Loading...
01-511CITY OF ST. PAUL c _ JV��S� '�i FINALORDER — � �-3 ��� COUNCIL FILE N0. � �— 5\ 1 BY ���1���L FILE O. 18944 VOTING WARD 6 In the Matter of unproving the alley in Block 14, Hayden Heights (bounded by Ivy, Furness Parkway, Cleaz and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. The azea to be improved is described as follows: All that part of the north/south alley in said Block 14 from Cleaz Avenue south to the easUwest alley, and all of the easdwest alley from the southerly extension of the east line of Lot 12 in said Block 14 east to Ruth Street. under Preliminary approved The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers aze hereby directed and authorized to proceed with the improvement; and be it F[JRTIIER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays �nanav �akey ✓�ostrom �leman v�atris v �antry � iter � In Favor � Against Adopted by Council: Date c�3 0 � Certified Passed by Council Secretary By �� c� tl--� � ,�� . __ �--- t� / Mayor Q a�-St� T.M.SJREAL ESTATE DIVISION Date: April 19, 2001 Green Sheet Number: 111909 Contac[ Persoa and Phone Nvmber: DEPARI'MENT DIILECIOR 1 CITY COi1NCII, Louise A Langbel'g 266-8861 �A1TOxr�Y crrvaexx Mus[ be on Comcil Agenda by: Ma3' L , 2001, for $�mcEx n�crox o�ce oF Fuvacaciac, svcs. Public Hearing on May 23, 2001 Mnxoxcoxasscsra� �ai.ESrn�n�ox TOTAL # OF SIGNATITRE PAGES 2 ccL�.u.L LocnTTOxs Fox sicxa�> ACTiON REQUFS'fED: Please set Public Hearing date of May 23, 2001 to discuss whether or not to approve the construction of alley improvements in Block 14, Hayden Heights (File #18944) RECOMA'�NDATIONS:APPROVE(A)ORREJECT(R) pg;ggONALSERVICECONTRAC15MU5TANSWERTI�FOLLOWING: 1. Has the personft ever worked under a con4ac[ for Utis department? YES NO PLANNI�`7GCOMMIISSION A SSAFF 2. Has this persodfirm ever been a City employee? YES NO CIVR. SERVICE COMM65[ON 3. Does t6is personlC�rm possess a skill not normally possessed by any YES NO Cm CO��n'ee ��r�eot City employee? � E laiu all YES aa+wers on a arate sheM and ariach. surroxTS wxic� covrrcn, osaECZrvE� Better & safer nei hborhoods COUNCII. ( DISTRICT PLANNING COUNCII. 2 ARD(S) INI77ATING PROBLEM, ISSUE, OPPOR'I'ONI1'7 (Who, What, When, Where, Why?): 64% of the property owners on Block 14, Aayden Heights have requested improvements to the alley they abut near Ivy, Fumess Parkway, Clear and Ruth. ADVANTAGESIFAPPROVED: Alley drainage and paving improvements could be built. DISADVANI'AGES TF APPROVED: Construction noise and disruption, and the cost of the improvements would be assessed to the improved properties, staying on the property record until paid. DLSADVANTAGES IF NOT APPROVED: ���°'�'��� ���� �:�� �� � �� �.�.� ��,:. � Continued poor drainage and alley surface. A P� ����� TOTAL AMOUNI' OF TRANSACTION: $53 ,544.26 COST/REVENIJE BUDGE7'ED (CIRCLE ONE) YES NO FONDINGSOURCE: ASSCSSIC1CIItS ACTiVITYNUMBER: FINANCIAL INFORMs1TION: (EXPLAIP� Cost to be covered 100% by assessments. 22 Prouertv owners to be notified of the vroiect. SummarXof Eneineering Recommendatfons Report Prepared March 30, 2001 Final Order Hearing PRO.TECT Ot -SI� Improve [he alley in HAYDEN HEIGHTS, BLOCK 14 (Bounded by Ivy, Fumess Pkwy, Cleaz and Ruth) by constructing storm sewer, grading and paving with bituminous material. Also, condemning and taking and easement in the land necessary for the slopes, cuzs and fills, including right of removal of lateral support from subject land or land remainder [hereof, occasioned by excavation thereof or consvuction of slopes in the grading and paving of said alley. INITIATING ACTION This improvement was initiated by a petition signed by 64% of the abntting property owners. EXISTING CONDITIONS The majority of the alley is platted 16 feet wide. A short segmen[ adjacent to the "tee" section is platted 20 feet wide. The alley is unimproved. The surface of che alley is gravel. Grade the alley to a width of 14 feet and place hot mix bituminous pavement. ESTIMATED COST AND FINANCING Estimated Construction Cost Engineering and Inspection Service Fee Miscellaneous Estimated Total Expenditures $33,517.53 10,055.26 3,267.96 6,703.51 $53,544.26 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING Not yet scheduled. SOURCE OF ADDITIONAL INFORMATION $53,544.26 $55.00 For additional information, contact Pete Gallagher at 651466-6085 SUMMARY OF RECOMMENDATIONS The Department of Public Works recommends that this project be conswcted. Respectfully submitted, Paul St. Martin Project Engineer 3S � .�' 6 � 959 � /� °" �/ iv COTTAG E ,.5 \ p 9l.z) 6 ,FO. x B � �� � 9 � I � > � (j6 I - ° I _ " I �--�'8---, i v � 1 // /.Z � K � I ' � � I � vl � , � l2 l3 /��%�i16 �.003 � ' ZO IJ O. G. AVE.� °S ` S . I - � ., . .f. o. � iolE .S �j� -¢ , 3 Z / A i � /.�" /6 /7 /6 � /9 I ,zo z/ z2 �.¢ 1985 . I r ( .. `_ 1 a /jf o1 .. .f-O. . .. . .��� CLEAR Av E , b q w y ('�a) iie. �'s ,f e. ., .. ., z cco •. � .. _ '. o. X : c ° � /D (c�) C%) C+s) Ct+1 C�s� �+z) �. Y ' �� // I �*U �t^) ,� . . d 9 8 7 6 .s -� �.3 ,2 / �, , ; ,,. G ' � (/) r: : (s°� /2 � � G / `�'�� � y � � '�{ '' � vw . i z5 \ \ �: (-/6� � • �� �:'� � � tl.. /CI �. 1.�'. � �_3a� b � ,t . I:• � � � I L \ ,-:' � � �S� /.� '/7 /8 /9 ,to z/ z2 �3 2� zs �6 z7 !: � M �SS) � I b / 9T5 I ��) C � � o� /6 <S� �s, �; <s�, � ��� zoo,� 6� , ti ,. o. e o..�.� . . , 6.� /<?// 670 �3 Y 2S P6 N '. f i I I I i N /S 3 � �� i/d /i ii � � 9 E � `; 0' :� ,:. ,.. r . l� �i,�` . i. .� ; ' ,•� ���� � �, . rj ��., � �, . � ..._-----------------�---- iVy ..------- ------�----. . ---- ----�------�---� � watK E>MT. ' � � � 80 .�er.; s �33 ' � �96o J; I I .� .. � . � 99 0 .. ` .. .. .. .. . u a7 !b ; f7 I /8 I /9 � Ailey Improvements Hayden Heights - Block 14 Area to be Improved a� � r ; �J�\ �� 2J 22 23 24 25 26 �� 2$ 29 30 � ��� � � I \ '! o._s�� CITY OF ST. PAUL PRELIMINARY ORDER COUNC � ILE NO. O l-. yy� BY � � FIL NO. 18944 VO'I'ING WARD _ 6 1'� In the Matter of improving the alley in Block 14, Hayden Heights (bounded by Iry, Furness Pazkway, Clear and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement and having considered said report, hereby resolves: 1. ►� 3. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $53,544.26 financed 100% by Assessments. That a public hearing be had on said improvement on the 23rd dav of Mav, 2001, at 530 o'clock n m in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cosi thereof as estimated. COUNCILPERSONS Yeas Nays �enanev �akey ✓�ostrom ✓�oleman ✓E'farris xantry �ter � In Favor QAgainst Adoptedby Council: Date �-ae Certified Passed by Council Secretazy By "��• � � � �— Mayor CITY OF ST. PAi3L FINAL ORDER �� � �� . ..� a _ � . �.. COi3N FI E 1�i0. 0 �•• S 1� SY �(;������1,��� FILE NO. 18444 VOTING WARD 6 a�t In the Matter of unproving the alley in Block 14, Hayden Heights (bounded by Ivy, Furness ParlyCvay, Clear and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. � under Preliminary Order � �^ yy'l �C.1_ The Council of the City of Saint Paul has conducted ublic hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heazd all per ns, objections and recommendations pertaining to said proposed improvement and has fully considered the same; no , therefore, be it RESOLVED, That the Council of the C�fty of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are her�'6y directed and authorized to proceed with the improvement; and be it Fi TRTHER RESOLVEA, That u on the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall re rt the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCII,PERSONS Yeas Nays Benanav Blakey Bostrom Coleman � Harris Lantry ;•' _In Favor _Against Adopted by Council: Date Certified Passed by Council Secretary �l Mayor CITY OF ST. PAUL c _ JV��S� '�i FINALORDER — � �-3 ��� COUNCIL FILE N0. � �— 5\ 1 BY ���1���L FILE O. 18944 VOTING WARD 6 In the Matter of unproving the alley in Block 14, Hayden Heights (bounded by Ivy, Furness Parkway, Cleaz and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. The azea to be improved is described as follows: All that part of the north/south alley in said Block 14 from Cleaz Avenue south to the easUwest alley, and all of the easdwest alley from the southerly extension of the east line of Lot 12 in said Block 14 east to Ruth Street. under Preliminary approved The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers aze hereby directed and authorized to proceed with the improvement; and be it F[JRTIIER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays �nanav �akey ✓�ostrom �leman v�atris v �antry � iter � In Favor � Against Adopted by Council: Date c�3 0 � Certified Passed by Council Secretary By �� c� tl--� � ,�� . __ �--- t� / Mayor Q a�-St� T.M.SJREAL ESTATE DIVISION Date: April 19, 2001 Green Sheet Number: 111909 Contac[ Persoa and Phone Nvmber: DEPARI'MENT DIILECIOR 1 CITY COi1NCII, Louise A Langbel'g 266-8861 �A1TOxr�Y crrvaexx Mus[ be on Comcil Agenda by: Ma3' L , 2001, for $�mcEx n�crox o�ce oF Fuvacaciac, svcs. Public Hearing on May 23, 2001 Mnxoxcoxasscsra� �ai.ESrn�n�ox TOTAL # OF SIGNATITRE PAGES 2 ccL�.u.L LocnTTOxs Fox sicxa�> ACTiON REQUFS'fED: Please set Public Hearing date of May 23, 2001 to discuss whether or not to approve the construction of alley improvements in Block 14, Hayden Heights (File #18944) RECOMA'�NDATIONS:APPROVE(A)ORREJECT(R) pg;ggONALSERVICECONTRAC15MU5TANSWERTI�FOLLOWING: 1. Has the personft ever worked under a con4ac[ for Utis department? YES NO PLANNI�`7GCOMMIISSION A SSAFF 2. Has this persodfirm ever been a City employee? YES NO CIVR. SERVICE COMM65[ON 3. Does t6is personlC�rm possess a skill not normally possessed by any YES NO Cm CO��n'ee ��r�eot City employee? � E laiu all YES aa+wers on a arate sheM and ariach. surroxTS wxic� covrrcn, osaECZrvE� Better & safer nei hborhoods COUNCII. ( DISTRICT PLANNING COUNCII. 2 ARD(S) INI77ATING PROBLEM, ISSUE, OPPOR'I'ONI1'7 (Who, What, When, Where, Why?): 64% of the property owners on Block 14, Aayden Heights have requested improvements to the alley they abut near Ivy, Fumess Parkway, Clear and Ruth. ADVANTAGESIFAPPROVED: Alley drainage and paving improvements could be built. DISADVANI'AGES TF APPROVED: Construction noise and disruption, and the cost of the improvements would be assessed to the improved properties, staying on the property record until paid. DLSADVANTAGES IF NOT APPROVED: ���°'�'��� ���� �:�� �� � �� �.�.� ��,:. � Continued poor drainage and alley surface. A P� ����� TOTAL AMOUNI' OF TRANSACTION: $53 ,544.26 COST/REVENIJE BUDGE7'ED (CIRCLE ONE) YES NO FONDINGSOURCE: ASSCSSIC1CIItS ACTiVITYNUMBER: FINANCIAL INFORMs1TION: (EXPLAIP� Cost to be covered 100% by assessments. 22 Prouertv owners to be notified of the vroiect. SummarXof Eneineering Recommendatfons Report Prepared March 30, 2001 Final Order Hearing PRO.TECT Ot -SI� Improve [he alley in HAYDEN HEIGHTS, BLOCK 14 (Bounded by Ivy, Fumess Pkwy, Cleaz and Ruth) by constructing storm sewer, grading and paving with bituminous material. Also, condemning and taking and easement in the land necessary for the slopes, cuzs and fills, including right of removal of lateral support from subject land or land remainder [hereof, occasioned by excavation thereof or consvuction of slopes in the grading and paving of said alley. INITIATING ACTION This improvement was initiated by a petition signed by 64% of the abntting property owners. EXISTING CONDITIONS The majority of the alley is platted 16 feet wide. A short segmen[ adjacent to the "tee" section is platted 20 feet wide. The alley is unimproved. The surface of che alley is gravel. Grade the alley to a width of 14 feet and place hot mix bituminous pavement. ESTIMATED COST AND FINANCING Estimated Construction Cost Engineering and Inspection Service Fee Miscellaneous Estimated Total Expenditures $33,517.53 10,055.26 3,267.96 6,703.51 $53,544.26 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING Not yet scheduled. SOURCE OF ADDITIONAL INFORMATION $53,544.26 $55.00 For additional information, contact Pete Gallagher at 651466-6085 SUMMARY OF RECOMMENDATIONS The Department of Public Works recommends that this project be conswcted. Respectfully submitted, Paul St. Martin Project Engineer 3S � .�' 6 � 959 � /� °" �/ iv COTTAG E ,.5 \ p 9l.z) 6 ,FO. x B � �� � 9 � I � > � (j6 I - ° I _ " I �--�'8---, i v � 1 // /.Z � K � I ' � � I � vl � , � l2 l3 /��%�i16 �.003 � ' ZO IJ O. G. AVE.� °S ` S . I - � ., . .f. o. � iolE .S �j� -¢ , 3 Z / A i � /.�" /6 /7 /6 � /9 I ,zo z/ z2 �.¢ 1985 . I r ( .. `_ 1 a /jf o1 .. .f-O. . .. . .��� CLEAR Av E , b q w y ('�a) iie. �'s ,f e. ., .. ., z cco •. � .. _ '. o. X : c ° � /D (c�) C%) C+s) Ct+1 C�s� �+z) �. Y ' �� // I �*U �t^) ,� . . d 9 8 7 6 .s -� �.3 ,2 / �, , ; ,,. G ' � (/) r: : (s°� /2 � � G / `�'�� � y � � '�{ '' � vw . i z5 \ \ �: (-/6� � • �� �:'� � � tl.. /CI �. 1.�'. � �_3a� b � ,t . I:• � � � I L \ ,-:' � � �S� /.� '/7 /8 /9 ,to z/ z2 �3 2� zs �6 z7 !: � M �SS) � I b / 9T5 I ��) C � � o� /6 <S� �s, �; <s�, � ��� zoo,� 6� , ti ,. o. e o..�.� . . , 6.� /<?// 670 �3 Y 2S P6 N '. f i I I I i N /S 3 � �� i/d /i ii � � 9 E � `; 0' :� ,:. ,.. r . l� �i,�` . i. .� ; ' ,•� ���� � �, . rj ��., � �, . � ..._-----------------�---- iVy ..------- ------�----. . ---- ----�------�---� � watK E>MT. ' � � � 80 .�er.; s �33 ' � �96o J; I I .� .. � . � 99 0 .. ` .. .. .. .. . u a7 !b ; f7 I /8 I /9 � Ailey Improvements Hayden Heights - Block 14 Area to be Improved a� � r ; �J�\ �� 2J 22 23 24 25 26 �� 2$ 29 30 � ��� � � I \ '! o._s�� CITY OF ST. PAUL PRELIMINARY ORDER COUNC � ILE NO. O l-. yy� BY � � FIL NO. 18944 VO'I'ING WARD _ 6 1'� In the Matter of improving the alley in Block 14, Hayden Heights (bounded by Iry, Furness Pazkway, Clear and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement and having considered said report, hereby resolves: 1. ►� 3. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $53,544.26 financed 100% by Assessments. That a public hearing be had on said improvement on the 23rd dav of Mav, 2001, at 530 o'clock n m in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cosi thereof as estimated. COUNCILPERSONS Yeas Nays �enanev �akey ✓�ostrom ✓�oleman ✓E'farris xantry �ter � In Favor QAgainst Adoptedby Council: Date �-ae Certified Passed by Council Secretazy By "��• � � � �— Mayor CITY OF ST. PAi3L FINAL ORDER �� � �� . ..� a _ � . �.. COi3N FI E 1�i0. 0 �•• S 1� SY �(;������1,��� FILE NO. 18444 VOTING WARD 6 a�t In the Matter of unproving the alley in Block 14, Hayden Heights (bounded by Ivy, Furness ParlyCvay, Clear and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. � under Preliminary Order � �^ yy'l �C.1_ The Council of the City of Saint Paul has conducted ublic hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heazd all per ns, objections and recommendations pertaining to said proposed improvement and has fully considered the same; no , therefore, be it RESOLVED, That the Council of the C�fty of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are her�'6y directed and authorized to proceed with the improvement; and be it Fi TRTHER RESOLVEA, That u on the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall re rt the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCII,PERSONS Yeas Nays Benanav Blakey Bostrom Coleman � Harris Lantry ;•' _In Favor _Against Adopted by Council: Date Certified Passed by Council Secretary �l Mayor CITY OF ST. PAUL c _ JV��S� '�i FINALORDER — � �-3 ��� COUNCIL FILE N0. � �— 5\ 1 BY ���1���L FILE O. 18944 VOTING WARD 6 In the Matter of unproving the alley in Block 14, Hayden Heights (bounded by Ivy, Furness Parkway, Cleaz and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. The azea to be improved is described as follows: All that part of the north/south alley in said Block 14 from Cleaz Avenue south to the easUwest alley, and all of the easdwest alley from the southerly extension of the east line of Lot 12 in said Block 14 east to Ruth Street. under Preliminary approved The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improvement and has fully considered the same; now, therefore, be it RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers aze hereby directed and authorized to proceed with the improvement; and be it F[JRTIIER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCILPERSONS Yeas Nays �nanav �akey ✓�ostrom �leman v�atris v �antry � iter � In Favor � Against Adopted by Council: Date c�3 0 � Certified Passed by Council Secretary By �� c� tl--� � ,�� . __ �--- t� / Mayor Q a�-St� T.M.SJREAL ESTATE DIVISION Date: April 19, 2001 Green Sheet Number: 111909 Contac[ Persoa and Phone Nvmber: DEPARI'MENT DIILECIOR 1 CITY COi1NCII, Louise A Langbel'g 266-8861 �A1TOxr�Y crrvaexx Mus[ be on Comcil Agenda by: Ma3' L , 2001, for $�mcEx n�crox o�ce oF Fuvacaciac, svcs. Public Hearing on May 23, 2001 Mnxoxcoxasscsra� �ai.ESrn�n�ox TOTAL # OF SIGNATITRE PAGES 2 ccL�.u.L LocnTTOxs Fox sicxa�> ACTiON REQUFS'fED: Please set Public Hearing date of May 23, 2001 to discuss whether or not to approve the construction of alley improvements in Block 14, Hayden Heights (File #18944) RECOMA'�NDATIONS:APPROVE(A)ORREJECT(R) pg;ggONALSERVICECONTRAC15MU5TANSWERTI�FOLLOWING: 1. Has the personft ever worked under a con4ac[ for Utis department? YES NO PLANNI�`7GCOMMIISSION A SSAFF 2. Has this persodfirm ever been a City employee? YES NO CIVR. SERVICE COMM65[ON 3. Does t6is personlC�rm possess a skill not normally possessed by any YES NO Cm CO��n'ee ��r�eot City employee? � E laiu all YES aa+wers on a arate sheM and ariach. surroxTS wxic� covrrcn, osaECZrvE� Better & safer nei hborhoods COUNCII. ( DISTRICT PLANNING COUNCII. 2 ARD(S) INI77ATING PROBLEM, ISSUE, OPPOR'I'ONI1'7 (Who, What, When, Where, Why?): 64% of the property owners on Block 14, Aayden Heights have requested improvements to the alley they abut near Ivy, Fumess Parkway, Clear and Ruth. ADVANTAGESIFAPPROVED: Alley drainage and paving improvements could be built. DISADVANI'AGES TF APPROVED: Construction noise and disruption, and the cost of the improvements would be assessed to the improved properties, staying on the property record until paid. DLSADVANTAGES IF NOT APPROVED: ���°'�'��� ���� �:�� �� � �� �.�.� ��,:. � Continued poor drainage and alley surface. A P� ����� TOTAL AMOUNI' OF TRANSACTION: $53 ,544.26 COST/REVENIJE BUDGE7'ED (CIRCLE ONE) YES NO FONDINGSOURCE: ASSCSSIC1CIItS ACTiVITYNUMBER: FINANCIAL INFORMs1TION: (EXPLAIP� Cost to be covered 100% by assessments. 22 Prouertv owners to be notified of the vroiect. SummarXof Eneineering Recommendatfons Report Prepared March 30, 2001 Final Order Hearing PRO.TECT Ot -SI� Improve [he alley in HAYDEN HEIGHTS, BLOCK 14 (Bounded by Ivy, Fumess Pkwy, Cleaz and Ruth) by constructing storm sewer, grading and paving with bituminous material. Also, condemning and taking and easement in the land necessary for the slopes, cuzs and fills, including right of removal of lateral support from subject land or land remainder [hereof, occasioned by excavation thereof or consvuction of slopes in the grading and paving of said alley. INITIATING ACTION This improvement was initiated by a petition signed by 64% of the abntting property owners. EXISTING CONDITIONS The majority of the alley is platted 16 feet wide. A short segmen[ adjacent to the "tee" section is platted 20 feet wide. The alley is unimproved. The surface of che alley is gravel. Grade the alley to a width of 14 feet and place hot mix bituminous pavement. ESTIMATED COST AND FINANCING Estimated Construction Cost Engineering and Inspection Service Fee Miscellaneous Estimated Total Expenditures $33,517.53 10,055.26 3,267.96 6,703.51 $53,544.26 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING Not yet scheduled. SOURCE OF ADDITIONAL INFORMATION $53,544.26 $55.00 For additional information, contact Pete Gallagher at 651466-6085 SUMMARY OF RECOMMENDATIONS The Department of Public Works recommends that this project be conswcted. Respectfully submitted, Paul St. Martin Project Engineer 3S � .�' 6 � 959 � /� °" �/ iv COTTAG E ,.5 \ p 9l.z) 6 ,FO. x B � �� � 9 � I � > � (j6 I - ° I _ " I �--�'8---, i v � 1 // /.Z � K � I ' � � I � vl � , � l2 l3 /��%�i16 �.003 � ' ZO IJ O. G. AVE.� °S ` S . I - � ., . .f. o. � iolE .S �j� -¢ , 3 Z / A i � /.�" /6 /7 /6 � /9 I ,zo z/ z2 �.¢ 1985 . I r ( .. `_ 1 a /jf o1 .. .f-O. . .. . .��� CLEAR Av E , b q w y ('�a) iie. �'s ,f e. ., .. ., z cco •. � .. _ '. o. X : c ° � /D (c�) C%) C+s) Ct+1 C�s� �+z) �. Y ' �� // I �*U �t^) ,� . . d 9 8 7 6 .s -� �.3 ,2 / �, , ; ,,. G ' � (/) r: : (s°� /2 � � G / `�'�� � y � � '�{ '' � vw . i z5 \ \ �: (-/6� � • �� �:'� � � tl.. /CI �. 1.�'. � �_3a� b � ,t . I:• � � � I L \ ,-:' � � �S� /.� '/7 /8 /9 ,to z/ z2 �3 2� zs �6 z7 !: � M �SS) � I b / 9T5 I ��) C � � o� /6 <S� �s, �; <s�, � ��� zoo,� 6� , ti ,. o. e o..�.� . . , 6.� /<?// 670 �3 Y 2S P6 N '. f i I I I i N /S 3 � �� i/d /i ii � � 9 E � `; 0' :� ,:. ,.. r . l� �i,�` . i. .� ; ' ,•� ���� � �, . rj ��., � �, . � ..._-----------------�---- iVy ..------- ------�----. . ---- ----�------�---� � watK E>MT. ' � � � 80 .�er.; s �33 ' � �96o J; I I .� .. � . � 99 0 .. ` .. .. .. .. . u a7 !b ; f7 I /8 I /9 � Ailey Improvements Hayden Heights - Block 14 Area to be Improved a� � r ; �J�\ �� 2J 22 23 24 25 26 �� 2$ 29 30 � ��� � � I \ '! o._s�� CITY OF ST. PAUL PRELIMINARY ORDER COUNC � ILE NO. O l-. yy� BY � � FIL NO. 18944 VO'I'ING WARD _ 6 1'� In the Matter of improving the alley in Block 14, Hayden Heights (bounded by Iry, Furness Pazkway, Clear and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement and having considered said report, hereby resolves: 1. ►� 3. That the said report and the same is hereby approved with no alternatives, and that the estimated cost thereof is $53,544.26 financed 100% by Assessments. That a public hearing be had on said improvement on the 23rd dav of Mav, 2001, at 530 o'clock n m in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. That notice of said public hearing be given to the persons and in the manner provided by the Charter, stating the time and place of hearing, the nature of the improvement and the total cosi thereof as estimated. COUNCILPERSONS Yeas Nays �enanev �akey ✓�ostrom ✓�oleman ✓E'farris xantry �ter � In Favor QAgainst Adoptedby Council: Date �-ae Certified Passed by Council Secretazy By "��• � � � �— Mayor CITY OF ST. PAi3L FINAL ORDER �� � �� . ..� a _ � . �.. COi3N FI E 1�i0. 0 �•• S 1� SY �(;������1,��� FILE NO. 18444 VOTING WARD 6 a�t In the Matter of unproving the alley in Block 14, Hayden Heights (bounded by Ivy, Furness ParlyCvay, Clear and Ruth) by constructing a storm sewer, and by grading and paving with bituminous material. � under Preliminary Order � �^ yy'l �C.1_ The Council of the City of Saint Paul has conducted ublic hearing upon the above improvement, due notice thereof having been given as prescribed by the City Charter; and WHEREAS, The Council has heazd all per ns, objections and recommendations pertaining to said proposed improvement and has fully considered the same; no , therefore, be it RESOLVED, That the Council of the C�fty of Saint Paul does hereby order that the above-described improvement be made, and the proper City officers are her�'6y directed and authorized to proceed with the improvement; and be it Fi TRTHER RESOLVEA, That u on the completion of said improvement, the proper City officers shall calculate all expenses incurred therein and shall re rt the same to the City Council in accordance with Chapter 14 of the City Charter. COUNCII,PERSONS Yeas Nays Benanav Blakey Bostrom Coleman � Harris Lantry ;•' _In Favor _Against Adopted by Council: Date Certified Passed by Council Secretary �l Mayor