Loading...
01-1205CITY OF ST. PAUL FINAL ORDER IN CONDENII�tATION PROC88DINGS a`�� .\ �a� \ �` � \�\ \V\1 \ !� \� COUNCI E : HY — FILE NO. � VOTING WARD In the Matter of condemning and taking an easement in the slopes, cuts, and fills, including the right support from subject land or reminder thereof, occ thereof or construction of slopes in the grading and Mary McManuss Rearrangement of Block 22 of Addition.(Bounded by Manomin, Morton, Smith, and P� under Preliminary Order o 1- ` A public hearing having been had upon the Council having heard all persons, thereto, and having fully considered t� RESOLVED, That the Council of improvement to be made. / .�;;� :.�.c,�_..:e the and necessary for of emoval of lateral �s' nal by excavations ving of the alley in anning and Olivers :.) (Project 189515). S c iabove improvement upon due notice, and bjections and recommendations relative same; herefore, be it City of Saint Paul hereby orders said Further Resolved, at the Council hereby determines that the estate required for this improvement e as described above, and that the proper City officers submit a report to t e City Council for the purpose of the Council's making an award of damages fo the interest acquired and determination of assessments, if any, against the b efitted property. COUNCILPERSON Yea ay Benana� Blake Bost om Col man x ris antry Reiter FO 189515 In Against Adopted by the Date: Certified Passes by Council Secretary By Mayor �eav�ir,� l� : ►�oveN..�,ev 7� �oo( � --. �... _._ _ Yubl�c Works �Pete GaUagher 266-2085 � MUST BE ON fAUNCILAGENpA BY (DATE) ;ASAP DAiEINiTIAi 9/6/2001 ASSIGN NUMBEfl FOR ROLRING OHDER GREEN SHEET 9�-(- No. 110468 IniliaVDa[6 IN4aVDate 2 DEPAqTMENTDIflEGTOF CRYCqUNCiL ��-�s�s ❑ CITYATTORNEY ❑ GffYCLERK � ❑FlNANCIALSERVICESDIR ❑FINHNCIALSERV/ACCTG ❑ MAYOR(ORASSISTANn ❑ TOTAL # OF SIGNATURE PAGES ACT10N REOUESTED I CAUNCILRE I ❑ I � I (CLIP ALL LOCATIONS FOR SIGNATURE) Improve the Alley in Mary McManuss' Reazrangement of Block 22 of Banning and Oliver s Addition (bounded by Manomin, Morton, Smith and Page) by grading and paving with bituminous material. Also, condemning and takina an easement in the land necessary for the siopes and cuts and fills in the a ading and paving of said alley. REGOMMENDATIONS:Approve (A) ar Feject (R) _ PLANNINGGOMMISSION _ CIeCOMMffTEE _ CIVILSERVICECOMMISSION A STAFF '�NITIATING PROBLEM, ISSUE, OPPORTUNITY {WHO, WHAT, WHEN, 1. Has this persoNfiem ever wo�lcetl unCer a cront2ct for Ihis department7 YES NO 2 Has this persoNfimi ever been a city empbyee7 YES NO 3. Does th's parsoMnm powess a skili not nortnapy possessetl by any curtent nry employee7 YES NO d. �sthisOersoNfirmatargeletivendoR VES NO Explain ali yes answers on separote sheot antl anach to green sheet This improvement was initiated by a petition signed by 64% of the property owners. ADVANTAGESIFAPPROVE�: Drainage in the alley will be improved. DISADVANTAGES IF APPRO�ED: Normai problems associated with consuuction, such as noise, dust, and general disruption will occur. DISADVANTpGE51P NOT APPROVED: AMOUNT OFTfiANSACTION $ 18,000.00 COSTIREVENUE BUDGETED (CIHCLE ONE) ES No FUNDING SOURCE �ssecsmen[c � ACTIVITY NUMBER FINANCIAL INFORMATION (EXPLAIN) Summar�of Engineering Recommendations Report Prepazed September 6, 2001 Final Order Hearing PRO.TECT d1-1�o5 Improve the alley in MARY McMANUSS' REARRANGEMEN'I' OF BLOCK 22 OF BANNING AND OLiVER'S ADDTTION (Bounded by Manomin, Morton, Smith and Page) by grading and paving wich bituminous material. Also, condemning and taldng an easement in the land necessary for the slopes, cuu and fills, including right of cemoval of lateral support from subject land or land remainder thereof, occasioned by excavadon thereof or construction of siopes in the grading and paving of said alley. INITIATING ACTION This impxovement was initiaced by a peation signed by 64% of the abutting propeRy owners. EXISTING CONDITIONS The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled. P120POSED IMPROVEMENT Grade the alley to a width of 16 feet and place hot mix bituminous pavement. ESTIMATED COST AND FINANCING Estimated Construction Cost Engineering and Inspecdon Service Fee Miscellaneous Estimated Total Expendimres $10,171.85 3,051.56 991.76 2.03437 $16,249.53 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING Not yet scheduled. SOURCE OF ADDITIONAL INFORMATION G� : 111 11 $30.00 For addidonal informa[ion, contact Pete Gallagher at 651-266-6085 SUMMARY OF RECOMMENDATIONS The Department of Public Works recommends that this project be constructed. Respectfully submitted, Paul St. Martin Project Engineer L—_�i, m I L.J I LJ I I ��� I I I I I �� v y I I I I II I I -„ U c � : - - - --- ......... . ..---.._o _ . --dMduo- o ,� � .� � - • s 'p � - }� � � . - r_ �� � � t q p1 � � � � � - �' N '_J_R PN jm O �� y -fl N b W . m i Av' 3 �O •m � �o PJ `� �`� a ' , .� s ' _ ,,, Q - , � -_ � ; � �r, __ � - � ` a C� - _ �-r = �:��:� _ - - '_ �� �� � _ . _ €�: �: �.~ -.._�� e .,.,�.-. � :. m r. � � o�''.'x--� : ��. e� � z r' I � > r. -s -a : �� . � I r � � ��,�� � � ,., u u � � � � �. t:�$ - - � I �I �1 � .� , - � ' NIWONVW . ............. ... - ---... _ _ ......... . ......_..- --_... --- -------- . ......_.. .. _--- ----- .......... .... .. ---- --- � �—` ^ � �. � •- x 9 � �� '{ J ' M1 ' �..� I } O S N � "' 3!. � "V� N �LJ O r � ❑ O�� � `�� � �:� � 4t. v N 2 hf � ��iIO _ �� _�� L-� �., _ E� 0 L �$ � s � - `- Cl`� � � S �� �] � � i - " a-�" � � � � � R � �" � x � , .�—, D, �� �" • srrv3�ao � �' V �" y a � . . x s _ _ r ,. U �� �.: :�� .� = � � � j 3 t�J.p-� # �N � � m:� A� .R� e h1� . � ��..1 N"' � Q 1 F �a OaOq � _.... ' U � N _ _ � w_ �. '� C fi , � * _.: . � . � 1 ' � � � .�. "v.._ . "' 'x . ""'_'_'_'_._....._ . __'_'_' . � _ • r i �- " �' . . „""'_� . . . - .,f : � .. „ l . _ _ N � � n � - � �=�: a� � 0 � AS � 5 `i U � � � � � ❑'n' � ❑ t c> ❑ °' B i o` .� °' � � � ` � J • � � �� � r f � I � � _1� -- a�-I�o� CITY OF ST. PAUL ORDER COUNC ILE N . �\� � BY a� FILE NO. 189515 VOTING WARD 2 In the Matter of condemning and taking an easement in the land necessary for the slopes, cuts, and fills, including the right of removal of lateral support from subject land or reminder thereof, occasional by excavations thereo£ or construction of slopes in the grading and paving of the alley in Mary McManuss Rearrangement of Block 22 of Banning and Olivers Addition.(BOUnded by Manomin, Morton, Smith, and Page.) (Project 189515). The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said alternatives, determined. report and the same is hereby approved with no and that the estimated cost thereof is yet to be 2. That a public hearing be had on said improvement on Wednesday, 7th of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. 3. That notice of said public hearing be given to the persons �nd in the manner provided by the Charter, stating the time and pl�ce of hearing, the nature of the improvement and the total cost th2reof as estimated. COUNCILPERSON Yea Nay ,/ Benanav � Blakey � Bostrom � Coleman � Harris � � Lantry ✓Reiter � Adopted by the Date t � d 1 Certified Passes by Council Secreta'!y rl In Faoo,�' BY 'V \ e�. � - �- - - -._� - C � Against Mayor Mayor (PO 18921S) CITY OF ST. PAUL FINAL ORDER IN CONDENII�tATION PROC88DINGS a`�� .\ �a� \ �` � \�\ \V\1 \ !� \� COUNCI E : HY — FILE NO. � VOTING WARD In the Matter of condemning and taking an easement in the slopes, cuts, and fills, including the right support from subject land or reminder thereof, occ thereof or construction of slopes in the grading and Mary McManuss Rearrangement of Block 22 of Addition.(Bounded by Manomin, Morton, Smith, and P� under Preliminary Order o 1- ` A public hearing having been had upon the Council having heard all persons, thereto, and having fully considered t� RESOLVED, That the Council of improvement to be made. / .�;;� :.�.c,�_..:e the and necessary for of emoval of lateral �s' nal by excavations ving of the alley in anning and Olivers :.) (Project 189515). S c iabove improvement upon due notice, and bjections and recommendations relative same; herefore, be it City of Saint Paul hereby orders said Further Resolved, at the Council hereby determines that the estate required for this improvement e as described above, and that the proper City officers submit a report to t e City Council for the purpose of the Council's making an award of damages fo the interest acquired and determination of assessments, if any, against the b efitted property. COUNCILPERSON Yea ay Benana� Blake Bost om Col man x ris antry Reiter FO 189515 In Against Adopted by the Date: Certified Passes by Council Secretary By Mayor �eav�ir,� l� : ►�oveN..�,ev 7� �oo( � --. �... _._ _ Yubl�c Works �Pete GaUagher 266-2085 � MUST BE ON fAUNCILAGENpA BY (DATE) ;ASAP DAiEINiTIAi 9/6/2001 ASSIGN NUMBEfl FOR ROLRING OHDER GREEN SHEET 9�-(- No. 110468 IniliaVDa[6 IN4aVDate 2 DEPAqTMENTDIflEGTOF CRYCqUNCiL ��-�s�s ❑ CITYATTORNEY ❑ GffYCLERK � ❑FlNANCIALSERVICESDIR ❑FINHNCIALSERV/ACCTG ❑ MAYOR(ORASSISTANn ❑ TOTAL # OF SIGNATURE PAGES ACT10N REOUESTED I CAUNCILRE I ❑ I � I (CLIP ALL LOCATIONS FOR SIGNATURE) Improve the Alley in Mary McManuss' Reazrangement of Block 22 of Banning and Oliver s Addition (bounded by Manomin, Morton, Smith and Page) by grading and paving with bituminous material. Also, condemning and takina an easement in the land necessary for the siopes and cuts and fills in the a ading and paving of said alley. REGOMMENDATIONS:Approve (A) ar Feject (R) _ PLANNINGGOMMISSION _ CIeCOMMffTEE _ CIVILSERVICECOMMISSION A STAFF '�NITIATING PROBLEM, ISSUE, OPPORTUNITY {WHO, WHAT, WHEN, 1. Has this persoNfiem ever wo�lcetl unCer a cront2ct for Ihis department7 YES NO 2 Has this persoNfimi ever been a city empbyee7 YES NO 3. Does th's parsoMnm powess a skili not nortnapy possessetl by any curtent nry employee7 YES NO d. �sthisOersoNfirmatargeletivendoR VES NO Explain ali yes answers on separote sheot antl anach to green sheet This improvement was initiated by a petition signed by 64% of the property owners. ADVANTAGESIFAPPROVE�: Drainage in the alley will be improved. DISADVANTAGES IF APPRO�ED: Normai problems associated with consuuction, such as noise, dust, and general disruption will occur. DISADVANTpGE51P NOT APPROVED: AMOUNT OFTfiANSACTION $ 18,000.00 COSTIREVENUE BUDGETED (CIHCLE ONE) ES No FUNDING SOURCE �ssecsmen[c � ACTIVITY NUMBER FINANCIAL INFORMATION (EXPLAIN) Summar�of Engineering Recommendations Report Prepazed September 6, 2001 Final Order Hearing PRO.TECT d1-1�o5 Improve the alley in MARY McMANUSS' REARRANGEMEN'I' OF BLOCK 22 OF BANNING AND OLiVER'S ADDTTION (Bounded by Manomin, Morton, Smith and Page) by grading and paving wich bituminous material. Also, condemning and taldng an easement in the land necessary for the slopes, cuu and fills, including right of cemoval of lateral support from subject land or land remainder thereof, occasioned by excavadon thereof or construction of siopes in the grading and paving of said alley. INITIATING ACTION This impxovement was initiaced by a peation signed by 64% of the abutting propeRy owners. EXISTING CONDITIONS The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled. P120POSED IMPROVEMENT Grade the alley to a width of 16 feet and place hot mix bituminous pavement. ESTIMATED COST AND FINANCING Estimated Construction Cost Engineering and Inspecdon Service Fee Miscellaneous Estimated Total Expendimres $10,171.85 3,051.56 991.76 2.03437 $16,249.53 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING Not yet scheduled. SOURCE OF ADDITIONAL INFORMATION G� : 111 11 $30.00 For addidonal informa[ion, contact Pete Gallagher at 651-266-6085 SUMMARY OF RECOMMENDATIONS The Department of Public Works recommends that this project be constructed. Respectfully submitted, Paul St. Martin Project Engineer L—_�i, m I L.J I LJ I I ��� I I I I I �� v y I I I I II I I -„ U c � : - - - --- ......... . ..---.._o _ . --dMduo- o ,� � .� � - • s 'p � - }� � � . - r_ �� � � t q p1 � � � � � - �' N '_J_R PN jm O �� y -fl N b W . m i Av' 3 �O •m � �o PJ `� �`� a ' , .� s ' _ ,,, Q - , � -_ � ; � �r, __ � - � ` a C� - _ �-r = �:��:� _ - - '_ �� �� � _ . _ €�: �: �.~ -.._�� e .,.,�.-. � :. m r. � � o�''.'x--� : ��. e� � z r' I � > r. -s -a : �� . � I r � � ��,�� � � ,., u u � � � � �. t:�$ - - � I �I �1 � .� , - � ' NIWONVW . ............. ... - ---... _ _ ......... . ......_..- --_... --- -------- . ......_.. .. _--- ----- .......... .... .. ---- --- � �—` ^ � �. � •- x 9 � �� '{ J ' M1 ' �..� I } O S N � "' 3!. � "V� N �LJ O r � ❑ O�� � `�� � �:� � 4t. v N 2 hf � ��iIO _ �� _�� L-� �., _ E� 0 L �$ � s � - `- Cl`� � � S �� �] � � i - " a-�" � � � � � R � �" � x � , .�—, D, �� �" • srrv3�ao � �' V �" y a � . . x s _ _ r ,. U �� �.: :�� .� = � � � j 3 t�J.p-� # �N � � m:� A� .R� e h1� . � ��..1 N"' � Q 1 F �a OaOq � _.... ' U � N _ _ � w_ �. '� C fi , � * _.: . � . � 1 ' � � � .�. "v.._ . "' 'x . ""'_'_'_'_._....._ . __'_'_' . � _ • r i �- " �' . . „""'_� . . . - .,f : � .. „ l . _ _ N � � n � - � �=�: a� � 0 � AS � 5 `i U � � � � � ❑'n' � ❑ t c> ❑ °' B i o` .� °' � � � ` � J • � � �� � r f � I � � _1� -- a�-I�o� CITY OF ST. PAUL ORDER COUNC ILE N . �\� � BY a� FILE NO. 189515 VOTING WARD 2 In the Matter of condemning and taking an easement in the land necessary for the slopes, cuts, and fills, including the right of removal of lateral support from subject land or reminder thereof, occasional by excavations thereo£ or construction of slopes in the grading and paving of the alley in Mary McManuss Rearrangement of Block 22 of Banning and Olivers Addition.(BOUnded by Manomin, Morton, Smith, and Page.) (Project 189515). The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said alternatives, determined. report and the same is hereby approved with no and that the estimated cost thereof is yet to be 2. That a public hearing be had on said improvement on Wednesday, 7th of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. 3. That notice of said public hearing be given to the persons �nd in the manner provided by the Charter, stating the time and pl�ce of hearing, the nature of the improvement and the total cost th2reof as estimated. COUNCILPERSON Yea Nay ,/ Benanav � Blakey � Bostrom � Coleman � Harris � � Lantry ✓Reiter � Adopted by the Date t � d 1 Certified Passes by Council Secreta'!y rl In Faoo,�' BY 'V \ e�. � - �- - - -._� - C � Against Mayor Mayor (PO 18921S) CITY OF ST. PAUL FINAL ORDER IN CONDENII�tATION PROC88DINGS a`�� .\ �a� \ �` � \�\ \V\1 \ !� \� COUNCI E : HY — FILE NO. � VOTING WARD In the Matter of condemning and taking an easement in the slopes, cuts, and fills, including the right support from subject land or reminder thereof, occ thereof or construction of slopes in the grading and Mary McManuss Rearrangement of Block 22 of Addition.(Bounded by Manomin, Morton, Smith, and P� under Preliminary Order o 1- ` A public hearing having been had upon the Council having heard all persons, thereto, and having fully considered t� RESOLVED, That the Council of improvement to be made. / .�;;� :.�.c,�_..:e the and necessary for of emoval of lateral �s' nal by excavations ving of the alley in anning and Olivers :.) (Project 189515). S c iabove improvement upon due notice, and bjections and recommendations relative same; herefore, be it City of Saint Paul hereby orders said Further Resolved, at the Council hereby determines that the estate required for this improvement e as described above, and that the proper City officers submit a report to t e City Council for the purpose of the Council's making an award of damages fo the interest acquired and determination of assessments, if any, against the b efitted property. COUNCILPERSON Yea ay Benana� Blake Bost om Col man x ris antry Reiter FO 189515 In Against Adopted by the Date: Certified Passes by Council Secretary By Mayor �eav�ir,� l� : ►�oveN..�,ev 7� �oo( � --. �... _._ _ Yubl�c Works �Pete GaUagher 266-2085 � MUST BE ON fAUNCILAGENpA BY (DATE) ;ASAP DAiEINiTIAi 9/6/2001 ASSIGN NUMBEfl FOR ROLRING OHDER GREEN SHEET 9�-(- No. 110468 IniliaVDa[6 IN4aVDate 2 DEPAqTMENTDIflEGTOF CRYCqUNCiL ��-�s�s ❑ CITYATTORNEY ❑ GffYCLERK � ❑FlNANCIALSERVICESDIR ❑FINHNCIALSERV/ACCTG ❑ MAYOR(ORASSISTANn ❑ TOTAL # OF SIGNATURE PAGES ACT10N REOUESTED I CAUNCILRE I ❑ I � I (CLIP ALL LOCATIONS FOR SIGNATURE) Improve the Alley in Mary McManuss' Reazrangement of Block 22 of Banning and Oliver s Addition (bounded by Manomin, Morton, Smith and Page) by grading and paving with bituminous material. Also, condemning and takina an easement in the land necessary for the siopes and cuts and fills in the a ading and paving of said alley. REGOMMENDATIONS:Approve (A) ar Feject (R) _ PLANNINGGOMMISSION _ CIeCOMMffTEE _ CIVILSERVICECOMMISSION A STAFF '�NITIATING PROBLEM, ISSUE, OPPORTUNITY {WHO, WHAT, WHEN, 1. Has this persoNfiem ever wo�lcetl unCer a cront2ct for Ihis department7 YES NO 2 Has this persoNfimi ever been a city empbyee7 YES NO 3. Does th's parsoMnm powess a skili not nortnapy possessetl by any curtent nry employee7 YES NO d. �sthisOersoNfirmatargeletivendoR VES NO Explain ali yes answers on separote sheot antl anach to green sheet This improvement was initiated by a petition signed by 64% of the property owners. ADVANTAGESIFAPPROVE�: Drainage in the alley will be improved. DISADVANTAGES IF APPRO�ED: Normai problems associated with consuuction, such as noise, dust, and general disruption will occur. DISADVANTpGE51P NOT APPROVED: AMOUNT OFTfiANSACTION $ 18,000.00 COSTIREVENUE BUDGETED (CIHCLE ONE) ES No FUNDING SOURCE �ssecsmen[c � ACTIVITY NUMBER FINANCIAL INFORMATION (EXPLAIN) Summar�of Engineering Recommendations Report Prepazed September 6, 2001 Final Order Hearing PRO.TECT d1-1�o5 Improve the alley in MARY McMANUSS' REARRANGEMEN'I' OF BLOCK 22 OF BANNING AND OLiVER'S ADDTTION (Bounded by Manomin, Morton, Smith and Page) by grading and paving wich bituminous material. Also, condemning and taldng an easement in the land necessary for the slopes, cuu and fills, including right of cemoval of lateral support from subject land or land remainder thereof, occasioned by excavadon thereof or construction of siopes in the grading and paving of said alley. INITIATING ACTION This impxovement was initiaced by a peation signed by 64% of the abutting propeRy owners. EXISTING CONDITIONS The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled. P120POSED IMPROVEMENT Grade the alley to a width of 16 feet and place hot mix bituminous pavement. ESTIMATED COST AND FINANCING Estimated Construction Cost Engineering and Inspecdon Service Fee Miscellaneous Estimated Total Expendimres $10,171.85 3,051.56 991.76 2.03437 $16,249.53 Financing - Assessments Estimated Rate per Assessable Foot INFORMATIONAL MEETING Not yet scheduled. SOURCE OF ADDITIONAL INFORMATION G� : 111 11 $30.00 For addidonal informa[ion, contact Pete Gallagher at 651-266-6085 SUMMARY OF RECOMMENDATIONS The Department of Public Works recommends that this project be constructed. Respectfully submitted, Paul St. Martin Project Engineer L—_�i, m I L.J I LJ I I ��� I I I I I �� v y I I I I II I I -„ U c � : - - - --- ......... . ..---.._o _ . --dMduo- o ,� � .� � - • s 'p � - }� � � . - r_ �� � � t q p1 � � � � � - �' N '_J_R PN jm O �� y -fl N b W . m i Av' 3 �O •m � �o PJ `� �`� a ' , .� s ' _ ,,, Q - , � -_ � ; � �r, __ � - � ` a C� - _ �-r = �:��:� _ - - '_ �� �� � _ . _ €�: �: �.~ -.._�� e .,.,�.-. � :. m r. � � o�''.'x--� : ��. e� � z r' I � > r. -s -a : �� . � I r � � ��,�� � � ,., u u � � � � �. t:�$ - - � I �I �1 � .� , - � ' NIWONVW . ............. ... - ---... _ _ ......... . ......_..- --_... --- -------- . ......_.. .. _--- ----- .......... .... .. ---- --- � �—` ^ � �. � •- x 9 � �� '{ J ' M1 ' �..� I } O S N � "' 3!. � "V� N �LJ O r � ❑ O�� � `�� � �:� � 4t. v N 2 hf � ��iIO _ �� _�� L-� �., _ E� 0 L �$ � s � - `- Cl`� � � S �� �] � � i - " a-�" � � � � � R � �" � x � , .�—, D, �� �" • srrv3�ao � �' V �" y a � . . x s _ _ r ,. U �� �.: :�� .� = � � � j 3 t�J.p-� # �N � � m:� A� .R� e h1� . � ��..1 N"' � Q 1 F �a OaOq � _.... ' U � N _ _ � w_ �. '� C fi , � * _.: . � . � 1 ' � � � .�. "v.._ . "' 'x . ""'_'_'_'_._....._ . __'_'_' . � _ • r i �- " �' . . „""'_� . . . - .,f : � .. „ l . _ _ N � � n � - � �=�: a� � 0 � AS � 5 `i U � � � � � ❑'n' � ❑ t c> ❑ °' B i o` .� °' � � � ` � J • � � �� � r f � I � � _1� -- a�-I�o� CITY OF ST. PAUL ORDER COUNC ILE N . �\� � BY a� FILE NO. 189515 VOTING WARD 2 In the Matter of condemning and taking an easement in the land necessary for the slopes, cuts, and fills, including the right of removal of lateral support from subject land or reminder thereof, occasional by excavations thereo£ or construction of slopes in the grading and paving of the alley in Mary McManuss Rearrangement of Block 22 of Banning and Olivers Addition.(BOUnded by Manomin, Morton, Smith, and Page.) (Project 189515). The Council of the City of Saint Paul having received the report of the Mayor upon the above improvement, and having considered said report, hereby resolves: 1. That the said alternatives, determined. report and the same is hereby approved with no and that the estimated cost thereof is yet to be 2. That a public hearing be had on said improvement on Wednesday, 7th of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of the City Hall and Court House Building in the City of Saint Paul. 3. That notice of said public hearing be given to the persons �nd in the manner provided by the Charter, stating the time and pl�ce of hearing, the nature of the improvement and the total cost th2reof as estimated. COUNCILPERSON Yea Nay ,/ Benanav � Blakey � Bostrom � Coleman � Harris � � Lantry ✓Reiter � Adopted by the Date t � d 1 Certified Passes by Council Secreta'!y rl In Faoo,�' BY 'V \ e�. � - �- - - -._� - C � Against Mayor Mayor (PO 18921S)