01-1204CITY OF ST. PAUL COUNCI F E NO. �� ������ _
FINAL ORDER ��{'p,}�'' � BY �S
v e\
N a � � i FILE NO. 18951
VOTING WARD
In the Matter of improving the alley in Mary McManuss Rearran
22 of Banning and Olivers Addition by grading and paving wi
material.(Bounded by Manomin, Morton, Smith, and Page.) /
under Preliminary
The Council of the City of Saint
upon the above improvement, due no
prescribed by the City Charter; and /
�nt of Block
a bituminous
has conducted a public hearing
thereof having been given as
WHEREAS, The Council has heard a11 persons, objections and
recommendations pertaining to s d proposed improvement and has fu11y
considered the same; now, therefo e, be it
RESOLVED, That the Counc� of the City of Saint Pau1 does hereby order
that the above-described impr vement be made, and the proper City officers
are hereby directed and autho ized to proceed with the improvement; and be it
FURTHER RESOLVED,
proper City officers s:
report the same to the
Charter.
COUNCILPERSON
Yea Nay
Benanav
Blakey
Bostrom
Coleman
Harris
Lantry
Reite
FO 18951 Smith Page
+E upon the completion of said improvement, the
calculate all expenses incurred therein and shall
Council in accordance with Chapter 14 of the City
In
Against
Adopted by the Date
Certified Passes by Council Secretary
�
Mayor
Hearing Date: November 7� 2001
� DEPA�MEM/OFFICE/COUNCIL DATE INITIATED
; �ublic Works 9/6/2001
� COMACT PEqSON 8 PHONE
; Pete Gallagher 266-2085
MUST BE ON CAUNGI AGENDA 8Y (OAT�
ASAP
TOTAL # OF SIGNATURE PAGES
❑ MAYOR(ORASSISTANn
❑
9 S'�'
No . 110468
mmawa�e
CITY CAUNQL
` a � ❑cmc�aK O ` _ �
❑ FlNANCIALSEqWACCrG
❑ COUNCILflESEAftCH
❑
(CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION REQUESTED
Improve che Alley in Mary McManuss' Rearrangement of Block 22 of Banning and Oliver's Addition (bounded by Manomin, Morton, Smith
and Page) by grading and paving with bituminous materiai. Also, condemning and taking an easement in the land necessary for the slopes
and cuts and filis in the a ading and paving of said alley.
RECOMMENDATIONS:Approve (A) or Rejed (R)
_ PIANNING COMMISSION
_ CIBCAMMITTEE
_ CIVILSERVICECOMMISSION
A STAFF
GREEN SHEET
� �DEPApTMENr01RECTOR
ASSIGN
CENATTOFNEY
NUMBERFOq
ROViING ❑ FINANCIALSERVICESDIR
ORUEN
Has ihis persoNfirm ever worketl untler a mnirad for Nis tlepa�tment?
YES NO
Has th's persoMttn ever been a ury employea7
YE$ NO
DoPS thi5 persoNiirtn possess a skill no� nortnaliy possessetl by any c�rrent city employee?
YES NO
Is ibis persoNhrm e targetetl vendoR
YES NO
yes answen an separate sheet and attach to green sheet
INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT,
This improvement was initiated by a petition signed by 64% of the property owners.
ADVANTAGESIFAPPROVED:
Drainage in the alley wiil be improved.
DISADVANTAGES IFAPPqO�ED:
Normal probiems associated with construction, such as noise, dust, and general disrupaon will occur. ��� � �����
DISADVAMAGES IF NOT APPROVED:
COTAL AMOUNT OF TRANSACTION $ 18,000.00 COSTIREVENffE BUDGETED (qACLE ONE) ES No _
FUNDING SOURCE Assessmen ACTNRY NUMBER
FINANCIAL INFORMATION (EXPLAIN)
Summarv of Eneineerine Recommendations
Report Prepazed September 6, 2001
Final Order Hearing
PROTECT
v ! -i�a�(
Improve the alley in MARY McMANUSS' REARRANGEMENT OF BLOCK 22 OF BAAINING AND
OLIVER'S ADDTITON (Bounded by Manomin, Morton, Smith and Page) by grading and paving with bituminous
material. Also, condemning and taking an easement in the land necessary for the slopes, cuu and £lls, including
right of removal of lateral support from subject land or land remainder thereof, occasioned by excavation thereof or
construction of slopes in the grading and paving of said alley.
IIVITIATING ACTION
This improvement was initiated by a petition signed by 64% of the abutting property owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled.
PROPOSEDIMPROVEMENT
Grade the alley to a width of 16 feet and place hot mix bituminous pavement.
ESTIMATED COST AND FINANCING
Estimated Construction Cost
Engineering and Inspection
Service Fee
Miscellaneous
Estimated Total Expenditures
$10,171.85
3,051.56
991.76
2.03437
$16,249.53
Financing - Assessments
Espmated Rate per Assessable Foot
INFORMATIONAL MEETING
Not yet scheduled.
SOURCE OF ADDITIONAL INFORMATION
$18,000.00
$30.00
For additional information, contact Pete Gallagher at 651-266-6085
SUMMARY OF J2ECOMMENDATIONS
The Deparlment of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
��
��
�� ��
� : J.
: � _ ��
� � + �. �
�Qe �
�_�
q � �
M � a � ��
�`
S �
�
�
I
4 6
0
�
� ms�a��
3 }a.
f t '_"�
� I C
a �
. . ..... .. .............. ... .. ...... ... ...
11� 4 9
__- ---- -_ , .. �
_ '" c;. x• �
� • ' ❑ N � k I
?�QO f � bH I
�a - � m ^ ❑.°� s�� �
� � - =e _
�� h� - $o �� �
- - � x ��� �-$�
� :_� __ <�, � o ] = s �
���,°', e� r�.;� � `LJ �' �
n vly � ...�1�
� , - { �
�Q �.
� ��
J `� _ /
_..."_...._._.."__ _' . ............. . ...."" .___.__�.__.__�5
�
� ..r i � ^ � t � b � a:'
� s�} �x:.'.
� s (r1 �- .�F • �{9
- � L
�
��y:,�;
W a " � I
�... . . C _
.. ,., Q s .
L � 3 ;_,
_ b� . ..§�.:. :; �� �_ O > ` S � �] � I
<q�o .•$ c�g `� Z O -� I
m � ...e � �� I
"6 � .a` � q
. r`, .x' �''d�
.a u w ::z r. : h w• ^ � , ' —
, ` J -` �
� , ¢ F,
r"t a �c � .4:�:. • �" `. 1 ❑
� N �1� IK ��t'ID �..W.� I
µ�' � vl��' �N n �n°
�� {. :�� ` � £ ry^ -
� a � _ -„ o f
vs`-'<S••i•Ai.j. `
t �����'�.���"` -v ::I
R �
� _ :C� ' - c' n. .. „,
� ��` ', .✓`-''.^': ."
��.
�� ��� �� •W ±� �c ib;� � `v �5 �� �w�.a
.� � ��l � � ��.�-� �,{ r _r:
a
n
�"_"-_'"". _
# :i
��
. .................. . . . ... ......... . . .
MANOMIN
CITY OF ST. PAUL
PRELIMINARY ORDER
Nay,s
VOTING WARD
In the Matter of improving the a11ey in Mary McManuss Rearrangement of Block
22 of Banning and Olivers Addition by grading and paving with a bituminous
material.(Bounded by Manomin, Morton, Smith, and Page.)
The Council of the City of 5aint Paul having received the report of the
Mayor upon•the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $18,000
financed by Assessment Project Funds.
2. That a public hearing be had on said improvement on Wednesday, 7th
of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in
the manner provided by the Charter, stating the time and place of
hearing, the nature of the improvement and the total cost thereof
as estimated.
COUNCILPERSON Adopted by the Date � �, +9 a o o\
Yeas
� Benanav
� Blakey
�Bostrom
�Coleman
�Harris
�Lantry
�Reiter
'b �- ` ��
a
covHCxz� � r, N a -9 ��/
BY �'-�
FSLE NO. 38951
Certified Passes by Council Secretary
1� IIl rZJSr By �_� a ��
C
�_ Against
Mayor
PO 18951 Smith & Page
CITY OF ST. PAUL COUNCI F E NO. �� ������ _
FINAL ORDER ��{'p,}�'' � BY �S
v e\
N a � � i FILE NO. 18951
VOTING WARD
In the Matter of improving the alley in Mary McManuss Rearran
22 of Banning and Olivers Addition by grading and paving wi
material.(Bounded by Manomin, Morton, Smith, and Page.) /
under Preliminary
The Council of the City of Saint
upon the above improvement, due no
prescribed by the City Charter; and /
�nt of Block
a bituminous
has conducted a public hearing
thereof having been given as
WHEREAS, The Council has heard a11 persons, objections and
recommendations pertaining to s d proposed improvement and has fu11y
considered the same; now, therefo e, be it
RESOLVED, That the Counc� of the City of Saint Pau1 does hereby order
that the above-described impr vement be made, and the proper City officers
are hereby directed and autho ized to proceed with the improvement; and be it
FURTHER RESOLVED,
proper City officers s:
report the same to the
Charter.
COUNCILPERSON
Yea Nay
Benanav
Blakey
Bostrom
Coleman
Harris
Lantry
Reite
FO 18951 Smith Page
+E upon the completion of said improvement, the
calculate all expenses incurred therein and shall
Council in accordance with Chapter 14 of the City
In
Against
Adopted by the Date
Certified Passes by Council Secretary
�
Mayor
Hearing Date: November 7� 2001
� DEPA�MEM/OFFICE/COUNCIL DATE INITIATED
; �ublic Works 9/6/2001
� COMACT PEqSON 8 PHONE
; Pete Gallagher 266-2085
MUST BE ON CAUNGI AGENDA 8Y (OAT�
ASAP
TOTAL # OF SIGNATURE PAGES
❑ MAYOR(ORASSISTANn
❑
9 S'�'
No . 110468
mmawa�e
CITY CAUNQL
` a � ❑cmc�aK O ` _ �
❑ FlNANCIALSEqWACCrG
❑ COUNCILflESEAftCH
❑
(CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION REQUESTED
Improve che Alley in Mary McManuss' Rearrangement of Block 22 of Banning and Oliver's Addition (bounded by Manomin, Morton, Smith
and Page) by grading and paving with bituminous materiai. Also, condemning and taking an easement in the land necessary for the slopes
and cuts and filis in the a ading and paving of said alley.
RECOMMENDATIONS:Approve (A) or Rejed (R)
_ PIANNING COMMISSION
_ CIBCAMMITTEE
_ CIVILSERVICECOMMISSION
A STAFF
GREEN SHEET
� �DEPApTMENr01RECTOR
ASSIGN
CENATTOFNEY
NUMBERFOq
ROViING ❑ FINANCIALSERVICESDIR
ORUEN
Has ihis persoNfirm ever worketl untler a mnirad for Nis tlepa�tment?
YES NO
Has th's persoMttn ever been a ury employea7
YE$ NO
DoPS thi5 persoNiirtn possess a skill no� nortnaliy possessetl by any c�rrent city employee?
YES NO
Is ibis persoNhrm e targetetl vendoR
YES NO
yes answen an separate sheet and attach to green sheet
INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT,
This improvement was initiated by a petition signed by 64% of the property owners.
ADVANTAGESIFAPPROVED:
Drainage in the alley wiil be improved.
DISADVANTAGES IFAPPqO�ED:
Normal probiems associated with construction, such as noise, dust, and general disrupaon will occur. ��� � �����
DISADVAMAGES IF NOT APPROVED:
COTAL AMOUNT OF TRANSACTION $ 18,000.00 COSTIREVENffE BUDGETED (qACLE ONE) ES No _
FUNDING SOURCE Assessmen ACTNRY NUMBER
FINANCIAL INFORMATION (EXPLAIN)
Summarv of Eneineerine Recommendations
Report Prepazed September 6, 2001
Final Order Hearing
PROTECT
v ! -i�a�(
Improve the alley in MARY McMANUSS' REARRANGEMENT OF BLOCK 22 OF BAAINING AND
OLIVER'S ADDTITON (Bounded by Manomin, Morton, Smith and Page) by grading and paving with bituminous
material. Also, condemning and taking an easement in the land necessary for the slopes, cuu and £lls, including
right of removal of lateral support from subject land or land remainder thereof, occasioned by excavation thereof or
construction of slopes in the grading and paving of said alley.
IIVITIATING ACTION
This improvement was initiated by a petition signed by 64% of the abutting property owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled.
PROPOSEDIMPROVEMENT
Grade the alley to a width of 16 feet and place hot mix bituminous pavement.
ESTIMATED COST AND FINANCING
Estimated Construction Cost
Engineering and Inspection
Service Fee
Miscellaneous
Estimated Total Expenditures
$10,171.85
3,051.56
991.76
2.03437
$16,249.53
Financing - Assessments
Espmated Rate per Assessable Foot
INFORMATIONAL MEETING
Not yet scheduled.
SOURCE OF ADDITIONAL INFORMATION
$18,000.00
$30.00
For additional information, contact Pete Gallagher at 651-266-6085
SUMMARY OF J2ECOMMENDATIONS
The Deparlment of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
��
��
�� ��
� : J.
: � _ ��
� � + �. �
�Qe �
�_�
q � �
M � a � ��
�`
S �
�
�
I
4 6
0
�
� ms�a��
3 }a.
f t '_"�
� I C
a �
. . ..... .. .............. ... .. ...... ... ...
11� 4 9
__- ---- -_ , .. �
_ '" c;. x• �
� • ' ❑ N � k I
?�QO f � bH I
�a - � m ^ ❑.°� s�� �
� � - =e _
�� h� - $o �� �
- - � x ��� �-$�
� :_� __ <�, � o ] = s �
���,°', e� r�.;� � `LJ �' �
n vly � ...�1�
� , - { �
�Q �.
� ��
J `� _ /
_..."_...._._.."__ _' . ............. . ...."" .___.__�.__.__�5
�
� ..r i � ^ � t � b � a:'
� s�} �x:.'.
� s (r1 �- .�F • �{9
- � L
�
��y:,�;
W a " � I
�... . . C _
.. ,., Q s .
L � 3 ;_,
_ b� . ..§�.:. :; �� �_ O > ` S � �] � I
<q�o .•$ c�g `� Z O -� I
m � ...e � �� I
"6 � .a` � q
. r`, .x' �''d�
.a u w ::z r. : h w• ^ � , ' —
, ` J -` �
� , ¢ F,
r"t a �c � .4:�:. • �" `. 1 ❑
� N �1� IK ��t'ID �..W.� I
µ�' � vl��' �N n �n°
�� {. :�� ` � £ ry^ -
� a � _ -„ o f
vs`-'<S••i•Ai.j. `
t �����'�.���"` -v ::I
R �
� _ :C� ' - c' n. .. „,
� ��` ', .✓`-''.^': ."
��.
�� ��� �� •W ±� �c ib;� � `v �5 �� �w�.a
.� � ��l � � ��.�-� �,{ r _r:
a
n
�"_"-_'"". _
# :i
��
. .................. . . . ... ......... . . .
MANOMIN
CITY OF ST. PAUL
PRELIMINARY ORDER
Nay,s
VOTING WARD
In the Matter of improving the a11ey in Mary McManuss Rearrangement of Block
22 of Banning and Olivers Addition by grading and paving with a bituminous
material.(Bounded by Manomin, Morton, Smith, and Page.)
The Council of the City of 5aint Paul having received the report of the
Mayor upon•the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $18,000
financed by Assessment Project Funds.
2. That a public hearing be had on said improvement on Wednesday, 7th
of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in
the manner provided by the Charter, stating the time and place of
hearing, the nature of the improvement and the total cost thereof
as estimated.
COUNCILPERSON Adopted by the Date � �, +9 a o o\
Yeas
� Benanav
� Blakey
�Bostrom
�Coleman
�Harris
�Lantry
�Reiter
'b �- ` ��
a
covHCxz� � r, N a -9 ��/
BY �'-�
FSLE NO. 38951
Certified Passes by Council Secretary
1� IIl rZJSr By �_� a ��
C
�_ Against
Mayor
PO 18951 Smith & Page
CITY OF ST. PAUL COUNCI F E NO. �� ������ _
FINAL ORDER ��{'p,}�'' � BY �S
v e\
N a � � i FILE NO. 18951
VOTING WARD
In the Matter of improving the alley in Mary McManuss Rearran
22 of Banning and Olivers Addition by grading and paving wi
material.(Bounded by Manomin, Morton, Smith, and Page.) /
under Preliminary
The Council of the City of Saint
upon the above improvement, due no
prescribed by the City Charter; and /
�nt of Block
a bituminous
has conducted a public hearing
thereof having been given as
WHEREAS, The Council has heard a11 persons, objections and
recommendations pertaining to s d proposed improvement and has fu11y
considered the same; now, therefo e, be it
RESOLVED, That the Counc� of the City of Saint Pau1 does hereby order
that the above-described impr vement be made, and the proper City officers
are hereby directed and autho ized to proceed with the improvement; and be it
FURTHER RESOLVED,
proper City officers s:
report the same to the
Charter.
COUNCILPERSON
Yea Nay
Benanav
Blakey
Bostrom
Coleman
Harris
Lantry
Reite
FO 18951 Smith Page
+E upon the completion of said improvement, the
calculate all expenses incurred therein and shall
Council in accordance with Chapter 14 of the City
In
Against
Adopted by the Date
Certified Passes by Council Secretary
�
Mayor
Hearing Date: November 7� 2001
� DEPA�MEM/OFFICE/COUNCIL DATE INITIATED
; �ublic Works 9/6/2001
� COMACT PEqSON 8 PHONE
; Pete Gallagher 266-2085
MUST BE ON CAUNGI AGENDA 8Y (OAT�
ASAP
TOTAL # OF SIGNATURE PAGES
❑ MAYOR(ORASSISTANn
❑
9 S'�'
No . 110468
mmawa�e
CITY CAUNQL
` a � ❑cmc�aK O ` _ �
❑ FlNANCIALSEqWACCrG
❑ COUNCILflESEAftCH
❑
(CLIP ALL LOCATIONS FOR SIGNATURE)
ACTION REQUESTED
Improve che Alley in Mary McManuss' Rearrangement of Block 22 of Banning and Oliver's Addition (bounded by Manomin, Morton, Smith
and Page) by grading and paving with bituminous materiai. Also, condemning and taking an easement in the land necessary for the slopes
and cuts and filis in the a ading and paving of said alley.
RECOMMENDATIONS:Approve (A) or Rejed (R)
_ PIANNING COMMISSION
_ CIBCAMMITTEE
_ CIVILSERVICECOMMISSION
A STAFF
GREEN SHEET
� �DEPApTMENr01RECTOR
ASSIGN
CENATTOFNEY
NUMBERFOq
ROViING ❑ FINANCIALSERVICESDIR
ORUEN
Has ihis persoNfirm ever worketl untler a mnirad for Nis tlepa�tment?
YES NO
Has th's persoMttn ever been a ury employea7
YE$ NO
DoPS thi5 persoNiirtn possess a skill no� nortnaliy possessetl by any c�rrent city employee?
YES NO
Is ibis persoNhrm e targetetl vendoR
YES NO
yes answen an separate sheet and attach to green sheet
INITIATING PROBLEM, ISSUE, OPPORTUNITY (WHO, WHAT,
This improvement was initiated by a petition signed by 64% of the property owners.
ADVANTAGESIFAPPROVED:
Drainage in the alley wiil be improved.
DISADVANTAGES IFAPPqO�ED:
Normal probiems associated with construction, such as noise, dust, and general disrupaon will occur. ��� � �����
DISADVAMAGES IF NOT APPROVED:
COTAL AMOUNT OF TRANSACTION $ 18,000.00 COSTIREVENffE BUDGETED (qACLE ONE) ES No _
FUNDING SOURCE Assessmen ACTNRY NUMBER
FINANCIAL INFORMATION (EXPLAIN)
Summarv of Eneineerine Recommendations
Report Prepazed September 6, 2001
Final Order Hearing
PROTECT
v ! -i�a�(
Improve the alley in MARY McMANUSS' REARRANGEMENT OF BLOCK 22 OF BAAINING AND
OLIVER'S ADDTITON (Bounded by Manomin, Morton, Smith and Page) by grading and paving with bituminous
material. Also, condemning and taking an easement in the land necessary for the slopes, cuu and £lls, including
right of removal of lateral support from subject land or land remainder thereof, occasioned by excavation thereof or
construction of slopes in the grading and paving of said alley.
IIVITIATING ACTION
This improvement was initiated by a petition signed by 64% of the abutting property owners.
EXISTING CONDITIONS
The alley is platted 20 feet wide. The alley is unimproved. The surface of the alley is oiled.
PROPOSEDIMPROVEMENT
Grade the alley to a width of 16 feet and place hot mix bituminous pavement.
ESTIMATED COST AND FINANCING
Estimated Construction Cost
Engineering and Inspection
Service Fee
Miscellaneous
Estimated Total Expenditures
$10,171.85
3,051.56
991.76
2.03437
$16,249.53
Financing - Assessments
Espmated Rate per Assessable Foot
INFORMATIONAL MEETING
Not yet scheduled.
SOURCE OF ADDITIONAL INFORMATION
$18,000.00
$30.00
For additional information, contact Pete Gallagher at 651-266-6085
SUMMARY OF J2ECOMMENDATIONS
The Deparlment of Public Works recommends that this project be constructed.
Respectfully submitted,
Paul St. Martin
Project Engineer
��
��
�� ��
� : J.
: � _ ��
� � + �. �
�Qe �
�_�
q � �
M � a � ��
�`
S �
�
�
I
4 6
0
�
� ms�a��
3 }a.
f t '_"�
� I C
a �
. . ..... .. .............. ... .. ...... ... ...
11� 4 9
__- ---- -_ , .. �
_ '" c;. x• �
� • ' ❑ N � k I
?�QO f � bH I
�a - � m ^ ❑.°� s�� �
� � - =e _
�� h� - $o �� �
- - � x ��� �-$�
� :_� __ <�, � o ] = s �
���,°', e� r�.;� � `LJ �' �
n vly � ...�1�
� , - { �
�Q �.
� ��
J `� _ /
_..."_...._._.."__ _' . ............. . ...."" .___.__�.__.__�5
�
� ..r i � ^ � t � b � a:'
� s�} �x:.'.
� s (r1 �- .�F • �{9
- � L
�
��y:,�;
W a " � I
�... . . C _
.. ,., Q s .
L � 3 ;_,
_ b� . ..§�.:. :; �� �_ O > ` S � �] � I
<q�o .•$ c�g `� Z O -� I
m � ...e � �� I
"6 � .a` � q
. r`, .x' �''d�
.a u w ::z r. : h w• ^ � , ' —
, ` J -` �
� , ¢ F,
r"t a �c � .4:�:. • �" `. 1 ❑
� N �1� IK ��t'ID �..W.� I
µ�' � vl��' �N n �n°
�� {. :�� ` � £ ry^ -
� a � _ -„ o f
vs`-'<S••i•Ai.j. `
t �����'�.���"` -v ::I
R �
� _ :C� ' - c' n. .. „,
� ��` ', .✓`-''.^': ."
��.
�� ��� �� •W ±� �c ib;� � `v �5 �� �w�.a
.� � ��l � � ��.�-� �,{ r _r:
a
n
�"_"-_'"". _
# :i
��
. .................. . . . ... ......... . . .
MANOMIN
CITY OF ST. PAUL
PRELIMINARY ORDER
Nay,s
VOTING WARD
In the Matter of improving the a11ey in Mary McManuss Rearrangement of Block
22 of Banning and Olivers Addition by grading and paving with a bituminous
material.(Bounded by Manomin, Morton, Smith, and Page.)
The Council of the City of 5aint Paul having received the report of the
Mayor upon•the above improvement, and having considered said report, hereby
resolves:
1. That the said report and the same is hereby approved with no
alternatives, and that the estimated cost thereof is $18,000
financed by Assessment Project Funds.
2. That a public hearing be had on said improvement on Wednesday, 7th
of November, 2001, at 5:30 o'clock P.M., in the Council Chambers of
the City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given to the persons and in
the manner provided by the Charter, stating the time and place of
hearing, the nature of the improvement and the total cost thereof
as estimated.
COUNCILPERSON Adopted by the Date � �, +9 a o o\
Yeas
� Benanav
� Blakey
�Bostrom
�Coleman
�Harris
�Lantry
�Reiter
'b �- ` ��
a
covHCxz� � r, N a -9 ��/
BY �'-�
FSLE NO. 38951
Certified Passes by Council Secretary
1� IIl rZJSr By �_� a ��
C
�_ Against
Mayor
PO 18951 Smith & Page