01-1267CITY OF ST. PAUL
FINAL ORDIIR
C���I�!��4L
�ri.ov� e�, — 0 ea. �a t
3.00t
- From Hyacinth Avenue to Sherwood Avenue.
- From Arlington Avenue to Hoyt Avenue. ���
- From Mississippi Street to Westminster Street..�;��
- From Mississippi Street to Westminster Street.
- From Brainerd Avenue to Ivy Avenue.
- From Cottage Avenue to Arlington Avenue°i4q�� ovc.r
- From Ivy Avenue to Sherwood Avenue . �rWC¢ta �:,+��
- From Ivy Avenue to Wheelock Parkway.
- From Wheelock Parkway south to cul-de-sac.
- From Payne Avenue to Greenbrier Street.
- From Payne Avenue to Arcade Street_
- From Edgerton Street to Arcade Street.
- From Edgerton Street to Wheelock Parkway.
- From Edgerton Street to Wheelock Parkway.
- From Edgerton Street to Wheelock Parkway.
In the Matter of Improving the following streets with new bituminous surfaced
roadway, concrete curbs and gutters, concrete driveway aprons and outwalks, boulevard
sodding, tree planting, construction of a lantern style lighting system, and doing
all other work necessary to complete said improvements as part of the
Cottage/Greenbrier Area Street Paving and Lighting Project:
Mississippi Street
Mississippi Street
Hyacinth Avenue
Cottage Avenue
Desoto Street
Bradley Street
�Searle Street
Greenbrier Street
Walsh Street
Clear Avenue
Cottage Avenue
Sherwood Avenue
Arlington Avenue
Nevada Avenue
Parkway Drive
�'' Rv�.r.t"; E`�.�s1t� l��o.-'t�:,� -3-o be.. rQ�....-b�a1.e� .
under Preliminary Order p�� t9�� approved ��_�
The Council of the City of Saint Paul has conducted a public hearing upon the
above improvement, due notice thereof having been given as prescribed by the City
Charter; and
WHEREAS, The Council has heard a11 persons, objections and recommendations
pertaining to said proposed improvement and has fully considered the same; now,
therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the
above-described improvement be made, and the proper City officers are hereby directed
and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City
officers shall calculate all expenses incurred therein and shall report the same to
the City Council in accordance with Chapter 14 of the City Charter.
COUNCILPERSONS
Yeas Nays
✓�enanav
✓�lakey
�Bostrom
✓Coleman
vFTarri s
�Y,antry
� iter
�o� z FIL N. o�-� ac�� 33
BY
FIL NO. 18954
V NG WARD 5& 6
Adopted by Council: Date �_S 300�
r
Certified Passed by Council Secretary
'1 In Favor By_� �� . �� �� -
O Against ---�.J��G�Y
Mayor
� .
Public Hearin Date: December 5, 2001 � o�-\ �.f.'1
.M.S./REAL ESTATE DIVISION Date: October 31, 2001 reen Sheet Number: 111919
ontact Person and Phone Number: EPAIC7'hIENT DIRECTOR 2 CPl'Y COIINCII.
Peter White 266'ggs� ATTORNEY CLERK
��neoocono��in�oaany: November14,2001, UDGEIDIItECiOR �cEOFFAr.uvcGV,svcs.
or Public Hearing on becember 5, 2001 xox�oxassrsTwrrr� 1 our,cu.�sEnxce
OTAL # OF SIGNATURE PAGES L(CLIP ALL LOCATIONS FOR SIGNA7'URE)
C1'[ON REQUESTED:
1. Set Publie Hearing date of December 5, 2001, to discuss the COTTAGE/GREENBRIER Area Street
Paving and Lighting Project, �Yle No.18954.
2. Approve said projeet.
COMl1�NDATIONS: APPROVE (A) OR REJECf (R) ERSONAL SERVICE CONTRACTS MOST ANSWER TE[E FOLLOWING:
. Has Yhe persoo/6rm ever worked urtder a coutraM for this department? YES NO
PI,ANNINGCOMhIISSIOCI A STAFF
_ . Has this persodfirm ever been a City employee? YES NO
C[VII. SERVICE COMMISS[ON
. Does this persoNfirm possess a slrill not normally possessed by any YES NO
current City employee?
CIB COMMITTEE
Ex lain all XES answers ou a se arate sheet and attach.
UPPORTS WHICH COUNCIL Better and safer streets � .
BJECI7VEY
COUNCIL WARD(S) S& 6 DISTRICT PLANNIP]G COUNCII. 5
INITIAITNG PROBLEM, ISSUE, OPPORI'UNITY (Who, What, When, Where, Why?):
This project is being proposed for construcfion as part of the City's Residential Street Vitality
Program.
VANTAGES IF APPROVED:
The reconstruction of the remaining oiled streets in the City wilI complete the paving of locai
residential streets in this area. The new street lighting will also improve safety in the area.
ISADVANTAGES IF APPROVED:
Normal problems associated with construction such as noise, dust and general disruption will
occur.
ISADVANTAGES IF NOT APPROVED:
The pavement structure will continue to deteriorate, maintenance costs will rise, and the level of
service provided by this street will drop.
OTAL AMOUNT OF TRANSACTION: $2�401�12 COST/REVENUE BUDGETED (CIILCLE ONE) YES NO
DINGSOURCE: 2OOZ CIB BIIfI ASSOSS[t1011tS ACTIVITYNUMBER:
INANCIAI. INFORMATION: (EXPLAI� '
ESTIMATED FINANCING:
2002 Capital Improvement Bonda - $1,767,968 �����y��%� �?�,�,a�,�
Assessments - $ 633.244
TOTAL - $2,401,212 , ;; � �
Ca:� Q s x
wHEELOCK � � _ � a ��
a
—� �
N
a
y
�
�
� ,
SHERwOODI
COTTAGE
N
a
�
N
N
�
HYACINTH
COTTAGE ��
O /
\
�
��
ADA , AVE.
J
� �
�
I
x �
J
3
CLEAR
� u
c�i AVE.
¢ IVY
3
Y
Q
AVE.
tt
w
I eR p�NF - ��Q y � w
m
7 _ _ _ _ _
UDo�
HYA� � ❑ �
OR ����
HAWT I�� �� � �
COTTAGE/GREENBRIER
STREETS TO BE RECONSTRUCTED IN 2002 =
Project Areo 23
s/zo/oi
SAINT
; PAUL
I�
#AAA
�.�..��
02—P-8124
2002
INTER-DEPARTMENTAL MEMO
CITY OF SAINT PAUL
Norm Co(eman, Maror
TO:
FROM:
DATE:
SUBJECT:
Peter White
Real Estate Division
Dan Haak �R t+
Public Works Street Engineering
September 25, 2001
Cottage-Greenbrier RSVP
02-P-8124
DEPARTMENT OF PUBLiC WORKS Q\— � 3(�?
Thomasl. Eggum, Director/City Engineer
Attached are a Summary of Engineering Recommendations and a Green Sheet for the .
above referenced project. Please proceed with setting up the final order for this project.
AttachmenYs
0
Responsive Services
� � � �
Qualiy Facilitics • EmpFoyee P�ide
rT
DEPARTMENT/OiFICE/COUNCIL
Public Works
%JNTACT PERSON 8 PHONE
Dan Haak 266-6084
dU5T BE ON COUNQL AGENDA BV (DATE)
9IZS/O�ATED �GREEN SHEET
� DEPAqTMENT�IRECTOR
ASSIGN
NUMBEq FOR � CITY ATTORNEY
ROUTING �FINANCIALSERVICESDIR
OFOER
� MAYOR (ORASSISTANn
NO �02824
INRIAVDATE _
�CRYCOVNqL
� CT' CLERK �L11�, �L �l
� � �`_
� FIN. SERVICES/ACCT.
� OIVISIONMANAGER
� ED WAflN
OICK PUPERT/ACCT.
TOTAL # OF SIGNATURE PAGES (CLIP ALL LOCATIONS FOR SIGNATURE)
PCT10N REOUESTED
Construction of new bituminous surfaced streets with concrete curb and gutter, concrete driveway aprons and outwalks,
boulevards landscaped with sod and trees, a new lantern style street lighting system, lead water service replacements, and
sanitary sewer repairs, in the area called Cottage/Greenbrier RSVP (Area 23), bounded by Wheelock Parkway, Arcade,
Maryland, and 35E.
RECOMMENDATIONS: Approve (A) or Reject (R)
PLANNING COMMISSION
CIB COMMITfEE
_ CIVIL SERVICE COMMISSION
q STAFF
PERSONAL SERVICE CONTRACTS MUST ANSWER THE
FOLLOWING QUESTIONS:
1. Has this person/firm ever worked under a contract for this
department?
YES NO
2. Has this person/firm ever been a city employee?
YES NO
3. Does this person/firm possess a skill not normally possessed by any
current city employee?
YES NO
Explain all yes answers on separete sheet and attach to green
sheet
INITIATING PROBLEM, ISSUE, OPPOflTUNITY (WHO, WHAT, WHEN, WHEPE, WHn:
This project is being completed as paR of the Residential Street Vitality Program (RSVP). This is one of three RSVP projects
selected for 2002 construction by Public Works, and approved by the Long Range Capitral Improvement Budget Committee
and the City Council.
ADVANTAGESIFAPPROVED:
General improvement of the right-of-way will enhance and add quality to the neighborhood. The newly rebuilt roadways will
improve drivability of the neighborhood, and continue the City's efforts to improve the street system in Saint Paul. Street oiling
in this neighborhood will be eliminated. Lantern style street lighting will also enhance neighborhood safety and aesthetics.
DISADVANTAGES IF APPROVED:
Normal problems associated with construction, such as noise, dust, and general disruption will occur.
DISADVANTAGES IF NOTAPPROVED:
The pavement structure will continue to deteriorate, maintenance costs will rise, and the level of service provided by these
streets will drop.
TOTAL AMOUNT OF TRANSAC710N $$2,4O1,Z1 Z COST/HEVENUE BUDGE7ED (CIRCLE ONE)
FUNDING SOURCE C�B Assessments ACINI7V NUMBER
ES no
FINANCIALINFORMATION:(EXPIAIN)
at-����
...
SUMMARY OF ENGINEERING RECOMMENDATIONS
Cottage-Greenbrier Residential Street Vitality Project (Area 23)
City Project No. 02-P-8124
Report Prepared - 9-18-01
Public Hearing -
PROJECT
This project is to improve the area referred to as the Cottage-Greenbrier Residential
Street Vitality Program Project (Area 23), by constructing new bituminous surfaced
streets with concrete curb and gutter, concrete driveway aprons and outwalks,
boulevards landscaped with sod and trees, and a new lantern style street lighting
system. In addition, appropriate sanitary sewer repairs will be made, lead water
services in the right-of-way will be replaced, and storm sewer and sanitary sewer
reconnections will be made at the request of property owners. This project area is
generally bounded by Wheelock Parkway on the north, Arcade Street on the east,
Maryland Avenue on the south, and Interstate 35E on the west. (See the attached map
for the project area.)
EXISTING CONDITIONS
Some of the residential streets in the project area are oiled, the remainder are older
paved streets. Some of the streets have concrete curb or curb and gutter; some have
bituminous curb, and the rest have no curb at all. The street widths vary in this area,
generally between 26' and 32'. The street surfaces are generally in fair condition, and a
little worse where there is no existing curb.
The project area has only one block of existing lantern style lights. The rest of the
lighting in the area is on Xcel Energy's wood poles.
PROPOSEDIMPROVEMENTS
It is proposed to improve the following streets with the construction of new bituminous
surfaced streets with concrete curb and gutter, concrete driveway aprons and outwalks,
and boulevards landscaped with sod and trees. In addition, appropriate sanitary sewer
repairs wili be made, lead water services in the right-of-way will be replaced, and storm
sewer and sanitary sewer connections will be made at the request of property owners.
MISSISSIPPI STREET - HYACINTH AVENUE TO SHERWOOD AVENUE
MISSISSIPPI STREET - ARLINGTON AVENUE TO HOYT AVENUE
HYACINTH AVENUE - MISSISSIPPI STREET TO WESTMINSTER STREET
COTTAGE AVENUE - MISSISSIPPI STREET TO WESTMINSTER STREET
D� _�a.4'j
DESOTO STREET - BRAINERD AVENUE TO IVY AVENUE
BRADLEY STREET - COTTAGE AVENUE TO ARLINGTON AVENUE
SEARLE STREET - IVY AVENUE TO SHERWOOD AVENUE
GREENBRIER STREET - IVY AVENUE TO WHEELOCK PARKWAY
WALSH STREET - WHEELOCK PARKWAY SOUTH TO CUL-DE-SAC
CLEAR AVENUE - PAYNE AVENUE TO GREENBRIER STREET
COTTAGE AVENUE - PAYNE AVENUE TO ARCADE STREET
SHERWOOD AVENUE - EDGERTON STREET TO ARCADE STREET
ARLINGTON AVENUE - EDGERTON STREET TO WHEELOCK PARKWAY
NEVADA AVENUE - EDGERTON STREET TO WHEELOCK PARKWAY
PARKWAY DRIVE - EDGERTON STREET TO WHEELOCK PARKWAY
Decisions regarding the street widths will be made keeping in mind the right-of-way and
existing street widths, any relevant neighborhood issues, and the impact on boulevard
trees. New curb and gutter may be hand formed to avoid damaging boulevard trees or
their roots. Tree trimming may be necessary to facilitate construction.
All the streets to be paved (listed above) will also have a lantem style street lighting
system installed as part of this project.
ALTERNATES
To do nothing would be inconsistent with the City's commitment to improve existing
oiled streets.
POSITIVE BENEFITS
General improvement of the public right-of-way will enhance and add quality to the
neighborhood. The newly rebuilt roadways will improve drivability of the neighborhood,
and continue the City's efforts to improve the street system in Saint Paul. Lantern style
lighting will enhance neighborhood safety and esthetics.
ADVERSE EFFECTS
Normal problems associated with construction such as noise, dust, reduced access to
the neighborhood, and general disruption will be present.
EFFECTS ON TREES
Street widths will be selected to minimize the impact on trees. New trees will be
planted as part of the boulevard restoration.
TIME SCHEDULE
The project will begin in the spring of 2002 and will be completed by late fali of 2002.
There will be further restrictions on the amount of time work is done on individual
segments of streets.
P:
o � _ � �.c.?
COST ESTIMATE
Construction
Engineering
Miscelianeous
PROJECT TOTAL
ESTIMATED FINANCING
CIB (2002)
Assessments
PROJECT TOTAL
$ 1,854,218
$ 361,572
$ 185.422
$ 2,401,212
$ '1,767,968
$ 633.244
$ 2,401,212
The proposed 2002 assessment rates for residential street paving and lighting are:
$27.71 per ASSESSABLE FOOT for street paving
$4.89 per ASSESSABLE FOOT for lantern style street lighting on residential
streets
SOURCE OF ADDITIONAL INFORMATION
For additional information, contact the Project Engineer, Dan Haak, at 266-6084.
SUMMARY AND RECOMMENDATION
The Department of Public Works feels that this is a necessary and worthwhile project,
and the Engineering Recommendation is for approval of the project and financing.
Respectfully submitted,
�P,,✓�t2 ff. /�i
Dan Haak
Civil Engineer 4
dah
3
CITY OF ST. PAUL
PRELIMINARY ORDSR
QRIGINAL
- From Hyacinth Avenue to Sherwood Avenue.
- From Arlington Avenue to Hoyt Avenue.
- From Mississippi Street to Westminster Street.
- From Mississippi Street to Westminster Street.
- From Brainerd Avenue to Ivy Avenue.
- From Cottage Avenue to Arlington Avenue.
- From Ivy Avenue to Sherwood Avenue.
- From Ivy Avenue to Wheelock Parkway.
- From Wheelock Parkway south to cul-de-sac.
- From Payne Avenue to Greenbrier Street_
- From Payne Avenue to Arcade Street.
- From Edgerton Street to Arcade Street.
- From Edgerton Street to Wheelock Parkway.
- From Edgerton Street to Wheelock Parkway.
- From Edgerton Street to Wheelock Parkway.
o � - t �.c.?
a3
In the Matter of Improving the following streets with new bituminous surfaced
raadway, concrete curbs and gutters, concrete driveway aprons and outwalks, boulevard '
sodding, tree planting, construction of a lantern style lighting system, and doing
all other work necessary to complete said improvements as part of the
Cottage/Greenbrier Area Street Paving and Lighting Project:
Mississippi Street
Mississippi Street
Hyacinth Avenue
Cottage Avenue
Desoto Street
Bradley Street
Searle Street
Greenbrier Street
Walsh Street
Clear Avenue
Cottage Avenue
Sherwood Avenue
Arlington Avenue
Nevada Avenue
Parkway Drive
The Council of the City of Saint Paul having received the report of the Mayor
upon the above improvement, and having considered said report, hereby resolves:
1
2
3
That the said report and the same is hereby approved with no alternatives, and
that the estimated cost thereof is 52,401,212 financed by 2002 Capital
Improvement Bonds $1,767,968 and Assessments $633,244.
That a public hearing be had on said improvement on the Sth day of December,
2001, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court
House Building in the City of Saint Paul.
That notice of said public hearing be given to the persons and in the manner
provided by the Charter, stating the time and place of hearing, the nature of
the improvement and the total cost thereof as estimated.
COUNCILPERSONS
Yeas Nays
�enanav
vBlakey
,�&ostrom
✓Coleman
✓fTarris
vLantry
�iter
�o zL Fr o. c�_ i a�9
�
BY
FI NO. 18954
VO� NG WARDS 5& 6
Adopted by Council : D�ate H a-oo �
Certified Passed by Council Secretary
1 In Favor By �__��a-„ -p.,-,7..�__
O Against
Mayor
�