free sidewalks for its citize�s. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVAMAGES IF APPROVED:
Historically, the sidewalk recortstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess foe walk reconstruction remains a controversial issue.
IF NOT APPROVED:
This option woufd allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal�njury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as weil as claim payouts.
�B38�iC�3 v�91�2!°
��l` � '7 2�01
IANSACTION $ /�M1 � 17 1, b/ COSLREVENUE BUDGETED (CIRCLE ONE) YES No
67TM-0672 A. PlA = b70 OQO ACfTVffYNUMBER C01-2T754-0784-00 00
(EXPLAIN) B, AST = 3 0,000 _
oi•sta
SUMMARY OF ENGINEERING RECOMNIENDATION
Wazd 1
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. OXFORD ST. from Portland Ave. to
Ashland Ave.
�'�� I�NITIATING ACTIDN: This order was initiated by the Director of Public works as public
�� Vnecessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, cracked, and uneven panels.
o�-sa��
SLTMMARY OF ENGINEERING REC011�VIENDATIONS
1.+��►a
PRO.IECT: RECONSTRUCT SIDEWALK E.S. N. LEXINGTON PKWY. from Summit Ave.
to Portland Ave. & N.S. SUMMTT AVE. from N. Lexington Pkwy. to N. Oxford St.
5 D1�� INITIATINGACTION: This order was initiated by the Director of Public works as public
necessity on the basis of four (4) complaints, a petition with one (1)signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
setded, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. OXFORD ST. from Summit Ave. to
Portland Ave. & S.S. PORTLAND AVE. from N. Lexington Pkwy. to N. Oxford St.
�`Oby INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, and cracked panels.
o�- sg�-
SUMMARY OF ENGINEERING RECONIlVIENDATIONS
C�.+f3fsc�'
PRO.IECT: RECONSTRUCT SIDEWALK B.S. AMHERST ST. from Princeton Ave. to
Goodrich Ave. & B.S. GOODRICH AVE. from S. Wheeler St. to Amherst St.
5 �(D�y INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. AMHERST ST. from 5t. Clair Ave. to
Princeton Ave.
�! O' � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is old tile and poured concrete with broken tile, water
pockets, asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRIICT SIDEWALK B.S. FORD PKWY. from Davern St. to Macalester
St.
50 � O7Q INITIATING ACTION: This order was initiated by the Director of Public Warks as public
�-'� necessity on the basis of five (5) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
setfled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. SARATOGA ST. from Hartford Ave. to
��'�' Niles Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
ai�s�'�
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. SARATOGA ST. from Niles Ave. to
Randolph Ave.
��(� INITIATING ACTION.• This order was initiated by the Director of Public Works as public
V°V necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. S. WHEELER ST. from St. Clair Ave. to
Princeton Ave.
�05$ INITIATINGACTION: This order was initiated by the Director of Yublic Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, disintegrated, scaled, settled, cracked, and uneven panels.
oi-sr�
SUMMARY OF ENGINEERING RECOMMENDATION
Wazd 4
PRO.IECT: RECONSTRUCT SIDEWALK E.S. KESTON ST. from Commonwealth Ave. to
Carter Ave. at 1280 & 1286 Keston St. Only.
5 �' D � INITIATING ACTION: This order was initiated by the Director of Public works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
This walk is poured concrete with water pockets, asphalt patches,
and setded panels.
CITY OF ST. PAUL
PRELIMINARY ORDER
��
�o�� No. °`-y D I- 5 g�
By
File No._501019, S01020, S01028,501046,
501058, 501061-501065
Voting Ward_1,2,3,4
Ia the Matter of sidewalk recoastxuction aad/or aem coastructioa at the follocviag
locations:
501019 - Both sides Amherst Street from St. Clair Avenue to Princeton Avenue.
501020 - Both sides Amherst Street from Princeton Avenue to Goodrich Avenue & Both
sides Goodrich Avenue from South Wheeler Street to Amherst Street.
501028 - Both sides Ford Parkway from Davern Street to Macalester Street.
501046 - Both sides North Oxford Street from Portland Avenue to Ashland Avenue.
501058 - Both sides South Wheeler Street from St. Clair Avenue to Princeton Avenue.
501061 - Both sides South Saratoga Street from Hartford Avenue to Niles Avenue.
S01062 - East side North Lexington Parkway from Summit Avenue to Portland Avenue
& North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501063 - Both sides South Saratoga Street from Niles Avenue to Randolph Avenue.
501064 - Both sides North Oxford Street from Summit Avenue to Portland Avenue &
North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501065 - East side Keston Street from Commonwealth Avenue to Carter Avenue at 1280
& 1286 Keston Street Only.
o, -�� � ��
01
*ESTIMATED CONSTRUCT20N RATES
RESIDENTIAL RATES (One, two or three family structures)
Recoastructioa (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New coastructioa
(where no walk existed) - 1008 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $6.09 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 200i Public Improvement Aid.
2. That a public hearing be had on said improvement on the 6t" dav of June . 2001
5:30 o'clock P.M in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
3. That notice o£ said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place o£ hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
�lakey
, /BOStrom
✓Coleman
✓Harris
i�antry
�iter
Adopted by Council: Date aQd�
Certified Passed by Council Se etary
�In Favor By a
�Against
Mayor
CITY OF ST. PAUL
FINAL ORDER
1
1 p.
By �% �/ �Cl `�
File No._SO 019, S01020, S01028,S01046
501058, 501061-501065
Voting Ward_1, 2, 3, 4
In the Matter of sidewalk reconstxuction at the following locations:
501019 - Both sides Amherst Street from St. Clair Avenue to Princeton Avenue.
501020 - Both sides Amherst Street from Princeton Avenue to Goodrich Avenue & Both
sides Goodrich Avenue from South Wheeler Street to Amherst Street.
501028 - Both sides Ford Parkway from Davern Street to Macalester Street.
501046 - Both sides North Oxford Street from Portland Avenue to Ashland Avenue.
501058 - Both Sides South Wheeler Street from St. Clair Avenue to Princeton Avenue.
501061 - Both Sides South Saratoga Street from Hartford Avenue to Niles Avenue.
501062 - East side North Lexington Parkway from Summit Avenue to Portland Avenue
& North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501063 - Both sides South Saratoga Street from Niles Avenue to Randolph Avenue.
501064 - Both sides North Oxford Street from Summit Avenue to Portland Avenue &
North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501065 - East side Keston Street from Commonwealth Avenue to Carter Avenue at 1280
& 1286 Keston Street Only.
oi- SS2-
*ESTIMATED CONSTRUCTION RATES
RESIDENTIAL RATES (One, two or three family structures)
Reconstruction (replacement of old sidewalk) -$10.06 per front foot for a five (5)
foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New construction
(where no walk existed) - 100$ of the actual cost estimatecl to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL (More than three family structures), NON RESSDENTIAL RATES
For new and reconstructed sidewalk; 1000 of actual cost estimated to be
approximately $6.09 per square foot.
under Preliminary
_ �
The Council of the City of Saint Paul has conducted a publi'E hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, Tha� upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
Benanav
f Blakey
✓Bostrom
✓Coleman
f arris
r/Lantry
//Iteiter
Adopted by Council: Date�3-�c�
Certified Passed by Council Secretary
� In Favor
� Against
, Nl�Sei�.�
��a6L1C
W orks - Sidewalk pivision
GREEN
R�.� 5f��01
T NO. 102775
PHONE I� DEPARTMEPIr DIFEGTOF
NUNBERFOR I�
- ] . ASSIGN CfTYATTORNEY
L AGENDA BY (DAiE}��� 1 ( �I`ttl !, O D p � gUIX'iEf DIRECTOR
��11� 117�1 F. N(� \ 111IV�+ �Ot U Il l l. �lMVOR (OFi ASSISTANr)
PAGES _ (GLJPALLLOCATIONSFORSIGNATUREy
Sidewa& in W ards t, 2, 3& 4
STAFP
COUNEIL
CH CAUNCIL OBJECTIVE?
CfiY COUNdL Q � I
CITV CLEFK
FIN.B MGT. SERVICES DIR
Council Research
� / I�ERSONAlSER'�ICECOMRACTSMUSTANSWERTHEFOLLOWMGUUESTIONS:
CMLSERVICECOMMISSION 1. Hasthisperso�rtneverworkedunderacoM2ctforihisdepaNnent?
YES NO
� 2. Has Uvs pecsoNfum ever been a ciTy emPbyee?
VES NO
- 3. Dces Mis persoNfirtn possess a skill not rwrtnally possessed by a�ry current ciry employee?
YES NO
Explain all yes answers on separate sheet aM attach to green sheet
WHAT. WHEN, WHERE,
The problem "defective sidewalk" was caused by multiple problems, tree roots, poor subgrade materiais, freeRhaw cycles,
service life limits, chemical additives, extreme temperature variatio�s, eta These problems occur on a citywide basis and
must be addressed and corrected annually. Left uncorrecFed, the sidewalk condition wouid worsen to a state where it
woutd be unusable and subject to increased pedestrian injuries from falls and possible litigations.
IF APPqOVED:
The community will benetit from ihis project because it wiii provide safe defect free sidewalks for its citize�s. The sidewalk
contracts are done by private contractors generating public sector jobs as a result.
DISADVAMAGES IF APPROVED:
Historically, the sidewalk recortstruction has created negative feedback because of construction procedures and
assessments. Property owners question the assessments, despite the fact that up to one-half the assessment is City
subsidized. Having to assess foe walk reconstruction remains a controversial issue.
IF NOT APPROVED:
This option woufd allow the infrastructure of sidewalk stock to deteriorate, which in turn, will generate more personal�njury
suits, resulting in the expenditure of larger dollar amounts in repairs and replacement, as weil as claim payouts.
�B38�iC�3 v�91�2!°
��l` � '7 2�01
IANSACTION $ /�M1 � 17 1, b/ COSLREVENUE BUDGETED (CIRCLE ONE) YES No
67TM-0672 A. PlA = b70 OQO ACfTVffYNUMBER C01-2T754-0784-00 00
(EXPLAIN) B, AST = 3 0,000 _
oi•sta
SUMMARY OF ENGINEERING RECOMNIENDATION
Wazd 1
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. OXFORD ST. from Portland Ave. to
Ashland Ave.
�'�� I�NITIATING ACTIDN: This order was initiated by the Director of Public works as public
�� Vnecessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
settled, cracked, and uneven panels.
o�-sa��
SLTMMARY OF ENGINEERING REC011�VIENDATIONS
1.+��►a
PRO.IECT: RECONSTRUCT SIDEWALK E.S. N. LEXINGTON PKWY. from Summit Ave.
to Portland Ave. & N.S. SUMMTT AVE. from N. Lexington Pkwy. to N. Oxford St.
5 D1�� INITIATINGACTION: This order was initiated by the Director of Public works as public
necessity on the basis of four (4) complaints, a petition with one (1)signer, and an inspection of
the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
setded, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. N. OXFORD ST. from Summit Ave. to
Portland Ave. & S.S. PORTLAND AVE. from N. Lexington Pkwy. to N. Oxford St.
�`Oby INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of two (2) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, and cracked panels.
o�- sg�-
SUMMARY OF ENGINEERING RECONIlVIENDATIONS
C�.+f3fsc�'
PRO.IECT: RECONSTRUCT SIDEWALK B.S. AMHERST ST. from Princeton Ave. to
Goodrich Ave. & B.S. GOODRICH AVE. from S. Wheeler St. to Amherst St.
5 �(D�y INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of seven (7) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. AMHERST ST. from 5t. Clair Ave. to
Princeton Ave.
�! O' � INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is old tile and poured concrete with broken tile, water
pockets, asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRIICT SIDEWALK B.S. FORD PKWY. from Davern St. to Macalester
St.
50 � O7Q INITIATING ACTION: This order was initiated by the Director of Public Warks as public
�-'� necessity on the basis of five (5) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, asphalt patches,
setfled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. SARATOGA ST. from Hartford Ave. to
��'�' Niles Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
ai�s�'�
-2-
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, settled, cracked, and uneven panels.
PRO.IECT: RECONSTRUCT SIDEWALK B.S. S. SARATOGA ST. from Niles Ave. to
Randolph Ave.
��(� INITIATING ACTION.• This order was initiated by the Director of Public Works as public
V°V necessity on the basis of one (1) complaint and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, scaled, settled, cracked, and uneven panels.
PRO.IECT.• RECONSTRUCT SIDEWALK B.S. S. WHEELER ST. from St. Clair Ave. to
Princeton Ave.
�05$ INITIATINGACTION: This order was initiated by the Director of Yublic Works as public
necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water pockets,
asphalt patches, disintegrated, scaled, settled, cracked, and uneven panels.
oi-sr�
SUMMARY OF ENGINEERING RECOMMENDATION
Wazd 4
PRO.IECT: RECONSTRUCT SIDEWALK E.S. KESTON ST. from Commonwealth Ave. to
Carter Ave. at 1280 & 1286 Keston St. Only.
5 �' D � INITIATING ACTION: This order was initiated by the Director of Public works as public
necessity on the basis of one (1) complaint and an inspection of the walk.
This walk is poured concrete with water pockets, asphalt patches,
and setded panels.
CITY OF ST. PAUL
PRELIMINARY ORDER
��
�o�� No. °`-y D I- 5 g�
By
File No._501019, S01020, S01028,501046,
501058, 501061-501065
Voting Ward_1,2,3,4
Ia the Matter of sidewalk recoastxuction aad/or aem coastructioa at the follocviag
locations:
501019 - Both sides Amherst Street from St. Clair Avenue to Princeton Avenue.
501020 - Both sides Amherst Street from Princeton Avenue to Goodrich Avenue & Both
sides Goodrich Avenue from South Wheeler Street to Amherst Street.
501028 - Both sides Ford Parkway from Davern Street to Macalester Street.
501046 - Both sides North Oxford Street from Portland Avenue to Ashland Avenue.
501058 - Both sides South Wheeler Street from St. Clair Avenue to Princeton Avenue.
501061 - Both sides South Saratoga Street from Hartford Avenue to Niles Avenue.
S01062 - East side North Lexington Parkway from Summit Avenue to Portland Avenue
& North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501063 - Both sides South Saratoga Street from Niles Avenue to Randolph Avenue.
501064 - Both sides North Oxford Street from Summit Avenue to Portland Avenue &
North side Summit Avenue from North Lexington Parkway to North Oxford
Street.
501065 - East side Keston Street from Commonwealth Avenue to Carter Avenue at 1280
& 1286 Keston Street Only.
o, -�� � ��
01
*ESTIMATED CONSTRUCT20N RATES
RESIDENTIAL RATES (One, two or three family structures)
Recoastructioa (replacement of old sidewalk) -$10.06 per front foot for a
five (5) foot wide walk and $12.07 per front foot for a six (6) foot wide
walk. All other widths will be prorated accordingly. New coastructioa
(where no walk existed) - 1008 of the actual cost estimated to be
approximately $4.50 per square foot.
All corner residential properties will receive a credit up to the first 150
feet of new or reconstructed sidewalk along and abutting the "long side" of
the property.
MULTI-RESIDENTIAL(More than three family structures), NON-RESIDENTIAL RATES
For new and reconstructed sidewalk; 100� of actual cost estimated to be
approximately $6.09 per square foot.
The Council of the City of Saint Paul having received the report of the Mayor upon
the above improvement, and having considered said report, hereby resolves:
1. That the said report and the same is hereby approved with no alternatives, �
that the estimated cost thereof is *SEE ABOVE for estimated construction rates,
financed by assessments and 200i Public Improvement Aid.
2. That a public hearing be had on said improvement on the 6t" dav of June . 2001
5:30 o'clock P.M in the Council Chambers of the City Hall and Court House
Building in the City of Saint Paul.
3. That notice o£ said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place o£ hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
�lakey
, /BOStrom
✓Coleman
✓Harris
i�antry
�iter
Adopted by Council: Date aQd�
Certified Passed by Council Se etary
�In Favor By a
�Against
Mayor