01-1205CITY OF ST. PAUL
FINAL ORDER IN
CONDENII�tATION PROC88DINGS
a`��
.\ �a�
\ �` � \�\
\V\1 \ !�
\�
COUNCI E :
HY —
FILE NO.
�
VOTING WARD
In the Matter of condemning and taking an easement in
the slopes, cuts, and fills, including the right
support from subject land or reminder thereof, occ
thereof or construction of slopes in the grading and
Mary McManuss Rearrangement of Block 22 of
Addition.(Bounded by Manomin, Morton, Smith, and P�
under Preliminary Order o 1- `
A public hearing having been had upon
the Council having heard all persons,
thereto, and having fully considered t�
RESOLVED, That the Council of
improvement to be made. /
.�;;� :.�.c,�_..:e
the and necessary for
of emoval of lateral
�s' nal by excavations
ving of the alley in
anning and Olivers
:.) (Project 189515).
S
c
iabove improvement upon due notice, and
bjections and recommendations relative
same; herefore, be it
City of Saint Paul hereby orders said
Further Resolved, at the Council hereby determines that the estate required
for this improvement e as described above, and that the proper City officers
submit a report to t e City Council for the purpose of the Council's making an
award of damages fo the interest acquired and determination of assessments, if
any, against the b efitted property.
COUNCILPERSON
Yea ay
Benana�
Blake
Bost om
Col man
x ris
antry
Reiter
FO 189515
In
Against
Adopted by the Date:
Certified Passes by Council Secretary
By
Mayor
�eav�ir,� l� : ►�oveN..�,ev 7� �oo(
� --. �... _._ _
Yubl�c Works
�Pete GaUagher 266-2085
� MUST BE ON fAUNCILAGENpA BY (DATE)
;ASAP
DAiEINiTIAi
9/6/2001
ASSIGN
NUMBEfl FOR
ROLRING
OHDER
GREEN SHEET
9�-(-
No. 110468
IniliaVDa[6 IN4aVDate
2
DEPAqTMENTDIflEGTOF CRYCqUNCiL
��-�s�s
❑ CITYATTORNEY ❑ GffYCLERK �
❑FlNANCIALSERVICESDIR ❑FINHNCIALSERV/ACCTG
❑ MAYOR(ORASSISTANn
❑
TOTAL # OF SIGNATURE PAGES
ACT10N REOUESTED
I
CAUNCILRE I
❑ I
�
I
(CLIP ALL LOCATIONS FOR SIGNATURE)
Improve the Alley in Mary McManuss' Reazrangement of Block 22 of Banning and Oliver s Addition (bounded by Manomin, Morton, Smith
and Page) by grading and paving with bituminous material. Also, condemning and takina an easement in the land necessary for the siopes
and cuts and fills in the a ading and paving of said alley.
REGOMMENDATIONS:Approve (A) ar Feject (R)
_ PLANNINGGOMMISSION
_ CIeCOMMffTEE
_ CIVILSERVICECOMMISSION
A STAFF
'�NITIATING PROBLEM, ISSUE, OPPORTUNITY {WHO, WHAT, WHEN,
1. Has this persoNfiem ever wo�lcetl unCer a cront2ct for Ihis department7
YES NO
2 Has this persoNfimi ever been a city empbyee7
YES NO
3. Does th's parsoMnm powess a skili not nortnapy possessetl by any curtent nry employee7
YES NO
d. �sthisOersoNfirmatargeletivendoR
VES NO
Explain ali yes answers on separote sheot antl anach to green sheet
This improvement was initiated by a petition signed by 64% of the property owners.
ADVANTAGESIFAPPROVE�:
Drainage in the alley will be improved.
DISADVANTAGES IF APPRO�ED:
Normai problems associated with consuuction, such as noise, dust, and general disruption will occur.
DISADVANTpGE51P NOT APPROVED:
AMOUNT OFTfiANSACTION $ 18,000.00 COSTIREVENUE BUDGETED (CIHCLE ONE) ES No
FUNDING SOURCE �ssecsmen[c � ACTIVITY NUMBER
FINANCIAL INFORMATION (EXPLAIN)
Summar�of Engineering Recommendations
Report Prepazed September 6, 2001
Final Order Hearing
PRO.TECT
d1-1�o5
Improve the alley in MARY McMANUSS' REARRANGEMEN'I' OF BLOCK 22 OF BANNING AND
OLiVER'S ADDTTION (Bounded by Manomin, Morton, Smith and Page) by grading and paving wich bituminous
material. Also, condemning and taldng an easement in the land necessary for the slopes, cuu and fills, including
right of cemoval of lateral support from subject land or land remainder thereof, occasioned by excavadon thereof or
construction of siopes in the grading and paving of said alley.
INITIATING ACTION
This impxovement was initiaced by a peation signed by 64% of the abutting propeRy owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled.
P120POSED IMPROVEMENT
Grade the alley to a width of 16 feet and place hot mix bituminous pavement.
ESTIMATED COST AND FINANCING
Estimated Construction Cost
Engineering and Inspecdon
Service Fee
Miscellaneous
Estimated Total Expendimres
$10,171.85
3,051.56
991.76
2.03437
$16,249.53
Financing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING
Not yet scheduled.
SOURCE OF ADDITIONAL INFORMATION
G� : 111 11
$30.00
For addidonal informa[ion, contact Pete Gallagher at 651-266-6085
SUMMARY OF RECOMMENDATIONS
The Department of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
L—_�i, m I L.J I LJ I I ��� I I I I I �� v y I I I I II I I
-„ U c � :
- - - --- ......... . ..---.._o
_ . --dMduo- o
,� � .� � - • s 'p � -
}� � �
. - r_ �� � � t q p1 � � � � � -
�'
N '_J_R PN jm O �� y -fl N b W . m i Av' 3 �O
•m �
�o PJ `� �`� a '
, .� s ' _ ,,, Q
- ,
� -_ � ; � �r, __
� - �
` a C� - _
�-r = �:��:� _ - -
'_ �� �� � _ . _ €�: �: �.~ -.._�� e .,.,�.-. � :. m r. � � o�''.'x--�
: ��.
e�
�
z r' I
�
> r. -s
-a :
�� .
� I
r
�
� ��,�� � � ,., u u � � � �
�. t:�$ - - � I �I �1 � .� , -
� ' NIWONVW . ............. ... - ---... _ _ ......... . ......_..- --_...
--- -------- . ......_.. .. _--- ----- .......... .... .. ---- ---
�
�—` ^ � �. � •-
x 9 � �� '{ J ' M1 ' �..�
I } O S N � "' 3!. � "V� N �LJ O r � ❑ O�� � `�� � �:� �
4t. v N 2 hf � ��iIO _ �� _�� L-� �., _ E� 0 L
�$ � s � - `- Cl`� � � S �� �] � �
i - " a-�" � �
�
� � R � �" � x � , .�—, D,
��
�" • srrv3�ao
� �' V �" y a � . . x s _ _ r ,.
U �� �.: :�� .� = �
� � j 3 t�J.p-� # �N � � m:� A� .R� e h1� . �
��..1 N"' � Q
1 F �a OaOq � _.... ' U
� N _ _ � w_ �. '� C
fi , �
* _.: . � . � 1 '
� � �
.�. "v.._ . "'
'x . ""'_'_'_'_._....._ . __'_'_' . � _ •
r i �-
" �'
. . „""'_� . . . - .,f : � ..
„ l . _ _ N �
� n � -
� �=�: a� � 0 � AS
� 5 `i U
� � � � � ❑'n' � ❑ t
c> ❑ °' B i
o` .� °' � � � ` � J •
� � �� � r f � I � � _1� --
a�-I�o�
CITY OF ST. PAUL
ORDER
COUNC ILE N . �\� �
BY a�
FILE NO. 189515
VOTING WARD 2
In the Matter of condemning and taking an easement in the land necessary for
the slopes, cuts, and fills, including the right of removal of lateral
support from subject land or reminder thereof, occasional by excavations
thereo£ or construction of slopes in the grading and paving of the alley in
Mary McManuss Rearrangement of Block 22 of Banning and Olivers
Addition.(BOUnded by Manomin, Morton, Smith, and Page.) (Project 189515).
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said
alternatives,
determined.
report and the same is hereby approved with no
and that the estimated cost thereof is yet to be
2. That a public hearing be had on said improvement on Wednesday, 7th
of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons �nd in
the manner provided by the Charter, stating the time and pl�ce of
hearing, the nature of the improvement and the total cost th2reof
as estimated.
COUNCILPERSON
Yea Nay
,/ Benanav
� Blakey
� Bostrom
� Coleman
� Harris �
� Lantry
✓Reiter �
Adopted by the Date t � d 1
Certified Passes by Council Secreta'!y
rl In Faoo,�' BY 'V \ e�. � - �- - - -._�
- C
� Against
Mayor
Mayor
(PO 18921S)
CITY OF ST. PAUL
FINAL ORDER IN
CONDENII�tATION PROC88DINGS
a`��
.\ �a�
\ �` � \�\
\V\1 \ !�
\�
COUNCI E :
HY —
FILE NO.
�
VOTING WARD
In the Matter of condemning and taking an easement in
the slopes, cuts, and fills, including the right
support from subject land or reminder thereof, occ
thereof or construction of slopes in the grading and
Mary McManuss Rearrangement of Block 22 of
Addition.(Bounded by Manomin, Morton, Smith, and P�
under Preliminary Order o 1- `
A public hearing having been had upon
the Council having heard all persons,
thereto, and having fully considered t�
RESOLVED, That the Council of
improvement to be made. /
.�;;� :.�.c,�_..:e
the and necessary for
of emoval of lateral
�s' nal by excavations
ving of the alley in
anning and Olivers
:.) (Project 189515).
S
c
iabove improvement upon due notice, and
bjections and recommendations relative
same; herefore, be it
City of Saint Paul hereby orders said
Further Resolved, at the Council hereby determines that the estate required
for this improvement e as described above, and that the proper City officers
submit a report to t e City Council for the purpose of the Council's making an
award of damages fo the interest acquired and determination of assessments, if
any, against the b efitted property.
COUNCILPERSON
Yea ay
Benana�
Blake
Bost om
Col man
x ris
antry
Reiter
FO 189515
In
Against
Adopted by the Date:
Certified Passes by Council Secretary
By
Mayor
�eav�ir,� l� : ►�oveN..�,ev 7� �oo(
� --. �... _._ _
Yubl�c Works
�Pete GaUagher 266-2085
� MUST BE ON fAUNCILAGENpA BY (DATE)
;ASAP
DAiEINiTIAi
9/6/2001
ASSIGN
NUMBEfl FOR
ROLRING
OHDER
GREEN SHEET
9�-(-
No. 110468
IniliaVDa[6 IN4aVDate
2
DEPAqTMENTDIflEGTOF CRYCqUNCiL
��-�s�s
❑ CITYATTORNEY ❑ GffYCLERK �
❑FlNANCIALSERVICESDIR ❑FINHNCIALSERV/ACCTG
❑ MAYOR(ORASSISTANn
❑
TOTAL # OF SIGNATURE PAGES
ACT10N REOUESTED
I
CAUNCILRE I
❑ I
�
I
(CLIP ALL LOCATIONS FOR SIGNATURE)
Improve the Alley in Mary McManuss' Reazrangement of Block 22 of Banning and Oliver s Addition (bounded by Manomin, Morton, Smith
and Page) by grading and paving with bituminous material. Also, condemning and takina an easement in the land necessary for the siopes
and cuts and fills in the a ading and paving of said alley.
REGOMMENDATIONS:Approve (A) ar Feject (R)
_ PLANNINGGOMMISSION
_ CIeCOMMffTEE
_ CIVILSERVICECOMMISSION
A STAFF
'�NITIATING PROBLEM, ISSUE, OPPORTUNITY {WHO, WHAT, WHEN,
1. Has this persoNfiem ever wo�lcetl unCer a cront2ct for Ihis department7
YES NO
2 Has this persoNfimi ever been a city empbyee7
YES NO
3. Does th's parsoMnm powess a skili not nortnapy possessetl by any curtent nry employee7
YES NO
d. �sthisOersoNfirmatargeletivendoR
VES NO
Explain ali yes answers on separote sheot antl anach to green sheet
This improvement was initiated by a petition signed by 64% of the property owners.
ADVANTAGESIFAPPROVE�:
Drainage in the alley will be improved.
DISADVANTAGES IF APPRO�ED:
Normai problems associated with consuuction, such as noise, dust, and general disruption will occur.
DISADVANTpGE51P NOT APPROVED:
AMOUNT OFTfiANSACTION $ 18,000.00 COSTIREVENUE BUDGETED (CIHCLE ONE) ES No
FUNDING SOURCE �ssecsmen[c � ACTIVITY NUMBER
FINANCIAL INFORMATION (EXPLAIN)
Summar�of Engineering Recommendations
Report Prepazed September 6, 2001
Final Order Hearing
PRO.TECT
d1-1�o5
Improve the alley in MARY McMANUSS' REARRANGEMEN'I' OF BLOCK 22 OF BANNING AND
OLiVER'S ADDTTION (Bounded by Manomin, Morton, Smith and Page) by grading and paving wich bituminous
material. Also, condemning and taldng an easement in the land necessary for the slopes, cuu and fills, including
right of cemoval of lateral support from subject land or land remainder thereof, occasioned by excavadon thereof or
construction of siopes in the grading and paving of said alley.
INITIATING ACTION
This impxovement was initiaced by a peation signed by 64% of the abutting propeRy owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled.
P120POSED IMPROVEMENT
Grade the alley to a width of 16 feet and place hot mix bituminous pavement.
ESTIMATED COST AND FINANCING
Estimated Construction Cost
Engineering and Inspecdon
Service Fee
Miscellaneous
Estimated Total Expendimres
$10,171.85
3,051.56
991.76
2.03437
$16,249.53
Financing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING
Not yet scheduled.
SOURCE OF ADDITIONAL INFORMATION
G� : 111 11
$30.00
For addidonal informa[ion, contact Pete Gallagher at 651-266-6085
SUMMARY OF RECOMMENDATIONS
The Department of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
L—_�i, m I L.J I LJ I I ��� I I I I I �� v y I I I I II I I
-„ U c � :
- - - --- ......... . ..---.._o
_ . --dMduo- o
,� � .� � - • s 'p � -
}� � �
. - r_ �� � � t q p1 � � � � � -
�'
N '_J_R PN jm O �� y -fl N b W . m i Av' 3 �O
•m �
�o PJ `� �`� a '
, .� s ' _ ,,, Q
- ,
� -_ � ; � �r, __
� - �
` a C� - _
�-r = �:��:� _ - -
'_ �� �� � _ . _ €�: �: �.~ -.._�� e .,.,�.-. � :. m r. � � o�''.'x--�
: ��.
e�
�
z r' I
�
> r. -s
-a :
�� .
� I
r
�
� ��,�� � � ,., u u � � � �
�. t:�$ - - � I �I �1 � .� , -
� ' NIWONVW . ............. ... - ---... _ _ ......... . ......_..- --_...
--- -------- . ......_.. .. _--- ----- .......... .... .. ---- ---
�
�—` ^ � �. � •-
x 9 � �� '{ J ' M1 ' �..�
I } O S N � "' 3!. � "V� N �LJ O r � ❑ O�� � `�� � �:� �
4t. v N 2 hf � ��iIO _ �� _�� L-� �., _ E� 0 L
�$ � s � - `- Cl`� � � S �� �] � �
i - " a-�" � �
�
� � R � �" � x � , .�—, D,
��
�" • srrv3�ao
� �' V �" y a � . . x s _ _ r ,.
U �� �.: :�� .� = �
� � j 3 t�J.p-� # �N � � m:� A� .R� e h1� . �
��..1 N"' � Q
1 F �a OaOq � _.... ' U
� N _ _ � w_ �. '� C
fi , �
* _.: . � . � 1 '
� � �
.�. "v.._ . "'
'x . ""'_'_'_'_._....._ . __'_'_' . � _ •
r i �-
" �'
. . „""'_� . . . - .,f : � ..
„ l . _ _ N �
� n � -
� �=�: a� � 0 � AS
� 5 `i U
� � � � � ❑'n' � ❑ t
c> ❑ °' B i
o` .� °' � � � ` � J •
� � �� � r f � I � � _1� --
a�-I�o�
CITY OF ST. PAUL
ORDER
COUNC ILE N . �\� �
BY a�
FILE NO. 189515
VOTING WARD 2
In the Matter of condemning and taking an easement in the land necessary for
the slopes, cuts, and fills, including the right of removal of lateral
support from subject land or reminder thereof, occasional by excavations
thereo£ or construction of slopes in the grading and paving of the alley in
Mary McManuss Rearrangement of Block 22 of Banning and Olivers
Addition.(BOUnded by Manomin, Morton, Smith, and Page.) (Project 189515).
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said
alternatives,
determined.
report and the same is hereby approved with no
and that the estimated cost thereof is yet to be
2. That a public hearing be had on said improvement on Wednesday, 7th
of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons �nd in
the manner provided by the Charter, stating the time and pl�ce of
hearing, the nature of the improvement and the total cost th2reof
as estimated.
COUNCILPERSON
Yea Nay
,/ Benanav
� Blakey
� Bostrom
� Coleman
� Harris �
� Lantry
✓Reiter �
Adopted by the Date t � d 1
Certified Passes by Council Secreta'!y
rl In Faoo,�' BY 'V \ e�. � - �- - - -._�
- C
� Against
Mayor
Mayor
(PO 18921S)
CITY OF ST. PAUL
FINAL ORDER IN
CONDENII�tATION PROC88DINGS
a`��
.\ �a�
\ �` � \�\
\V\1 \ !�
\�
COUNCI E :
HY —
FILE NO.
�
VOTING WARD
In the Matter of condemning and taking an easement in
the slopes, cuts, and fills, including the right
support from subject land or reminder thereof, occ
thereof or construction of slopes in the grading and
Mary McManuss Rearrangement of Block 22 of
Addition.(Bounded by Manomin, Morton, Smith, and P�
under Preliminary Order o 1- `
A public hearing having been had upon
the Council having heard all persons,
thereto, and having fully considered t�
RESOLVED, That the Council of
improvement to be made. /
.�;;� :.�.c,�_..:e
the and necessary for
of emoval of lateral
�s' nal by excavations
ving of the alley in
anning and Olivers
:.) (Project 189515).
S
c
iabove improvement upon due notice, and
bjections and recommendations relative
same; herefore, be it
City of Saint Paul hereby orders said
Further Resolved, at the Council hereby determines that the estate required
for this improvement e as described above, and that the proper City officers
submit a report to t e City Council for the purpose of the Council's making an
award of damages fo the interest acquired and determination of assessments, if
any, against the b efitted property.
COUNCILPERSON
Yea ay
Benana�
Blake
Bost om
Col man
x ris
antry
Reiter
FO 189515
In
Against
Adopted by the Date:
Certified Passes by Council Secretary
By
Mayor
�eav�ir,� l� : ►�oveN..�,ev 7� �oo(
� --. �... _._ _
Yubl�c Works
�Pete GaUagher 266-2085
� MUST BE ON fAUNCILAGENpA BY (DATE)
;ASAP
DAiEINiTIAi
9/6/2001
ASSIGN
NUMBEfl FOR
ROLRING
OHDER
GREEN SHEET
9�-(-
No. 110468
IniliaVDa[6 IN4aVDate
2
DEPAqTMENTDIflEGTOF CRYCqUNCiL
��-�s�s
❑ CITYATTORNEY ❑ GffYCLERK �
❑FlNANCIALSERVICESDIR ❑FINHNCIALSERV/ACCTG
❑ MAYOR(ORASSISTANn
❑
TOTAL # OF SIGNATURE PAGES
ACT10N REOUESTED
I
CAUNCILRE I
❑ I
�
I
(CLIP ALL LOCATIONS FOR SIGNATURE)
Improve the Alley in Mary McManuss' Reazrangement of Block 22 of Banning and Oliver s Addition (bounded by Manomin, Morton, Smith
and Page) by grading and paving with bituminous material. Also, condemning and takina an easement in the land necessary for the siopes
and cuts and fills in the a ading and paving of said alley.
REGOMMENDATIONS:Approve (A) ar Feject (R)
_ PLANNINGGOMMISSION
_ CIeCOMMffTEE
_ CIVILSERVICECOMMISSION
A STAFF
'�NITIATING PROBLEM, ISSUE, OPPORTUNITY {WHO, WHAT, WHEN,
1. Has this persoNfiem ever wo�lcetl unCer a cront2ct for Ihis department7
YES NO
2 Has this persoNfimi ever been a city empbyee7
YES NO
3. Does th's parsoMnm powess a skili not nortnapy possessetl by any curtent nry employee7
YES NO
d. �sthisOersoNfirmatargeletivendoR
VES NO
Explain ali yes answers on separote sheot antl anach to green sheet
This improvement was initiated by a petition signed by 64% of the property owners.
ADVANTAGESIFAPPROVE�:
Drainage in the alley will be improved.
DISADVANTAGES IF APPRO�ED:
Normai problems associated with consuuction, such as noise, dust, and general disruption will occur.
DISADVANTpGE51P NOT APPROVED:
AMOUNT OFTfiANSACTION $ 18,000.00 COSTIREVENUE BUDGETED (CIHCLE ONE) ES No
FUNDING SOURCE �ssecsmen[c � ACTIVITY NUMBER
FINANCIAL INFORMATION (EXPLAIN)
Summar�of Engineering Recommendations
Report Prepazed September 6, 2001
Final Order Hearing
PRO.TECT
d1-1�o5
Improve the alley in MARY McMANUSS' REARRANGEMEN'I' OF BLOCK 22 OF BANNING AND
OLiVER'S ADDTTION (Bounded by Manomin, Morton, Smith and Page) by grading and paving wich bituminous
material. Also, condemning and taldng an easement in the land necessary for the slopes, cuu and fills, including
right of cemoval of lateral support from subject land or land remainder thereof, occasioned by excavadon thereof or
construction of siopes in the grading and paving of said alley.
INITIATING ACTION
This impxovement was initiaced by a peation signed by 64% of the abutting propeRy owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled.
P120POSED IMPROVEMENT
Grade the alley to a width of 16 feet and place hot mix bituminous pavement.
ESTIMATED COST AND FINANCING
Estimated Construction Cost
Engineering and Inspecdon
Service Fee
Miscellaneous
Estimated Total Expendimres
$10,171.85
3,051.56
991.76
2.03437
$16,249.53
Financing - Assessments
Estimated Rate per Assessable Foot
INFORMATIONAL MEETING
Not yet scheduled.
SOURCE OF ADDITIONAL INFORMATION
G� : 111 11
$30.00
For addidonal informa[ion, contact Pete Gallagher at 651-266-6085
SUMMARY OF RECOMMENDATIONS
The Department of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
L—_�i, m I L.J I LJ I I ��� I I I I I �� v y I I I I II I I
-„ U c � :
- - - --- ......... . ..---.._o
_ . --dMduo- o
,� � .� � - • s 'p � -
}� � �
. - r_ �� � � t q p1 � � � � � -
�'
N '_J_R PN jm O �� y -fl N b W . m i Av' 3 �O
•m �
�o PJ `� �`� a '
, .� s ' _ ,,, Q
- ,
� -_ � ; � �r, __
� - �
` a C� - _
�-r = �:��:� _ - -
'_ �� �� � _ . _ €�: �: �.~ -.._�� e .,.,�.-. � :. m r. � � o�''.'x--�
: ��.
e�
�
z r' I
�
> r. -s
-a :
�� .
� I
r
�
� ��,�� � � ,., u u � � � �
�. t:�$ - - � I �I �1 � .� , -
� ' NIWONVW . ............. ... - ---... _ _ ......... . ......_..- --_...
--- -------- . ......_.. .. _--- ----- .......... .... .. ---- ---
�
�—` ^ � �. � •-
x 9 � �� '{ J ' M1 ' �..�
I } O S N � "' 3!. � "V� N �LJ O r � ❑ O�� � `�� � �:� �
4t. v N 2 hf � ��iIO _ �� _�� L-� �., _ E� 0 L
�$ � s � - `- Cl`� � � S �� �] � �
i - " a-�" � �
�
� � R � �" � x � , .�—, D,
��
�" • srrv3�ao
� �' V �" y a � . . x s _ _ r ,.
U �� �.: :�� .� = �
� � j 3 t�J.p-� # �N � � m:� A� .R� e h1� . �
��..1 N"' � Q
1 F �a OaOq � _.... ' U
� N _ _ � w_ �. '� C
fi , �
* _.: . � . � 1 '
� � �
.�. "v.._ . "'
'x . ""'_'_'_'_._....._ . __'_'_' . � _ •
r i �-
" �'
. . „""'_� . . . - .,f : � ..
„ l . _ _ N �
� n � -
� �=�: a� � 0 � AS
� 5 `i U
� � � � � ❑'n' � ❑ t
c> ❑ °' B i
o` .� °' � � � ` � J •
� � �� � r f � I � � _1� --
a�-I�o�
CITY OF ST. PAUL
ORDER
COUNC ILE N . �\� �
BY a�
FILE NO. 189515
VOTING WARD 2
In the Matter of condemning and taking an easement in the land necessary for
the slopes, cuts, and fills, including the right of removal of lateral
support from subject land or reminder thereof, occasional by excavations
thereo£ or construction of slopes in the grading and paving of the alley in
Mary McManuss Rearrangement of Block 22 of Banning and Olivers
Addition.(BOUnded by Manomin, Morton, Smith, and Page.) (Project 189515).
The Council of the City of Saint Paul having received the report of the
Mayor upon the above improvement, and having considered said report, hereby
resolves:
1. That the said
alternatives,
determined.
report and the same is hereby approved with no
and that the estimated cost thereof is yet to be
2. That a public hearing be had on said improvement on Wednesday, 7th
of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons �nd in
the manner provided by the Charter, stating the time and pl�ce of
hearing, the nature of the improvement and the total cost th2reof
as estimated.
COUNCILPERSON
Yea Nay
,/ Benanav
� Blakey
� Bostrom
� Coleman
� Harris �
� Lantry
✓Reiter �
Adopted by the Date t � d 1
Certified Passes by Council Secreta'!y
rl In Faoo,�' BY 'V \ e�. � - �- - - -._�
- C
� Against
Mayor
Mayor
(PO 18921S)